Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Fencing data transfers in a parallel active messaging interface of a parallel computer

Fencing data transfers in a parallel active messaging interface (`PAMI`) of a parallel computer, the PAMI including data communications endpoints, each endpoint comprising a specification of data communications parameters for a thread of execution on a compute node, including specifications of a client, a context, and a task, the compute nodes coupled for data communications through the PAMI and through data communications resources including a deterministic data communications network, including initiating execution through the PAMI of an ordered sequence of active SEND instructions for SEND data transfers between two endpoints, effecting deterministic SEND data transfers; and executing through the PAMI, with no FENCE accounting for SEND data transfers, an active FENCE instruction, the FENCE instruction completing execution only after completion of all SEND instructions initiated prior to execution of the FENCE instruction for SEND data transfers between the two endpoints.

97 MATHEMATICS AND COMPUTING↗

Statistical fingerprinting for malware detection and classification

A system detects malware in a computing architecture with an unknown pedigree. The system includes a first computing device having a known pedigree and operating free of malware. The first computing device executes a series of instrumented functions that, when executed, provide a statistical baseline that is representative of the time it takes the software application to run on a computing device having a known pedigree. A second computing device executes a second series of instrumented functions that, when executed, provides an actual time that is representative of the time the known software application runs on the second computing device. The system detects malware when there is a difference in execution times between the first and the second computing devices.

97 MATHEMATICS AND COMPUTING↗

Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document

01 COAL, LIGNITE, AND PEAT↗

Texas Clean Energy Project: Topical Report, Phase 1 - February 2010-December 2012

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In December 2011, STCE executed fixed-price turnkey EPC contracts and a long-term O&M agreement with industry-leading contractors.. Other work completed during Phase 1 includes execution of all major commercial input and offtake agreements. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. An MOU for natural gas supply was completed with ONEOK, and a long-term water supply agreement was completed with a private landowner. In addition, STCE secured options for easements and rights-of-way, completed a transmission study, executed an interconnection agreement and devoted substantial effort to debt and conventional and tax equity structuring to position the Project for project financing, currently scheduled for closing on December 31, 2012.

Mattes, Karl↗

Technique for grouping instructions into independent strands

A device compiler and linker is configured to group instructions into different strands for execution by different threads based on the dependence of those instructions on other, long-latency instructions. A thread may execute a strand that includes long-latency instructions, and then hardware resources previously allocated for the execution of that thread may be de-allocated from the thread and re-allocated to another thread. The other thread may then execute another strand while the long-latency instructions are in flight. With this approach, the other thread is not required to wait for the long-latency instructions to complete before acquiring hardware resources and initiating execution of the other strand, thereby eliminating at least a portion of the time that the other thread would otherwise spend waiting.

Mehrara, Mojtaba↗

Processing unit performance projection using dynamic hardware behaviors

Methods for estimating accelerator performance for dynamic hardware behaviors are disclosed. Computer program code to be executed on a first processing unit is received, and an execution of the computer code on the first processing unit is monitored to determine a plurality of performance characteristics. A plurality of dynamic hardware behaviors is determined by applying a clustering algorithm to the performance characteristics, and an equivalent accelerator portion of computer code to be executed on a second processing unit is generated by translating a set of instructions in a first portion of computer code corresponding to a first one of the plurality of dynamic hardware behaviors to an equivalent set of instructions to be executed on the second processing unit. An estimated measure of performance for executing the equivalent accelerator portion on the second processing unit is determined for the first one of the plurality of dynamic hardware behaviors.

97 MATHEMATICS AND COMPUTING↗

High-Level Synthesis of Parallel Specifications Coupling Static and Dynamic Controllers

The increased need for efficient ways to implement domain-specific accelerators is driving design methodologies towards the use of abstractions higher than the Register Transfer Level (RTL). In this scenario, High Level Synthesis (HLS) plays a significant role by enabling the automatic generation of custom hardware accelerators starting from high level descriptions (e.g., C code). Conventional HLS tools exploit parallelism mostly at the Instruction Level (ILP). They statically schedule the input specifications, and build centralized Finite State Machine (FSM) controllers. However, aggressive exploitation of ILP in many applications has diminishing returns and, usually, centralized approaches do not efficiently exploit coarser parallelism because FSMs are inherently serial. In this paper we present a HLS framework able to synthesize applications that, beside ILP, also expose Task Level Parallelism (TLP). An application can expose TLP through annotations that identify the parallel functions (i.e., tasks). To generate accelerators that efficiently execute concur- rent tasks, we need to solve several issues: devise a mechanism to support concurrent execution flows, exploit memory parallelism, and manage synchronization. To support concurrent execution flows, we introduce a novel adaptive controller. The adaptive controller is composed of a set of interacting control elements that independently manage the execution of a single operation or function call. These control elements check dependencies and resource constraints at runtime, enabling as soon as possible execution. To support parallel access to shared memories and synchronization, we introduce a novel Hierarchical Memory Interface (HMI). With respect to previous solutions, the proposed interface supports multi-ported memories and atomic memory operations, which commonly occur in parallel programming. Our framework can generate the hardware implementation of C functions by employing two different approaches, depending on its characteristics. If a function exposes TLP, then the framework generates hardware implementations based on the adaptive controller. Otherwise, the framework implements the function by exploiting a more conventional FSM approach, which is optimized for ILP exploitation. We evaluate our framework on a set of parallel applications, and show substantial performance improvements (average speedup of 4.7) with limited area over- heads (average area increase of 5.48 times).

Castellana, Vito G.↗

High-Level Synthesis of Parallel Specifications Coupling Static and Dynamic Controllers

The increased need for efficient ways to implement domain-specific accelerators is driving design methodologies towards the use of abstractions higher than the Register Transfer Level (RTL). In this scenario, High Level Synthesis (HLS) plays a significant role by enabling the automatic generation of custom hardware accelerators starting from high level descriptions (e.g., C code). Conventional HLS tools exploit parallelism mostly at the Instruction Level (ILP). They statically schedule the input specifications, and build centralized Finite State Machine (FSM) controllers. However, aggressive exploitation of ILP in many applications has diminishing returns and, usually, centralized approaches do not efficiently exploit coarser parallelism because FSMs are inherently serial. In this paper we present a HLS framework able to synthesize applications that, beside ILP, also expose Task Level Parallelism (TLP). An application can expose TLP through annotations that identify the parallel functions (i.e., tasks). To generate accelerators that efficiently execute concur- rent tasks, we need to solve several issues: devise a mechanism to support concurrent execution flows, exploit memory parallelism, and manage synchronization. To support concurrent execution flows, we introduce a novel adaptive controller. The adaptive controller is composed of a set of interacting control elements that independently manage the execution of a single operation or function call. These control elements check dependencies and resource constraints at runtime, enabling as soon as possible execution. To support parallel access to shared memories and synchronization, we introduce a novel Hierarchical Memory Interface (HMI). With respect to previous solutions, the proposed interface supports multi-ported memories and atomic memory operations, which commonly occur in parallel programming. Our framework can generate the hardware implementation of C functions by employing two different approaches, depending on its characteristics. If a function exposes TLP, then the framework generates hardware implementations based on the adaptive controller. Otherwise, the framework implements the function by exploiting a more conventional FSM approach, which is optimized for ILP exploitation. We evaluate our framework on a set of parallel applications, and show substantial performance improvements (average speedup of 4.7) with limited area over- heads (average area increase of 5.48 times).

Castellana, Vito G.↗

Enhanced atomics for workgroup synchronization

A technique for synchronizing workgroups is provided. The techniques comprise detecting that one or more non-executing workgroups are ready to execute, placing the one or more non-executing workgroups into one or more ready queues based on the synchronization status of the one or more workgroups, detecting that computing resources are available for execution of one or more ready workgroups, and scheduling for execution one or more ready workgroups from the one or more ready queues in an order that is based on the relative priority of the ready queues.

Dutu, Alexandru↗

Explosive Demolition of a Fire-Water Tower At East Tennessee Technology Park, Oak Ridge TN

On June 17, 2006, the Department of Energy (DOE) successfully demolished a {approx}60 year old fire-water tower (K-1206-E), located at the East Tennessee Technology Park (ETTP) in Oak Ridge, TN, using strategically placed explosive charges. The subject demolition project was executed by MCM Management Corporation and Demolition Dynamics under the management of DoE's prime contractor Bechtel Jacobs Company LLC (BJC). The K-1206-E Fire Water Tower (Tower) supported the ETTP fire water protection system from the mid- 1950's until 1991. The 378,500-L (100,000-gallon) Tower, elevated 53-m (175-feet) above grade, was located in a grassy area within 152-m (500-feet) of several other occupied facilities. Electrical, control circuits and supply water servicing the Tower were deactivated in 2003. Free liquids and sludge were removed from the tank prior to demolition. Demolition of a facility employing explosive demolition at a federal site in the 'post-9/11 era' was a substantial challenge. The subject paper discusses: - the planning and coordination steps that were taken to successfully overcome the challenges prior to the demolition of the empty, deactivated Tower; - the method used for the engineered demolition of the Tower; and - the factors responsible for the successful execution of this demolition project. At least two previous attempts were made to demolish the Tower. In the first attempt, the execution of the project was deferred by the re-allocation of funds. In the subsequent attempt in 2004, the execution of this project was postponed due to concerns that an adjacent facility would have to shut down operations during the duration of mobilization and execution of the project and thereby incur potential financial losses. A total of 51 cubic meters (1,800 cubic feet) of demolition debris was generated, which was compliantly disposed of at a local landfill followed by site restoration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fine-grained conditional dispatching

Techniques for executing workgroups are provided. The techniques include executing, for a first workgroup of a first kernel dispatch, a workgroup dependency instruction that includes an indication to prioritize execution of a second workgroup of a second kernel dispatch, and in response to the workgroup dependency instruction, dispatching the second workgroup of the second kernel dispatch prior to dispatching a third workgroup of the second kernel dispatch, wherein no workgroup dependency instruction including an indication to prioritize execution of the third workgroup has been executed.

Dutu, Alexandru↗

The Oak Ridge Site Specific Advisory Board - How a Recommendation Comes to Life - 18523

The Oak Ridge Site Specific Advisory Board (ORSSAB) is a federally appointed citizens' panel that provides independent advice and recommendations to the DOE's Oak Ridge Office of Environmental Management (OREM). To provide unbiased evaluation and recommendations on DOE's cleanup efforts related to the Oak Ridge Reservation (ORR), the board seeks opportunities for input through collaborative dialogue with the communities surrounding the Oak Ridge Reservation, Governmental regulators, and other stakeholders. This paper describes how a recommendation from the ORSSAB comes to life. There are two stages to the board's process, the planning stage and the execution stage. The planning stage begins several months prior to the start of the fiscal year (FY). During this planning stage OREM develops a list of issues that it would like input from the community on. The EPA and Tennessee Department of Environment and Conservation (TDEC) act as consulting parties and provide their input in the form of letters to the board. ORSSAB holds a planning meeting in August, where DOE EM, EPA and TDEC present their suggestions to the board. The board members have opportunity to ask questions and hold discussions on the issues presented but can also present issues of their own. DOE then takes the input from the meeting and develops the ORSSAB Work Plan for the next FY. The execution stage begins with the ORSSAB Work Plan which sets the issues for each month and the specific dates of the activities associated with each issue. The remaining elements of the execution stage include: presentations by DOE OREM at the monthly ORSSAB Meetings, field trips (as appropriate), and additional discussion at the monthly subcommittee meeting of the EM/Stewardship Committee. Early in the FY, members of the ORSSAB are given the opportunity to sign up to be involved with the potential development of a recommendation for the various issues on the Work Plan that interest them and to provide support as an issue manager. Then at the EM/Stewardship Committee Meeting the issue manager is assigned to lead the issue group and a decision is made as to whether to make a recommendation on the specific issue. The issue group prepares the recommendation for discussion and approval by the EM/Stewardship Committee. Once the EM/Stewardship Committee has reached consensus on the wording for the recommendation, the EM/Stewardship Committee Chair presents the recommendation to the ORSSAB Executive Committee for discussion and approval. The Executive Committee then approves the recommendation for presentation and discussion at the next month's ORSSAB General Meeting, providing opportunity for discussion by the full board. The ORSSAB may approve the recommendation as is, approve it with changes, or it may send the recommendation back to the EM/Stewardship Committee for further consideration. Once approved by the full ORSSAB, the recommendation is sent to DOE OREM for consideration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

: A Scalable and Transparent System for Simulating MPI Programs

is a scalable, transparent system for experimenting with the execution of parallel programs on simulated computing platforms. The level of simulated detail can be varied for application behavior as well as for machine characteristics. Unique features of are repeatability of execution, scalability to millions of simulated (virtual) MPI ranks, scalability to hundreds of thousands of host (real) MPI ranks, portability of the system to a variety of host supercomputing platforms, and the ability to experiment with scientific applications whose source-code is available. The set of source-code interfaces supported by is being expanded to support a wider set of applications, and MPI-based scientific computing benchmarks are being ported. In proof-of-concept experiments, has been successfully exercised to spawn and sustain very large-scale executions of an MPI test program given in source code form. Low slowdowns are observed, due to its use of purely discrete event style of execution, and due to the scalability and efficiency of the underlying parallel discrete event simulation engine, sik. In the largest runs, has been executed on up to 216,000 cores of a Cray XT5 supercomputer, successfully simulating over 27 million virtual MPI ranks, each virtual rank containing its own thread context, and all ranks fully synchronized by virtual time.

97 MATHEMATICS AND COMPUTING↗

Quantum Computing in the Cloud: Analyzing job and machine characteristics

As the popularity of quantum computing continues to grow, quantum machine access over the cloud is critical to both academic and industry researchers across the globe. And as cloud quantum computing demands increase exponentially, the analysis of resource consumption and execution characteristics are key to efficient management of jobs and resources at both the vendor-end as well as the client-end. While the analysis of resource consumption and management are popular in the classical HPC domain, it is severely lacking for more nascent technology like quantum computing. This paper is a first-of-its-kind academic study, analyzing various trends in job execution and resources consumption / utilization on quantum cloud systems. We focus on IBM Furthermore, quantum systems and analyze characteristics over a two year period, encompassing over 6000 jobs which contain over 600,000 quantum circuit executions and correspond to almost 10 billion “shots” or trials over 20+ quantum machines. Specifically, we analyze trends focused on, but not limited to, execution times on quantum machines, queuing/waiting times in the cloud, circuit compilation times, machine utilization, as well as the impact of job and machine characteristics on all of these trends. Furthermore, our analysis identifies several similarities and differences with classical HPC cloud systems. Based on our insights, we make recommendations and contributions to improve the management of resources and jobs on future quantum cloud systems.

42 ENGINEERING↗

The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects, High Explosive Experiments, and High Explosive Construction Activities: Volume 1 of 3

This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

(2002-2008)↗

The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects, High Explosive Experiments, and High Explosive Construction Activities: Volume 2 of 3

This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

(2002-2008)↗

The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects, High Explosive Experiments, and High Explosive Construction Activities: Volume 3 of 3

This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

(2002-2008)↗