Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “leak”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Reduced Order Models for Liquid Hydrogen Pooling and Vaporization Supported by Experiments

In the event of a leak of liquid hydrogen, a pool can form that vaporizes, disperses, and eventually dilutes to a non-flammable mixture. In this work, we describe fast-running models for the pooling and vaporization of liquid hydrogen in a steady cross-wind. Several pooling models from the literature are compared to solve for the flow and extent of the pool. The size of the pool can serve as the source for a separate dispersion model, which builds upon the existing one-dimensional Gaussian plume model in HyRAM+. Additional terms for the effects of a cross-wind on momentum and entrainment were added so that the model could handle the effects of a cross-wind on a low-speed flow. The models are compared to experimental data on pooling extent and downwind dispersion for steady flow rates of liquid hydrogen in a steady cross-wind. In the two compared experiments, liquid flow rates of 15 and 45 g/s were spilled onto concrete in cross-winds of approximately 1.8 m/s. The rate of growth of the pool and the downwind concentration boundaries are compared to the models, showing good agreement, although additional tuning is needed. These models can contribute to the advancement of codes and standards for liquid hydrogen systems.

dispersion↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve the airtightness and waterproofness of prefabricated components, we developed a sealant that can be installed at the plant and have its curing reaction triggered at the jobsite. Additionally, we used this opportunity to explore the use of bio-based feedstocks that are abundant and not used for food. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of bio-based components, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one-part sealant allowing a fast-curing system to remain unreacted until the right trigger is applied. When the microcapsules are activated and broken by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The open-air shelf stability of the sealant complexes was demonstrated by peel strength values of ~16 ppi when triggering the curing reaction even after being exposed for 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at the jobsite. These force-triggered bio-based sealants for prefabricated buildings could result in lower installation time and cost as well as better performance than tapes and caulks at the jobsite.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Late-life restoration of mitochondrial function reverses cardiac dysfunction in old mice

Diastolic dysfunction is a prominent feature of cardiac aging in both mice and humans. We show here that 8-week treatment of old mice with the mitochondrial targeted peptide SS-31 (elamipretide) can substantially reverse this deficit. SS-31 normalized the increase in proton leak and reduced mitochondrial ROS in cardiomyocytes from old mice, accompanied by reduced protein oxidation and a shift towards a more reduced protein thiol redox state in old hearts. Improved diastolic function was concordant with increased phosphorylation of cMyBP-C Ser282 but was independent of titin isoform shift. Late-life viral expression of mitochondrial-targeted catalase (mCAT) produced similar functional benefits in old mice and SS-31 did not improve cardiac function of old mCAT mice, implicating normalizing mitochondrial oxidative stress as an overlapping mechanism. These results demonstrate that pre-existing cardiac aging phenotypes can be reversed by targeting mitochondrial dysfunction and implicate mitochondrial energetics and redox signaling as therapeutic targets for cardiac aging.

59 BASIC BIOLOGICAL SCIENCES↗

NREL 25-cm2 High-Pressure Low-Temperature Electrolysis Cell Hardware (Open Source)

This data resource describes an open-source cell hardware that enables low temperature electrolysis (LTE) testing at elevated pressures. Existing commercial options have several downsides when it comes to R&D testing. They are often not designed for repeated reassembly, may not be able to accommodate porous transport layers with different thicknesses, and do not give state-of-the-art performance. Therefore, this hardware was developed specifically with LTE R&D in mind and its design is being made available to the global LTE community. This work was planned and funded by the U.S. Department of Energy's H2NEW consortium (https://h2new.energy.gov/). The hardware design package (.zip file) details the drawings, auxiliary materials, and procedures required to fabricate, assemble, and operate the National Renewable Energy Laboratory's (NREL's) high-pressure low-temperature electrolysis cells. While the hardware itself—end plates, current collectors, flow fields, bolts and washers, tube fittings—is always the same, the assembly and operating procedures may change depending on the active materials being tested, especially for the membrane. Material-specific assembly and operating procedures will be posted to the H2NEW website as they are developed and validated. Disclaimer: The documents and drawings included in this download package describe a design for a low temperature electrolysis hardware that is intended to comply with leak testing according to ASME B31.1. Safe operation at ambient and elevated pressures is the sole responsibility of the end user, which should be evaluated on a case-by-case basis for each individual cell. Factors affecting the sealing capability may depend on, for example, machining quality, cell assembly components, operating conditions, and operating history. Operation at pressure should only be performed on qualified test stands by qualified operators. NREL/ALLIANCE FOR SUSTAINABLE ENERGY, LLC/DOE DISCLAIM ALL WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, AND MAKES NO WARRANTY AS TO THE ACCURACY, COMPLETENESS, OR USEFULNESS OF ANY INFORMATION PROVIDED HEREIN. USE OF THIS PACKAGE IS AT THE USER’S OWN RISK.

08 HYDROGEN↗

Project Methods to Enhance Wellbore Cement Integrity with Microbially-Induced Calcite Precipitation (MICP) (Final Scientific/Technical Report)

The goal of this project was to develop improved methods for sealing compromised wellbore cement in leaking oil and gas wells, thereby reducing the risk of unwanted upward fluid migration. Novel methods for improving wellbore integrity, such as microbially induced calcite precipitation (MICP), can reduce leakage potential, improve the safety of fossil fuel extraction, improve the public perception of hydraulic fracturing, and promote environmentally-prudent unconventional oil and gas development. Microbes, with the urease enzyme, can catalyze the chemical reaction of urea hydrolysis to induce the precipitation of calcium carbonate which can be used as a cementitious material to seal leakage pathways. In this project, methods to promote robust bio-composite cementitious materials were designed and tested in the laboratory. Scale-up of those methods were tested in meso-scale reactor systems and in field applications. In this report, in Section One, we describe laboratory efforts to develop injection strategies to promote precipitation in wellbore analogs and determine the strength of the bio-composite cements as compared to fine cement. In Section Two, we describe the efforts to scale up the work and study the use of materials that can be used in field application, for example exploring the use of calcium chloride ice melt or urea fertilizer as source chemicals. In Section Three, the three field trials (methods and results) performed as part of the project are described and summarized. At the end of the report is a comprehensive summary and conclusion section which highlights the key findings of the project. The work performed during this project significantly advanced the technology readiness level (TRL) of the MICP wellbore sealing strategy.

02 PETROLEUM↗

Methods to Enhance Wellbore Cement Integrity with Microbially-Induced Calcite Precipitation (MICP) (Final Scientific/ Technical Report)

The goal of this project was to develop improved methods for sealing compromised wellbore cement in leaking oil and gas wells, thereby reducing the risk of unwanted upward fluid migration. Novel methods for improving wellbore integrity, such as microbially induced calcite precipitation (MICP), can reduce leakage potential, improve the safety of fossil fuel extraction, improve the public perception of hydraulic fracturing, and promote environmentally-prudent unconventional oil and gas development. Microbes, with the urease enzyme, can catalyze the chemical reaction of urea hydrolysis to induce the precipitation of calcium carbonate which can be used as a cementitious material to seal leakage pathways. In this project, methods to promote robust bio-composite cementitious materials were designed and tested in the laboratory. Scale-up of those methods were tested in meso-scale reactor systems and in field applications. In this report, in Section One, we describe laboratory efforts to develop injection strategies to promote precipitation in wellbore analogs and determine the strength of the bio-composite cements as compared to fine cement. In Section Two, we describe the efforts to scale up the work and study the use of materials that can be used in field application, for example exploring the use of calcium chloride ice melt or urea fertilizer as source chemicals. In Section Three, the three field trials (methods and results) performed as part of the project are described and summarized. At the end of the report is a comprehensive summary and conclusion section which highlights the key findings of the project. The work performed during this project significantly advanced the technology readiness level (TRL) of the MICP wellbore sealing strategy.

03 NATURAL GAS↗

Results of Multiple Tracer Injections into Fractures in the EGS Collab Testbed-1

The EGS Collab project constructed an intermediate scale (~10-20 m) testbed at the 4850 level of the Stanford Underground Research Facility (SURF) in South Dakota for testing and validating fracture stimulation and flow/transport models. This testbed consists of eight ~200 ft (~60 m) HQ-diameter (9.6 cm) boreholes that are drilled into the crystalline rocks of the Poorman Formation from the West Access Drift tunnel. Of the eight boreholes, one borehole is used as an injection/stimulation well, while another sub-parallel borehole located about 10 m away from the injection well is used as a production well, and rest of the other boreholes are used as geophysical/fluid sampling monitoring wells. Hydraulic stimulation activities were conducted at three locations along the injection hole in an attempt to create direct fracture connections to the production hole. A flow system has been established between injection and production boreholes through a set of hydraulically stimulated fractures propagated from a notch located at 164 ft in the injection hole. Although we planned for a single production well, a set of natural fractures in the testbed is believed to have intersected the stimulated hydraulic fractures and provided additional flow paths for water to be transported to the drift through multiple monitoring boreholes and weep zones. As the flow tests continued after stimulation activities, single or a combination of two or three producers become dominant producers at different times, mostly as a response to intersection of hydraulic fracture and testbed wells, activation of natural fractures and making new leak points to the monitoring wells, resealing of leaky wells, and so on. Since late October 2018, multiple tracers were injected into the fracture system at the 164 ft location that involves both stimulated and natural fractures, and tracers were recovered from multiple locations in nearby wells and weep. The cumulative water recoveries over the time have ranged from 50 to 90%; however, the injected tracer recoveries from various production sources are much less (ranging from a few percentages to 38%). Changes in water/tracer recoveries, shifting of major producing wells from one well to the others, and other observations (e.g., microseismic, electric resistivity tomography, etc.) indicate a testbed that has undergone several changes since October 2018. In this paper, we present tracer recovery data accumulated during several tracer campaigns, provide conceptual testbed flow pathways, and provide observations that suggest a evolutionary nature of fracture volume and fracture geometry in the testbed.

15 GEOTHERMAL ENERGY↗

Design and Fabrication of the Mu2e Cryogenic Distribution System

The muon-to-electron conversion (Mu2e) experiment at Fermilab will be used to search for the charged lepton flavor-violating conversion of muons to electrons in the field of an atomic nucleus. The Mu2e experiment is currently in the design and construction stage and is expected to begin operations in 2022. The Mu2e experiment uses four large superconducting solenoid magnets including a Production Solenoid (PS), an Upstream and Downstream Transport Solenoid (TSu and TSd) and a Detector Solenoid (DS). This paper will focus on the cryogenic distribution system for these four solenoid magnets. Liquid helium will be supplied from two re-purposed Tevatron satellite refrigerators. A large cryogenic distribution box (DB) is located in the Mu2e building to distribute the required cryogens to each of the four solenoid magnets. Each solenoid magnet will have a dedicated transfer line and cryogenic feed box (FB). The solenoid magnets each require two liquid helium circuits and two liquid nitrogen circuits. The most unique feature about this cryogenic system is that the assemblies for the start of the superconducting portion of the power leads are mounted in feed boxes that are in the range of 23 m to 31 m away from the solenoid magnets. The cryogenic feed boxes are located remotely to provide protection from radiation damage and high magnetic fields. The power leads are NbTi superconducting cable stabilized with high conductivity aluminum. The 6061-T6 aluminum grade was selected for the transfer line piping so that the piping would thermally contract at the same rate as the power lead. A major concern for this transfer line is that a small helium leak could create an electric discharge arc due to the Paschen effect. This paper includes a description of the design features and testing done to ensure that the power leads are protected from the Paschen effect while still being adequately cooled to liquid helium temperatures.

43 PARTICLE ACCELERATORS↗

Design of the DUNE APATF cryogenic system

Fermi National Accelerator Laboratory (FNAL) is developing the international Long- Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) to advance neutrino science. The flagship of the DUNE project consists of a large particle detector constructed one-mile (1.6 km) beneath the surface at the Sanford Underground Research Facility (SURF) in Lead, SD. The SURF detector is the largest of its type ever built and is comprised of four cryostats totaling 70,000 tons of liquid argon (LAr) to record neutrino interactions with unprecedented precision. Each cryostat houses a detector, the first includes 150 Anode Panel Assemblies (APA) submersed within 17,500 tons of LAr. Before installing 150 APA within the SURF detector they will be cryogenically cooled to nominally 90 K at the APA Test Facility (APATF) utilizing nitrogen flows. The APATF cryogenic system is entirely located one-mile underground at the SURF facility and includes nominally 13 kW of refrigeration at 80 K, cryogenic transfer lines, APA test cryostats, a cryogenic control system, and various control and pressure safety elements to ensure performance and safety requirements are achieved. The APATF preliminary design is in progress and major considerations include an efficient, costeffective mechanism to deliver the required refrigeration to the APATF underground, support of rigid testing intervals to support the DUNE operating schedule, temperature stability of the APA and electronics within cryostats, efficient cryogenic system operation to minimize heat leak and/or liquid nitrogen consumption, thermo-mechanical stability and flexibility of components, and pressure safety of the APATF cryogenic system. Installation and integration of the APATF cryogenic system within the footprint and to adjacent sub-systems is also discussed.

43 PARTICLE ACCELERATORS↗

Supercritical CO2 Recuperators, Presented at The ASME Turbo Expo 2017, June 29, 2017, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

High Effectiveness, Compact, High Pressure and Low-Cost Recuperator, Presented at The Fifth International Symposium – Super-Critical CO2 Power Cycles, San Antonio, Texas, March 28-31, 2016, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

High Effectiveness, Compact, High Pressure and Low Cost Recuperator for Super-Critical CO2 Power Cycles, Paper Presented at The Fifth International Symposium – Super-Critical CO2 Power Cycles, San Antonio, Texas, March 28-31, 2016, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

Long Reach Robotic Arm

The Accelerator Division at Fermilab began a robotics program, known as the AD Robotics Initiative. A multi-axis robotic arm was proposed to be included in the program. This summer internship, our team began the planning and design for this project, called the Long Reach Robotic Arm. The problem is that critical systems around the magnets require analysis when water leaks cause them to fail. However, the tightly compacted parts and the quadrupole magnet, weighing approximately 1,000 pounds, cause access viewing problems. The process of having to dismantle and remove the magnet is time-consuming; it is not an efficient solution. The goal for the Long Reach Robotic Arm was to extend and reach behind the component of the Main Injector while "snaking" around and avoiding obstructions. At the start of the project, my teammate, Amanda Hoeksema, and I coded a program in the C language that will determine the number of links and their respective lengths for the robot arm. After, we began the 3D CAD model of the robot arm, base, and counterweight system. The design of the Long Reach Robotic Arm provided a learning experience in learning how to code in the C programming language, using SDL libraries and understanding mechanical engineering.

43 PARTICLE ACCELERATORS↗

Hydraulic fracturing experiments at 1500 m depth in a deep mine: Highlights from the kISMET project

In support of the U.S. DOE SubTER Crosscut initiative, we established a field test facility in a deep mine and designed and carried out in situ hydraulic fracturing experiments relevant to enhanced geothermal systems (EGS) in crystalline rock to characterize the stress field, understand the effects of rock fabric on fracturing, and gain experience in monitoring using geophysical methods. The project also included pre- and post-fracturing simulation and analysis, and laboratory measurements and experiments. The kISMET (permeability (k) and Induced Seismicity Management for Energy Technologies) site was established in the West Access Drift of the Sanford Underground Research Facility (SURF) 4757 ft (1450 m) below ground (on the 4850 ft level (4850L)) in phyllite of the Precambrian Poorman Formation. We drilled and continuously cored five near-vertical boreholes in a line on 3 m (10 ft) spacing, deviating the two outermost boreholes slightly to create a five-spot pattern around the test borehole centered in the test volume 40 m below the drift invert (floor) at a total depth of ~1490 m (4890 ft). Laboratory measurements of core from the center test borehole showed P-wave velocity heterogeneity along each core indicating strong, fine-scale (~1 cm or smaller) changes in the mechanical properties of the rock. Field measurements of the stress field by hydraulic fracturing showed that the minimum horizontal stress at the kISMET site averages 21.7 MPa (3146 psi) trending approximately N-S (356 degrees azimuth) and plunging slightly NNW at 12°. The vertical and horizontal maximum stresses are similar in magnitude at 42-44 MPa (6090-6380 psi) for the depths of testing, which averaged approximately 1530 m (5030 ft). Hydraulic fractures were remarkably uniform suggesting core-scale and larger rock fabric did not play a role in controlling fracture orientation. Analytical solutions suggest that the fracture radius of the large fracture (stimulation test) was more than 6 m (20 ft), depending on the unknown amount of leak-off.

Oldenburg, C↗

Thermal Insulation for a High Temperature Molten Salt Storage Tank in a CSP Plant: Preprint

A ternary molten chloride has been suggested as a high temperature (550-720 °C) sensible heat storage medium for a two-tank system. An effective thermal insulation is proposed to provide an opportunity for the fabrication of both the hot and cold storage tanks from lower cost metals, e.g. A240-347H, by maintaining the tank wall below 500 °C. To achieve this, the hot storage tank mainly comprises of inner shell (11.4 cm of a refractory brick as liner (KX-99 ®), 30 cm of insulation brick) and outer metal shell, where 5 cm of frozen layer of PCM800 (NaCl), and 5 cm of ceramic wool fill the annular space between the shells. Another layer of ceramic wool was introduced at the outer side of the metal shell to keep the temperature lower than 60 °C. ANSYS Fluent was used for the numerical study of the cool down behavior of the system during idle period when tank is quarter-filled. The heat transfer modes were considered as radiation and natural convection heat transfer from the hot molten salt at 720 °C, conduction through the solid layers and convection heat transfer from the outer shell to the environment at 15 °C. The results showed that the proposed insulation system including a frozen layer of PCM800 maintains the temperature at the metal wall lower than 500 °C, and lower than 60 °C at the outer side of the tank. Apart from the insulation property of the frozen layer of PCM800, it absorbs any leak of hot molten salt, acting as a barrier between salt and the metal shell. The thermal performance analysis provide an insight into the benefits of the multilayer insulation.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Simulating current flow through a well casing and an induced fracture

A system includes a receiver component that receives a model of a well system, the model comprising a representation of an electrically energized well casing and/or a fracture as a transmission line that leaks electric current as the current traverses the well casing and/or fracture. The receiver component also receives a value that indicates an amount of the current that is applied to the well casing and a location of a source of the current on the well casing. The system further includes an electromagnetic field calculator component that calculates an estimated electromagnetic field at at least one location on the surface of the earth based at least in part upon the representation of the electrically energized well casing and/or fracture, the value that indicates the amount of current that is applied to the well casing, and the location of the source of the current on the well casing.

02 PETROLEUM↗

Wellbore Leakage Mitigation Using Advanced Mineral Precipitation Strategies (Final Scientific/Technical Report)

This research project, entitled Wellbore Leakage Mitigation using Advanced Mineral Precipitation Strategies, was directed toward advancing mineral precipitation technologies to seal wellbore leaks and other potential carbon dioxide (CO 2 ) leakage pathways, including compromised wellbore cement and fracture networks of varying geometries throughout the wellbore and surrounding formation. The advanced mineral sealing techniques were evaluated in the laboratory and the field to expand the range of temperature, pressure, and chemical conditions where mineral precipitation could be used. Rates of enzymatically or thermally induced calcium carbonate precipitation (EICP, TICP) were determined as well as rates of enzyme inactivation at elevated temperatures (>60 °C). Immobilization was shown to enhance the thermal stability of urease enzyme and provide protection from inhibition in low pH conditions. Mineral seals promoted by EICP and TICP were used to seal fractured composite (cement/sandstone) and shale cores in high pressure reactors operated at temperatures greater than 55 °C and 130 °C, respectively. A computational model was updated to model processes of EICP and TICP. The work resulted in a successful field test, which showed that EICP in the presence of low pH fluids (CO 2 -impacted brine) could promote permeability reduction and seal a channel in the near-wellbore environment.

54 ENVIRONMENTAL SCIENCES↗

Development of dispensing hardware for safe fueling of heavy duty vehicles

The development of safe dispensing equipment for the fueling of heavy duty (HD) vehicles is critical to the expansion of this newly and quickly expanding market. This paper discusses the development of a HD dispenser and nozzles assembly (nozzle, hose, breakaway) for these new, larger vehicles where flow rates are more than double compared to light duty (LD) vehicles. This equipment must operate at nominal pressures of 700 bar, -40o C gas temperature, and average flow rate of 5-10 kg/min at a high throughput commercial hydrogen fueling station without leaking hydrogen. The project surveyed HD vehicle manufacturers, station developers, and component suppliers to determine the basic specifications of the dispensing equipment and nozzle assembly. The team also examined existing codes and standards to determine necessary changes to accommodate HD components. From this information, the team developed a set of specifications which will be used to design the dispensing equipment. In order to meet these goals, the team performed computational fluid dynamic, pressure modelling, and temperature analysis in order to determine the necessary parameters to meet existing safety standards modified for HD fueling. The team also considered user, operational, and maintenance requirements, such as freeze lock which has been an issue which prevents the removal of the nozzle from LD vehicles. The team also performed a failure mode and effects analysis (FMEA) to identify the possible failures in the design. The dispenser and nozzle assembly will be tested separately, and then installed on an innovative, HD fueling station which will use a HD vehicle simulator to test the entire system.

08 HYDROGEN↗