Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

MALEO: Modular Assembly in Low Earth Orbit. A strategy for an IOC lunar base

Modular Assembly in Low Earth Orbit (MALEO) is a new strategy for building an initial operational capability lunar habitation base. In this strategy, the modular lunar base components are brought up to Low Earth Orbit by the Space Transportation System/Heavy Lift Launch Vehicle fleet, and assembled there to form a complete lunar base. Modular propulsion systems are then used to transport the MALEO lunar base, complete and intact, all the way to the moon. Upon touchdown on the lunar surface, the MALEO lunar habitation base is operational. An exo-skeletal truss superstructure is employed in order to uniformly absorb and distribute the rocket engine thrusting forces incurred by the MALEO lunar base during translunar injection, lunar orbit insertion, and lunar surface touchdown. The components, configuration, and structural aspects of the MALEO lunar base are discussed. Advantages of the MALEO strategy over conventional strategies are pointed out. It is concluded that MALEO holds promise for lunar base deployment.

Thangavelu, M.↗

CCSDS telemetry systems experience at the Goddard Space Flight Center

NASA Goddard Space Flight Center (GSFC) designs, builds, manages, and operates science and applications spacecraft in near-earth orbit, and provides data capture, data processing, and flight control services for these spacecraft. In addition, GSFC has the responsibility of providing space-ground and ground-ground communications for near-earth orbiting spacecraft, including those of the manned spaceflight programs. The goal of reducing both the developmental and operating costs of the end-to-end information system has led the GSFC to support and participate in the standardization activities of the Consultative Committee for Space Data Systems (CCSDS), including those for packet telemetry. The environment in which such systems function is described, and the GSFC experience with CCSDS packet telemetry in the context of the Gamma-Ray Observatory project is discussed.

Carper, Richard D.↗

Structured prototyping as risk management

A methodology is presented for integrating the systems-engineering management recommendation of prototyping into the traditional project-management process for developing large-scale systems. The suggested methodology begins with the identification of life-cycle risk areas, outlines the structure and conduct of the prototyping process, and defines the composition of the prototyping team. The methodology includes a step-by-step procedure for creating, executing, and documenting a prototyping test plan to evaluate design alternatives. It is argued that managers who adopt this methodology and apply it rigorously will increase the likelihood that the systems they build will be operationally effective and will be accepted by the intended users.

Hornstein, Rhoda SH.↗

STS-56, RSRM-031, 360L031 KSC processing configuration and data report

KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build-up, booster assembly, and closeout for STS-56, RSRM flight set 36OL031. Section 2.0 contains a summary of RSRM-031 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-031 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-031 flow. Section 7.0 provides recommendations, if any, for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumables information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

Source record↗

Generic Health Management: A System Engineering Process Handbook Overview and Process

Health Management, a System Engineering Process, is one of those processes-techniques-and-technologies used to define, design, analyze, build, verify, and operate a system from the viewpoint of preventing, or minimizing, the effects of failure or degradation. It supports all ground and flight elements during manufacturing, refurbishment, integration, and operation through combined use of hardware, software, and personnel. This document will integrate Health Management Processes (six phases) into five phases in such a manner that it is never a stand alone task/effort which separately defines independent work functions.

Wilson, Moses Lee↗

STS-35: ASTRO-1 Assembly at O&C

Live footage shows the assembly of the ASTRO-1 payload for STS-35. The assembly occurred in the Operations and Checkout Building.

Source record↗

STS-36: Isolated Camera Breakfast Suit-up Walkout

Live footage shows the crewmembers of STS-36, Commander John O. Creighton, Pilot John H. Casper, Mission Specialists Richard M. Mullane, David C. Hilmers, and Pierre J. Thuot, having a traditional breakfast. The crew is also shown suiting up, and walking out to the Astronaut-van from the Operations and Checkout Building.

Source record↗

STS-37: TCDT Pad B Atlantis GRO (1 of 3)

Live footage shows the crewmembers of STS-37, Commander Steven R. Nagel, Pilot Kenneth D. Cameron, and Mission Specialists Jerry L. Ross, Jay Apt, and Linda M. Godwin, participating in Terminal Countdown Demonstration Test. The crew is seen in the breakfast room, in the Operations and Checkout Building suiting up and walking out to the Astronaut-Van. Scenes include the drive out to the launch pad, the boarding of the crew on the elevator, crew entrance in the White Room, and the ingress of the crew into the launch vehicle. Linda and Jerry are seen standing on the Gantry (bridge) looking out as they wait to enter the White Room to finish suiting up to enter the vehicle. Also shown are some beautiful panoramic views of the shuttle on the pad. This is tape 1 of 3. Tape 2 has a report # of NONP-NASA-VT-2000013417, and tape 3 has a report # of NONP-NASA-VT-2000013418.

Source record↗

STS-40/SLS-1 Breakfast/Suit-up/Depart O&C/Ingress/Launch with isolated Views

Live footage shows the crew members, Commander Bryan D. O'Connor, Pilot Sidney M. Gutierrez, Mission Specialists James P. Bagian, Tamara E. Jernigan, M. Rhea Seddon, and Payload Specialists F. Drew Gaffney, and Millie-Hughes Fulford, sitting down at the traditional breakfast table. The crew is also seen suiting-up, entering the elevator, leaving the Operations and Checkout Building (O&C), and getting into the Astro-van. Scenes also show the crew members entering the vehicle as well as various isolated morning launch views, and some beautiful panoramic shots of the shuttle on the launch pad.

Source record↗

STS-112 Post Flight Presentation

The STS-112 post flight presentation begins with a shot of the moonrise over the Earth's Limb. A photograph of the STS-112 crew is shown. The crew consists of Mission Specialists Sandy Magnus, David Wolf, Piers Sellers and Fodor Yurchikhin, Pilot Pam Melroy and Commander Jeff Ashby. The crew departs from the Operations and Control Building to the launch pad at Kennedy Space Center in Florida. Sandy Magnus is shown preparing to board the Space Shuttle Atlantis. The actual STS-112 launch with flight deck activity during rendezvous with the International Space Station is also presented.

Source record↗

STS-112/Atlantis/ISS 9A Pre-Launch - Launch On-Orbit - Landing - Crew Egress

The video starts with an introduction of the crew of Space Shuttle Atlantis on STS-112 at their customary pre-flight meal. The crew consists of Commander Jeffrey Ashby, Pilot Pam Melroy, and Mission Specialists David Wolf, Sandra Magnus, Piers Sellers, and Fyodor Yurchikhin. The crew is then shown during suit-up, while exiting the Operations and Checkout Building to board the Astrovan, and during ingress and seating. Launch views include: Beach Tracker, VAB, PAD-B, Tower-1, DLTR-3, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, OTV-170, OTV-171, and External Tank Camera. On-orbit footage includes the Atlantis orbiter docking with the ISS (International Space Station). The video shows clips of extravehicluar activities (EVAs), and some of the tasks performed during the mission. Footage included shows the installation of the S1 Truss onto the ISS with the Space Station Remote Manipulator System (Canadarm 2), Canadarm 2 carrying the Ammonia Tank Assembly prior to connection, the checkout of the Thermal Radiator Rotary Joint, the soft docking of an S-Band antenna, and the deployment of the S1 Radiator. An onboard repair of the ISS humidity separator is also shown. Landing views include: VAB, Tower 1, Mid-Field, Runway South End, Runway North End, Tower-2, Cocoa Beach DOAMS, and PPOV. Kennedy Space Center managers greet the crew upon arrival, and Commander Ashby gives a brief speech while standing with his crew members.

Source record↗

Air Traffic Control Decision Support Tools for Noise Mitigation

NASA has initiated a new five year program this year, the Quiet Aircraft Technology (QAT) Program, a program which will investigate airframe and engine system noise reduction. QAT will also address community noise impact. As part of this community noise impact component, NASA will investigate air traffic management (ATM) challenges in reducing noise. In particular, controller advisory automation aids will be developed to aid the air traffic controller in addressing noise concerns as he/she manages traffic in busy terminal areas. NASA has developed controller automation tools to address capacity concerns and the QAT strategy for ATM Low Noise Operations is to build upon this tool set to create added advisories for noise mitigation. The tools developed for capacity will be briefly reviewed, followed by the QAT plans to address ATM noise concerns. A major NASA goal in global civil aviation is to triple the aviation system throughput in all-weather conditions while maintaining safety. A centerpiece of this activity is the Center/TRACON Automation System (CTAS), an evolving suite of air traffic controller decision support tools (DSTs) to enhance capacity of arrivals and departures in both the enroute center and the TRACON. Two of these DSTs, the Traffic Management Advisor (TMA) and the passive Final approach Spacing Tool (pFAST), are in daily use at the Fort Worth Center and the Dallas/Fort Worth (DFW) TRACON, respectively, where capacity gains of 5-13% have been reported in recent NASA evaluations. Under the Federal Aviation Administration's (FAA) Free Flight Phase One Program, TMA and pFAST are each being implemented at six to eight additional sites. In addition, other DSTs are being developed by NASA under the umbrella of CTAS. This means that new software will be built upon CTAS, and the paradigm of real-time simulation evaluation followed by field site development and evaluation will be the pathway for the new tools. Additional information is included in the original extended abstract.

Tobias, Leonard↗

The Space Technology 5 Avionics System

The Space Technology 5 (ST5) mission is a NASA New Millennium Program project that will validate new technologies for future space science missions and demonstrate the feasibility of building launching and operating multiple, miniature spacecraft that can collect research-quality in-situ science measurements. The three satellites in the ST5 constellation will be launched into a sun-synchronous Earth orbit in early 2006. ST5 fits into the 25-kilogram and 24-watt class of very small but fully capable spacecraft. The new technologies and design concepts for a compact power and command and data handling (C&DH) avionics system are presented. The 2-card ST5 avionics design incorporates new technology components while being tightly constrained in mass, power and volume. In order to hold down the mass and volume, and quali& new technologies for fUture use in space, high efficiency triple-junction solar cells and a lithium-ion battery were baselined into the power system design. The flight computer is co-located with the power system electronics in an integral spacecraft structural enclosure called the card cage assembly. The flight computer has a full set of uplink, downlink and solid-state recording capabilities, and it implements a new CMOS Ultra-Low Power Radiation Tolerant logic technology. There were a number of challenges imposed by the ST5 mission. Specifically, designing a micro-sat class spacecraft demanded that minimizing mass, volume and power dissipation would drive the overall design. The result is a very streamlined approach, while striving to maintain a high level of capability, The mission's radiation requirements, along with the low voltage DC power distribution, limited the selection of analog parts that can operate within these constraints. The challenge of qualifying new technology components for the space environment within a short development schedule was another hurdle. The mission requirements also demanded magnetic cleanliness in order to reduce the effect of stray (spacecraft-generated) magnetic fields on the science-grade magnetometer.

Speer, Dave↗

The Mars Exploration Rover Project

The twin rovers of the Mars Exploration Rover Project successfully landed on the surface of Mars in January 2004, and initiated a highly successful science and exploration campaign. This marked the culmination of an unprecedented four-year effort to design, build, launch, and operate two of the most complex planetary spacecraft ever built. The project was started in the aftermath of the 1999 Mars mission failures, and was commissioned to take advantage of the highly advantageous 2003 opportunity. The development schedule from project start to launch was only 35 months, so schedule management was the most significant challenge facing the project. This problem was compounded when early assumptions about the extent of design heritage from Mars Pathfinder proved to be flawed. The project derived a number of useful lessons learned in solving these challenges that can be applied to future missions.

Mars↗

Root Source Analysis/ValuStream[Trade Mark] - A Methodology for Identifying and Managing Risks

Root Source Analysis (RoSA) is a systems engineering methodology that has been developed at NASA over the past five years. It is designed to reduce costs, schedule, and technical risks by systematically examining critical assumptions and the state of the knowledge needed to bring to fruition the products that satisfy mission-driven requirements, as defined for each element of the Work (or Product) Breakdown Structure (WBS or PBS). This methodology is sometimes referred to as the ValuStream method, as inherent in the process is the linking and prioritizing of uncertainties arising from knowledge shortfalls directly to the customer's mission driven requirements. RoSA and ValuStream are synonymous terms. RoSA is not simply an alternate or improved method for identifying risks. It represents a paradigm shift. The emphasis is placed on identifying very specific knowledge shortfalls and assumptions that are the root sources of the risk (the why), rather than on assessing the WBS product(s) themselves (the what). In so doing RoSA looks forward to anticipate, identify, and prioritize knowledge shortfalls and assumptions that are likely to create significant uncertainties/ risks (as compared to Root Cause Analysis, which is most often used to look back to discover what was not known, or was assumed, that caused the failure). Experience indicates that RoSA, with its primary focus on assumptions and the state of the underlying knowledge needed to define, design, build, verify, and operate the products, can identify critical risks that historically have been missed by the usual approaches (i.e., design review process and classical risk identification methods). Further, the methodology answers four critical questions for decision makers and risk managers: 1. What s been included? 2. What's been left out? 3. How has it been validated? 4. Has the real source of the uncertainty/ risk been identified, i.e., is the perceived problem the real problem? Users of the RoSA methodology have characterized it as a true bottoms up risk assessment.

Brown, Richard Lee↗

Research on the International Space Station - An Overview

The International Space Station (ISS) celebrates ten years of operations in 2008. While the station did not support permanent human crews during the first two years of operations November 1998 to November 2000 it hosted a few early science experiments months before the first international crew took up residence. Since that time and simultaneous with the complicated task of ISS construction and overcoming impacts from the tragic Columbia accident science returns from the ISS have been growing at a steady pace. As of this writing, over 162 experiments have been operated on the ISS, supporting research for hundreds of ground-based investigators from the U.S. and international partners. This report summarizes the experimental results collected to date. Today, NASA's priorities for research aboard the ISS center on understanding human health during long-duration missions, researching effective countermeasures for long-duration crewmembers, and researching and testing new technologies that can be used for future exploration crews and spacecraft. Through the U.S. National Laboratory designation, the ISS is also a platform available to other government agencies. Research on ISS supports new understandings, methods or applications relevant to life on Earth, such as understanding effective protocols to protect against loss of bone density or better methods for producing stronger metal alloys. Experiment results have already been used in applications as diverse as the manufacture of solar cell and insulation materials for new spacecraft and the verification of complex numerical models for behavior of fluids in fuel tanks. A synoptic publication of these results will be forthcoming in 2009. At the 10-year point, the scientific returns from ISS should increase at a rapid pace. During the 2008 calendar year, the laboratory space and research facilities were tripled with the addition of ESA's Columbus and JAXA's Kibo scientific modules joining NASA's Destiny Laboratory. All three laboratories, together with external payload accommodations, support a wide variety of research racks and science and technology experiments. In 2009, the number of crewmembers will increase from three to six, greatly increasing the time available for research. The realization of the international scientific partnership provides new opportunities for scientific collaboration and broadens the research potential on the ISS. Engineers and scientists from around the world are working together to refine their operational relationships and build from their experiences conducting early science to ensure maximum utilization of the expanded capabilities aboard ISS. This paper will summarize science results and accomplishments, and discuss how the early science utilization provides the foundation for continuing research campaigns aboard the ISS that will benefit future exploration programs.

Evans, Cynthia A.↗

Multijunction Solar Cell Development and Production at Spectrolab

Development of multijunction space solar cells is much like that for any high technology product. New products face two major pressures from the market: improving performance while maintaining heritage. This duality of purpose is not new and has been represented since ancient times by the Roman god Janus.[1] This deity was typically represented as two faces on a single head: one facing forward and the other to the rear. The image of Janus has been used as symbolism for many combined forces of dual purpose, such as the balance in life between beginnings and endings, or between art and science. For our purposes, Janus represents our design philosophy balance between looking to the future for improvement while simultaneously blending past heritage. In the space photovoltaics industry there are good reasons for both purposes. Looking to the past, a product must have a space flight heritage to gain widespread use. The main reason being that this is an unforgiving business. Spacecraft are expensive to build, launch and operate. Typically once a satellite is launched, in-field service for a power systems problem is near impossible.[2Balanced with this is looking forward. New missions typically require more power than previous programs or attempt new objectives such as a new orbit. And there is always the cost pressure for both the satellite itself as well as the launch costs. Both of which push solar technology to improve power density at a lower cost. The consequence of this balance in a high-risk environment is that space PV develops as a series of infrequent large technology steps or generational changes interspersed with more frequent small technology steps or evolutionary changes. Figure 1 gives a bit of clarification on this point. It depicts the historical progress in space solar cells tracked by efficiency against first launch date for most major products introduced by Spectrolab. The first generation is the Si-based technology reaching a peak values near 15% AM0 (herein denoted for max. power, AM0, 1.353 W/cm2, 28 C). The GaAs single junction device generation supplanted this technology with first flight of GaAs on GaAs substrate in 1982.[3] More recently this generation has been supplanted by the multijunction solar cell GaInP/GaAs/Ge generation. The first launch of a commercial satellite powered by multijunction technology was in 1997 (Hughes HS 601HP) using solar arrays based on Spectrolab s dual junction (DJ) cells. The cells at that time were an impressive 21.5% efficient at beginning-of-life (BOL).[4] Eight years later, the multijunction device has evolved through several versions. The incorporation of an active Ge subcell formed the Triple Junction (TJ) product line at 25.1% efficient, on orbit since November 2001. The evolution of the TJ into the Improved Triple Junction (ITJ) at 26.8% efficient has been on orbit since June of 2002.[5]

Fetzer, Chris↗