Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Changing the Rules of the Game: Used Fuel Studies Outside of a Remote Handling Facility

Recent advances in micro-fabrication tools like the FEI Helios NanoLab 660 dual Focused Ion Beam (FIB) and Scanning Electron Microscope (SEM) now make it possible to easily and reliably prepare micron (or smaller) specimens for analyses or further experimentation. Pacific Northwest National Laboratory (PNNL) has leveraged this capability at the Category II Nuclear Facility, the Radiochemical Processing Laboratory, to facilitate nuclear materials analysis and experimentation of used nuclear fuel. Micron-scale specimens of un-irradiated UO2 fuel pellets of various enrichments from depleted to 4.95% enriched, relative to 235U, were prepared at PNNL and shipped to the University of Missouri’s Research Reactor (MURR) for irradiation. Prior to shipping, samples were attached to commercially available Transmission Electron Microscopy half-grids via ion deposition, which were then housed in specially designed aluminum sample holders approved for use at the reactor facility. This minimized handling and preparation requirements prior to materials analysis after irradiation. Samples were irradiated to a burnup equivalent of 8 – 3,700 MWd/MTU. Additionally, by reducing the size of the specimens, and therefore their emitted radiation dose, the required cooling time after irradiation and prior to analysis was greatly diminished, and handling of these samples could proceed outside of a hot cell facility. Results from these experiments provided insight into the initial production of noble metal phase particles in used nuclear fuel at extremely low burnup levels. Some incompatibility with the container was observed at higher burnup. Micro-scale irradiation experiments were performed at roughly 1/7th of the time, effort and expense a similar bulk-scale study requiring a shielded hot cell facility would require. Conducting nuclear materials analysis at the micron-scale holds the promise of enhancing collaboration and material accessibility to the broader research community, improving accessibility to cutting edge research tools by the nuclear materials science community, lowering the risk to the scientist by reducing radiation dose and exposure, reducing facility and research costs associated with the requirement to conduct nuclear materials science within glovebox or remote handling facilities, and minimizing waste.

Schwantes, Jon M.↗

An energy storage dispatch optimization for demand-side management in industrial facilities

An energy storage (ES) dispatch optimization was implemented to test lithium-ion battery ES, supercapacitor ES, and compressed air ES on two different industrial facilities – one intermittent process facility and one continuous process facility. The model first shows the capability of optimizing the size of a single technology on a single industrial facility to maximize the return on investment. Then, for the same profile, the model identifies significant differences in the optimal size for different technologies based on their performance parameters. Third, the model identifies differences in the optimal size for each technology based on the facilities profile. Here the results show compressed air ES yields the highest return on investment for both facilities and provides insight for future development of ES systems.

25 ENERGY STORAGE↗

Overview of the fusion nuclear science facility, a credible break-in step on the path to fusion energy

Here the Fusion Nuclear Science Facility (FNSF) is examined as part of a two step program from ITER to commercial power plants. This first step is considered mandatory to establish the materials and component database in the real fusion in-service environment before proceeding to larger electricity producing facilities. The FNSF can be shown to make tremendous advances beyond ITER, toward a power plant, particularly in plasma duration and fusion nuclear environment. A moderate FNSF is studied in detail, which does not generate net electricity, but does reach the power plant blanket operating temperatures. The full poloidal Dual Coolant Lead Lithium (DCLL) blanket is chosen, with alternates being the Helium Cooled Lead Lithium (HCLL) and Helium Cooled Ceramic Breeder/Pebble Bed (HCCB/PB). Several power plant relevant choices are made in order to follow the philosophy of targeted technologies. Any fusion core component must be qualified by fusion relevant neutron testing and highly integrated non-nuclear testing before it can be installed on the FNSF in order to avoid the high probability of constant failures in a plasma-vacuum system. A range of missions for the FNSF, or any fusion nuclear facility on the path toward fusion power plants, are established and characterized by several metrics. A conservative physics strategy is pursued to accommodate the transition to ultra-long plasma pulses, and parameters are chosen to represent the power plant regime to the extent possible. An operating space is identified, and from this, one point is chosen for further detailed analysis, with R = 4.8 m, a = 1.2 m, I P = 7.9 MA, B T = 7.5 T, β N < 2.7, n/n Gr = 0.9, f BS = 0.52, q95 = 6.0, H 98 ~1.0, and Q = 4.0. The operating space is shown to be robust to parameter variations. A program is established for the FNSF to show how the missions for the facility are met, with a He/H, a DD and 5 DT phases. The facility requires ~25 years to complete its DT operation, including 7.8 years of neutron production, and the remaining spent on inspections and maintenance. The DD phase is critical to establish the ultra-long plasma pulse lengths. The blanket testing strategy is examined, and shows that many sectors have penetrations for heating and current drive (H/CD), diagnostics, or Test Blanket Modules (TBMs). The hot cell is a critical facility element in order for the FNSF to perform its function of developing the in-service material and component database. The pre-FNSF R&D is laid out in terms of priority topics, with the FNSF phases driving the time-lines for R&D completion. A series of detailed technical assessments of the FNSF operating point are reported in this issue, showing the credibility of such a step, and more detailed emphasis on R&D items to pursue. These include nuclear analysis, thermo-mechanics and thermal-hydraulics, liquid metal thermal hydraulics, transient thermo-mechanics, tritium analysis, maintenance assessment, magnet specification and analysis, materials assessments, core and scrape-off layer (SOL)/divertor plasma examinations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Automated electrical demand peak leveling in a manufacturing facility with short term energy storage for smart grid participation

Demand side management of energy is a vital function in the smart grid that allows for greater integration of renewable energy resources, and is facilitated with economic incentives in energy and demand pricing schedules. Manufacturing systems can take advantage of these incentives to reduce their energy costs through active energy management. This paper is a simulation analysis on the implementation of a novel algorithm that levelizes the maximum power load of an industrial bakery that operates under an on-peak demand price structure. The algorithm takes advantage of an untapped thermal energy storage resource in the facility, a chilled glycol buffer tank, to level the short intra-day power oscillations that the facility experiences. One of the key advantages of the algorithm is that it does not require precise demand forecasting or complex control algorithms, such as model predictive control. Even with substantial error in peak power estimates (5%), the algorithm is expected to result in at least a 2% peak reduction. Under ideal prediction, the algorithm reduces the on-peak facility power maximum by 7.3% of the possible 9.0% reduction the storage can provide. Further, the algorithm uses very few facility specific inputs, and can readily be adapted for any facility with short intra-day oscillatory power profiles and untapped storage capacity. The key insight of the paper is the employment of a novel algorithm to leverage untapped energy storage in manufacturing facilities to transform them into smart grid participants with no major capital investment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

System benefits of industrial battery storage: A comparison of grid and facility control and dispatch

Customer-owned, distributed battery installations are being incentivized by utilities to increase installed battery capacity. In many of these incentive agreements, the battery owner relinquishes battery control to the utility in exchange for incentive money. The industrial sector has lagged in storage installation when compared to the residential and commercial sectors. This study compares the economic advantages to utilities and industrial facilities in different dispatch control situations. The study presents a novel framework for the optimization of multiple systems using load profiles from the industrial, residential, and commercial sectors. Case studies are presented to illustrate different dispatch scenarios. Further, the simulations showed more fiscal benefit for the industrial facilities to dispatch the battery for electrical demand reduction than utility dispatch. In the case studies, facility dispatch control resulted in an increase of facility savings by a factor of about 8.7 when compared to utility dispatch. Battery size plays a significant factor on the impact of the grid’s generating costs, showing that larger batteries can provide significant benefit even if dispatched by the facility. Future policies concerning industrial battery installations should consider overall economic benefits to utility and facility in the form of rate structures and incentive participation based on battery size.

25 ENERGY STORAGE↗

Criteria Air Pollutants and Greenhouse Gas Emissions from Hydrogen Production in U.S. Steam Methane Reforming Facilities

The global and U.S. domestic effort to develop a clean energy economy and curb environmental pollution incentivizes the use of hydrogen as a transportation fuel, owing to its zero tailpipe pollutant emissions and high fuel efficiency in fuel cell electric vehicles (FCEVs). However, the hydrogen production process is not emissions free. Conventional hydrogen production via steam methane reforming (SMR) is energy intensive, coproduces carbon dioxide, and emits air pollutants. Therefore, it is necessary to quantify the environmental impacts of SMR hydrogen production alongside the use-phase of FCEVs. This study fills the information gap, analyzing the greenhouse gas (GHG) and criteria air pollutant (CAP) emissions associated with hydrogen production in U.S. SMR facilities by compiling and matching the facility-reported GHG and CAP emissions data with facilities’ hydrogen production data. The actual amounts of hydrogen produced at U.S. SMR facilities are often confidential. Thus, we have developed four approaches to estimate the hydrogen production amounts. The resultant GHG and CAP emissions per MJ of hydrogen produced in individual facilities were aggregated to develop emission values for both a national median and a California state median. Lastly, this study also investigates the breakdown of facility emissions into combustion emissions and noncombustion emissions.

54 ENVIRONMENTAL SCIENCES↗

Characterizing Hydrogen Storage Potential in U.S. Underground Gas Storage Facilities

Abstract Underground hydrogen storage is a long‐duration energy storage option for a low‐carbon economy. Although research into the technical feasibility of underground hydrogen storage is ongoing, existing underground gas storage (UGS) facilities are appealing candidates for the technology because of their ability to store and deliver natural gas. We estimate that UGS facilities in the United States (U.S.) can store 327 TWh (9.8 MMT) of pure hydrogen. A complete transition to hydrogen storage would reduce the collective working‐gas energy of UGS facilities by ∼75%; however, most (73.2%) UGS facilities could maintain current energy demand using a 20% hydrogen‐natural gas blend. U.S. UGS facilities can buffer 23.9%–44.6% of the high and low hydrogen demand projected for 2050, respectively, which exceeds the current percentage of natural gas demand buffered by storage. Thus, transitioning UGS infrastructure to hydrogen could substantially reduce the number of new hydrogen storage facilities needed to support a hydrogen economy.

08 HYDROGEN↗

A 6 MW/m 2 High Heat Flux Testing Facility of Irradiated Materials Using Infrared Plasma-Arc Lamps

Assessing the effect of neutron irradiation of plasma-facing materials has been challenging due to both the technical and radiological challenges involved. In an effort to address the radiological challenges, a facility was developed to conduct high heat flux testing (HHFT) of inherently small samples of neutron-irradiated materials. A new line-focus reflector was designed and fabricated at Oak Ridge National Laboratory for a plasma-arc lamp (PAL) to attain a source heat flux of 12 MW/m 2 . The new reflector was fabricated with two ports for monitoring specimen condition during HHFT. At the same operational conditions for PAL, the absorbed heat flux in tungsten was increased from 1.39 MW/m 2 with the uniform irradiance reflector to 5.12 MW/m 2 for the line-focus reflector. This fourfold increase in the heat flux, at the same PAL electrode lifetimes, enabled cost-effective facility operation for a high number of cyclic high heat flux tests. Specifically, the test section is confined to a hemispherical dome, and specimens are bolted directly to a water-cooled copper alloy rod. Temperature measurement in the PAL facility was a main challenge due to a limited line of sight. For the first time in a PAL facility operating at high heat fluxes, the specimen surface temperature was directly measured during HHFT with a pyrometer. Finally, the HHFT data, which were obtained in this upgraded PAL facility, demonstrated the facility readiness for irradiated materials.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Applying ALARA Principles in the Design of New Radiological Facilities

The application of ALARA (As Low As Reasonably Achievable) principles to the design of new radiological facilities at Argonne National Laboratory provides a consistent radiation safety basis for future facility operations. The Department of Energy Rule 10 CFR 835 specifies design objectives to be adopted during the design of new facilities for controlling personal radiation exposure. One is to keep exposure levels below 20% of the applicable standards in 10 CFR 835.202. For a radiation worker 20% of the standard corresponds to 5 µSv hr -1 for a 2,000 hour work year. For a member of the public the DOE design objective corresponds to 0.2 mSv in a calendar year. For a new facility worst case radionuclides and their source strengths are chosen. Local shielding is specified to reduce exposure rates to less than 50 µSv hr -1 at 30 cm from the shielding. The current version MCNP6 of the Los Alamos radiation shielding computer program MCNP is then used to calculate the exposure rates elsewhere. Design modifications are made to meet the criteria. The calculations and resulting facility design modifications are discussed for two new radiological facilities.

61 RADIATION PROTECTION AND DOSIMETRY↗

Enabling discovery data science through cross-facility workflows

Experimental and observational instruments for scientific research (such as light sources, genome sequencers, accelerators, telescopes and electron microscopes) increasingly require High Performance Computing (HPC) scale capabilities for data analysis and workflow processing. Next-generation instruments are being deployed with higher resolutions and faster data capture rates, creating a big data crunch that cannot be handled by modest institutional computing resources. Often these big data analysis pipelines also require near real-time computing and have higher resilience requirements than the simulation and modeling workloads more traditionally seen at HPC centers. While some facilities have enabled workflows to run at a single HPC facility, there is a growing need to integrate capabilities across HPC facilities to enable cross-facility workflows, either to provide resilience to an experiment, increase analysis throughput capabilities, or to better match a workflow to a particular architecture. In this paper we describe the barriers to executing complex data analysis workflows across HPC facilities and propose an architectural design pattern for enabling scientific discovery using cross-facility workflows that includes orchestration services, application programming interfaces (APIs), data access and co-scheduling.

Antypas, Katerina B.↗

Status of the Top Plate and Anticryostat for High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (Fermilab) is currently constructing a new High Field Vertical Magnet Test Facility (HFVMTF) designed for testing High Temperature Superconducting (HTS) cables under high magnetic fields. This facility is expected to offer capabilities similar to those of EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15 T will be generated by a magnet supplied by Lawrence Berkeley National Laboratory. The primary function of HFVMTF will be to serve as a superconducting cable test facility, facilitating tests under high magnetic fields and a broad spectrum of cryogenic temperatures. Additionally, the facility will be utilized for testing high-field superconducting magnet models and demonstrators, including hybrid magnets, developed by the US Magnet Development Program (MDP). This paper provides a comprehensive description of the current status of two pivotal components of the facility: the Top/Lambda Plates Assembly and the Anticryostat for the Test Sample Holder. The latter will serve as a principal interface component connecting cable test samples with the facility's cryostat.

43 PARTICLE ACCELERATORS↗

Comparing facility-level methane emission rate estimates at natural gas gathering and boosting stations

Coordinated dual-tracer, aircraft-based, and direct component-level measurements were made at midstream natural gas gathering and boosting stations in the Fayetteville shale (Arkansas, USA). On-site component-level measurements were combined with engineering estimates to generate comprehensive facility-level methane emission rate estimates ('study on-site estimates (SOE)') comparable to tracer and aircraft measurements. Combustion slip (unburned fuel entrained in compressor engine exhaust), which was calculated based on 111 recent measurements of representative compressor engines, accounts for an estimated 75% of cumulative SOEs at gathering stations included in comparisons. Measured methane emissions from regenerator vents on glycol dehydrator units were substantially larger than predicted by modelling software; the contribution of dehydrator regenerator vents to the cumulative SOE would increase from 1% to 10% if based on direct measurements. Concurrent measurements at 14 normally-operating facilities show relative agreement between tracer and SOE, but indicate that tracer measurements estimate lower emissions (regression of tracer to SOE = 0.91 (95% CI = 0.83-0.99), R2 = 0.89). Tracer and SOE 95% confidence intervals overlap at 11/14 facilities. Contemporaneous measurements at six facilities suggest that aircraft measurements estimate higher emissions than SOE. Aircraft and study on-site estimate 95% confidence intervals overlap at 3/6 facilities. The average facility level emission rate (FLER) estimated by tracer measurements in this study is 17-73% higher than a prior national study by Marchese et al.

03 NATURAL GAS↗

Safeguards Approaches for Black Box Processes or Facilities

The objective of this study is to determine whether a safeguards approach can be developed for “black box” processes or facilities. These are facilities where a State or operator may limit IAEA access to specific processes or portions of a facility; in other cases, the IAEA may be prohibited access to the entire facility. The determination of whether a black box process or facility is safeguardable is dependent upon the details of the process type, design, and layout; the specific limitations on inspector access; and the restrictions placed upon the design information that can be provided to the IAEA. This analysis identified the necessary conditions for safeguardability of black box processes and facilities.

black box↗

NSR&D Program Fiscal Year (FY) 2015 Call for Proposals Mitigation of Seismic Risk at Nuclear Facilities using Seismic Isolation

Seismic isolation (SI) has the potential to drastically reduce seismic response of structures, systems, or components (SSCs) and therefore the risk associated with large seismic events (large seismic event could be defined as the design basis earthquake (DBE) and/or the beyond design basis earthquake (BDBE) depending on the site location). This would correspond to a potential increase in nuclear safety by minimizing the structural response and thus minimizing the risk of material release during large seismic events that have uncertainty associated with their magnitude and frequency. The national consensus standard America Society of Civil Engineers (ASCE) Standard 4, Seismic Analysis of Safety Related Nuclear Structures recently incorporated language and commentary for seismically isolating a large light water reactor or similar large nuclear structure. Some potential benefits of SI are: 1) substantially decoupling the SSC from the earthquake hazard thus decreasing risk of material release during large earthquakes, 2) cost savings for the facility and/or equipment, and 3) applicability to both nuclear (current and next generation) and high hazard non-nuclear facilities. Issue: To date no one has evaluated how the benefit of seismic risk reduction reduces cost to construct a nuclear facility. Objective: Use seismic probabilistic risk assessment (SPRA) to evaluate the reduction in seismic risk and estimate potential cost savings of seismic isolation of a generic nuclear facility. This project would leverage ongoing Idaho National Laboratory (INL) activities that are developing advanced (SPRA) methods using Nonlinear Soil-Structure Interaction (NLSSI) analysis. Technical Approach: The proposed study is intended to obtain an estimate on the reduction in seismic risk and construction cost that might be achieved by seismically isolating a nuclear facility. The nuclear facility is a representative pressurized water reactor building nuclear power plant (NPP) structure. Figure 1: Project activities The study will consider a representative NPP reinforced concrete reactor building and representative plant safety system. This study will leverage existing research and development (R&D) activities at INL. Figure 1 shows the proposed study steps with the steps in blue representing activities already funded at INL and the steps in purple the activities that would be funded under this proposal. The following results will be documented: 1) Comparison of seismic risk for the non-seismically isolated (non-SI) and seismically isolated (SI) NPP, and 2) an estimate of construction cost savings when implementing SI at the site of the generic NPP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Requirements Doc for Refurb of JASPER Facility in B131HB

The Joint Actinide Shock Physics Experimental Research (JASPER) Program target fabrication facility is currently located in building 131 (B131) of the Lawrence Livermore National Laboratory (LLNL). A portion of this current facility has been committed to another program as part of a larger effort to consolidate LLNL capabilities into newer facilities. This facility assembles precision targets for scientific studies at the Nevada National Security Site (NNSS). B131 is also going through a modernization project to upgrade the infrastructure and abate asbestos. These activities will interrupt the continuous target fabrication efforts for the JASPER Program. Several options are explored to meet the above conflicting requirements, with the final recommendation to prepare a new facility for JASPER target fabrication operations before modernization efforts begin in the current facility assigned to JASPER. This recommendation fits within all schedule constraints and minimizes the disruption to the JASPER Program. This option is not without risk, as it requires moving an aged, precision coordinate measuring machine, which is essential to the JASPER Program’s success. The selected option balances the risk to the machine with continuity of operations.

42 ENGINEERING↗

Reactor Physics Experiment NEA Benchmark Possibilities for Measurements at ORCEF and Other DOE Facilities

This report documents a wide variety of critical and subcritical reactor physics measurements that could be included in the Nuclear Energy Agency (NEA) International Handbook of Evaluated Reactor Physics Benchmark Experiments. The experiments were performed by John T. Mihalczo and coworkers at many (8) DOE facilities including the Oak Ridge National Laboratory Critical Experiments Facility (ORCEF between 1958 and 1975), Los Alamos National Laboratory, Pacific Northwest National Laboratory, and Babcock and Wilcox at Lynchburg, Virginia, and the Y-12 National Security Complex (the latter between 1975 and up to 2006). This report lists the various measurement programs and a limited description of the reactor physics measurement that were performed in each that could be benchmarks. Some criticality safety measurements at these facilities have already been documented in the NEA International Handbook of evaluated Criticality Safety Benchmark Experiments. Some of these reactor physics measurements have also been documented in the literature and this document give a complete list of references for which John T. Mihalczo was an author or co-author. The experiments are divided into four classes: critical experiments only, critical and subsequent subcritical experiments, subcritical experiments at critical facilities, and subcritical measurements performed in material balance areas of the Y-12 National Security Complex (NSC) and other facilities. Because of the high cost and large amount of facility time related to these measurements, it is very cost-effective to mine the existing data to produce NEA reactor physics benchmarks. The information for many of these measurements is documented in critical experiment and subcritical experiment logbooks at the International Criticality Safety Benchmark Program at Idaho National Laboratory and in Laboratory Records at Oak Ridge National laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Scientific Justification for a U.S. Domestic High-Performance Reactor-Based Research Facility

The Basic Energy Science Advisory Committee (BESAC) was charged with forming a subcommittee to assess the scientific justification for a U.S. domestic high-performance reactor-based research facility in order to continue providing the U.S scientific community with leading neutron capabilities in support of DOE's missions in science, energy, environment, and national security. The assessment included consideration of current international plans and existing domestic facility infrastructure. The subcommittee held a series of meetings from August 19, 2019 to April 24, 2020 that included DOE senior officials, leaders of national and international neutron facilities (SNS, HFIR, NIST, ILL, FRM-II), chairs of the NAS and POPA HEU-LEU committees, and outside experts on important areas of science, technology, and industry where high flux nuclear reactor facilities make important contributions. Also included were tours of neutron facilities (SNS, HFIR, NIST, BR2 reactor, and the planned Jules Horowitz Reactor). This July 2020 (revised 10-28-2020) report describes scientific use cases, brief summaries of existing and planned neutron facilities in the US and Europe, a comprehensive review of HFIR, a comprehensive discussion of the current state of progress on HEU-LEU conversion, user information from NIST and ORNL, and three recommendations to DOE for moving forward.

36 MATERIALS SCIENCE↗