Successes and Challenges of the Integrated Waste Treatment Unit's 50-Day Demonstration Run - 20151
The Integrated Waste Treatment Unit (IWTU) has been tasked with using steam reforming technology to treat 3.4 million liters (900,000 gallons) of radioactive sodium-bearing waste (SBW) at the Idaho National Laboratory (INL). The project has been hampered by a number of processing issues associated with process equipment during simulant testing, with the two main issues involving the fluidizing gas distribution system in the main reactor vessel, the denitration mineralization reformer (DMR), and high differential pressures in the main filter vessel, the process gas filter (PGF). Following the replacement of the fluidizing gas distribution system in the DMR, a successful 30-day demonstration run was performed that revealed unacceptable bridging in the filter bundles of the PGF. The bundles were replaced with new ones, and a 50-day demonstration run was performed. The main purpose of this run was to operate the IWTU over a range of operating conditions. Overall, the run was a success; however, there were multiple challenges that arose from the run. (authors)