Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “life testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Design and development of a solar array drive

The design and development of a dry lubricated direct solar array pointing mechanism is discussed from its inception in 1970 to its present development into a flight mechanism for use on the Orbital Test Satellite (OTS), MAROTS, European Communication satellite and others. Results of life testing the original prototype and the OTS mechanism are presented together with an appraisal of expected future development.

Rees, T.↗

Quantitative optical scanning tests of complex microcircuits

An approach for the development of the optical scanner as a screening inspection instrument for microcircuits involves comparing the quantitative differences in photoresponse images and then correlating them with electrical parameter differences in test devices. The existing optical scanner was modified so that the photoresponse data could be recorded and subsequently digitized. A method was devised for applying digital image processing techniques to the digitized photoresponse data in order to quantitatively compare the data. Electrical tests were performed and photoresponse images were recorded before and following life test intervals on two groups of test devices. Correlations were made between differences or changes in the electrical parameters of the test devices.

Erickson, J. J.↗

Electrical Ground Support Equipment for the Sampling Caching System of the Mars 2020 Rover

In this work we describe in detail the architecture, design, testing and operation of the Electrical Ground Support Equipment (EGSE) “Blue Box” used to test and validate the Sampling Caching System (SCS) of the Mars 2020 Perseverance rover. The Blue Box architecture is centered around COTS motor controllers and COTS input-output modules communicating over an EtherCAT bus. A custom, low-level safety subsystem ensures no harm can be done to the flight articles. The modular architecture of the EGSE reduces cost and complexity while expediting assembly time. The Blue Box drives the 19 actuators of the SCS which span the main robotic arm, the corer system, the internal sample handling arm, the sample tube sealing system and the gas dust removal tool; mimicking the Rover Motor Control Assembly (RMCA). Due to the limited availability of RMCA’s, the EGSE enabled and performed the bulk of testing activities for SCS. The majority of the SCS actuators are composed of a 3-phase DC brushless motors, hall sensors for commutation, dual resolvers for output angular measurement, brakes, heaters and platinum thermistors. Additionally, the EGSE read 12 strain gauges forming part of a force torque sensor, and switches used for external positioning references. Over the 3-year span of the V&V campaign for the SCS, over 32 EGSE systems were built, tested and deployed to test venues at JPL and externally. The EGSE tested several families of the SCS subsystem, ranging from engineering units, life test units and two flight units. Test venues that this EGSE supported included lab benches, ultra-clean cleanrooms, ATLO facilities, and thermal vacuum chambers. Together with the test software systems, SSDEV and SSDEV-ECAT, the Blue Box EGSE enabled the team to efficiently test flight hardware and flight software together. We go over the safety features and fault management techniques employed to protect flight hardware. The effects of the long, 50-feet, EGSE harnesses on motor performance, EMI, electrical noise, and motor control performance are explained. Mitigations to these unwanted effects, including shielding strategy and inductance compensation, are summarized. We go over an excerpt of notable anomalies that this EGSE suffered through its operation, along with investigations and resolutions. Lessons learned, areas of improvement as part of future work, and recommendations for future implementations for similar EGSE’s, are shared.

Levine, Dan↗

A 9700-hour durability test of a five centimeter diameter ion thruster

A modified Hughes SIT-5 thruster was life-tested at the Lewis Research Center. The final 2700 hours of the test are described with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were nearly constant throughout the test except for neutralizer heater power requirements and accelerator drain current. A post-shutdown inspection revealed sputter erosion of ion chamber components and component flaking of sputtered metal. Several flakes caused beamlet divergence and anomalous grid erosion, causing the test to be terminated. All sputter erosion sources were identified.

Nakanishi, S.↗

Overview of the Environmental Control and Life Support System (ECLSS) Testing At MSFC

Previously, almost all water used by the crew during space flight has been transported from earth or generated in-flight as a by-product of fuel cells. Additionally, this water has been stored and used for relatively short periods. To achieve the United States' commitment to a permanent manned presence in space, more innovative techniques are demanded. Over 20,000 pounds of water and large quantities of air would have to be transported to the International Space Station (ISS) every 90 days with a corresponding amount of waste returned to earth, for an 8-person crew. This approach results in prohibitive logistics costs, and necessitates near complete recovery and recycling of water. The potential hazards associated with long-term reuse of reclaimed water and revitalized air resulted in the recognition that additional characterization of closed-loop systems and products is essential. Integrated physical/chemical systems have been designed, assembled, and operated to provide air and potable water meeting ISS quality specifications. The purpose of the Environmental Control and Life Support System (ECLSS) test program at NASA's Marshall Space Flight Center is to conduct research related to the performance of the ISS and its Environmental Control components. The ECLSS Test Program encompasses the Water Recovery Test (WRT), the Integrated Air Revitalization Test (IART), and Life Testing, which permits ECLSS design evaluation. These subsystems revitalize air and reclaim waste waters representative of those to be generated on-orbit. This paper provides an overview of MSFC's 1997 ECLSS testing. Specific tests include: the Stage 10 Water Recovery Test; the Contaminant Injection Test; the Performance Enhancement Test and Life Testing of the Four Bed Molecular Sieve; the Oxygen Generator Assembly Life Test; and the ISS Water Distribution Biofilm Life Test.

Traweek, Mary S.↗

A 9700-hour durability test of a five centimeter diameter ion thruster

A modified Hughes SIT-5 thrustor has been life-tested at the Lewis Research Center. The final 2700 hours of the test are described with a charted history of thrustor operating parameters and off-normal events. Performance and operating characteristics were nearly constant throughout the test except for neutralizer heater power requirements and accelerator drain current. A post-shutdown inspection revealed sputter erosion of ion chamber components and component flaking of sputtered metal. Several flakes caused beamlet divergence and anomalous grid erosion, causing the test to be terminated. All sputter erosion sources have been identified and promising sputter resistant components are currently being evaluated.

Nakanishi, S.↗

Characteristics of the WWR-K test core and the LEU LTAS to be placed in the central experimental beryllium device.

In 2010 life test of three LEU (19.7%) lead test assemblies (LTA) is expected in the existing WWR-K reactor core with regular WWR-C-type fuel assemblies and a smaller core with a beryllium insert. Preliminary analysis of test safety is to be carried out. It implies reconstruction of the reactor core history for last three years, including burnup calculation for each regular fuel assembly (FA), as well as calculation of characteristics of the test core. For the planned configuration of the test core a number of characteristics have been calculated. The obtained data will be used as input for calculations on LTA test core steady-state thermal hydraulics and on transient analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lessons Learned in Space Life Support System Testing

The earlier problems can be found and corrected, the easier and cheaper it is to fix them. Doing less testing saves cost and time but doing too little testing increases the risk of operational failures causing large costs and delays. Integrated test is necessary to determine if the subsystems work together and the overall architecture performs as intended. This report reviews the testing lessons learned from the NASA Systems Engineering Handbook, a National Research Council report, and five reviews of International Space Station (ISS) lessons learned. The five reviews all mention two important points. First, that testing should be performed on the final integrated system, one as close as possible to the intended flight system. Second, “test as you fly,” while operating as planned in an environment as close as possible to the expected flight environment. Other lessons are the need for extensive preflight ground testing, the need to establish and defend an adequate budget, the problems using protoflight hardware on ISS, and the benefit of having ISS as a zero gravity test bed. The major ISS life support systems, carbon dioxide, water recycling, and oxygen recovery, were protoflight systems with little testing before launch to ISS. The failure rates these systems have been much greater than predicted and this has caused dissatisfaction with the protoflight approach. The more costly traditional approach is building qualification and test units in addition to flight units. The test units are used to test, analyze, and fix failure modes. Other work shows that there is an optimum cost-effective intuitive appeal of a human ecosystem in space.

Life support↗

Viking orbiter 1975 articulation control actuators

The articulation subsystem actuators were rigorously tested in severe environments. They were operated through temperature ranges from -73 C to +121 C. In each case the temperature rate of change was at maximum. The actuator under test at room temperature was put into a pre-chilled or preheated chamber. Satisfactory performance was obtained throughout this full temperature range and under the temperature shock conditions above. However, at temperatures below -78 C some leakage was experienced through the O-ring seal around the shaft. The actuators were subjected to severe vibration and 500 g shock test with a time duration of 0.0007 seconds. The scan actuator was life tested by operating it from stop to stop through 2,000 cycles with 20,000 start-stop procedures randomly distributed through the 2,000 cycles.

Perkins, G. S.↗

Coordinated NASA nickel-cadmium battery technology program

This paper describes the NASA nickel-cadmium (Ni-Cd) battery technology program which is being coordinated by JPL to provide NASA and other users with lighter and/or longer-lived Ni-Cd cells for low-earth-orbit, geosynchronous-orbit, and planetary spacecraft missions in the 1980s. The goal is to double the energy density and/or life of the system. Failure modes and mechanisms are differentiated and discussed to point out the critical design variables which affect Ni-Cd cell life. Cell component weights are listed, approaches for reducing weight are discussed, and program tasks and schedules are presented. The nine major tasks being worked on by various organizations are described. Progress has been made in weight reduction, understanding of life reliability mechanisms, and development of a process for manufacturing more stable electrodes. An accelerated and predictive life test program is approximately 30% complete. It appears feasible to double the life and/or usable energy density of the Ni-Cd cell.

Bogner, R. S.↗

Design and development of a solar array drive

The design and development of a dry lubricated direct drive solar array pointing mechanism is discussed for use on the Orbital Test Satellite (OTS), MAROTS, European Communication Satellite (ECS), and others. Results of life testing the original prototype and the OTS mechanism are presented together with an appraisal of expected future development.

Rees, T.↗

A systems approach to water recovery testing for space life support - Initial biomedical results from the ECLSS Water Recovery Test and plans for testbed utilization

Among the challenges of designing and constructing Space Station Freedom is the development of the water system. A review of past efforts in reclaiming waste water in enclosed environments reveals that there are many gaps in the biomedical understanding of this process. Some of the key uncertainties of human interaction with a closed water system include determining potential contaminants and establishing safe levels of multiple compounds in the enclosed system of Space Station. Another uncertainty is the microbial constituency of such a system and what impact it could have on crew health and performance. The use of iodine as the passive biocide may have both an indirect and direct impact on the crew. In this paper the initial results of the Water Recovery Test are reviewed from a biomedical perspective, revealing areas where more information is needed to develop the ECLSS water system. By including the approach of 'man as a subsystem', consideration is given to how man interacts with the total water system. Taking this systems approach to providing the crew with a safe source of water gives useful insight into the most efficient design and utilization of closed system testbeds.

Aten, Laurie A.↗

Failures in Hybrid Microcircuits During Environmental Testing. History Cases

This purpose of this viewgraph presentation is to discuss failures in hermetic hybrids observed at the GSFC PA Lab during environmental stress testing. The cases discussed are: Case I. Substrate metallization failures during Thermal cycling (TC). Case II. Flex lid-induced failure. Case Ill. Hermeticity failures during TC. Case IV. Die metallization cracking during TC. and how many test cycles and parts is necessary? Case V. Wire Bond failures after life test. Case VI. Failures caused by Au/In IMC growth.

Teverovsky, Alexander↗

Evaluation of Polymer Hermetically Sealed Tantalum Capacitors

Polymer cathode tantalum capacitors have lower ESR (equivalent series resistance) compared to other types of tantalum capacitors and for this reason have gained popularity in the electronics design community. Their use allows improved performance of power supply systems along with substantial reduction of size and weight of the components used. However, these parts have poor thermal stability and can degrade in humid environments. Polymer hermetically sealed (PHS) capacitors avoid problems related to environmental degradation of molded case parts and can potentially replace current wet and solid hermetically sealed capacitors. In this work, PHS capacitors manufactured per DLA LAM DWG#13030 are evaluated for space applications. Several lots of capacitors manufactured over period from 2010 to 2014 were tested for the consistency of performance, electrical and thermal characteristics, highly accelerated life testing, and robustness under reverse bias and random vibration conditions. Special attention was given to analysis of leakage currents and the effect of long-term high temperature storage on capacitors in as is condition and after hermeticity loss. The results show that PHS capacitors might be especially effective for low-temperature applications or for system requiring a cold start-up. Additional screening and qualification testing have been recommended to assure the necessary quality of capacitors for space projects.

ferrite beads↗

Summary of NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel Robinson↗

Summary of NASA Progress on the Development and Qualification of a 12 kW Hall Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel W Robinson↗