Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Orbit Transfers for Dawn's Vesta Operations : Navigation and Mission Design Experience

Dawn, a mission belonging to NASA's Discovery Program, was launched on September 27, 2007 to explore main belt asteroids in order to yield insights into important questions about the formation and evolution of the solar system. From July of 2011 to August of 2012, the Dawn spacecraft successfully returned valuable science data, collected during the four planned mapping orbits at its first target asteroid, Vesta. Each mapping orbit was designed to enable a different set of scientific observations. Such a mission would have been impossible without the low thrust ion propulsion system (IPS). Maneuvering a spacecraft using only the IPS for the transfers between the mapping orbits posed many technical challenges to Dawn's flight team at NASA's Jet Propulsion Laboratory. Each transfer needs a robust plan that accounts for uncertainties in maneuver execution, orbit determination, and physical characteristics of Vesta. This paper discusses the mission design and navigational experience during Dawn's Vesta operations. Topics include requirements and constraints from Dawn's science and spacecraft teams, orbit determination and maneuver design and building process for transfers, developing timelines for thrust sequence build cycles, and the process of scheduling very demanding coverage with ground antennae at NASA's Deep Space Network.

low thrust↗

Lincoln Advanced Science and Engineering Reinforcement (LASER) program

Lincoln University, under the Lincoln Advanced Science and Engineering Reinforcement (LASER) Program, has identified and successfully recruited over 100 students for majors in technical fields. To date, over 70 percent of these students have completed or will complete technical degrees in engineering, physics, chemistry, and computer science. Of those completing the undergraduate degree, over 40 percent have gone on to graduate and professional schools. This success is attributable to well planned approaches to student recruitment, training, personal motivation, retention, and program staff. Very closely coupled to the above factors is a focus designed to achieve excellence in program services and student performance. Future contributions by the LASER Program to the pool of technical minority graduates will have a significant impact. This is already evident from the success of the students that began the first year of the program. With program plans to refine many of the already successful techniques, follow-on activities are expected to make even greater contributions to the availability of technically trained minorities. For example, undergraduate research exposure, broadened summer, and co-op work experiences will be enhanced.

Williams, Willie E.↗

Mars Planetary Network for Human Exploration Era – Potential Challenges and Solutions

During 2016-2017, a study was conducted under the sponsorship of the NASA’s Space Communications and Navigation (SCaN) Program to investigate the deep space communications capacity taking into account the needs of all the present and envisioned future missions toward 2030s. It was soon recognized that planning for human exploration to Mars would impose certain unprecedent challenges, both fiscal and technical, to the current space communications paradigm. Targeting the assumed missions concepts, i.e., Crewed Mission to Phobos (CMTP) and Mars Short Stay Mission (MSSM), a Mars Planetary Network for the human exploration era has been formulated. The activity modeling and network traffic simulation/modeling we performed gave some insight into the technical challenges in space communications for the envisioned human Mars exploration era. Chief among the potential challenges are: (1) the high demand on the deep space network (DSN) assets for achieving the high-rate links, both return and forward, from Mars farthest/farther distance (up to 2.67 AU); (2) the need for resilient, persistent communication coverage for crewed vehicles, on surface and in orbits; (3) the significant period of outage for the Mars-Earth link due to superior solar conjunction; (4) the need for on-demand, simultaneous access to the proximity link by multiple vehicles and astronauts in the exploration zone; (5) the capability of determining precise, real-time, positions of surface vehicles and astronauts by the deep space habitat and/or other tele-operations entities. Solution space to each of the above challenges has been explored and analyzed in the context of the individual problem domain and, more importantly, in conjunction with that for the other challenges. This has led to an end-to-end definition of a Mars Planetary Network that would feature: (1) the fusion of deep space Ka-band and optical communications for achieving Mars-Earth high-rate links taking advantage of the optical/RF hybrid 8m/34m antennas in DSN; (2) the integrated application of the Multiple Spacecraft Per Antenna (MSPA) technique, for return link data acquisition, and the Multiple Uplink Per Antenna (MUPA) technique, for forward link data trasnmission, to reduce the number of 34m beam-wave guide (BWG) antennas needed for the era; (3) the integration of three, arrayed, 34m beam-wave guide (BWG) antennas, to provide a high G/T aperture, with the MSPA/MUPA techniques, and a dual “trunk link”approach to cut down the needed G/T -- hence, reducing the number of 34m antennas, relative to that in the single trunk approach by 50%; (4) the deployment of two areostationary/areosynchronous Mars relay orbiters; one of them could also function as (or be served by) a notional Deep Space Habitat (DSH); (5) the opportunistic deployment of a science orbiter in a Pioneer-6 type orbit, equidistant Mars/Earth, that could also serve as an intermediary relay during the Mars superior solar conjunction perod; (6) the existence of the multi-function Mars proximity link that provides the demand-assigned, multiple access (DAMA) capability; and (7) the provision of tracking observables, by leveraging on the planned Mars orbiting and surface infrastructure, to enable the in-situ navigation for surface and orbiting vehicles. This paper provides the description of the proposed Mars Planetary Network in the human exploration era, the trade-off analysis for the various alternative architectures, and the optimal solutions to the key challenges in defining this end-to-end network.

Cheung, Kar-Ming↗

Technical challenges involved in supporting the Lambda Point Experiment

The Lambda Point Experiment (LPE) is one of the instruments included in the U.S. Microgravity Payload Mission 1 planned for one of the Space Shuttle flights in 1992. The objective of the experiment is to measure the heat capacity of liquid helium within a narrow interval around the transition between superfluid and normal helium (the lambda point) with an unprecedented temperature resolution of about 10 to the -10th. Multiple technical challenges are presented in the areas of structural support, safety analysis, and modal frequency tests. This paper describes the technical challenges of JPL's multidisciplinary involvement in support of these experiments in microgravity.

Petrac, D.↗

Software verification plan for GCS

This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

Dent, Leslie A.↗

A Portfolio Analysis Tool for Measuring NASAs Aeronautics Research Progress toward Planned Strategic Outcomes

Description of a tool for portfolio analysis of NASA's Aeronautics research progress toward planned community strategic Outcomes is presented. The strategic planning process for determining the community Outcomes is also briefly described. Stakeholder buy-in, partnership performance, progress of supporting Technical Challenges, and enablement forecast are used as the criteria for evaluating progress toward Outcomes. A few illustrative examples are also presented.

Portfolio Analysis↗

Research and Technology Objectives and Plans Summary (RTOPS)

The NASA Research and Technology program for FY 1978 is represented by this compilation of the 'Summary' portions of each of the Research and Technology Objectives and Plans (RTOPS). The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section contains citations and abstracts of the RTOPs. Following this section are four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

Source record↗

Satellite Power Systems (SPS) concept definition study exhibit C. Volume 3: Experimental verification definition

An environmentally oriented microwave technology exploratory research program aimed at reducing the uncertainty associated with microwave power system critical technical issues is described. Topics discussed include: (1) Solar Power Satellite System (SPS) development plan elements; (2) critical technology issues related to the SPS preliminary reference configuration; (3) pilot plant to demonstrate commercial viability of the SPS system; and (4) research areas required to demonstrate feasibility of the SPS system. Progress in the development of advanced GaAs solar cells is reported along with a power distribution subsystem.

Source record↗

Tethers in space; Proceedings of the International Conference, Arlington, VA, Sept. 17-19, 1986

A collection of papers on the applications of tethers in space is presented. Tether flight experiments of the past, in planning stages, and in the future are examined. Tether dynamics and the applications and technical aspects of electrodynamic tethers are addressed. The use of tethers on the Space Station and applications in the Space Station era are considered. Individual tether technology issues, including tether materials and instrumentation for atmospheric measurements are discussed.

Bainum, Peter M.↗

System level design analyses for the Space Station Environmental Control and Life Support System

The development and verification of a computer model for the design and analysis of the current Space Station ECLSS configuration are discussed. The model is used to resolve system-level design issues, such as sizing accumulators and assessing flow control techniques. Actual component verification efforts are outlined, and technical aspects of each component model are identified. The results obtained to date and plans for future analytical efforts are summarized.

Bacskay, A. S.↗

Preserving the Finger Lakes for the Future: A Prototype Decision Support System for Water Resource Management, Open Space, and Agricultural Protection

This report summarizes the activity conducted under NASA Grant NAG13-02059 entitled "Preserving the Finger Lakes for the Future" A Prototype Decision Support System for Water Resources Management, Open Space and Agricultural Protection, for the period of September 26, 2003 to September 25, 2004. The RACNE continues to utilize the services of its affiliate, the Institute for the Application of Geospatial Technology at Cayuga Community College, Inc. (IAGT), for the purposes of this project under its permanent operating agreement with IAGT. IAGT is a 501(c)(3) not-for-profit Corporation created by the RACNE for the purpose of carrying out its programmatic and administrative mission. The "Preserving the Finger Lakes for the Future" project has progressed and evolved as planned, with the continuation or initiation of a number of program facets at programmatic, technical, and inter-agency levels. The project has grown, starting with the well received core concept of the Virtual Management Operations Center (VMOC), to the functional Watershed Virtual Management Operations Center (W-VMOC) prototype, to the more advanced Finger Lakes Decision Support System (FLDSS) prototype, deployed for evaluation and assessment to a wide variety of agencies and organizations in the Finger Lakes region and beyond. This suite of tools offers the advanced, compelling functionality of interactive 3D visualization interfaced with 2D mapping, all accessed via Internet or virtually any kind of distributed computer network.

Brower, Robert↗

External Tank Program Legacy of Success

I.Goal: a) Extensive TPS damage caused by extreme hail storm. b) Repair plan required to restore TPS to minimize program manifest impacts. II. Challenges: a) Skeptical technical community - Concerned about interactions of damage with known/unknown failure modes. b) Schedule pressure to accommodate ISS program- Next tank still at MAF c)Limited ET resources. III. How d We Do It?: a) Developed unique engineering requirements and tooling to minimize repairs. b) Performed large amount of performance testing to demonstrate understanding of repairs and residual conditions. c) Effectively communicated results to technical community and management to instill confidence in expected performance.

Welzyn, Ken↗

Ground-Ground Data Communication-Assisted Planning and Coordination: Shorter Verbal Communications

A human-in-the-loop simulation was conducted to investigate the operational feasibility, technical requirements, and potential improvement in airspace efficiency of adding a Multi-Sector Planner position. A subset of the data from that simulation is analyzed here to determine the impact, if any, of ground-ground data communication (Data Comm) on verbal communication and coordination for multi-sector air traffic management. The results suggest that the use of Data Comm significantly decreases the duration of individual verbal communications. The results also suggest that the use of Data Comm, as instantiated in the current simulation, does not obviate the need for accompanying voice calls.

Kessell, Angela Mary↗

NASA's Space Launch System: Progress Toward Unmatched Exploration Capability

The Space Launch System (SLS) Program delivered the first element of the exploration-class rocket and completed manufacturing of all major structural elements in 2017. The Program continues component integration and testing in 2018 in preparation for the inaugural launch of NASA's new deep space exploration system in fiscal year 2020. SLS represents a new strategic national capability designed for the most challenging human and robotic exploration and is engineered for overall mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2018 and 2019.

Honeycutt, John↗

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

NASA’s Space Launch System: First Mission Hardware Nears Completion

The Space Launch System (SLS) Program (Fig. 1) completed several significant production milestones in 2018 for its first mission and is poised for greater accomplishments in 2019. With manufacturing and hardware installation complete, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success and scientific discovery. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

Propulsion Airframe Aeroacoustics and Aircraft System Noise Flight Research Test: NASA Overview

Motivations and the formulation of the objectives are described for an ambitious flight research test conducted in collaboration between NASA and The Boeing Company. The Propulsion Airframe Aeroacoustics and Aircraft System Noise Flight Research Test was executed by the Boeing ecoDemonstrator Program with an Etihad Airways Boeing 787-10 aircraft. Five key technical approaches are described that were used to accomplish the more unconventional and challenging objectives of the research. In addition to the modern technology of the 787, these include evaluating multiple acoustic shielding and reflection effects using both the wing and fuselage in straight flight and banking flight paths, hardwalling the aft duct liner, and utilizing an extensive instrumentation array both on the ground and on the aircraft. The research level version of NASA’s aircraft system noise prediction capability including a new acoustic scattering method were used to confirm the technical approaches and provide guidance for the detailed design of instrumentation and flight test plans. Initial comparisons are shown of flight test data to predictions using the research level of NASA’s Aircraft Noise Prediction Program. Significant prediction challenges are revealed when compared to these high-quality data, while major progress is shown both in the measurement and the prediction of propulsion airframe aeroacoustic effects in flight. This comparison marks the first rigorous validation with modern flight test data and establishes a basis to further understand and quantify the state of NASA’s current capability and to develop improvements in the fidelity of aircraft system noise predictions. The context of multiple coordinated companion research papers is described as well as future plans for the continued analysis of this flight research data.

Propulsion Airframe Aeroacoustics↗