Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TRANSACTIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

City of Klamath Falls, Oregon Geothermal Power Plant Feasibility Study

The purpose of the Klamath Falls project is to demonstrate the effectiveness of a combined thermal distribution system and power generation facility. The city of Klamath Falls operates a geothermal district heating system which would appear to be an attractive opportunity to install a power generation system. Since the two wells have operated reliably and consistently over many years, no new sources or resource exploration would be necessary. It appears that it will cost more to construct, operate, maintain and amortize a proposed geothermal facility than the long-term value of the power it would produce. The success of a future project will be determined by whether utility power production costs will remain low and whether costs of construction, operations, or financing may be reduced. There are areas that it would be possible to reduce construction cost. More detailed design could enable the city to obtain more precise quotes for components and construction, resulting in reduction in contingency projections. The current level of the contingency for uncertainty of costs is between $200,000 and $300,000. Another key issue with this project appears to be operation cost. While it is expected that only minimal routine monitoring and operating expenses will occur, the cost of water supply and waste water disposal represents nearly one quarter of the value of the power. If the cost of water alone could be reduced, the project could become viable. In addition, the projected cost of insurance may be lower than estimated under a city-wide policy. No provisions have been made for utilization of federal tax incentives. If a transaction with a third-party owner/taxpayer were to be negotiated, perhaps the net cost of ownership could be reduced. It is recommended that these options be investigated to determine if the costs and benefits could be brought together. The project has good potential, but like many alternative energy projects today, they only work economically if the federal tax incentives come into play.

15 GEOTHERMAL ENERGY↗

AMI Communication Requirements to Implement Demand-Response: Applicability of Hybrid Spread Spectrum Wireless

While holistically defining the smart grid is a challenge, one area of interest is demand-response. In 2009, the Department of Energy announced over $\$$4 billion in grant and project funding for the Smart Grid. A significant amount of this funding was allotted to utilities for cost sharing projects to deploy Smart Grid technologies, many of whom have deployed and are deploying advanced metering infrastructure (AMI). AMI is an enabler to increase the efficiency of utilities and the bulk power grid. The bulk electrical system is unique in that it produces electricity as it is consumed. Most other industries have a delay between generation and consumption. This aspect of the power grid means that there must be enough generation capacity to meet the highest demand whereas other industries could over produce during off-peak times. This requires significant investment in generation capacity to cover the few days a year of peak consumption. Since bulk electrical storage doesn't yet exist at scale another way to curb the need for new peak period generation is through demand-response; that is to incentivize consumers (demand) to curtail (respond) electrical usage during peak periods. Of the various methods proposed for enabling demand-response, this paper will focus on the communication requirements for creating an energy market using transactional controls. More specifically, the paper will focus on the communication requirements needed to send the peak period notices and receive the response back from the consumers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Program Development Tools and Infrastructures: Activities by ASC CSSE/CCE and Partners

Exascale class machines will exhibit a new level of complexity: they will feature an unprecedented number of cores and threads, will most likely be heterogeneous and deeply hierarchical, and offer a range of new hardware techniques (such as speculative threading, transactional memory, programmable prefetching, and programmable accelerators), which all have to be utilized for an application to realize the full potential of the machine. Additionally, users will be faced with less memory per core, fixed total power budgets, and sharply reduced MTBFs. At the same time, it is expected that the complexity of applications will rise sharply for exascale systems, both to implement new science possible at exascale and to exploit the new hardware features necessary to achieve exascale performance. This is particularly true for many of the NNSA codes, which are large and often highly complex integrated simulation codes that push the limits of everything in the system including language features. To overcome these limitations and to enable users to reach exascale performance, users will expect a new generation of tools that address the bottlenecks of exascale machines, that work seamlessly with the (set of) programming models on the target machines, that scale with the machine, that provide automatic analysis capabilities, and that are flexible and modular enough to overcome the complexities and changing demands of the exascale architectures. Further, any tool must be robust enough to handle the complexity of large integrated codes while keeping the user's learning curve low. With the ASC program, in particular the CSSE (Computational Systems and Software Engineering) and CCE (Common Compute Environment) projects, we are working towards a new generation of tools that fulfill these requirements and that provide our users as well as the larger HPC community with the necessary tools, techniques, and methodologies required to make exascale performance a reality.

43 PARTICLE ACCELERATORS↗

Review of the WECC EDT phase 2 EIM benefits analysis and results report.

A region-wide Energy Imbalance Market (EIM) was recently proposed by the Western Electricity Coordinating Council (WECC). In order for the Western Area Power Administration (Western) to make more informed decisions regarding its involvement in the EIM, Western asked Argonne National Laboratory (Argonne) to review the EIM benefits study (the October 2011 revision) performed by Energy and Environmental Economics, Inc. (E3). Key components of the E3 analysis made use of results from a study conducted by the National Renewable Energy Laboratory (NREL); therefore, we also reviewed the NREL work. This report examines E3 and NREL methods and models used in the EIM study. Estimating EIM benefits is very challenging because of the complex nature of the Western Interconnection (WI), the variability and uncertainty of renewable energy resources, and the complex decisions and potentially strategic bidding of market participants. Furthermore, methodologies used for some of the more challenging aspects of the EIM have not yet matured. This review is complimentary of several components of the EIM study. Analysts and modelers clearly took great care when conducting detailed simulations of the WI using well-established industry tools under stringent time and budget constraints. However, it is our opinion that the following aspects of the study and the interpretation of model results could be improved upon in future analyses. The hurdle rate methodology used to estimate current market inefficiencies does not directly model the underlying causes of sub-optimal dispatch and power flows. It assumes that differences between historical flows and modeled flows can be attributed solely to market inefficiencies. However, flow differences between model results and historical data can be attributed to numerous simplifying assumptions used in the model and in the input data. We suggest that alternative approaches be explored in order to better estimate the benefits of introducing market structures like the EIM. In addition to more efficient energy transactions in the WI, the EIM would reduce the amount of flexibility reserves needed to accommodate forecast errors associated with variable production from wind and solar energy resources. The modeling approach takes full advantage of variable resource diversity over the entire market footprint, but the projected reduction in flexibility reserves may be overly optimistic. While some reduction would undoubtedly occur, the EIM is only an energy market and would therefore not realize the same reduction in reserves as an ancillary services market. In our opinion the methodology does not adequately capture the impact of transmission constraints on the deployment of flexibility reserves. Estimates of flexibility reserves assume that forecast errors follow a normal distribution. Improved estimates could be obtained by using other probability distributions to estimate up and down reserves to capture the underlying uncertainty of these resources under specific operating conditions. Also, the use of a persistence forecast method for solar is questionable, because solar insolation follows a deterministic pattern dictated by the sun's path through the sky. We suggest a more rigorous method for forecasting solar insolation using the sun's relatively predictable daily pattern at specific locations. The EIM study considered only one scenario for hydropower resources. While this scenario is within the normal range over the WI footprint, it represents a severe drought condition in the Colorado River Basin from which Western schedules power. Given hydropower's prominent role in the WI, we recommend simulating a range of hydropower conditions since the relationship between water availability and WI dispatch costs is nonlinear. Also, the representation of specific operational constraints faced by hydropower operators in the WI needs improvements. The model used in the study cannot fully capture all of the EIM impacts and complexities of power system operations. In particular, a primary benefit of the EIM is a shorter dispatch interval; namely, 5 minutes. However, the model simulates the dispatch hourly. Therefore it cannot adequately measure the benefits of a more frequent dispatch. A tool with a finer time resolution would significantly improve simulation accuracy. When the study was conducted, the rules for the EIM were not clearly defined and it was appropriate to estimate societal benefits of the EIM assuming a perfect market without a detailed specification of the market design. However, incorporating a more complete description of market rules will allow for better estimates of EIM benefits. Furthermore, performing analyses using specific market rules can identify potential design flaws that may be difficult and expensive to correct after the market is established. Estimated cost savings from a more efficient dispatch are less than one percent of the total cost of electricity production.

14 SOLAR ENERGY↗

Fuel Cycle Research & Development: Technical Monthly – June 2012

Topics are: (1) MPACT Campaign - (a) Management and Integration • Coordination meetings between NE and NA-22, NA-24, and NA-82 were conducted the week of June 11th. Preparations are being made for the next MPACT working group meeting, scheduled for Aug 28-30 at Idaho Falls. In addition to covering accomplishments and discussing future plans, a site tour of INL facilities (MFC, EBR, ATR, INTEC) is being organized. (2) Accounting and Control Technologies - (a) Microcalorimetry • Now operating 256-pixel array at LANL. We are in the process of tuning detector parameters to improve and optimize performance. Preliminary measurements show approximate number of live pixels is similar to that observed previously at NIST. Continuing to study contribution to systematic error from uncertainties in tabulated gamma-ray energies. (b) Electrochemical Sensor • Testing of sensors fashioned from different precursor materials continued. SEM analysis of all used sensors has been or will be performed. (c) Lead Slowing Down Spectrometer • Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Continuing to look into a He4 detector. Research into local construction of a He4 detector continued. We have started to apply the algorithm to test the LSDS using experimental data from previous RPI measurements. PNNL also developed a plan to address the lack of statistics in the MCNP modeling of the NGSI 64 assemblies. The ISU graduate student built and tested a fission chamber to gain experience with them. (d) Fast Neutron Imaging to Quantify Nuclear Materials • The imaging detector design was modified for each pixel to have an 8 x 8 pixel array. Quotations and purchasing process for components, including the new PSD scintillator are in progress. (e) Fast Neutron Multiplicity Analysis • The team submitted two papers to the upcoming INMM meeting that are related to the fast neutron multiplicity R&D effort. Progress was made on the project's main goal of designing a concept for a prototype fast-neutron multiplicity counter. We started laying out the outline for the final report. We have been working with our ORNL collaborators to develop a new digitizer system to support our experimental campaign planned for next year. (3) MPACT Analysis Tools - (a) Multi-isotope Process Monitor • Fuel characterization framework development continued during June. A report describing the methodologies is being completed. Kenneth Dayman, from University of Texas, spent a week at PNNL wrapping up his master's research and working on a journal submission covering that work. The target journal is the IEEE transactions on Nuclear Science; submission is planned for the end of July. A proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program. The impact of gamma-ray spectrum counting statistics on the precision of relative radioisotope component intensities as reconstructed via Principal Component Regression (PCR) continued in June with Monte Carlo simulations of a two-component (i.e., two radioisotope) system. This work generalizes earlier studies in FY12 in which Poisson counting variations of only a single spectrum component were simulated. (b) Modeling and Simulation for Analysis of Safeguards Performance (Electrochemical) • Preliminary insights into safeguards challenges and the initial design for an electrochemical plant have been written up into an INMM paper and will be presented at the INMM Summer Meeting. Work is currently adding a new visualization capability for integrating materials accountancy with physical protection. (c) Material Control including Process Monitoring (Pattern Recognition, Sensors) • Fabrication of quartz chips continued at an external foundry. Awaiting delivery of the heat exchange manifold and chip holder. (d) MPACT System Integration and Technical Support • The initial report on cost-basis metrics for nuclear material security risk and proliferation risk was completed as scheduled. (4) Safeguards and Security by Design - (a) Used fuels storage security analysis, guidance and best practices • RFP was finalized and sent out. Awaiting response from World Institute for Nuclear Security. Coordinated with Scott Demuth on joint report • LANL milestone on best practices. Attended Nuclear Energy Institute National Nuclear Security Conference. Developed plan for soliciting input on prioritized issues for used fuel storage security. Worked on setting up a meeting with the Nuclear Regulatory Commission. Worked on FY2013 work package planning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Market and behavioral barriers to energy efficiency: A preliminary evaluation of the case for tariff financing in California

Consumers regularly forgo purchases of high efficiency appliances that appear to be cost effective at a reasonable rate of return. While some argue that this is a true revelation of preferences for appliance features, this 'efficiency gap' can be largely explained by a combination of market and behavioral failures that reduce consumers ability to evaluate the relative value of appliances and skew preferences toward initial cost savings, undervaluing future reductions in operating costs. These failures and barriers include externalities of energy use, imperfect competition between manufacturers, asymmetric information, bounded rationality, split incentives, and transaction costs (Golove 1996). Recognizing the social benefit of energy conservation, several major methods are used by policymakers to ensure that efficient appliances are purchased: minimum efficiency standards, Energy Star labeling, and rebates and tax credits. There is no single market for energy services; there are hundreds of uses, thousands of intermediaries, and millions of users, and likewise, no single appropriate government intervention (Golove 1996). Complementary approaches must be implemented, considering policy and institutional limitations. In this paper, I first lay out the rationale for government intervention by addressing the market and behavioral failures and barriers that arise in the context of residential energy efficiency. I then consider the ways in which some of these failures and barriers are addressed through major federal programs and state and utility level programs that leverage them, as well as identifying barriers that are not addressed by currently implemented programs. Heterogeneity of consumers, lack of financing options, and split incentives of landlords and tenants contribute significantly to the under-adoption of efficient appliances. To quantify the size of the market most affected by these barriers, I estimate the number of appliances, and in particular the number of outdated appliances, in California rental housing. Appliances in rental housing are on average older than those in owner occupied housing. More importantly, a substantial proportion of very old appliances are in rental housing. Having established that a very old stock of appliances exists in California rental housing, I discuss tariff financing as a policy option to reduce the impact of the remaining market and behavioral barriers. In a tariff financing program, the utility pays the initial cost of an appliance, and is repaid through subsequent utility bills. By eliminating upfront costs, tying repayment to the gas or electric meter, requiring a detailed energy audit, and relying upon utility bill payment history rather than credit score in determining participant eligibility, tariff financing largely overcomes many barriers to energy efficiency. Using California as a case study, I evaluate the feasibility of implementing tariff financing. For water heaters in particular, this appears to be a cost-effective strategy. Tariff financing from utilities is particularly valuable because it improves the ability of low-income renters to lower their utility bills, without burdening landlords with unrecoverable capital costs. To implement tariff financing country-wide, regulations in many states defining private loan-making institutions or the allowable use of public benefit funds may need to be modified. Tariff financing is relatively new and in most locations is only available as a pilot program or has only recently exited pilot phase. This preliminary evaluation suggests that tariff financing is a valuable future addition to the toolkit of policymakers who aim to increase the diffusion of efficient appliances. While regulatory approval is necessary in states that wish to pursue tariff financing, at this point, the major barrier to further implementation appears to be the newness of the financing mechanism.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Continuing Developments in PV Risk Management: Strategies, Solutions, and Implications

As the PV industry matures, successful risk management practices will become more imperative to ensure investor confidence, control costs, and facilitate further growth. This report discusses several key aspects of risk management during the commercial- and utility-scale project life cycle, from identification of risks, to the process of mitigating and allocating those risks among project parties, to transferring those risks through insurance. The report also explores novel techniques in PV risk management, options to offload risks onto the capital markets, and innovative insurance policies (namely warranty policies) that address risks unique to the PV sector. One of the major justifications for robust risk management in the PV industry is the cost-reduction opportunities it affords. If the PV industry can demonstrate the capability to successfully manage its risks, thereby inspiring confidence in financiers, it may be able to obtain a lower cost of capital in future transactions. A lower cost of capital translates to a lower cost of energy, which will in turn enhance PV's competitiveness at a time when it will have to rely less on subsidies to support its market penetration.

14 SOLAR ENERGY↗

Domestic and International Nuclear Energy Voluntary Consensus Standards Needs

This report introduces the reader to the domestic and international standards development organizations (SDOs) and their structures and operations. It also identifies some of the support and subject matter needs for the development of standards on the subject of nuclear energy. The support needs are described with regard to organizational structure and subject-matter-expert (SME) participation that is required for producing voluntary consensus standards. The subject matter needs are described with regard to growing technologies and objectives that approach the boundaries of existing standards; implementation of knowledge; and safety of people, facilities, and the environment. The development of voluntary consensus standards has been initiated by a group of multiple stakeholders that broadly recognizes the need for one or more standards. Voluntary consensus SDOs have professional participation by individuals who generally receive limited or no financial or infrastructural support, which is in contrast to the approach for nonconsensus or limited-consensus industry, agency, and government guidance, standards, regulations, or laws. Generally, nonconsensus standards exist as the result of an industry- or government-focused infrastructural and financial support system that addresses a specific subject matter need (e.g., the compatibility of discharge hoses on a specific brand of clothes washing machines; the content and format of the US Department of Energy [DOE]/Nuclear Regulatory Commission [NRC] Form 741, “Nuclear Material Transaction Reports”).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Morris County Improvement Authority, Morris County, New Jersey Renewable Energy Initiative

The Morris County Improvement Authority (Authority), a public body corporate and politic of the State of New Jersey and created and controlled by the County, at the direction of the County and through the Program guaranteed by the County, financed 3.2 MW of solar projects (Solar Projects) at fifteen (15) sites for seven (7) local government units (Local Units) in and including the County. The Program uses a Power Purchase Agreement (PPA) structure, where the Solar Developer constructs, operates and maintains all of the Solar Projects, for the benefit of the Local Units and the Authority, for the maximum State law allowable PPA period of fifteen (15) years. Although all fifteen (15) sites were funded by the Authority, only the Mennen Arena site was considered for the purposes of the required local match funding for this grant. Specifically at the Mennen Arena site, the Authority financed 1.6 MW of solar panels. On October 18, 2013, the DOE Grant was drawn down following completion of the necessary application documents and final execution of an agreement memorializing the contemplated transaction by the Local Units, the County, The Authority and the solar developer. The proceeds of the DOE Grant were then applied to reduce the PPA price to all Local Units across the program and increase the savings from approximately 1/3 to almost half off the existing and forecasted utility pricing over the fifteen (15) year term, without adversely affecting all of the other benefits. With the application of the rate buy down, the price of electricity purchased under the PPA dropped from 10.9 to 7.7 cents/kWh. This made acquisition of renewable energy much more affordable for the Local Units, and it enhanced the success of the program, which will encourage other counties and local units to develop similar programs.

14 SOLAR ENERGY↗

Sensor Characteristics Reference Guide

The Buildings Technologies Office (BTO), within the U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), is initiating a new program in Sensor and Controls. The vision of this program is: • Buildings operating automatically and continuously at peak energy efficiency over their lifetimes and interoperating effectively with the electric power grid. • Buildings that are self-configuring, self-commissioning, self-learning, self-diagnosing, self-healing, and self-transacting to enable continuous peak performance. • Lower overall building operating costs and higher asset valuation. The overarching goal is to capture 30% energy savings by enhanced management of energy consuming assets and systems through development of cost-effective sensors and controls. One step in achieving this vision is the publication of this Sensor Characteristics Reference Guide. The purpose of the guide is to inform building owners and operators of the current status, capabilities, and limitations of sensor technologies. It is hoped that this guide will aid in the design and procurement process and result in successful implementation of building sensor and control systems. DOE will also use this guide to identify research priorities, develop future specifications for potential market adoption, and provide market clarity through unbiased information.

Cree, Johnathan V.↗

Final report for LDRD13-0130 :

This is the final report on the LDRD, though the interested reader is referred to the ANS Transactions paper which more thoroughly documents the technical work of this project.

Franke, Brian Claude↗

Designing a water leasing market for the Mimbres River, New Mexico.

The objective of this study is to develop a conceptual framework for establishing water leasing markets in New Mexico using the Mimbres River as a test case. Given the past and growing stress over water in New Mexico and the Mimbres River in particular, this work will develop a mechanism for the short term, efficient, temporary transfer of water from one user to another while avoiding adverse effects on any user not directly involved in the transaction (i.e., third party effects). Toward establishing a water leasing market, five basic tasks were performed, (1) a series of stakeholder meetings were conducted to identify and address concerns and interests of basin residents, (2) several gauges were installed on irrigation ditches to aid in the monitoring and management of water resources in the basin, (3) the hydrologic/market model and decision support interface was extended to include the Middle and Lower reaches of the Mimbres River, (4) experiments were conducted to aid in design of the water leasing market, and (5) a set of rules governing a water leasing market was drafted for future adoption by basin residents and the New Mexico Office of the State Engineer.

Reno-Trujillo, Marissa Devan↗

Global Threat Reduction Initiative (GTRI): PNNL GTRI Convert Program (Program Management Plan)

The National Nuclear Security Administration (NNSA) Global Threat Reduction Initiative (GTRI) strategic mission includes efforts to reduce and protect vulnerable nuclear and radiological material at civilian sites around the world. Converting research reactors from using highly enriched uranium (HEU) to low enriched uranium (LEU) was originally started in 1978 as the Reduced Enrichment for Research and Test Reactors Program under the U.S. Department of Energy (DOE) Office of Science. In 2004, the NNSA established the GTRI by combining five existing programs, including the Reduced Enrichment for Research and Test Reactors Program, under one combined threat reduction initiative to focus on one common mission. Within this strategic mission, the GTRI has three goals that provide a comprehensive approach to achieving this mission: 1) convert research reactors from using HEU to LEU, 2) remove or dispose of excess nuclear and radiological materials, and 3) protect nuclear and radiological material from theft and sabotage. The GTRI Convert mission seeks to minimize and, to the extent possible, eliminate HEU in civilian applications throughout the world through the conversion of research reactors. Once that need is eliminated, remaining HEU fresh and spent fuel can be removed or disposed of by GTRI’s Remove activities. Attainment of the Convert objectives will permanently reduce the availability and affiliated transactions of HEU materials, thus eliminating a substantial threat to proliferation. GTRI’s Convert mission is comprised of two sub-programs: the GTRI Reactor Conversion Program and the Mo-99 Capability Development Project.

Cleary, Eugene J.↗

Financing, Overhead, and Profit: An In-Depth Discussion of Costs Associated with Third-Party Financing of Residential and Commercial Photovoltaic Systems

Previous work quantifying the non-hardware balance-of-system costs -- or soft costs -- associated with building a residential or commercial photovoltaic (PV) system has left a significant portion unsegmented in an 'other soft costs' category. This report attempts to better quantify the 'other soft costs' by focusing on the financing, overhead, and profit of residential and commercial PV installations for a specific business model. This report presents results from a bottom-up data-collection and analysis of the upfront costs associated with developing, constructing, and arranging third-party-financed residential and commercial PV systems. It quantifies the indirect corporate costs required to install distributed PV systems as well as the transactional costs associated with arranging third-party financing.

14 SOLAR ENERGY↗

Classification of HTTP Attacks: A Study on the ECML/PKDD 2007 Discovery Challenge

As the world becomes more reliant on Web applications for commercial, financial, and medical transactions, cyber attacks on the World Wide Web are increasing in frequency and severity. Web applications provide an attractive alternative to traditional desktop applications due to their accessibility and ease of deployment. However, the accessibility of Web applications also makes them extremely vulnerable to attack. This inherent vulnerability is intensified by the distributed nature ofWeb applications and the complexity of configuring application servers. These factors have led to a proliferation of Web-based attacks, in which attackers surreptitiously inject code into HTTP requests, allowing them to execute arbitrary commands on remote systems and perform malicious activities such as reading, altering, or destroying sensitive data. One approach for dealing with HTTP-based attacks is to identify malicious code in incoming HTTP requests and eliminate bad requests before they are processed. Using machine learning techniques, we can build a classifier to automatically label requests as “Valid” or “Attack.” For this study, we develop a simple, but effective HTTP attack classifier, based on the vector space model used commonly for Information Retrieval. Our classifier not only separates attacks from valid requests, but can also identify specific attack types (e.g., “SQL Injection” or “Path Traversal”). We demonstrate the effectiveness of our approach through experiments on the ECML/PKDD 2007 Discovery Challenge data set. Specifically, we show that our approach achieves higher precision and recall than previous methods. In addition, our approach has a number of desirable characteristics, including robustness to missing contextual information, interpretability of models, and scalability.

97 MATHEMATICS AND COMPUTING↗

Requirements Document for the Redesign of the DIM-based Diagnostics Transport and Handling System at the National Ignition Facility (NIF)

The National Ignition Facility (NIF, Figure 1) is the world’s leading user research facility for inertial confinement fusion. Diagnostic instruments that collect data from the experiment shots are transported around the facility using a series of disjointed, suboptimal transport and handling (T&H) subsystems that compromise user efficiency and ergonomics. Significant time savings and improvements to the diagnostic exchange process could be realized by designing a new transport and handling system that minimizes the hand-offs between T&H subsystems, reduces operator hassle and ergonomic strain, and improves the long-term maintainability of the system. In contrast to the current system – which employs several manually-operated carts and containers to transport the diagnostic, dock it to its destination, and install it – the new diagnostic transporter integrates the contamination container with the transport cart and provides a dynamic range of adjustability to interface with its destination. This single transporter has the requisite maneuverability, height adjustability, and fine adjustment capabilities without any rigging transactions to support contaminated diagnostic transport and handling at the alignment station and Equatorial and Polar DIMs. A remote-controlled user interface device allows operators a more hands-off experience that reduces ergonomic strain and improves safety. Assuming the cost is not prohibitive, diagnostic storage will be accomplished by simply stowing the transporter in its lowest position in the designated area of NIF. This concept for a new diagnostic transport and handling system would be better aligned with the core values of NIF: safety, quality, and reliability.

42 ENGINEERING↗

Selling an Energy Efficiency Loan Portfolio in Oregon: Resale of the Craft3 loan portfolio to Self-Help Credit Union

Under the Clean Energy Works (CEW) program, Craft3 developed a loan product that widened access to financing for homeowners, offered long term funding, and collected repayments through the customer?s utility bill. The program?s success led Craft3 to pursue the sale of the loan portfolio to both mitigate its own risks and replenish funds for lending. This sale breaks new ground for energy efficiency finance and is notable as it was completed even with many novel program design elements. It replenished Craft3?s program capital and uncovered some valuable lessons that may facilitate future transactions. However, the lack of data history and the unproven nature of the loan portfolio meant that Craft3 had to limit the risk of losses to Self-Help, the purchaser of the portfolio. It remains to be seen whether this experience will pave the way for more sales of on-bill energy efficiency loan portfolios. This case study illustrates how certain program design decisions can sometimes both facilitate programmatic objectives and possibly present challenges for the sale of a portfolio of energy efficiency loans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Improving the Success Rate of Delivering Annual Occupational Dosimetry Reports to Persons Issued Temporary External Dosimeters

Workers who are not routinely monitored for occupational radiation exposure at LANL may be issued temporary dosimeters in the field. Per 10CFR835 and DOE O 231.1A, the Laboratory's radiation protection program is responsible for reporting these results to the worker at the end of the year. To do so, the identity of the worker and their mailing address must be recorded by the delegated person at the time the dosimeter is issued. Historically, this data has not been consistently captured. A new online application was developed to record the issue of temporary dosimeters. The process flow of the application was structured such that: 1) the worker must be uniquely identified in the Lab's HR database, and 2) the mailing address of record is verified live time via a commercial web service, for the transaction to be completed. A COPQ savings (Type B1) of $96K/year is demonstrated for the new application.

61 RADIATION PROTECTION AND DOSIMETRY↗