NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Perturbation Modeling and Navigation Tuning for a Crewed Station in Near Rectilinear Halo Orbit

NASA's Gateway program will build a crew-tended station in an Earth-Moon Near Rectilinear Halo Orbit (NRHO) to support deep space missions to the lunar surface and heliocentric space. The station in the NRHO will be visited by crewed vehicles including lunar landers that are high mass relative to Gateway. Docking events with large vehicles induce significant thruster plume and docking contact velocity perturbations. Crewed vehicles induce significant venting perturbations that can stress the navigation filter's ability to remain converged about an estimated state. The torques that arise from venting and lunar gravity gradient require reaction control system (RCS) thruster intervention, which themselves induce a velocity perturbation. The best method to model RCS thruster perturbations is currently in development. This paper simulates different RCS perturbation models, schedules, and an increasing magnitude to investigate the navigation sensitivity to different RCS perturbation models. From the RCS perturbation models simulated, a worst-case scenario is chosen for further scrutiny. The navigation filter is further tuned to handle the most disruptive perturbation modeling and the resulting performance is analyzed.

Navigation↗

Attitude Control and Orbit Determination of a Crewed Spacecraft with Lunar Lander in near Rectilinear Halo Orbit

NASA's Gateway program plans to place a crew-tended spacecraft in cislunar Near Rectilinear Halo Orbit (NRHO). The craft will support arrivals of crews in Orion and the undocking and return of a crewed lunar lander. The impact to at-titude control of a Gateway with the addition of a lunar lander is investigated. Perturbations from Orion and a lander's docking and undocking from the Gate-way are considered. Deep Space Network (DSN) tracking is supplemented with optical measurements to lunar north pole craters to analyze the possible benefit in solution accuracy and/or DSN scheduling relief.

Newman, Clark P.↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

STS-106 Crew Interviews: Scott D. Altman

Live footage of a preflight interview with Pilot Scott D. Altman is seen. The interview addresses many different questions including why Altman became a pilot, the events that led to his interest, his career path through the Navy, and then finally, his selection by NASA as an astronaut. Other interesting information discussed in this one-on-one interview was his work on the movie set of "Top Gun," the highlights of his Navy career, and possible shorter time frame turnarounds for missions. Altman also mentions the scheduled docking with the new International Space Station (ISS) after the arrival of the Zvezda Service Module.

Source record↗

Superfluid Helium On-Orbit Transfer (SHOOT) flight demonstration

The Superfluid Helium On-Orbit Transfer (SHOOT) Flight Demonstration was an attached Shuttle payload mounted on a Hitchhiker cross-bay carrier which flew on STS-57 in June of 1993. SHOOT successfully demonstrated the handling and transfer of superfluid helium between two containers, called dewars, in low gravity. SHOOT was a class C payload and for the STS-57 mission was termed a complex secondary payload. The primaries were the retrieval of the EURECA carrier and a collection of modular experiments contained in SPACEHAB. Because the liquid helium was continuously boiling off, SHOOT's activities were scheduled for the first three days of the mission, concurrent with some SPACEHAB experiments, but well before the EURECA retrieval. Control of the SHOOT experiment was highly interactive and originated primarily from the Goddard Payload Operations and Control Center (POCC). Transfer and calibration activities required continuous command windows of up to 50 minutes duration and up to 80 minutes out of each orbit. Occasionally the crew controlled the experiment using the Payload General Support Computer (PGSC) when near-real time control and monitoring was required. SHOOT also placed considerable demands on the orbiter, including a pitch rotation of 3 deg./sec for 15 minutes, and translational burns using both the aft and forward RCS jets to generate accelerations up to 7 milli-g. The basis for these and other requirements are discussed. Interacion with the crew and timing of crew activity during the mission will be detailed. The processing flow of SHOOT at KSC is described with emphasis on the tradeoffs for vertical, as opposed to horizontal, installation in the orbiter. Finally, some lessons learned are presented that are relevant to future cryogenic and Hitchhiker payloads.

Shirron, Peter↗

STS-103 Flight Day Highlights and Crew Activity Report

The crew of Discovery, Mission Commander Curtis L. Brown, Pilot Scott J. Kelly, Mission Specialists Steven L. Smith, C. Michael Foale, John M. Grunsfeld, Claude Nicollier, and Jean-Francois Clervoy are seen executing various activities. Live footage of Clervoy powering up the robotic arm is seen. While Clervoy powers the robotic arm, Brown and Kelly set up the tools for the various different space walks scheduled, Grunsfeld and Nicollier check out the space suits, and Smith and Foale tend to the space walk tools. Foale, Brown, Kelly and Clervoy are also shown participating in a series of interviews.

Source record↗

Minimum Control Requirements for Advanced Life Support Systems

Advanced control technologies are not necessary for the safe, reliable and continuous operation of Advanced Life Support (ALS) systems. ALS systems can and are adequately controlled by simple, reliable, low-level methodologies and algorithms. The automation provided by advanced control technologies is claimed to decrease system mass and necessary crew time by reducing buffer size and minimizing crew involvement. In truth, these approaches increase control system complexity without clearly demonstrating an increase in reliability across the ALS system. Unless these systems are as reliable as the hardware they control, there is no savings to be had. A baseline ALS system is presented with the minimal control system required for its continuous safe reliable operation. This baseline control system uses simple algorithms and scheduling methodologies and relies on human intervention only in the event of failure of the redundant backup equipment. This ALS system architecture is designed for reliable operation, with minimal components and minimal control system complexity. The fundamental design precept followed is "If it isn't there, it can't fail".

Boulange, Richard↗

NASA's Initial Artemis Human Landing System

In April 2020, NASA announced the selection of three companies to begin the initial phase of development of human landing systems to take the first woman and the first person of color to the lunar surface through NASA’s Artemis lunar exploration program. The selected companies were a Blue Origin-led team with Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. Contracts were awarded shortly after, kicking off a ten-month base period during which NASA worked closely with each company to finalize functional and performance requirements, confirm lander development standards, and establish baseline designs, schedules, and management plans for contract execution and human spaceflight certification. At the end of the base period, in the Spring of 2021, NASA awarded a single follow-on Option A contract to SpaceX to continue their work on Human Landing System (HLS) Starship development. Currently NASA and SpaceX are working collaboratively on Option A which will ultimately culminate in one uncrewed and one crewed mission to the lunar surface under Artemis III. This paper will provide a look at the Option A phase of development for the Human Landing System Program, including publicly available information on SpaceX’s HLS Starship design as well as near-term and future milestones for HLS and the Artemis program.

Lisa Watson-Morgan↗

Optimized Trajectory Correction Burn Placement for NRHO Orbit Maintenance

NASA's future Artemis missions plan to utilize a near rectilinear halo orbit (NRHO) in the lunar vicinity to facilitate access to the lunar surface and place other critical assets to support human exploration. This exploration architecture requires a vehicle to remain in the NRHO for long periods of time ranging from several days, to weeks, to months, and even years. Consequently, periodic orbit maintenance burns become essential to ensure the spacecraft follows the desired reference trajectory in an efficient yet effective manner despite crew activity, navigation uncertainty, maneuver execution errors, disturbance accelerations, orbit insertion dispersions, and other system limitations. This work introduces a targeting algorithm that can be utilized to analyze a variety of targeting constraints and parameters that maximizes overall performance. Techniques associated with robust trajectory optimization are used to identify the optimized number and placement for NRHO trajectory correction (NTC) burns that accounts for the mission schedule, both a primary and backup navigation system, targeting strategies and burn plan configurations, vehicle venting, thruster selection, and integrated GN\&C performance. A notional scenario extracted from the NASA Artemis III mission is used to motivate and demonstrate these concepts and performance results.

Linear Covariance Analysis↗

STS-96 Crew Interview: Ellen Ochoa

Live footage of a preflight interview with Mission Specialist Ellen Ochoa is seen. The interview addresses many different questions including why Ochoa became an astronaut, the events that led to her interest, and her career path through research and engineering. Other interesting information that this one-on-one interview discusses is the logistics and supply mission, why it is important to send equipment to the International Space Station (ISS), and the Integrated Cargo Carrier (ICC). Ochoa mentions Discovery's anticipated docking with the ISS, her role during the scheduled space walk with Tamara E. Jernigan and Daniel T. Barry, and plans for the supply and equipment transfers. Ochoa also discusses her involvement in a Volatile Removal Assembly (VRA) experiment to remove contaminants from the water, the undocking of the spacecraft from the ISS, and a fly-around maneuver to take pictures of the ISS.

Source record↗

Orbit transfer operations for the Space Shuttle era

Orbit transfer operations are reviewed relative to the objectives, operational factors, and crew model concepts of future mission requirements. The review is based on studies presently underway and on projected needs and goals of the Space Shuttle era. Numerous tradeoff studies and further analyses are needed before the best form of the manned geostationary vehicle becomes fixed. However, the Shuttle can provide the necessary low-orbit logistics service for dispatching manned geostationary missions on as frequent a schedule as will be needed to serve the advanced geostationary satellites of the near future.

Davis, H. P.↗

Visual observations over oceans

Important factors in locating, identifying, describing, and photographing ocean features from space are presented. On the basis of crew comments and other findings, the following recommendations can be made for Earth observations on Space Shuttle missions: (1) flyover exercises must include observations and photography of both temperate and tropical/subtropical waters; (2) sunglint must be included during some observations of ocean features; (3) imaging remote sensors should be used together with conventional photographic systems to document visual observations; (4) greater consideration must be given to scheduling earth observation targets likely to be obscured by clouds; and (5) an annotated photographic compilation of ocean features can be used as a training aid before the mission and as a reference book during space flight.

Terry, R. D.↗

Advanced Sensor Platform to Evaluate Manloads For Exploration Suit Architectures

Space suit manloads are defined as the outer bounds of force that the human occupant of a suit is able to exert onto the suit during motion. They are defined on a suit-component basis as a unit of maximum force that the suit component in question must withstand without failure. Existing legacy manloads requirements are specific to the suit architecture of the EMU and were developed in an iterative fashion; however, future exploration needs dictate a new suit architecture with bearings, load paths, and entry capability not previously used in any flight suit. No capability currently exists to easily evaluate manloads imparted by a suited occupant, which would be required to develop requirements for a flight-rated design. However, sensor technology has now progressed to the point where an easily-deployable, repeatable and flexible manloads measuring technique could be developed leveraging recent advances in sensor technology. INNOVATION: This development positively impacts schedule, cost and safety risk associated with new suit exploration architectures. For a final flight design, a comprehensive and accurate man loads requirements set must be communicated to the contractor; failing that, a suit design which does not meet necessary manloads limits is prone to failure during testing or worse, during an EVA, which could cause catastrophic failure of the pressure garment posing risk to the crew. This work facilitates a viable means of developing manloads requirements using a range of human sizes & strengths. OUTCOME / RESULTS: Performed sensor market research. Highlighted three viable options (primary, secondary, and flexible packaging option). Designed/fabricated custom bracket to evaluate primary option on a single suit axial. Manned suited manload testing completed and general approach verified.

McFarland, Shane↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Architecture Trade Study

The Asteroid Redirect Crewed Mission (ARCM) requires a Launch/Entry/Abort (LEA) suit capability and short duration Extra Vehicular Activity (EVA) capability for Orion. The EVAs will involve a two-person crew for approximately four hours. Currently, two EVAs are planned with one contingency EVA in reserve. Providing this EVA capability is very challenging due to system level constraints and a new and unknown environment. The goal of the EVA architecture for ARCM is one that builds upon previously developed technologies and lessons learned, and that accomplishes the ARCM mission while providing a stepping stone to future missions and destinations. The primary system level constraints are to 1) minimize system mass and volume and 2) minimize the interfacing impacts to the baseline Orion design. In order to minimize the interfacing impacts and to not perturb the baseline Orion schedule, the concept of adding "kits" to the baseline system is proposed. These kits consist of: an EVA kit (converts LEA suit to EVA suit), EVA Servicing and Recharge Kit (provides suit consumables), the EVA Tools, Translation Aids & Sample Container Kit (the tools and mobility aids to complete the tasks), the EVA Communications Kit (interface between the EVA radio and the MPCV), and the Cabin Repress Kit (represses the MPCV between EVAs). This paper will focus on the trade space, analysis, and testing regarding the space suit (pressure garment and life support system). Historical approaches and lessons learned from all past EVA operations were researched. Previous and current, successfully operated EVA hardware and high technology readiness level (TRL) hardware were evaluated, and a trade study was conducted for all possible pressure garment and life support options. Testing and analysis was conducted and a recommended EVA system architecture was proposed. Pressure garment options that were considered for this mission include the currently in-use ISS EVA Mobility Unit (EMU), all variations of the Advanced Crew Escape Suit (ACES), and the Exploration Z-suit. For this mission, the pressure garment that was selected is the Modified ACES (MACES) with EVA enhancements. Life support options that were considered included short closed-loop umbilicals, long open-loop umbilicals, the currently in-use ISS EMU Portable Life Support System (PLSS), and the currently in development Exploration PLSS. For this mission, the life support option that was selected is the Exploration PLSS. The greatest risk in the proposed architecture is viewed to be the comfort and mobility of the baseline MACES and the delicate balance between adding more mobility features while not compromising landing safety. Feasibility testing was accomplished in low fidelity analogs and in the JSC Neutral Buoyancy Laboratory (NBL) to validate the concept before a final recommendation on the architecture was made. The proposed architecture was found to meet the mission constraints, but much more work is required to determine the details of the required suit upgrades, the integration with the PLSS, and the rest of the tools and equipment required to accomplish the mission. This work and further definition of the remaining kits will be conducted in government fiscal year 14.

Blanco, Raul A.↗

A Feasible Approach for an Early Manned Lunar Landing. Part II: Detailed Report of Ad Hoc Task Group

This report, in two parts, presents a program development plan for attempting a first manned lunar landing in 1967. The two parts consist of a Summary Report and a Detailed Report representing the coordinated output of the Ad Hoc Task Group assigned to the study. The study was started in response to the request for such a study by the Associate Administrator in his memorandum of May 2, 1961 establishing the Ad Hoc Task Group. The purpose of the study was to take a first cut at the tasks associated with the design, development and construction of the equipment and facilities as well as the development of the crews, and to show the time phasing 6f these tasks. Included are the space sciences, life science and advanced technology tasks whose data and results are needed for designing and developing the systems required in carrying out the mission. The plan presented in the two reports does not presume to be a firm plan. Its basic purpose is, by choosing one feasible method, to size up the scope, schedule and cost of the job, discover the main problems, pacing items and major decisions and provide a threshold from which a firm and detailed project development plan can be jointly formulated by the various elements of NASA.

Fleming, William A.↗

STS-74 Flight Day 2

On the second day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hadfield, were awakened to music from the play 'The Nutcracker'. The astronauts hosted an in-orbit interview with Canadian reporters and journalists from Toronto, answering general questions about living in space and space flight, and explaining the delicate maneuvers that the shuttle will have to perform for the Mir docking procedures scheduled for the next day. Due to the awkward angle that the shuttle will use to approach the Mir, the docking procedure will be done in an almost blind state.