Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installed base”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Mechanical Design of NESSI: New Mexico Tech Extrasolar Spectroscopic Survey Instrument

NESSI: the New Mexico Tech Extrasolar Spectroscopic Survey Instrument is a ground-based multi-object spectrograph that operates in the near-infrared. It will be installed on one of the Nasmyth ports of the Magdalena Ridge Observatory (MRO) 2.4-meter Telescope sited in the Magdalena Mountains, about 48 km west of Socorro-NM. NESSI operates stationary to the telescope fork so as not to produce differential flexure between internal opto-mechanical components during or between observations. An appropriate mechanical design allows the instrument alignment to be highly repeatable and stable for both short and long observation timescales, within a wide-range of temperature variation. NESSI is optically composed of a field lens, a field de-rotator, re-imaging optics, an auto-guider and a Dewar spectrograph that operates at LN2 temperature. In this paper we report on NESSI's detailed mechanical and opto-mechanical design, and the planning for mechanical construction, assembly, integration and verification.

exoplanet↗

A Quiet Helicopter for Air Taxi Operations

NASA is exploring rotorcraft designs for VTOL air taxi operations, also known as urban air mobility (UAM) or on-demand mobility (ODM) applications. Several concept vehicles have been developed, intended to focus and guide NASA research activities in support of aircraft development for this emerging market. This paper examines a single main-rotor helicopter designed specifically for low-noise air taxi operations. Based on demonstrated technology, the aircraft uses a turboshaft engine with a sound-absorbing installation, and the NOTAR anti-torque system to eliminate tail-rotor noise, consequently the noise and annoyance of the aircraft are dominated by the main rotor. Several design parameters are explored to reduce the noise, including rotor tip speed, blade geometry, and higher-harmonic control. Commensurate with the level of design detail, the noise is calculated for compact loading and thickness sources on the rotating blades. The metric is the reduction of the noise for the helicopter certification conditions (takeoff, flyover, and approach), relative a baseline aircraft with typical (high) tip speed, conventional blade planform, and no higher-harmonic control.

Johnson, Wayne↗

Hygrothermal simulation of exterior retrofits in a cold climate

This work presents results from moisture modeling as part of a project undertaken by Pacific Northwest National Laboratory and its research partners, the University of Minnesota, and the Oak Ridge National Laboratory. The research goal is to identify exterior wall retrofit systems for cold climates that are low cost, energy efficient, and do not result in moisture durability problems. A base case wall was identified representing a typical wood frame construction, circa 1950. Retrofit options were selected based on input from industry, academia, and published work and seven options were constructed and installed at the University of Minnesota’s cold weather exposure facility in Cloquet, MN. Measurements were carried out during winter months and the data was used for model validation. Hygrothermal simulations were then carried out using WUFI (Version 6.4) in accordance with standard ANSI/ASRHAE 160-2016, Criteria for Moisture-Control Design Analysis in Buildings. Simulations were run out to three years and results show that the exterior retrofits improve thermal performance and do not negatively impact moisture durability of the existing wall.

Aldykiewicz Jr, Antonio↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling Savings for ENERGY STAR Smart Home Energy Management Systems

The objective of this study was to develop a repeatable and defensible methodology to analyze the energy savings for Home Energy Management Systems (HEMS) that meets the minimum requirements for certification under ENERGY STAR ® Smart Home Energy Management System (SHEMS) Version 1. Mandatory connected loads include a smart thermostat, two smart lights, and one smart power strip or smart outlet. Control strategies must include feedback to occupants through an in-home display, user programming, occupancy sensor-based controls, and responsiveness to utility signals such as demand response programs. Several occupant behavior patterns were selected to quantify the range of energy savings potential for a HEMS with this basic functionality. A literature review was conducted to establish realistic room-by-room occupancy levels and usage patterns for connected devices. A series of event-driven hourly profiles were created, followed by adjustments based on application of HEMS control strategies to thermostats, interior lighting, and plug load schedules. EnergyPlus modeling was performed using these hourly schedules in three locations (Boston, Houston, and Phoenix) to examine climate dependence of energy savings. Total site energy savings ranged from 4.3 to 27.1 MBtu/year (7%-35%), and utility bill savings ranged from $\$$123 to $\$$670/year (6%-29%). The highest predicted savings was realized by occupants that were not energy conscious prior to HEMS installation, but highly engaged with the HEMS controls once the system was installed. The smart thermostat accounted for most of the savings, followed by the smart power strip. Smart lighting did not save a significant amount of energy in our analysis, based on an assumption that efficient LEDs with no standby power would normally be installed anyway.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Secure boot, trusted boot and remote attestation for ARM TrustZone-based IoT Nodes

With the extensive application of IoT techniques, IoT devices have become ubiquitous in daily lives. Meanwhile, attacks against IoT devices have emerged to compromise IoT devices by tampering with system pre-installed programs or injecting new malware. To mitigate these attacks, integrity enforcement of IoT systems has been proposed. The integrity of an IoT device system includes load-time integrity and runtime integrity. In this paper, we design an IoT system based on ARM TrustZone to enforce the system integrity. First, we establish the root of trust and propose a hybrid booting approach consisting of both secure boot and trusted boot to enforce the system load-time integrity. Second, we investigate a paging-based process integrity measurement method to measure the NW processes and conduct remote attestation based on the measurement results ensuring the NW runtime process integrity. We implement an IoT prototype system on a NXP i.MX6Q SABRE SD development board to assess its feasibility. Finally, real-world experiment results demonstrate that our prototype introduces negligible performance overhead to the original system.

97 MATHEMATICS AND COMPUTING↗

Automation of FARM from Alpha Phase to Beta Phase

Integrated energy systems (IES) combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework and the RAVEN plugin for grid and capacity optimization (HERON) are used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES, by respecting the limits on the production variables and the corresponding rates of variation (explicit constraints). Besides, there are other process variables whose evolution needs to be bounded to avoid damaging the components (e.g., condensers, heat exchangers, steam generators, etc.) or degrading the process efficiency (e.g., electrolysis in the hydrogen production process). To avoid violating these latter limits (implicit constraints), a proof-of-concept HERON validator based on Feasible Actuator Range Modifier (FARM-Alpha) was developed by Argonne National Laboratory in January 2021. This FARM-Alpha validator calculates the evolution of process variables on whom the implicit constraints are placed, and then provides feedback to HERON dispatcher to adjust the power setpoints of three IES components, i.e., Balance of Plant, Secondary Energy Source, and Thermal Energy Storage, so as to meet both the explicit and implicit constraints. FARM-Alpha was designed to assess the performance of FARM as a HERON validator only, i.e., the list of components and implicit operational constraints were hard-coded within the source code. The lack of flexibility of the corresponding software structure does not allow the deployment in production environment. This report describes the development and the implementation of an enhanced version of the FARM-based validator (FARM-Beta), which ensures more flexibility for the end user in modeling multiple IES configurations and scenarios. Several test cases of the power dispatch problem were then selected to demonstrate the capabilities offered by FARM-beta. The test cases illustrate the efficiency of the closed-loop optimization scheme and the capability to calculate set-point trajectories satisfying both explicit and implicit constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fleet retrofit report

Flight tests are evaluated of an avionics system which aids the pilot in making two-segment approaches for noise abatement. The implications are discussed of equipping United's fleet of Boeing 727-200 aircraft with two-segment avionics for use down to Category 2 weather operating minima. The experience is reported of incorporating two-segment approach avionics systems on two different aircraft. The cost of installing dual two-segment approach systems is estimated to be $37,015 per aircraft, including parts, labor, and spares. This is based on the assumption that incremental out-of-service and training costs could be minimized by incorporating the system at airframe overhaul cycle and including training in regular recurrent training. Accelerating the modification schedule could add up to 50 percent to the modification costs. Recurring costs of maintenance of the installation are estimated to be of about the same magnitude as the potential recurrent financial benefits due to fuel savings.

Source record↗

State-of-the-art short-term electricity market operation with solar generation: A review

With the accelerating penetration of solar energy in energy systems, market operations concerning the solar-associated intermittency are widely discussed. How to correctly model the solar generation in the market and solve the uncertainty-based operation problems call for solutions. Unlike other renewable resources, solar power can be more easily applied to the demand side through behind-the-meter installations in a distributed manner with significant future extensibility. The corresponding operational rules in the markets are largely being revised. Over the past two decades, with the development of deregulated power markets, numerous studies related to uncertainty-based market operations tend to transform the market from a deterministic and centralized framework to a stochastic and decentralized one. As the relevant literature is most recent, this paper reviews their contributions to electricity market operations with solar integration and underlines the research directions of this topic and ongoing industry practices. A thorough review of the electricity markets worldwide with solar energy is provided. A variety of proposed mathematical solutions to the problem are also addressed.

14 SOLAR ENERGY↗

Getting brighter: Impacts of improved day-ahead solar forecasts in high-solar, high-storage electricity systems

This paper analyzes the impacts of improved day-ahead solar forecasts on costs and dispatch in the solar-rich Southeast U.S. It uses an optimized high-solar, high-storage resource portfolio in which solar generation capacity accounts for 45 % of total installed capacity (34 %–36 % of generation) and energy storage capacity (43 GW) is equivalent to 33 % of peak demand. In a base scenario, improved day-ahead solar forecasts reduce production costs by $\$87$ million per year ($\$0.13$ per MWh load, $2023$$). This level of savings is within the range or lower than earlier studies of solar forecast improvements at lower levels of solar generation (<25 % of total generation). In this study, solar expansion was accompanied by two important sources of flexibility for managing solar forecast error: energy storage and day-ahead solar curtailment. Furthermore, the analysis finds that regional coordination complements day-ahead solar forecast improvements while natural gas commitment flexibility is a substitute for forecast improvements, as the improved solar forecast leads to sub-optimal commitment of thermal units. Day-ahead solar forecast improvements reduce reserves required to manage forecast error by 30 %. Fewer reserves to manage large, infrequent solar forecast errors could be an important benefit of improved solar forecasts.

14 SOLAR ENERGY↗

Global Techno-Economic Performance of Bifacial and Tracking Photovoltaic Systems

Although most of the current photovoltaic (PV) system installations use monofacial modules with fixed-tilt mounting structures, bifacial modules, trackers, and the combination of them are also getting more attention as potential candidates to further reduce the PV levelized cost of electricity (LCOE). This work is then the first to present a worldwide analysis on the yield potential and cost-effectiveness of PV farms composed of monofacial fixed-tilt and single/dual (1T/2T) tracker installations, as well as their bifacial counterparts. Our approach starts by estimating the irradiance reaching the front and rear surface of the modules for the different system designs (validated based on data from real PV systems and results from the literature) to estimate their energy production (row-row shading is neglected). Subsequently, the overall system cost during their 25-year lifetime is factored in, and LCOE is obtained. The results reveal that bifacial-1T installations increase energy yield by 35% and reach the lowest LCOE for the majority of the world (93.1% of the land area). Although dual axis trackers achieve the highest energy generation — especially for bifacial modules — their cost is still too high, and are therefore not as cost-effective. Sensitivity analyses based on the Monte Carlo and region sensitivity approach are performed to analyze the impact of input assumptions on the calculated LCOE. These reveal that our conclusions are robust in general but exact configuration to choose depends on specific site conditions. This investigation is not only of interest to the scientific community, but also can be used as a guide for PV installation companies and investors to determine the most suitable technology for a particular location.

14 SOLAR ENERGY↗

Building Analytics Tool Deployment at Scale: Benefits, Costs, and Deployment Practices

Buildings are becoming more data-rich. Building analytics tools, including energy information systems (EIS) and fault detection and diagnostic (FDD) tools, have emerged to enable building operators to translate large amounts of time-series data into actionable findings to achieve energy and non-energy benefits. To expedite data analytics adoption and facilitate technology innovation, building owners, technology developers, and researchers need reliable cost–benefit data and evidence-based guidance on deployment practices. This paper fulfills these needs with the energy use and survey data from a wide-ranging research and industry partnership program that covers thousands of buildings installed with analytics tools. The paper indicates that after two years of implementation, organizations using FDD tools and EIS tools achieved 9% and 3% median annual energy savings, respectively. The median base cost and annual recurring cost for FDD are USD 0.65 per square meter (m2) (USD 0.06 per square foot [ft2]) and USD 0.22 per m2 (USD 0.02 per ft2), and are USD 0.11 per m2 (USD 0.01 per ft2) and USD 0.11 per m2 (USD 0.01 per ft2) for EIS. The common metrics and analyses that are used in the tools to support the discovery of energy efficiency measures are summarized in detail. Two best practice examples identified to maximize the benefits of tool implementation are also presented. Opportunities to advance the state of technology include simplified data integration and management, and more efficient processes for acting on analytics outputs. Compared with previous efforts in the literature, the findings presented in this paper demonstrate the effectiveness of building analytics tools with the largest known dataset.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Test and Evaluation of the Next Generation Blower for FBCO2 Scrubber

The four-bed carbon dioxide (FBCO2) scrubber was deployed on the ISS in late 2021 as a technology demonstration. The system was launched with a Honeywell blower that, while performing well, is no longer supported by the manufacturer with no available spares. Thus, NASA contracted with Calnetix Technologies to develop a next-generation, magnetic-bearing blower to meet FBCO2 demands and deliver the flowrates required for effective CO2 scrubbing. The first flight blower assembly was tested by Marshall Space Flight Center (MSFC) in the summer of 2022 and installed in FBCO2 in February 2023. This paper presents the blower performance ground testing results, with details on the test plan and test setup provided. The performance data is used not only to qualify the blower for use in F BCO2, but also to create a model for use in predictions of on-orbit performance based on available telemetry data. The paper concludes with discussions on test limitations and early FBCO2 performance data with the new blower installed.

Kaitlin Oliver-Butler↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Exploring Lightning and Convective Processes Using the Ground-Radar Multiplatform Precipitation Feature Database

The Multiplatform Precipitation Feature (MPF) database synthesizes coincident spaceborne and ground-based lightning and radar data in a framework of storm-based features, fusing broader spaceborne detection capabilities with process-based, storm-level analysis practices. The MPF database was designed to extend the scale and scope of investigations into the complex connections between precipitation, updrafts, and lightning. The NASA International Space Station Lightning Imaging Sensor (ISS LIS) serves as the source of lightning information for the database. The first iteration of the MPF database leveraged the NASA Global Precipitation Measurement (GPM) mission spaceborne Dual-frequency Precipitation Radar (DPR) to define features, along with contributions of microphysics data and vertical wind retrievals from the GPM Validation Network (VN) of ground-based radar data. The dependency on coincident ISS and GPM satellite overpasses of radars in a dual-Doppler configuration significantly limited the size of the initial database of features, referred to as VNMPFs, but established the database infrastructure and feasibility. We present here a second iteration of the MPF database that omits the GPM DPR and VN, instead incorporating data directly from selected proximal installations of the operational Next Generation Radar (NEXRAD) network that facilitate vertical wind retrievals via dual-Doppler analysis. These features based exclusively on ground-based polarimetric Doppler radar are hereafter referred to as Ground-Radar MPFs (GRMPFs). Removing the restriction of a coincident GPM overpass appreciably increases the size of the GRMPF database while incorporating more detailed information from higher-resolution radar data and retrievals. This expansion allows for unprecedented broad, robust statistical analyses of the electrical, kinematic, and microphysical characteristics of deep convective processes. These results highlight the potential for advancements in lightning meteorology made possible by combining multiple perspectives from global lightning measurements and ground-based radar data.

Lightning↗

Effect of perturbed flow on the transition from the supersonic laminar boundary layer to the turbulent

Results of experimental studies on the effect of various factors on the transition of a supersonic boundary layer are discussed. It is shown that in supersonic wind tunnels, a significant effect on the transition of the boundary layer on a model is exerted by the scale of acoustic perturbations, which is proportional to the boundary layer displacement thickness of the working section. Experimental data obtained over a wide range of variation of flow parameters in aerodynamically similar test installations with different dimensions of the working section are generalized by means of a correlation parameter based on the displacement thickness.

Kharitonov, A. M.↗

Preliminary study of VTO thrust requirements for a V/STOL aircraft with lift plus lift/cruise propulsion

A preliminary assessment was made of the VTO thrust requirements for a supersonic (Type B) aircraft with a Lift plus Lift/Cruise propulsion system. A baseline aircraft with a takeoff gross weight (TOGW) of 13 608 kg (30,000 lb) was assumed. Pitch, roll, and yaw control thrusts (i.e., the thrusts needed for aircraft attitude control in the flight hover mode) were estimated based on a specified set of maneuver acceleration requirements for V/STOL aircraft. Other effects (such as installation losses, suckdown, reingestion, etc.), which add to the thrust requirements for VTO were also estimated. For the baseline aircraft, the excess thrust required for attitude control of the aircraft during VTO and flight hover was estimated to range from 36.9 to 50.9 percent of the TOGW. It was concluded that the total thrust requirements for the aircraft/propulsion system are large and significant. In order to achieve the performance expected of this aircraft/propulsion system, reductions must be made in the excess thrust requirements.

Turney, G. E.↗

Radio frequency performance of DSS 14 64-meter antenna at X-band using an improved subreflector

The performance of the Deep Space Station (DSS) 14 64-meter antenna X-band gain determined using the X- and K-band Radar feedcone is discussed. Tests prior to, and following the installation of an improved subreflector, proved the unit largely (if not totally) restored initial performance levels at that station. The X-band peak gain with the subreflector is +17.8dBi(area efficiency of 47.3 percent); an increase of +0.47 dB due to the unit installation. The test further showed a significant shift in the axial focus required (function of elevation angle) which, if not implemented operationally, will cause a serious degradation. An historical summary of all documented X-band gain measurements at DSS 14 is included and reviewed. The initial performance is traced through various major configuration changes such as the installation of the X-band dual hybrid mode horn within the operational XRO feedcone. Finally, based on the summary and recent data, a peak X-band antenna gain of +72.1 dBi (area efficiency of 50.8 percent) is projected for the operational feedcone.

Freiley, A. J.↗