Well #1 Drilling Permits: Kemper County, Mississippi (Deliverable 3.3.a)
Establishing an Early CO2 Storage Complex in Kemper County, Mississippi (ECO2S): Well #1 Drilling Permit
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Establishing an Early CO2 Storage Complex in Kemper County, Mississippi (ECO2S): Well #1 Drilling Permit
Establishing an Early CO2 Storage Complex in Kemper County, Mississippi (ECO2S): Well #2 Drilling Permit (Deliverable 3.3.b)
Establishing an Early CO2 Storage Complex in Kemper County, Mississippi (ECO2S): Well #3 Drilling Permit (Deliverable 3.3.c)
The UT-GOM2-1 Hydrate Pressure Coring Expedition will drill two holes in Green Canyon Block 955 in the deepwater Gulf of Mexico to pressure core and wireline log a coarse-grained methane hydrate reservoir. We will take ten, 10 ft, pressure cores in each well. The cores will be imaged and logged under pressure. Samples will be degassed to interpret hydrate concentration. Microbiological and porewater analyses will be performed. 20 3 ft pressure cores will be returned to shore for analysis. The log and core data will provide a foundation for scientific exploration by the greater hydrate research community.
A coating architecture is disclosed that includes a substrate having a surface finish Ra of 0.3μ or finer, an intermediate layer overlying and in contact with the substrate; and a solid lubricant layer overlying and in contact with the intermediate layer. The test results of applying the coating architecture to a reciprocating hammer drill utilizing the coating is also disclosed.
The objective of this report is to detail enhanced open-hole drill stem test (DST) of the Residual Oil Zone in the Cypress Sandstone. DST are 1) to confirm there is no mobile oil from the suspected residual oil zone (ROZ), 2) estimate vertical and horizontal permeability in the ROZ, and 3) test vertical communication between the Cypress main pay zone (MPZ) and the ROZ, across the upper calcite layer.
A method for monitoring and controlling a downhole pressure of a well during formation of a borehole of a well is provided. The method can include monitoring a downhole pressure of a well during formation of a borehole of the well using a millimeter wave drilling apparatus including a waveguide configured for insertion into the borehole. The monitoring can include determining the downhole pressure. The downhole pressure can include an amount of pressure present at a bottom of the well. The method can also include determining a lithostatic pressure of rock surrounding the well at the bottom of the well. The method can further include controlling the downhole pressure relative to the lithostatic pressure of the rock surrounding the well at the bottom of the well. Related systems performing the methods are also provided.
The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing activities related to the disposal of TRU and TRU-mixed waste in the geologic repository at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. The WIPP Compliance Certification Application had a reference concerning natural resources at the site of the Waste Isolation Pilot Plant. This reference suggested that resources could be withdrawn from under the repository area from a distance and not affect the integrity of the repository. This would not eliminate, but would certainly diminish, the rate of exploratory drilling in the distant future. Currently the only scenarios that result in releases from the repository are human intrusion scenarios, without human intrusion radioactive releases to the accessible environment are essentially zero for the very long term future. (authors)
A coating architecture is disclosed that includes a substrate having a surface finish Ra of 0.3μ or finer, an intermediate layer overlying and in contact with the substrate; and a solid lubricant layer overlying and in contact with the intermediate layer. The test results of applying the coating architecture to a reciprocating hammer drill utilizing the coating is also disclosed.
The current approach to disposing unloaded reservoirs is to snap the remaining stem, and seal the hole with JB weld, a two-part epoxy mix that is messy to work with and that takes many hours to ensure it is property cured. During this time, reservoirs may be outgassing and cause higher than desired activity in the glovebox. This project will develop, characterize, and deploy a method to drill stems to unload the reservoirs (already in use in the facility, but may require some simple process / procedure modifications), demonstrate that the reservoirs are fully unloaded, and reweld stems by returning to the unloading station and firing the laser to weld the unloading hole closed.
core and drilling data, hydraulic fracturing
Methods are demonstrated that allow drilling response parameters to be evaluated in constraint models for improved performance. Electronic Data Records from Geysers Power Company/Calpine well GDC-36 have been used for the analyses.
Methods are demonstrated that allow drilling response parameters to be evaluated in constraint models for improved performance. Electronic Data Records from Geysers Power Company/Calpine well GDC-36 have been used for the analyses.
Rheology data obtained from flow loop tests, performed using different lost circulation materials (LCM) to study their effect on fluid rheology and wellbore hydraulics. The sealing performance of different LCM was tested using different fracture sizes. Five academic papers / reports derived from this research are also presented.
CSI Technologies, in conjunction with Alta Rock Energy and the University of Utah have undergone a study investigating materials and mechanisms with potential for use in Enhanced Geothermal Systems wells as temporary diverters or lost circulation materials. Studies were also conducted with regards to particle size distribution and sealing effectiveness using a lab-scale slot testing apparatus to simulate fractures. From the slot testing a numerical correlation was developed to determine the optimal PSD for a given fracture size. Field trials conducted using materials from this study were also successful.
Lost circulation occurs when the returned fluid is less than what is pumped into the well due to loss of fluid to pores or fractures. A lost-circulation event is a common occurrence in a geothermal well. Typical geothermal reservoirs are often under-pressured and have larger fracture apertures. A severe lost-circulation event is costly and may lead to stuck pipe, well instability, and well abandonment. One typical treatment is adding lost-circulation materials (LCMs) to seal fractures. Conventional LCMs fail to properly seal fractures because their mechanical limit is exceeded at elevated temperatures. In this paper, parametric studies in numerical simulations are conducted to better understand different thermal effects on the sealing mechanisms of LCMs. The computational fluid dynamics (CFDs) and the discrete element method (DEM) are coupled to accurately capture the true physics of sealing by granular materials. Due to computational limits, the traditional Eulerian–Eulerian approach treats solid particles as a group of continuum matter. With the advance of modern computational power, particle bridging is achievable with DEM to track individual particles by modeling their interactive forces between each other. Particle–fluid interactions can be modeled by coupling CFD algorithms. Fracture sealing capability is investigated by studying the effect of four individual properties including fluid viscosity, particle size, friction coefficient, and Young’s modulus. It is found that thermally degraded properties lead to inefficient fracture sealing.
Explore the source record for details and available documents.