At least 559 records · Page 31

EUVE/XTE orbit decay study

The Explorer Platform (EP) program currently comprises two missions, the Extreme Ultraviolet Explorer (EUVE) and the X-ray Timing Explorer (XTE), each of which consists of a scientific payload mounted to the EP. The EP has no orbit maintenance capability. The EP with the EUVE payload will be launched first. At the end of the EUVE mission, the spacecraft will be serviced by the Space Transportation System (STS), and the EUVE instrument will be exchanged for the XTE. The XTE mission will continue until reentry or reservicing by the STS. Because the missions will be using the EP sequentially, the orbit requirements are unusually constrained by orbit decay rates. The initial altitude must be selected so that, by the end of the EUVE mission (2.5 years), the spacecraft will have decayed to an altitude within the STS capabilities. In addition, the payload exchange must occur at an altitude that ensures meeting the minimum XTE mission lifetime (3 years) because no STS reboost will be available. Studies were performed using the Goddard Mission Analysis System to estimate the effects of mass, cross-sectional area, and solar flux on the fulfillment of mission requirements. In addition to results from these studies, conclusions are presented as to the accuracy of the Marshall Space Flight Center solar flux predictions.

Richon, K.↗

Operationally Efficient Propulsion System Study (OEPPS)

A description is presented, through view graphs, of the problems encountered in today's launch vehicles and how these problems have adversely affected the ability to achieve serviceability, reliability, and operability. The need is emphasized to recognize and understand the operations problems and the effort that must be made to avoid them in future designs. Technology areas that will enhance operations requirements are also presented.

Wong, G. S.↗

Attitude Estimation in Fractionated Spacecraft Cluster Systems

An attitude estimation was examined in fractioned free-flying spacecraft. Instead of a single, monolithic spacecraft, a fractionated free-flying spacecraft uses multiple spacecraft modules. These modules are connected only through wireless communication links and, potentially, wireless power links. The key advantage of this concept is the ability to respond to uncertainty. For example, if a single spacecraft module in the cluster fails, a new one can be launched at a lower cost and risk than would be incurred with onorbit servicing or replacement of the monolithic spacecraft. In order to create such a system, however, it is essential to know what the navigation capabilities of the fractionated system are as a function of the capabilities of the individual modules, and to have an algorithm that can perform estimation of the attitudes and relative positions of the modules with fractionated sensing capabilities. Looking specifically at fractionated attitude estimation with startrackers and optical relative attitude sensors, a set of mathematical tools has been developed that specify the set of sensors necessary to ensure that the attitude of the entire cluster ( cluster attitude ) can be observed. Also developed was a navigation filter that can estimate the cluster attitude if these conditions are satisfied. Each module in the cluster may have either a startracker, a relative attitude sensor, or both. An extended Kalman filter can be used to estimate the attitude of all modules. A range of estimation performances can be achieved depending on the sensors used and the topology of the sensing network.

Hadaegh, Fred Y.↗

Genesis Solar Wind – Capture, Return, Curate and Analyze: Looking Backward and Creating a Timeline

Introduction: In 1997 NASA’S Discovery Program selected the Genesis mission proposal to return solar wind samples to Earth for laboratory analyses. Principal Investigator Donald S. Burnett and the science team defined the purity of collector materials and ability to analyze solar wind composition to the precision required for planetary science. As a small mission, focused on a well-defined science goal, yet needing careful attention to engineering details, the communication among scientists and engineers, nurtured by Don Burnett, was exceptional. Genesis Mission and Curation Legacy: Genesis, as the first U. S. spacecraft to return astromaterial samples since Apollo, not only integrated the mission planning and flight teams, but also the science and sample curation teams during the mission development period. Since Genesis is a sample return mission, the Science Team was essential in certifying the collectors (sample containers for solar atoms). From inception, Genesis established mission funding for returned sample curation. JSC was lead in contamination control during mission preparation, including establishment of an ISO 4 cleanroom facility and use of ultrapure water (UPW) for cleaning flight hardware (and, as it turned out, for cleaning collectors after the mishap). Reliable, fast communication among scientists, engineers and curators at the hands-on level established deep respect among team members and efficient decision-making. JSC’s 50-years of astromaterial sample curation provided experienced sample processors onsite during recovery in Utah (a deep bench for emergency response). Post-recovery curation included iterative collaboration with science sample users to clean or verify cleanliness of samples. The science legacy from Genesis is addressed by Burnett and Jurewicz, this volume. In The Beginning: After Apollo sample return, Burnett and Marcia Neugebauer at JPL began discussing a solar wind sample return, with Neugebauer arguing that separate collection of solar wind regimes was essential science. By 1992 a solar wind sample return mission was presented at a workshop, and by 1994 a mission was proposed named Suess-Urey. The mission was re-proposed under a new name GENESIS and selected in 1997. Susan Niebur captured the Genesis mission history and stories, from high level management documents and from many interviews with participants [2]. Her account lets readers glimpse personality of participants in quotations from interviews. Need and Scope for Detailed Technical Timeline: A timeline constructed from lower level task documents has been initiated to document the resources and skills actually used, as well as task sequence or concurrency. Timelines for high level mission events are captured in two documents [1] [2] and for detailed re-entry events in [3]. A detailed technical timeline for Genesis mission and curation activities will provide data points for lower level tasks, such as ISO 4 curation facility construction time, preparation for nominal sample field recovery, mishap recovery, and UPW expansion. Changes in technology context 1990-2024: Semiconductor technologies were easily accessible in the U.S.A. (1990-1999), and the Genesis team used those resources for cleanroom design and UPW system expansion. Image documentation was changing from film to digital during cleanroom construction and payload cleaning (1997-2001). Engineering design was done using computer aided design proprietary software, making more difficult the archiving of payload configuration and materials. Email of documents, tracked delivery service and virtual meeting capability greatly improved communication efficiency. Information sources – Pre-launch mission preparation: Examples of mission science, engineering and contamination control are collector purity testing, payload design/fabrication and ISO 4 cleanroom construction. Information on timing of these activities comes from facility readiness reviews, management reviews, shipping documents, procurement documents, test reports, travel documents, laboratory logs, Quality Assurance documents, dates on images, participant notebooks and emails. Information sources – Sample return re-entry and field recovery activities: Information comes from event timelines produced by Mid-Air Recovery team, Lockheed team lead notes and from chase video, JPL Quality Assurance. Information also comes from images and logbooks from UTTR cleanroom operations and from curatorial documents. Information sources – Resulting science and sample cleaning processes: Agendas from the annual gatherings of the science team initially trace testing for collector purity/cleanliness, and after sample recovery, include collector cleaning and cleanliness assessment. Post-recovery documents include curatorial orders and procedures, sample allocation documents and LPSC abstracts. Timeline Objectives: A simple spreadsheet timeline with headers DATE, EVENT, PEOPLE, COMMENT, INFORMATION SOURCE has been initiated and currently has over 90 entries. While this is not definitive historical research, it is a quick look at the evolution of Genesis curation with pointers to documents or people with information. Engineers for future missions may find useful points of comparison for development of facilities. References:[1] Genesis Mission Reference Document, (2011) JPL D-62382.[2] Niebur S. M., edited by Brown D. W. (2023) NASA’s Discovery Program: The First 20 Years of Competitive Planetary Exploration, NASA-SP-2023-4238.[3] Genesis Mishap Investigation Board Report, Vol. 1 (July 2005).

solar wind↗

Spatiotemporal Analysis of High-Resolution Pressure-Sensitive Paint Measurements on a Launch Vehicle Wind Tunnel Model

An accurate understanding of unsteady aerodynamic loads is critical for launch vehicle structural design and for development of the vibro-acoustic environment for payload components. Analysts commonly use point-wise surface pressure measurements from wind tunnel testing to build statistical models of the in-flight turbulent boundary layer flow structures, often extrapolating over large swaths of the surface due to measurement sparsity. We present novel results from a transonic wind tunnel test using fast-response pressure-sensitive paint (PSP) and show how it can be used to visualize and quantify localized turbulent boundary layer wall pressure statistics with unprecedented spatial resolution. The wind tunnel model is a scaled model of the Space Launch System (SLS) rocket Block 1B Crew configuration and analysis focused on the compression corner between the Service Module fairing and the Universal Stage Adapter.

Corcos Model↗

NASA's Ares I and Ares V Launch Vehicles--Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) is charting a renewed course for lunar exploration, with the fielding of a new human-rated space transportation system to replace the venerable Space Shuttle, which will be retired after it completes its missions of building the International Space Station (ISS) and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Altair Lunar Lander, which will be delivered by the Ares V Cargo Launch Vehicle (fig. 1). This configuration will empower rekindled investigation of Earth's natural satellite in the not too distant future. This new exploration infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit (LEO) for extended lunar missions and preparation for the first long-distance journeys to Mars. All space-based operations - to LEO and beyond - are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective architecture solutions to sustain this multi-billion-dollar program across several decades. Leveraging SO years of lessons learned, NASA is partnering with private industry and academia, while building on proven hardware experience. This paper outlines a few ways that the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Constellation Program and its project offices to streamline ground operations concepts by designing for operability, which reduces lifecycle costs and promotes sustainable space exploration.

Singer, Christopher E.↗

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.↗

COMET: First mission progress

The COMmercial Experiment Transporter (COMET) is a set of hardware and related infrastructure used to support orbital experiments of the Commerical Centers for the Development of Space (CCDS's) and their industrial partners. During the three years since the program started, contracts have been signed, design reviews conducted on all components, experiments selected for the first mission, all hardware has been manufactured, the first phase of integrated testing of the satellite, the experiments, and the Launch Facility have all been completed. The program experienced several delays in 1993. A component failure in the Service Module during preparation for environmental testing in January resulted in an eight-week delay for the Service Module part of the FreeFlyer. Discovery of large overruns of the mass budget required a major revision of the mission profile for COMET 1. In the spring of 1993, Space Industries Incorporated (SII) and Westinghouse stopped work because of a lack of funds. EER continued to work toward completion of their launch systems. SII and Westinghouse resumed work in September 1993. Since resumption of work, a technical review of all systems to ascertain their state of readiness has been completed. No major problems were discovered. All systems are proceeding toward a launch date in the first quarter of 1994.

Pawlick, Joseph F., Jr.↗

Advanced service equipment

Orbiter-based service equipment needs/usage are identified by considering a broad spectrum of on-orbit operational scenarios associated with three primary mission events: initial launch, revisits, and Earth return. Nominal and alternate modes of operation, contingency situations (as remote manipulator system inoperative), and Orbiter close proximity operations are included. Satellite classes considered are direct delivery and servicing of the orbiter, low Earth orbiter/propulsion, sorties and DOD, geosatellites, and planetary and other satellites.

Mockovciak, J., Jr.↗

Manipulator design and development for the Ranger satellite servicing vehicle

The Ranger program is a planned series of low cost telerobotics flight experiments, based on the use of Pegasus launch vehicles. As the first step towards this goal, the Space Systems Lab was developing a neutral buoyancy version of Ranger for use in design verification and operations testing. The design approach and results of the Ranger manipulator development program is related. Ranger is designed to incorporate four appendages: a pair of dexterous, seven degree of freedom manipulators for general manipulation; a six DOF grappling arm for securing the vehicle to the local work site; and a five DOF positioning manipulator for the stereo camera pair that provide feedback to the remote operator. Each of these manipulators incorporate unique approaches to satisfying design requirements. The numerical and operational requirements are given for Ranger manipulators, and the evolution is discussed of the differing design approaches based on similarities and differences in the requirements. Testing results for individual joints and manipulator assemblies are presented, followed by initial results of operational testing on satellite servicing tasks with the integrated Ranger neutral buoyancy vehicle.

Howard, Russell D.↗

Control System Design Implementation and Preliminary Demonstration for a Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN)

Satellite servicing is a high priority task for NASA and the space industry, addressing the needs of a variety of missions, and potentially lowering the overall cost of missions through refurbishment and reuse. However, the ability to service satellites is severely limited by the lack of long reach manipulation capability and inability to launch new devices due the end of the Space Transport System, or Space Shuttle Program. This paper describes the design and implementation of a control system for a Tendon-Actuated Lightweight In-Space MANipulator (TALISMAN), including; defining the forward and inverse kinematics, endpoint velocity to motor velocity, required cable tensions, and a proportional-integral-derivative (PID) controller. The tensions and velocities necessary to maneuver and capture small and large payloads are also discussed. To demonstrate the utility of the TALISMAN for satellite servicing, this paper also describes a satellite servicing demonstration using two TALISMAN prototypes to grasp and inspect a satellite mockup. Potential avenues for improving the control system are discussed.

Komendera, Erik E.↗

Reusability Studies for Ares I and Ares V Propulsion

With a mission to continue to support the goals of the International Space Station (ISS) and explore beyond Earth orbit, the United States National Aeronautics and Space Administration (NASA) is in the process of launching an entirely new space exploration initiative, the Constellation Program. Even as the Space Shuttle moves toward its final voyage, Constellation is building from nearly half a century of NASA spaceflight experience, and technological advances, including the legacy of Shuttle and earlier programs such as Apollo and the Saturn V rocket. Out of Constellation will come two new launch vehicles: the Ares I crew launch vehicle and the Ares V cargo launch vehicle. With the initial goal to seamlessly continue where the Space Shuttle leaves off, Ares will firstly service the Space Station. Ultimately, however, the intent is to push further: to establish an outpost on the Moon, and then to explore other destinations. With significant experience and a strong foundation in aerospace, NASA is now progressing toward the final design of the First Stage propulsion system for the Ares I. The new launch vehicle design will considerably increase safety and reliability, reduce the cost of accessing space, and provide a viable growth path for human space exploration. To achieve these goals, NASA is taking advantage of Space Shuttle hardware, safety, reliability, and experience. With efforts to minimize technical risk and life-cycle costs, the First Stage office is again pulling from NASA s strong legacy in aerospace exploration and development, most specifically the Space Shuttle Program. Trade studies have been conducted to evaluate life-cycle costs, expendability, and risk reduction. While many first stage features have already been determined, these trade studies are helping to resolve the operational requisites and configuration of the first stage element. This paper first presents an overview of the Ares missions and the genesis of the Ares vehicle design. It then looks at one of the most important trade studies to date, the "Ares I First Stage Expendability Trade Study." The purpose of this study was to determine the utility of flying the first stage as an expendable booster rather than making it reusable. To lower the study complexity, four operational scenarios (or cases) were defined. This assessment then included an evaluation of the development, reliability, performance, and transition impacts associated with an expendable solution. This paper looks at these scenarios from the perspectives of cost, reliability, and performance.

Williams, Thomas J.↗

Reusability Studies for Ares I and Ares V Propulsion

With a mission to continue to support the goals of the International Space Station (ISS) and explore beyond Earth orbit, the United States National Aeronautics and Space Administration (NASA) is in the process of launching an entirely new space exploration initiative, the Constellation Program. Even as the Space Shuttle moves toward its final voyage, Constellation is building from nearly half a century of NASA spaceflight experience, and technological advances, including the legacy of Shuttle and earlier programs such as Apollo and the Saturn V rocket. Out of Constellation will come two new launch vehicles: the Ares I crew launch vehicle and the Ares V cargo launch vehicle. With the initial goal to seamlessly continue where the Space Shuttle leaves off, Ares will firstly service the Space Station. Ultimately, however, the intent is to push further: to establish an outpost on the Moon, and then to explore other destinations. With significant experience and a strong foundation in aerospace, NASA is now progressing toward the final design of the First Stage propulsion system for the Ares I. The new launch vehicle design will considerably increase safety and reliability, reduce the cost of accessing space, and provide a viable growth path for human space exploration. To achieve these goals, NASA is taking advantage of Space Shuttle hardware, safety, reliability, and experience. With efforts to minimize technical risk and life-cycle costs, the First Stage office is again pulling from NASA's strong legacy in aerospace exploration and development, most specifically the Space Shuttle Program. Trade studies have been conducted to evaluate lifecycle costs, expendability, and risk reduction. While many first stage features have already been determined, these trade studies are helping to resolve the operational requisites and configuration of the first stage element. This paper first presents an overview of the Ares missions and the genesis of the Ares vehicle design. It then looks at one of the most important trade studies to date, the "Ares I First Stage Expendability Trade Study." The purpose of this study was to determine the utility of flying the first stage as an expendable booster rather than making it reusable. To lower the study complexity, four operational scenarios (or cases) were defined. This assessment then included an evaluation of the development, reliability, performance, and transition impacts associated with an expendable solution. The paper looks at these scenarios from the perspectives of cost, reliability, and performance. The presentation provides an overview of the paper.

Williams, Thomas J.↗

Analysis of the March 30, 2011 Hail Event at Shuttle Launch Pad 39A

The Kennedy Space Center (KSC) Hail Monitor System, a joint effort of the NASA KSC Physics Lab and the KSC Engineering Services Contract (ESC) Applied Technology Lab, was first deployed for operational testing in the fall of 2006. Volunteers from the Community Collaborative Rain, Hail, and Snow Network (CoCoRaHS) in conjunction with Colorado State University have been instrumental in validation testing using duplicate hail monitor systems at sites in the hail prone high plains of Colorado. The KSC Hail Monitor System (HMS), consisting of three stations positioned approximately 500 ft from the launch pad and forming an approximate equilateral triangle, as shown in Figure 1, was first deployed to Pad 39B for support of STS-115. Two months later, the HMS was deployed to Pad 39A for support of STS-116. During support of STS-117 in late February 2007, an unusually intense (for Florida standards) hail event occurred in the immediate vicinity of the exposed space shuttle and launch pad. Hail data of this event was collected by the HMS and analyzed. Support of STS-118 revealed another important application of the hail monitor system. Ground Instrumentation personnel check the hail monitors daily when a vehicle is on the launch pad, with special attention after any storm suspected of containing hail. If no hail is recorded by the HMS, the vehicle and pad inspection team has no need to conduct a thorough inspection of the vehicle immediately following a storm. On the afternoon of July 13, 2007, hail on the ground was reported by observers at the Vertical Assembly Building (VAB) and Launch Control Center (LCC), about three miles west of Pad 39A, as well as at several other locations at KSC. The HMS showed no impact detections, indicating that the shuttle had not been damaged by any of the numerous hail events which occurred on that day.

Lane, John E.↗

Tracking and data relay satellite system configuration and tradeoff study. Volume 1: Summary. Part 2: Final Report, 22 August 1972 - 1 April 1973

A Tracking and Data Relay Satellite System (TDRSS) concept for service of low, medium, and high data rate user spacecraft has been defined. During the study, four TDRS dual spin stabilized configurations (contractual requirement) were designed; two are compatible with Delta 2914, one with Atlas Centaur, and one with space shuttle launches. A summary of the study and the salient results are presented. The topics included are: (1) TDRSS operations, (2) telecommunications service performance, telecommunications service equipment, (3) TDRS configurations and their design characteristics, and (4) TDRS system reliability.

Source record↗

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP↗