Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “active space selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Benchmark full configuration-interaction calculations on HF and NH2

Full configuration-interaction (FCI) calculations are performed at selected geometries for the 1-sigma(+) state of HF and the 2-B(1) and 2-A(1) states of NH2 using both DZ and DZP gaussian basis sets. Higher excitations become more important when the bonds are stretched and the self-consistent field (SCF) reference becomes a poorer zeroth-order description of the wave function. The complete active space SCF - multireference configuration-interaction (CASSCF-MRCI) procedure gives excellent agreement with the FCI potentials, especially when corrected with a multi-reference analog of the Davidson correction.

Bauschlicher, C. W., Jr.↗

Benchmark full configuration-interaction calculations on HF and NH2

Full configuration-interaction (FCI) calculations are performed at selected geometries for the 1-sigma(+) state of HF and the 2-B(1) and 2-A(1) states of NH2 using both DZ and DZP gaussian basis sets. Higher excitations become more important when the bonds are stretched and the self-consistent field (SCF) reference becomes a poorer zeroth-order description of the wave function. The complete active space SCF - multireference configuration-interaction (CASSCF-MRCI) procedure gives excellent agreement with the FCI potentials, especially when corrected with a multi-reference analog of the Davidson correction.

Bauschlicher, C. W., Jr.↗

Architecture and evolution of Goddard Space Flight Center Distributed Active Archive Center

The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been developed to enhance Earth Science research by improved access to remote sensor earth science data. Building and operating an archive, even one of a moderate size (a few Terabytes), is a challenging task. One of the critical components of this system is Unitree, the Hierarchical File Storage Management System. Unitree, selected two years ago as the best available solution, requires constant system administrative support. It is not always suitable as an archive and distribution data center, and has moderate performance. The Data Archive and Distribution System (DADS) software developed to monitor, manage, and automate the ingestion, archive, and distribution functions turned out to be more challenging than anticipated. Having the software and tools is not sufficient to succeed. Human interaction within the system must be fully understood to improve efficiency to improve efficiency and ensure that the right tools are developed. One of the lessons learned is that the operability, reliability, and performance aspects should be thoroughly addressed in the initial design. However, the GSFC DAAC has demonstrated that it is capable of distributing over 40 GB per day. A backup system to archive a second copy of all data ingested is under development. This backup system will be used not only for disaster recovery but will also replace the main archive when it is unavailable during maintenance or hardware replacement. The GSFC DAAC has put a strong emphasis on quality at all level of its organization. A Quality team has also been formed to identify quality issues and to propose improvements. The DAAC has conducted numerous tests to benchmark the performance of the system. These tests proved to be extremely useful in identifying bottlenecks and deficiencies in operational procedures.

Bedet, Jean-Jacques↗

Reusable Rack Interface Controller Common Software for Various Science Research Racks on the International Space Station

The purpose of the EXPRESS (Expedite the PRocessing of Experiments to Space Station) rack project is to provide a set of predefined interfaces for scientific payloads which allow rapid integration into a payload rack on International Space Station (ISS). VxWorks' was selected as the operating system for the rack and payload resource controller, primarily based on the proliferation of VME (Versa Module Eurocard) products. These products provide needed flexibility for future hardware upgrades to meet everchanging science research rack configuration requirements. On the International Space Station, there are multiple science research rack configurations, including: 1) Human Research Facility (HRF); 2) EXPRESS ARIS (Active Rack Isolation System); 3) WORF (Window Observational Research Facility); and 4) HHR (Habitat Holding Rack). The RIC (Rack Interface Controller) connects payloads to the ISS bus architecture for data transfer between the payload and ground control. The RIC is a general purpose embedded computer which supports multiple communication protocols, including fiber optic communication buses, Ethernet buses, EIA-422, Mil-Std-1553 buses, SMPTE (Society Motion Picture Television Engineers)-170M video, and audio interfaces to payloads and the ISS. As a cost saving and software reliability strategy, the Boeing Payload Software Organization developed reusable common software where appropriate. These reusable modules included a set of low-level driver software interfaces to 1553B. RS232, RS422, Ethernet buses, HRDL (High Rate Data Link), video switch functionality, telemetry processing, and executive software hosted on the FUC computer. These drivers formed the basis for software development of the HRF, EXPRESS, EXPRESS ARIS, WORF, and HHR RIC executable modules. The reusable RIC common software has provided extensive benefits, including: 1) Significant reduction in development flow time; 2) Minimal rework and maintenance; 3) Improved reliability; and 4) Overall reduction in software life cycle cost. Due to the limited number of crew hours available on ISS for science research, operational efficiency is a critical customer concern. The current method of upgrading RIC software is a time consuming process; thus, an improved methodology for uploading RIC software is currently under evaluation.

Lu, George C.↗

Design Concepts for a Small Space-Based GEO Relay Satellite for Missions Between Low Earth and near Earth Orbits

The main purpose of the Small Space-Based Geosynchronous Earth orbiting (GEO) satellite is to provide a space link to the user mission spacecraft for relaying data through ground networks to user Mission Control Centers. The Small Space Based Satellite (SSBS) will provide services comparable to those of a NASA Tracking Data Relay Satellite (TDRS) for the same type of links. The SSBS services will keep the user burden the same or lower than for TDRS and will support the same or higher data rates than those currently supported by TDRS. At present, TDRSS provides links and coverage below GEO; however, SSBS links and coverage capability to above GEO missions are being considered for the future, especially for Human Space Flight Missions (HSF). There is also a rising need for the capability to support high data rate links (exceeding 1 Gbps) for imaging applications. The communication payload on the SSBS will provide S/Ka-band single access links to the mission and a Ku-band link to the ground, with an optical communication payload as an option. To design the communication payload, various link budgets were analyzed and many possible operational scenarios examined. To reduce user burden, using a larger-sized antenna than is currently in use by TDRS was considered. Because of the SSBS design size, it was found that a SpaceX Falcon 9 rocket could deliver three SSBSs to GEO. This will greatly reduce the launch costs per satellite. Using electric propulsion was also evaluated versus using chemical propulsion; the power system size and time to orbit for various power systems were also considered. This paper will describe how the SSBS will meet future service requirements, concept of operations, and the design to meet NASA users' needs for below and above GEO missions. These users' needs not only address the observational mission requirements but also possible HSF missions to the year 2030. We will provide the trade-off analysis of the communication payload design in terms of the number of links looking above and below GEO; the detailed design of a GEO SSBS spacecraft bus and its accommodation of the communication payload, and a summary of the trade study that resulted in the selection of the Falcon 9 launch vehicle to deploy the SSBS and its impact on cost reductions per satellite. ======================================================================== Several initiatives have taken place within NASA1 and international space agencies2 to create a human exploration strategy for expanding human presence into the solar system; these initiatives have been driven by multiple factors to benefit Earth. Of the many elements in the strategy one stands out: to send robotic and human missions to destinations beyond Low Earth Orbit (LEO), including cis-lunar space, Near-Earth Asteroids (NEAs), the Moon, and Mars and its moons.3, 4 The time frame for human exploration to various destinations, based on the public information available,1,4 is shown in Figure 1. Advance planning is needed to define how future space communications services will be provided in the new budget environment to meet future space communications needs. The spacecraft for these missions can be dispersed anywhere from below LEO to beyond GEO, and to various destinations within the solar system. NASA's Space Communications and Navigation (SCaN) program office provides communication and tracking services to space missions during launch, in-orbit testing, and operation phases. Currently, SCaN's space networking relay satellites mainly provide services to users below GEO, at Near Earth Orbit (NEO), below LEO, and in deep space. The potential exists for using a space-based relay satellite, located in the vicinity of various solar system destinations, to provide communication space links to missions both below and above its orbit. Such relays can meet the needs of human exploration missions for maximum connectivity to Earth locations and for reduced latency. In the past, several studies assessed the ability of satellite-based relays working above GEO in conjunction with Earth ground stations. Many of these focused on the trade between space relay and direct-to-Earth station links5,6,7. Several others focused on top-level architecture based on relays at various destinations8,9,10,11,12. Much has changed in terms of microwave and optical technology since the publication of the referenced papers; Ka-band communication systems are being deployed, optical communication is being demonstrated, and spacecraft buses are becoming increasingly more functional and operational. A design concept study was undertaken to access the potential for deploying a Small Space-Based Satellite (SSBS) relay capable of serving missions between LEO and NEO. The needs of future human exploration missions were analyzed, and a notional relay-based architecture concept was generated as shown in Fig. 1. Relay satellites in Earth through cis-Lunar orbits are normally located in stable orbits requiring low fuel consumption. Relay satellites for Mars orbit are normally selected based on the mission requirement and projected fuel consumption. Relay satellites have extreme commonalities of functions between them, differing only in the redundancy and frequencies used; therefore, the relay satellite in GEO was selected for further analysis since it will be the first step in achieving a relay-based architecture for human exploration missions (see Fig.Figure 2). The mission design methodology developed by the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team13 was used to produce the satellite relay design and to perform various design trades. At the start of the activity, the team was provided with the detailed concept of the notional architecture and the system and communication payload drivers.

Relay Satellites↗

Elemental composition of suspended particulates as functions of space and time in Cleveland, Ohio

An approach to the analysis of a very large elemental concentration data set. The particular data considered was generated by instrumental neutron activation and emission spectroscopy analyses of over 750 24-hour ambient air particulate samples collected at 16 sites in Cleveland, Ohio, during the 15 months from August 1971 thru October 1972. Examples are presented that show the use of multiple approaches to interpreting the data, including pairwise correlation statistics, selective data plotting and cluster analysis.

Neustadter, H. E.↗

4D Dynamic RNP Annual Interim Report-Year 1

This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an experiment using the Airspace and Traffic Operations Simulation (ATOS) system to validate the 4D Dynamic RNP construct. This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. A comprehensive assessment of the state-of-the-art international implementation of current RNP was completed and presented in the Contractor Report RNP State-of-the-Art Assessment, Version 4, 17 December 2008 . The team defined in detail two 4DT operations, Airborne Precision Spacing and Self-Separation, that are ideally suited to be supported by 4D Dynamic RNP and developed their respective conceptual frameworks, Required Interval Management Performance (RIMP) Version 1.1, 13 April 2009 and Required Self Separation Performance (RSSP) Version 1.1, 13 April 2009 . Finally, the team started the development of a mathematical model and simulation tool for RIMP and RSSP scheduled to be delivered during the second year of this research effort.

Finkelsztein, Daniel M.↗

A methodology for selecting optimum organizations for space communities

This paper suggests that a methodology exists for selecting optimum organizations for future space communities of various sizes and purposes. Results of an exploratory study to identify an optimum hypothetical organizational structure for a large earth-orbiting multidisciplinary research and applications (R&A) Space Base manned by a mixed crew of technologists are presented. Since such a facility does not presently exist, in situ empirical testing was not possible. Study activity was, therefore, concerned with the identification of a desired organizational structural model rather than the empirical testing of it. The principal finding of this research was that a four-level project type 'total matrix' model will optimize the effectiveness of Space Base technologists. An overall conclusion which can be reached from the research is that application of this methodology, or portions of it, may provide planning insights for the formal organizations which will be needed during the Space Industrialization Age.

Ragusa, J. M.↗

A consideration of atomic oxygen interactions with space station

A computer model is developed in order to calculate fluence for a generalized spacecraft in orbital flight based on mass spectrometer and incoherent scatter (MSIS) measurements of ambient density. The calculations are used to identify criteria for the selection of materials for the construction of an LEO Space Station. The model is generalized such that the surfaces for study can be oriented in any direction with respect to: a body coordinate system fixed to the spacecraft (E surfaces); and a solar inertial coordinate system. A parametric study was performed in order to evaluate the effects of altitude, inclination, and solar activity on atomic oxygen fluence. Values are obtained for samples of Mylar, Kevlar, Kapton, Tedlar, Teflon and sulfone, as well as for some ethylene polymers. The range of values for material reactivities is from 360 microns for ram-facing surfaces to 200 microns for solar power surfaces during each cycle of solar activity. The possibility of improving reactivity by employing certain chemical coatings is also discussed.

Leger, L. J.↗

Adaptive structures

The fundamental principles of the adaptive structures concept and its applications to current and planned space missions are reviewed and illustrated with diagrams, drawings, graphs, and photographs. An adaptive structure is defined as one which can be modified to meet mission requirements, either by remote commands or automatically in response to external stimuli. Topics addressed include the need for adaptive structures, analytical models, ground testing, sensor/actuator-structure interactions, structural concepts, active damping, wave propagation in large structures, the selection of active member locations, and on-orbit system identification. Particular attention is given to adaptive structures being developed for the NASA Large Deployable Reflector and Optical Interferometer projects.

Wada, Ben K.↗

The advanced tracking and data relay satellite system - The next generation

NASA is currently performing cost and feasibility studies for the next generation of TDRSS spacecraft. These spacecraft are needed to replenish the current generation of spacecraft and will be available in the 1997 time frame. The next generation of NASA satellites will perform tracking and data relay functions well into the next century. The challenge facing NASA is to provide new services in an evolutionary way without disrupting services provided to current users. Furthermore, these new services must be carefully coordinated with other similar international data relay activities to facilitate efficient and cost effective operation and to avoid interference. This orderly evolution requires careful planning and coordination. This paper describes the reference architecture and the new services under consideration by NASA including data rates and selected frequencies of operation. The paper also describes the planned implementation schedule and defines the evolutionary process from the current TDRSS system through the Space Station Freedom era and the implementation of the Advanced TDRSS.

Brandel, Daniel↗

Precision slew/settle technologies for flexible spacecraft

Many spacecraft missions in the next decade will require both a high degree of agility and precision pointing. Agility includes both rotational maneuvering for retargeting and translational motion for orbit adjustment and threat avoidance. The major challenge associated with such missions is the need for control over a wide range of amplitudes and frequencies, ranging from tens of degrees at less than 1 Hz to a few micron radians at hundreds of Hz. TRW's internally funded Precision Control of Agile Spacecraft (PCAS) project is concerned with developing and validating in hardware the tools necessary to successfully complete the combined agile maneuvering/precision pointing missions. Development has been undertaken on a number of fronts for quietly slewing flexible structures. Various methods for designing slew torque profiles have been investigated. Prime candidates for slew/settle scenarios include Inverse Dynamics and Parameterized Function Space. Joint work with Processor Bayo at the University of California, Santa Barbara and Professor Flashner at the University of Southern California has led to promising torque profile design methods. Active and passive vibration suppression techniques also play a key role for rapid slew/settle mission scenarios. Active members with local control loops and passive members with high loss factor viscoelastic material have been selected for hardware verification. Progress in each of these areas produces large gains in the quiet slewing of flexible spacecraft. The main thrust of the effort to date has been the development of a modular testbed for hardware validation of the precision control concepts. The testbed is a slewing eighteen foot long flexible truss. Active and passive members can be interchanged with the baseline aluminum members to augment the inherent damping in the system. For precision control the active members utilize control laws running on a high speed digital structural control processor. Tip and midspan motions of the truss are determined using optical sensors while accelerometers can be used to monitor the motions of other points of interest. Preliminary results indicate that a mix of technologies produces the greatest benefit. For example, shaping the torque profile produces large improvements in slew/settle performance, but without added damping settling times may still be excessive. With the introduction of moderate amounts of damping, slew/settle performance is vastly improved. On the other hand, introducing damping without shaping the torque profile may not yield the desired level of performance.

Manning, R. A.↗

Clean assembly and integration techniques for the Hubble Space Telescope High Fidelity Mechanical Simulator

A mechanical simulator of the Hubble Space Telescope (HST) Aft Shroud was built to perform verification testing of the Servicing Mission Scientific Instruments (SI's) and to provide a facility for astronaut training. All assembly, integration, and test activities occurred under the guidance of a contamination control plan, and all work was reviewed by a contamination engineer prior to implementation. An integrated approach was followed in which materials selection, manufacturing, assembly, subsystem integration, and end product use were considered and controlled to ensure that the use of the High Fidelity Mechanical Simulator (HFMS) as a verification tool would not contaminate mission critical hardware. Surfaces were cleaned throughout manufacturing, assembly, and integration, and reverification was performed following major activities. Direct surface sampling was the preferred method of verification, but access and material constraints led to the use of indirect methods as well. Although surface geometries and coatings often made contamination verification difficult, final contamination sampling and monitoring demonstrated the ability to maintain a class M5.5 environment with surface levels less than 400B inside the HFMS.

Hughes, David W.↗

One NASA PEM qualification standard : comparison of JPL and GSFC standards

Although use of Plastic Encapsulated Microelectronics (PEMs) in space applications is discouraged, their use is mandatory for selected applications involving the need for advanced technology and small packages. Various space systems designers and manufacturers have developed methods to qualify and screen PEMs. In general, each procedure is different. The purpose of this fiscal year’s investigation is to initiate a process to coordinate the efforts at various NASA centers to eventually develop a One NASA method. Part of this activity includes sharing of test data and PEM qualification methodologies. Various experts in the NASA community were identified and contacted to support this effort. We were successful in finding such experts at GSFC, APL and the Constellation office (Orion and Ares). All these experts provided typical qualification program plans. Since funding was severely restricted, it was decided to concentrate on coordination activity with GSFC. GSFC is planning a new version of IEEE-INST-002 section applying to PEMs. The GSFC expert (Dr. Alexander Teverovsky) provided a detailed assessment of the differences between the planned new version of IEEE-INST-002 and the JPL-D-19426 (JPL guideline) as well as a summary rationale for the decisions within the IEEE-INST-002. It should be noted that GSFC’s assessment of IEEE-INST-002 in the area of PEMs is not finalized. JPL is also considering changes in PEM qualification methodologies based on test data from recent qualification testing for their newer Projects (MSL, Grail, Juno). A spreadsheet delineating the differences between the JPL standard and the GSFC standard is presented.

Cooper, Mark↗

Vertical Habitability Layout Studies and Neutral Buoyancy/Parabolic Flight Habitat Studies

In the Summer of 2013, the University of Maryland was selected for two projects under the NASA X-Hab 2014 program, administered by the National Space Grant Foundation: Vertical Habitability Layout Studies (XHab201406) and Neutral Buoyancy/Parabolic Flight Habitat Studies (XHab201407). This document, at the direction of the NASA Technical Monitor, comprises the final report for both of these contracts. Recognizing from the outset the mismatch between the desired scope of research activities under the contracts and the severely limited funding and duration, the University of Maryland leveraged the X-Hab support by integrating the programs into a number of academic classes throughout the 2013-2014 academic year. By far the most significant interaction was with the Department of Aerospace Engineering Senior capstone experience in spacecraft design sequence, ENAE 483/484. Throughout the academic year, 42 students in this sequence worked on both projects in conjunction with their senior project to design an artificial gravity research station in a distant lunar retrograde orbit. As part of this research project, the students worked with previously created 1-G habitats and underwater simulations to better understand habitat design from microgravity to full Earth gravity, as well as at lunar and Mars gravity levels between those two endpoints.

David L. Akin↗

Dusty Environment Classification and Testing: Dust Mitigation Slide Wipes & Tapes

During the Apollo missions many mechanisms, equipment, and surfaces were contaminated by lunar dust and often negatively affected. The methods used to clear these devices of dust proved ineffective, which led to premature failure in some cases. Systems being designed for upcoming missions to the Moon will need to address the performance degradation risk of dust contamination. Surfaces at risk include thermal control surfaces, solar cells, camera and sensor optics, seals, metal joints and tools, and space suit assemblies. To improve state of the art dust mitigation approaches, the dust mitigation team at NASA Glenn Research Center (GRC) explored the effects imposed on substrates during cleaning activities in the presence of lunar dust. The Uniform Dust Deposition System (UDDS) was used to conduct a study of various cleaning techniques on different substrates. Test substrates and cleaning media were selected to represent a wide range of structural and functional materials. Substrates included orthofabric, thermal radiator coating, aluminum, quartz glass, silicone rubber, aluminized Mylar, and FEP. Cleaning materials included cloth wipes, tapes, a brush, and a pliable cleaner concept. Cleaning material / substrate pairs were rated on cleaning efficiency, substrate damage, cleaning material longevity, and ease of use. The best performing cleaning method varied based on application.

lunar simulant↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗