Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Trusses”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

System identification of large flexible structures by using simple continuum models

Simple continuum models for the representation of large truss beams and truss platforms are constructed and employed in the solution of system identification problems permitting the significant reduction of the number of structural parameters. Two simple and easily computer-implemented algorithms are presented for the estimation of a simple model's equivalent structural parameters, and analytical and numerical solutions are given for the truss beam and truss platform cases in order to illustrate the basic concepts. It is found that model simplicity, in conjunction with the principle of least square erors, yields a feasible integration of structural and identification problems.

Juang, J. N.↗

SPF/DB primary structure for supersonic aircraft (T-38 horizontal stabilizer)

The structural integrity and potential cost savings of superplastic forming/diffusion bonding (SPF/DB) titanium structure for future Supersonic Cruise Research (SCR) and military aircraft primary structure applications was demonstrated. Using the horizontal stabilizer of the T-38 aircraft as a baseline, the structure was redesigned to the existing criteria and loads, using SPF/DB titanium technology. The general concept of using a full-depth sandwich structure which is attached to a steel spindle, was retained. Trade studies demonstrated that the optimum design should employ double-truss, sinewave core in the deepest section of the surface, making a transition to single-truss core in the thinner areas at the leading and trailing edges and at the tip. At the extreme thin edges of the surface, the single-truss core was changed to dot core to provide for gas passages during the SPF/DB process. The selected SPF/DB horizontal stabilizer design consisted of a one-piece SPF/DB sinewave truss core panel, a trunnion fitting, and reinforcing straps. The fitting and the straps were mechanically fastened to the SPF/DB panel.

Delmundo, A. R.↗

ACCESS (Assembly Concept for Construction of Erectable Space Structure) - A Shuttle flight experiment

ACCESS is a planned Shuttle flight experiment to assess the potential of an on-orbit construction concept designed for efficient manual assembly of a space truss. The experiment, which is scheduled for launch November 27, 1985, on the Space Transportation System (STS) flight 61-B, uses two astronauts secured in fixed foot restraints located in the Shuttle cargo bay to assemble a 45-foot long aluminum truss beam from 93 tubular struts and 33 nodal joints. Neutral buoyancy simulations of the flight experiment indicate the truss can be assembled in less than thirty minutes. Structural assembly, structural repair, flexible cable attachment and manual manipulation of the truss is also planned for the experiment using an astronaut secured in the Manipulator Foot Restraint attached to the Remote Manipulator System arm. Flight assembly data will be generated for correlation of the neutral buoyancy ground test data. This paper describes the ACCESS flight experiment and presents results of the neutral buoyancy development and training tests.

Heard, W. L., Jr.↗

A space station Structures and Assembly Verification Experiment, SAVE

The Space Station structure has been baselined to be a 5 M (16.4 ft) erectable truss. This structure will provide the overall framework to attach laboratory modules and other systems, subsystems and utilities. The assembly of this structure represents a formidable EVA challenge. To validate this capability the Space Station Structures/Dynamics Technical Integration Panel (TIP) met to develop the necessary data for an integrated STS structures flight experiment. As a result of this meeting, the Langley Research Center initiated a joint Langley/Boeing Aerospace Company study which supported the structures/dynamics TIP in developing the preliminary definition and design of a 5 M erectable space station truss and the resources required for a proposed flight experiment. The purpose of the study was to: (1) devise methods of truss assembly by astronauts; (2) define a specific test matrix for dynamic characterization; (3) identify instrumentation and data system requirements; (4) determine the power, propulsion and control requirements for the truss on-orbit for 3 years; (5) study the packaging of the experiment in the orbiter cargo bay; (6) prepare a preliminary cost estimate and schedule for the experiment; and (7) provide a list of potential follow-on experiments using the structure as a free flyer. The results of this three month study are presented.

Russell, R. A.↗

Equivalent beam modeling using numerical reduction techniques

Numerical procedures that can accomplish model reductions for space trusses were developed. Three techniques are presented that can be implemented using current capabilities within NASTRAN. The proposed techniques accomplish their model reductions numerically through use of NASTRAN structural analyses and as such are termed numerical in contrast to the previously developed analytical techniques. Numerical procedures are developed that permit reductions of large truss models containing full modeling detail of the truss and its joints. Three techniques are presented that accomplish these model reductions with various levels of structural accuracy. These numerical techniques are designated as equivalent beam, truss element reduction, and post-assembly reduction methods. These techniques are discussed in detail.

Chapman, J. M.↗

Space station structures development

A study of three interrelated tasks focusing on deployable Space Station truss structures is discussed. Task 1, the development of an alternate deployment system for linear truss, resulted in the preliminary design of an in-space reloadable linear motor deployer. Task 2, advanced composites deployable truss development, resulted in the testing and evaluation of composite materials for struts used in a deployable linear truss. Task 3, assembly of structures in space/erectable structures, resulted in the preliminary design of Space Station pressurized module support structures. An independent, redundant support system was developed for the common United States modules.

Teller, V. B.↗

A 60-meter erectable assembly concept for a control of flexible structures flight experiment

A flight experiment which proposes to use a 60-m deployable/retractable truss beam attached to the Space Shuttle to study dynamic characterization and control of flexible structures is being studied by NASA. The concept requires a relatively complex mechanism for deploying and retracting the truss on-orbit. Development of such a mechanism having a high degree of reliability will be expensive. An alternative method for constructing the truss is discussed requiring no new technology development or complex mechanisms and has already been demonstrated on-orbit. The alternative method proposes an erectable truss beam which can be assembled by two astronauts in EVA. The EVA crew would have to manually assemble the beam from 468 struts and 165 nodes, and install 7 instrumentation platforms with signal and power cabling. The predicted assembly time is 3 hr and 23 min. The structure would also have to be disassembled and restowed following testing, thus 2 EVA days would be required. To allow 25 hr for data collection (probably a bare minimum to accomplish meaningful tests), current Shuttle operations policy dictates a 9-day mission. The design, assembly procedure and issues associated with the alternative concept are discussed.

Watson, Judith J.↗

A telerobotic system for automated assembly of large space structures

Future space missions such as polar platforms and antennas are anticipated to require large truss structures as their primary support system. During the past several years considerable research has been conducted to develop hardware and construction techniques suitable for astronaut assembly of truss structures in space. A research program has recently been initiated to develop the technology and to demonstrate the potential for automated in-space assembly of large erectable structures. The initial effort will be focussed on automated assembly of a tetrahedral truss composed of 2-meter members. The facility is designed as a ground based system to permit evaluation of assembly concepts and was not designed for space qualification. The system is intended to be used as a tool from which more sophisticated procedures and operations can be developed. The facility description includes a truss structure, motionbases and a robot arm equipped with an end effector. Other considerations and requirements of the structural assembly describe computer control systems to monitor and control the operations of the assembly facility.

Rhodes, Marvin D.↗

The Sizing and Optimization Language (SOL): A computer language to improve the user/optimizer interface

The nonlinear mathematical programming method (formal optimization) has had many applications in engineering design. A figure illustrates the use of optimization techniques in the design process. The design process begins with the design problem, such as the classic example of the two-bar truss designed for minimum weight as seen in the leftmost part of the figure. If formal optimization is to be applied, the design problem must be recast in the form of an optimization problem consisting of an objective function, design variables, and constraint function relations. The middle part of the figure shows the two-bar truss design posed as an optimization problem. The total truss weight is the objective function, the tube diameter and truss height are design variables, with stress and Euler buckling considered as constraint function relations. Lastly, the designer develops or obtains analysis software containing a mathematical model of the object being optimized, and then interfaces the analysis routine with existing optimization software such as CONMIN, ADS, or NPSOL. This final state of software development can be both tedious and error-prone. The Sizing and Optimization Language (SOL), a special-purpose computer language whose goal is to make the software implementation phase of optimum design easier and less error-prone, is presented.

Lucas, S. H.↗

Robotic space construction

Research at Langley AFB concerning automated space assembly is reviewed, including a Space Shuttle experiment to test astronaut ability to assemble a repetitive truss structure, testing the use of teleoperated manipulators to construct the Assembly Concept for Construction of Erectable Space Structures I truss, and assessment of the basic characteristics of manipulator assembly operations. Other research topics include the simultaneous coordinated control of dual-arm manipulators and the automated assembly of candidate Space Station trusses. Consideration is given to the construction of an Automated Space Assembly Laboratory to study and develop the algorithms, procedures, special purpose hardware, and processes needed for automated truss assembly.

Mixon, Randolph W.↗

Assembly considerations for large reflectors

The technologies developed at LaRC in the area of erectable instructures are discussed. The information is of direct value to the Large Deployable Reflector (LDR) because an option for the LDR backup structure is to assemble it in space. The efforts in this area, which include development of joints, underwater assembly simulation tests, flight assembly/disassembly tests, and fabrication of 5-meter trusses, led to the use of the LaRC concept as the baseline configuration for the Space Station Structure. The Space Station joint is linear in the load and displacement range of interest to Space Station; the ability to manually assemble and disassemble a 45-foot truss structure was demonstrated by astronauts in space as part of the ACCESS Shuttle Flight Experiment. The structure was built in 26 minutes 46 seconds, and involved a total of 500 manipulations of untethered hardware. Also, the correlation of the space experience with the neutral buoyancy simulation was very good. Sections of the proposed 5-meter bay Space Station truss have been built on the ground. Activities at LaRC have included the development of mobile remote manipulator systems (which can traverse the Space Station 5-meter structure), preliminary LDR sun shield concepts, LDR construction scenarios, and activities in robotic assembly of truss-type structures.

Bush, H.↗

Initial test results for the mini-mast

The objectives of the 20-meter Mini-Mast were: (1) to learn how to efficiently test this type of large truss structure, (2) to relate component testing to the overall behavior of the structure, and (3) to update the associated analytical model based upon the experimental data. The Mini-Mast represents structural characteristics similar to the COFS beam which is planned to be flown on Shuttle to perform on-orbit structures and controls experiments. The information is of interest to LDR because it represents analysis and test information on a truss-type structure which may be similar to the Large Deployable Reflector (LDR) backup structure. The structure has a total of 111 titanium joints; the joint in the center of the truss element is a near-center latch joint. The results of this research indicate that linear deployable-type structures can be built, but difficulties do exist in extracting modes with identical frequencies; gravitational loading does affect the ground test results; and prediction of truss-type-structure dynamic characteristics is not trivial.

Horta, L.↗

Screening actuator locations for static shape control

Correction of shape distortion due to zero-mean normally distributed errors in structural sizes which are random variables is examined. A bound on the maximum improvement in the expected value of the root-mean-square shape error is obtained. The shape correction associated with the optimal actuators is also characterized. An actuator effectiveness index is developed and shown to be helpful in screening actuator locations in the structure. The results are specialized to a simple form for truss structures composed of nominally identical members. The bound and effectiveness index are tested on a 55-m radiometer antenna truss structure. It is found that previously obtained results for optimum actuators had a performance close to the bound obtained here. Furthermore, the actuators associated with the optimum design are shown to have high effectiveness indices. Since only a small fraction of truss elements tend to have high effectiveness indices, the proposed screening procedure can greatly reduce the number of truss members that need to be considered as actuator sites.

Haftka, Raphael T.↗

A telerobotic system for automated assembly of large space structures

Future space missions such as polar platforms and antennas are anticipated to require large truss structures as their primary support system. During the past several years considerable research has been conducted to develop hardware and construction techniques suitable for astronaut assembly of truss structures in space. A research program has recently been initiated to develop the technology and to demonstrate the potential for automated in-space assembly of large erectable structures. The initial effort will be focused on automated assembly of a tetrahedral truss composed of 2-meter members. The facility is designed as a ground based system to permit evaluation of assembly concepts and was not designed for space qualification. The system is intended to be used as a tool from which more sophisticated procedures and operations can be developed. The facility description includes a truss structure, motionbases and a robot arm equipped with an end effector. Other considerations and requirements of the structural assembly describe computer control systems to monitor and control the operations of the assembly facility.

Rhodes, Marvin D.↗

Limits on static shape control for space structures

This paper deals with correction of shape distortion due to zero-mean normally distributed errors in structural sizes. The concept of ideal actuators - actuators that can produce any desired displacement field - is introduced. Using this concept, a bound on the possible improvement in the expected value of the root-mean-square shape error is obtained. The shape correction associated with the ideal actuators is also characterized. An actuator effectiveness index is developed by comparing the displacement field generated by the actuator to the ideal. The results are specialized to a simple form for truss structures composed of nominally identical members. The bound and effectiveness index are tested on a 55-m radiometer antenna truss structure. It is found that previously obtained results for optimum actuators had a performance close to the bound obtained here. Also, it is found that large numbers of actuators are needed for large reductions in shape errors. Furthermore, the actuators associated with the optimum design are shown to have high effectiveness indices. Since only a small fraction of truss elements tend to have high effectiveness indices, the use of the effectiveness index can greatly reduce the number of truss members that need to be considered actuator sites.

Haftka, Raphael T.↗

Modelling issues of the SCOLE control problem

Nonlinear and linear equations of motions were derived. The preliminary investigation consisted of model beam as truss structure, effects of truss structure on control design, and effects of reflector offset on control design. It was concluded that the offset of the reflector c.g. from the beam reflector attach point is dynamically significant. Also, truss effects may also significantly effect the performance of the controller if ignored. If the truss is included in the modeling of the NASA/SCOLE configuration, a practically implementable scheme is available to reduce the model order.

Hotz, A. F.↗

The damper placement problem for large flexible space structures

The damper placement problem for large flexible space truss structures is formulated as a combinatorial optimization problem. The objective is to determine the p truss members of the structure to replace with active (or passive) dampers so that the modal damping ratio is as large as possible for all significant modes of vibration. Equivalently, given a strain energy matrix with rows indexed on the modes and the columns indexed on the truss members, we seek to find the set of p columns such that the smallest row sum, over the p columns, is maximized. We develop a tabu search heuristic for the damper placement problems on the Controls Structures Interaction (CSI) Phase 1 Evolutionary Model (10 modes and 1507 truss members). The resulting solutions are shown to be of high quality.

Kincaid, Rex K.↗

Structural load control during construction

The topics are presented in viewgraph form and include the following: examples of high transient loadings on large space structures; energy absorbing/load limiting strut research objectives; scope of research on energy absorbing struts to date; energy characteristics of cantilevered trusses with a tip load; ten bay long resilient truss example; stored energy characteristics of one meter deep truss; energy absorbing potential for 10-bay 5-meter deep truss; schematic of energy absorbing strut; linear load and motion control actuator; rigid body response of a solar array to the shuttle thruster pressure impingement; solar array piecewise linear response; solar array characteristics; solar array tip deflection and required actuator stroke; solar array response from finite element analysis; 12 bay energy absorbing test bed dynamics; and new AERO-Lab with 12-bay test beam.

Mikulas, Martin↗