Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TEST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Shaker Table Test Plan

Currently, spent nuclear fuel (SNF) is stored in onsite independent spent fuel storage facilities (ISFSIs), which is a dry storage facility, at 55 nuclear power plant sites. The majority of SNF in dry storage is in welded metal canisters (2,917 canisters at the end of 2019). The canisters are loaded for storage in storage overpacks (vertical casks or horizontal storage modules) and placed on outdoor concrete pads. Because the SNF will be stored at ISFSIs for an extended period of time, there is growing concern with regards to the behavior of the SNF within these dry storage systems during earthquakes. To address these concerns, the SFWST program is considering conducting an earthquake shaker table test. The goal of this test is to determine the strains and accelerations on fuel assembly hardware and cladding during earthquakes of different magnitudes to better quantify the potential damage an earthquake could inflict on spent nuclear fuel rods. The seismic integrity of the storage system has been addressed in the past by the US Nuclear Regulatory Commission and is not the focus of this potential test. Instead the DOE would benefit from knowing the condition of the fuel cladding from storage, transportation, to disposal so that it can ascertain repository performance for the fuel and packaging in its final state. A seismic event is part of the possible loading events that the fuel could experience in its lifetime. This report proposes several earthquake shaker table tests with different degrees of complexity. Alternative 1 was defined in the FY20 work scope. Alternatives 2 and 3 were recently developed to take advantage of the NUHOMS 32PTH dry storage canister that may be available in FY21 for this test at a minimum cost to the project. The selection of the alternative(s) will depend on the available budget and the SFWST program priorities for the near future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Irradiation and PIE of alloys X-750 and XM-19 (EPRI Phase III)

The Nuclear Science User Facilities (NSUF) based at Idaho National Laboratory (INL), along with the Electric Power Research Institute (EPRI), formed an agreement to test representative alloys used as reactor structural materials as a pilot program to establish guidelines for future NSUF research programs. This report contains results from the portion of this program established as Phase III (of three phases), entailing irradiation and post-irradiation examination of select alloys typical of boiling water reactor (BWR) internal structural materials. Phases I and II are the subject of separate reports and represent baseline material test results and irradiation experiment design, respectively. The intent of this Phase III research program is to determine properties for the materials of interest after being irradiated at the Advanced Test Reactor (ATR) to three different target fast (E>1MeV) fluences: 5.0 x 10¹⁹ n/cm², 2.0 x 10²⁰ n/cm², and 1.0 x 10²¹ n/cm². These correspond to irradiation damage levels (displacements per atom [dpa]) of approximately 0.08, 0.30, and 1.4 dpa, which represent comparable levels to (a) a previous study which looked at X-750 irradiated to ~1 x 10¹⁹ n/cm², comparable to the lowest fluence; (b) approximately a medium level of fluence for BWR components; and (c) extended life (60 – 80 years) for BWR components. The materials chosen for this research are the nickel-based alloy X-750 and austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co., and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research Center (GE-GRC), and parts were provided to INL for use in this pilot project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Irradiation and PIE of alloys X-750 and XM-19 (EPRI Phase III)

The Nuclear Science User Facilities (NSUF) based at Idaho National Laboratory (INL), along with the Electric Power Research Institute (EPRI), formed an agreement to test representative alloys used as reactor structural materials as a pilot program to establish guidelines for future NSUF research programs. This report contains results from the portion of this program established as Phase III (of three phases), entailing irradiation and post-irradiation examination of select alloys typical of boiling water reactor (BWR) internal structural materials. Phases I and II are the subject of separate reports and represent baseline material test results and irradiation experiment design, respectively. The intent of this Phase III research program is to determine properties for the materials of interest after being irradiated at the Advanced Test Reactor (ATR) to three different target fast (E>1MeV) fluences: 5.0 x 10¹⁹ n/cm², 2.0 x 10²⁰ n/cm², and 1.0 x 10²¹ n/cm². These correspond to irradiation damage levels (displacements per atom [dpa]) of approximately 0.08, 0.30, and 1.4 dpa, which represent comparable levels to (a) a previous study which looked at X-750 irradiated to ~1 x 10¹⁹ n/cm², comparable to the lowest fluence; (b) approximately a medium level of fluence for BWR components; and (c) extended life (60 – 80 years) for BWR components. The materials chosen for this research are the nickel-based alloy X-750 and austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co., and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research Center (GE-GRC), and parts were provided to INL for use in this pilot project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closer of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closure of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Geophysical monitoring using active seismic techniques at the Citronelle Alabama CO 2 storage demonstration site

Between August 2012 and September 2014, about 114,000 metric tonnes of CO 2 was captured from the coal-fired Plant Barry Power Station at Bucks Alabama and injected into the Paluxy Formation above the oil pool in the southeast unit of the Citronelle Oilfield. Various monitoring methods were deployed at land surface and in project wells to measure system performance, comply with permit requirements and test new and innovative monitoring tools. The monitoring program relied heavily on active seismic methods for subsurface imaging of geologic structure and time-lapse seismic techniques to track the CO 2 migration in the injection interval. Both conventional geophone/hydrophone and fiber-optic based Distributed Acoustic Sensing (DAS) arrays were deployed and tested, allowing a side by side comparison of the equipment and techniques. Geophysical imaging of the subsurface was successful using DAS in the offset vertical seismic profile (OVSP) survey configuration. A high resolution OVSP image of the subsurface was obtained in 2014 with DAS, which exceeded project expectations in comparison to a lower resolution image obtained in 2012 using a conventional 80-level geophone array. A time-lapse image of the redistribution of CO 2 after injection ended in September 2014 was obtained with two DAS OVSP surveys from June 2014 and December 2015, thus successfully demonstrating its proof-of-concept. Unfortunately, a pre-injection baseline survey with DAS, which was in its initial stage of technology development in 2012, did not have sufficient quality for use, making it difficult to interpret the acquired DAS time-lapse difference. Additional research in this area has since demonstrated the utility of time-lapse DAS OVSP. DAS data were also acquired during a cross-well seismic survey conducted in 2014. Unfortunately, the DAS technique was not success in the cross-well survey configuration because the system noise level was too high in the crosswell frequency output range (100–1200 Hz) of the piezoelectric source (increasing by a factor of ten compared to VSP frequency band). Additionally, the cross-well geometry causes sub-horizontal (broadside) incidence on the vertical DAS fiber cable, which is known to be problematic. Current research is focused on improving the DAS cable response to broadside acoustic energy. Time-lapse seismic surveys using commercially available conventional arrays were also acquired. In contrast to the DAS acquired data, the cross-well seismic results obtained with the conventional array was highly successful and clearly showed the CO 2 remained in zone at the end of injection. Time-lapse differencing of the OSVP surveys acquired with the conventional arrays proved to be inconclusive. Finally, changes in wellbore conditions between surveys and unavoidable changes in equipment (the array used for the baseline survey was retired) affected data quality, making it difficult to interpret the OVSP results.

58 GEOSCIENCES↗

MDPCT1 Quench Data and Performance Analysis

MDPCT1 is a four-layer cos-theta Nb3Sn dipole demonstrator developed and tested at FNAL in the framework of the U.S. Magnet Development Program. The magnet reached record fields for accelerator magnets of 14.1 T at 4.5 K in the first test and 14.5 T at 1.9 K in the second test and then showed large degradation. While its inner coils performed exceptionally well with only two quenches up to 14.5 T and no evidence of degradation, the outer coils degraded over the course of testing. By adopting new measurement and analysis techniques at FNAL we are discussing in detail what happened. Both success and failure in our diagnostics are discussed. The evolution of techniques over the course of two tests (and three thermal cycles) shows the path to address challenges brought by the first four-layer magnet tested at FNAL. This paper presents the analysis of quench data along with diagnostic features and complementary measurements taken in support of the magnet performance analysis.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Instrumentation for the In-Core Real-Time Mechanical Testing of Structural Materials (INCREASE) Project

Idaho National Laboratory (INL), in collaboration with the Electric Power Research Institute (EPRI), the Nuclear Regulatory Commission (NRC), the French Atomic and Alternative Energies Commission (CEA), the Joint Research Center (JRC), the Nuclear Research and Consultancy Group (NRG), and the Research Center Rez (CVR), started a Joint Experimental Program (JEEP) project that operates within the Nuclear Energy Agency’s Framework for Irradiation Experiments (FIDES II) program in order to develop capabilities for the in-core real-time mechanical testing of structural materials. This effort will focus on designing a shared capsule capable of housing a variety of in-core mechanical testing instrumentation allowing enhanced experiments for the material science community. The outcome of the project would be high-priority, stress relaxation data for stainless-steel-based materials provided by EPRI and CEA. Stress relaxation is a major phenomenon that contributes to material degradation in nuclear reactor components. Currently, nuclear material stress relaxation is assessed both before and after irradiation, using complex and costly post-irradiation examination (PIE) activities. In-situ data would support the development of precision modeling and simulation of this degradation phenomena and would provide validation and benchmarking for existing models using the PIE data. As part of the U.S. Department of Energy Advanced Sensor and Instrumentation (ASI) program, INL has fabricated and tested out-of-core mechanical test instrumentation. This instrumentation was designed for easy adaptation to the irradiation capsule proposed under this JEEP, and can be deployed to measure real-time stress relaxation under pressurized-water reactor (PWR) conditions. This initial effort will partially serve to replace the testing capabilities lost because of shutting down the Halden Boiling Water Reactor (HBWR). The project would provide these capabilities to the international community via a shared capsule design that is easily adaptable to additional material test reactors. The design features will incorporate expansion to PWR and non-light-water reactor (LWR) environments that will be developed in future work. The capsule and instrumentation will be demonstrated in the Massachusetts Institute of Technology Reactor (MITR) for phase I and the Petten High Flux Reactor (HFR) for phase II irradiations to deliver real-time stress relaxation data on high priority stainless steel structural materials.

36 MATERIALS SCIENCE↗

R&D to Ensure a Scientific Basis for Qualification Tests and Standards (Final Report)

Project return on investment in a photovoltaic (PV) system depends increasingly on maintaining high energy yields, and the system lifetime is a major factor in levelized cost of electricity (LCOE). Thus, the rate of PV deployment and the success of these assets depends upon reliable long-term power generation. The overarching objective of this program is to improve photovoltaic (PV) module reliability via development of tests and standards. Where reliability problems or risk are discovered, we can design tests to ensure that these liabilities don't affect future generations of products. Customers can use these tests to understand which products are susceptible to certain degradation mechanisms, and manufacturers can use the tests to design unwanted characteristics out of their products. The work under this program identifies PV reliability needs, performs characterization that provides scientific understanding of targeted degradation mechanisms, and translates those data into practical and predictive test protocols and standards. Major accomplishments include: A model for polarization-type potential induced degradation (PID-p) was developed and validated against experimental data. NREL is currently leading a new edition of IEC 62804-1 for PID detection. PID-p can cause large losses in current and voltage for some module designs on cloudy days. Finite element modeling (FEM) and experiment was used to determine when cells crack in a module. It was shown that cells in landscape orientation are much more likely to crack than those on portrait orientation. Shortly thereafter, the first products with portrait-oriented cells were introduced. Studies of how to test for light and elevated temperature degradation (LeTID) culminated with the publication of IEC TS 63342. Software to predict the progression of LeTID was developed, validated, and made publicly available. Field validated tests and international standards for durability of PV module coatings abrasion, backsheets, and encapsulants were developed. Examples are IEC 62788-1-1, IEC 62788-2 ED2, IEC TS 62788-7-2, IEC 62788-7-3 ED1, IEC 63209-2. NREL led the development a high-temperature testing technical specification, and published guidelines that enable installers to determine whether higher-temperature testing is needed, simply based on location and mounting configuration. In a number of our case studies, variations in the bills of materials or workmanship have been associated with variations in reliability. These observations emphasize the importance of quality assurance to reliability. A framework for criticality (i.e. Pareto) analysis was developed and published. The framework helps us and other researchers determine what problems should be addressed for reliability research to have the biggest industry impact. NREL continues to participate actively in international standards development and stakeholder engagement activities, including organizing an annual PV Reliability Workshop. These activities are important for ensuring we address issues that are relevant and timely, and that we convey our results to those who may benefit.

14 SOLAR ENERGY↗

HFTS-2 (Final Report)

This report delves into the research program, identified tasks, various studies, observations, results, and conclusions under the Hydraulic Fracturing Test Site (HFTS-2) project. This test site is located in Loving County close to the Texas, New Mexico border. The program targeted the Wolfcamp formation in Delaware Basin. The aim of the project was to improve our understanding of hydraulic fracturing processes to not only optimize unconventional resource development in US Basins but to minimize environmental footprint as well. Various new diagnostic technologies were demonstrated at this site, including distributed acoustic microseismic, high resolution strain using Rayleigh frequency band (DSS-RFS), and in-fill proppant logging tool. Significant conclusions from this study include: 1) lateral and vertical fracture growth mapping as well as proppant transport behavior, 2) Use of DSS-RFS as a diagnostic tool to understand cluster level behavior, 3) Validation of proppant log, both at core scale as well as in-fill well implementation, and 4) New modeling tools to map far-field strain response using distributed strain sensing data. Specifically, far-field fracture distribution is influenced by linear fracture corridors defined by the stress-state as well as clustering behavior influenced by spatio-temporal effects. Depletion impacts on new stimulation was demonstrated and technically quantified. Significant vertical fracture height growth was observed. However, our understanding is limited by available gauge data availability. Numerical strain modeling techniques have been developed and demonstrated to help understand observed strain response behavior. Finally, proppant log has been further validated as a useful tool to map propped zones within the SRV. It has also shown very strong correlation with observed drawdown behavior at this test site. This report will detail many of these studies as well as technical results and conclusions from said studies. These include general subsurface characterization work, completion designs as implemented, studies looking at fracture geometry, high resolution microseismic study including source mechanisms, advanced DSS-RFS studies including drainage characterization, core characterization results, proppant analysis (core and in-fill child well), geochemistry, etc.

02 PETROLEUM↗

INL Site ARG-US Implementation – FY22 Activities and FY23 Plans

The Packaging Certification and Life Cycle Management program at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US provides necessary data for nuclear facility and system operation and maintenance, and has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Irradiated Fuel Storage Facility in relation to the upcoming Department of Energy (DOE) Spent Nuclear Fuel (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in INL’s Nuclear Science and Technology (NS&T) directorate. This investigation is expected to recommend INL site processes or facilities in which to implement ARG-US systems. INL has engaged local site technical and oversight representatives, security, nuclear safeguards, and program management personnel to identify good candidates for ARG-US test implementations. INL has identified the following high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. As a result, INL suggests three program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “Tank Farm,” and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions for completing the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Demonstration of a Fuel-Efficient, Class 8 Tractor & Trailer Engine System (SuperTruck II)

Navistar presents the SuperTruck II (ST II) Final Report to the Unites States Department of Energy (US DOE), which covers the five Budget Periods (BPs) from 10-1-2016 through 6-30-2022. For ST II, Navistar built on the achievements of the SuperTruck I (ST I) Program as a catalyst to continue critical research, design and development, testing, and operations to reach the ambitious goals of the ST II project. This approach allowed Navistar to continue contributing to the essential needs of our nation for safe, efficient, and cost-effective delivery of goods and services, as we reduced negative environmental effects and improved operational productivity. This document contains information specified in DOE F 4600.2, Final Scientific/Technical Report DOE F 241.3, B. SCIENTIFIC/TECHNICAL REPORTS, explaining how we met and exceeded program requirements. Throughout this Final Report, Navistar extracted information from documents prepared during the project that represent our management, design and development, building, and testing efforts to meet and exceed SuperTruck II project goals. Navistar followed Plan requirements to achieve / exceed Project Objectives: a) >100% improvement in vehicle freight efficiency (FE) (on ton-MPG basis) relative to 2009 baseline with stretch goal of 140% improvement [actual: 170%); b) >55% engine brake thermal efficiency (BTE) demonstrated in operational engine at a 65-mph cruise point on a dynamometer – ≥31% increase from 2009 baseline [actual: 55.20% of combined BTE) ; and c) development and implementation of commercially cost effective technologies (in terms of a simple payback). Technology selection / development path focused on developing technologies applicable for production within 3-year approach, while ensuring technology readiness and cost of ownership for end users. The Program was organized into five budget periods: Requirements / Technology Assessment and Initial Hardware Testing; Technology Development and Concept Readiness Demonstration; Technology Finalization and Validation Tractor / Trailer Fabrication, Integration and Commissioning Demonstration; and Fuel Economy (FE) and Brake Thermal Efficiency (BTE) and Program Completion. Leadership was provided by DOE, with tasks performed by laboratories (Argonne National Laboratory, Lawrence Livermore National Laboratory); partners at Bosch, TPI, Dana, and J.B. Hunt; , and support from University of Michigan and Clemson University. Navistar lead this team with Principal Investigator / Contracting Officer; Project Manager (PM); Vehicle, Engine, and Aftertreatment Engineers; Finance Manager, Technical Program Leads, and Legal/IP; and other key personnel. Work also included personnel in risk management; funding / budget / finance. Work involved analysis, development, testing, and down selection of individual/system engine, aftertreatment, and vehicle technologies, with integration of selected technologies into a prototype vehicle for demonstration of fuel-efficiency gain. Work also included component/integrated system level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. As ST II progressed, Navistar performed computer-based modeling / simulations of technologies focused on the primary operational areas: Engine, Aftertreatment, and Vehicle. During the ST II Program, the COVID Virus outbreak unexpectedly challenged by the effects of, which affected staffing, scheduling, design, supplies, availability of materials, production procedures, and testing. The DOE responded by extending the program by three quarters to ensure that project tasks were completed for this vital project. Focus continued on analyzing, developing, testing, and down selecting individual-/system-level engine and vehicle technologies for integration of the final selected technologies into a prototype vehicle that would demonstrate fuel-efficiency gains made possible through these technologies. This included component/integrated system-level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, solar power, distributed and intelligent vehicle power, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. Throughout the program, function, reliability, and performance at all levels were ensured through testing. Proof of this approach was demonstrated in multiple, on-road demonstrations: Scenario A (Flatland) Fuel Economy, Scenario B (Hilly) Fuel Economy, and City Cycle Tests. Other benefits derived from ST II included new/improved products, publications, patents, and next-step capabilities related to electric/hydrogen vehicles and autonomous driving.

Zukouski, Russ↗

Comparison of Light-Weight Radioisotope Heater Unit (LWRHU) Historical Testing to Special Form Testing Requirements

This paper compares the Light-Weight Radioisotope Heater Unit (LWRHU) historical testing to Department of Transportation (DOT) Special Form criteria per 49 CFR Part 173, Shippers-General Requirements for Shipments and Packages, Section 469, Tests for special form Class 7 (radioactive) materials as specified in DOE-STD-1027, Hazard Categorization of DOE Nuclear Facilities. Compliance with the aforementioned criteria allows for the exclusion of radioactive sources from the facility’s nuclear material inventory. As part of a new program at Los Alamos National Laboratory (LANL), LWRHUs are planned to be moved into TA-55, PF-5 Power Source Assembly Area (PSAA) for assembly and testing activities. The PSAA Facility is categorized as a low hazard, non-nuclear facility per DOE STD-1027 and is described in TA55-PF-5-FHC-11-001, Facility Hazard Categorization of the PSAA at PF-5, TA-55. The Facility Hazard Categorization document states, there must be documentation that radioactive sources are engineered to pass the special form testing specified by DOT in 49 CFR 173.469, Tests for special form Class 7 (radioactive) materials or ANSI N43.6, Sealed Radioactive Sources - Classification. This paper documents the extensive historical environmental safety testing of the LWRHU and demonstrates its ability to survive potential launch safety accident scenarios. The testing results are used herein to demonstrate through a comparative analysis that the robust design of the LWRHU meets or exceeds the special form testing specifications in 49 CFR 173.469, enabling the LWRHU to be transported and handled in PF-5 in support of testing and assembly program.

07 ISOTOPE AND RADIATION SOURCES↗

Contaminant Transport Parameters for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 1

This document presents a summary and framework of available transport data and other information directly relevant to the development of the groundwater transport model for Central and Western Pahute Mesa (PM) corrective action units (CAU). This model is referred to as the “PM CAU transport model” in this document. Central and Western PM are two areas of the Nevada National Security Site (NNSS) that historically were used for underground nuclear testing. These nuclear tests resulted in groundwater contamination in the vicinity of the underground test areas. As a result, the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program is currently conducting a corrective action investigation (CAI) of the PM underground test areas. This work is a part of the Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

H- ion source research and development at the Oak Ridge National Laboratory

The U.S. Spallation Neutron Source (SNS) is a state-of-the-art neutron scattering facility delivering the world's most intense pulsed neutron beams to a wide array of instruments which are used to conduct investigations in many fields of science and engineering. Neutrons are produced by spallation of liquid Hg due to bombardment of short (~1µs), intense (~35 A) pulses of protons delivered at 60 Hz from a storage ring which is fed by a high-intensity, 1 GeV H- LINAC. This facility has operated almost continuously since 2006, with ion source performance increasing over those years, and currently providing 50-60 mA of H- ions with a duty-factor of 6% for maintenance-free runs of ~120 days with near 100% availability. Ion source research and development at ORNL has played a key role in enabling and supporting these achievements: this report provides some historical highlights of this effort, describes our current ion source testing facilities, discusses the goals of the program and finally provides a snapshot of some of our ongoing R&D activities. In particular, we have recently simplified and improved the reliability of the plasma ignition gun for the external antenna ion source which is discussed in detail.

Welton, Robert F.↗

Soft Matter Thermal and Mechnical Devices

The participant company, Treau, makes homes and buildings more comfortable with quiet, energy efficient, and easy to install heating and cooling systems. They entered the Cyclotron Road program with an idea for a heat exchanger and compressor and a general idea that the building heating and cooling sector was the best first target market. While at Cyclotron Road, they used the Cyclotron Road program staff and Berkeley Lab expertise to better understand the needs of the heating and cooling equipment market. This was critical to understand who the end customer was, and what features were needed in this market. They were then able to conduct product development with this target market/customer in mind. The Cyclotron Road program was also critical in building a manufacturing and scale-up plan that allowed the participant to build a credible growth and fundraising strategy. By the end of the program, the participant had a working prototype testing at Berkeley Lab’s HVAC testing facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Beam Halo Monitor

Muons, Inc. proposed improved Residual-Gas luminescent Beam Profile Monitors for Intense Beams by adding novel features including a mirascope, a light collecting device devised in the 16th century by an inventor of the telescope. A modern mirascope consists of 2 paraboloids. Light generated by the beam is collected by the paraboloids and creates a beam image. By placing a lens near the image it is possible to collect almost 100% of the emitted light, up to ten times better than existing fluorescence profilometers. Intense (multi-MW) proton beams pose a challenge for beam profile measurements. Solid-based beam intercepting instrumentation produces unallowable levels of radiation at these high powers. An alternative is to use a zero-or-low mass device such as a residual-gas profile monitor, either through collection of ionization or fluorescence. Fluorescence has an intrinsic advantage over the usual collection of ionized electrons in that it is not affected by the strong and variable electric and magnetic fields created by the beam that can distort profiles and make calibration difficult. For this reason, we proposed the fluorescence technique using the mirascope and other methods to enhance light collection and versatility by modifying the residual gas and its spatial distribution. In Phase I, we designed a mirascope and its electronics for commissioning and beam tests in a proposed Phase II. The design was based on optical simulations done in Phase I, and a physics run plan was developed for optimizing and testing. The Phase II experimental site and program have been planned and our goal is to produce a universal low cost Mirascope Residual-Gas Luminescent Beam Profile Monitor that can replace all other profile monitors currently used in accelerators.

43 PARTICLE ACCELERATORS↗

The JLab Eta Factory (JEF) experiment

The new experiment, JLab Eta Factory (JEF), in the experimental Hall D at Jefferson Lab will extend the physics potential of the GlueX detector beyond the main spectroscopy program and perform precision measurements of various ?(?)decays with emphasis on rare neutral modes. The physics program of the experiment spans from precision tests of low-energy QCD to search of gauge bosons in the mass range below 1 GeV coupling the SM sector to the dark sector. Photoproduction of highly boosted ?(?)mesons using a tagged photon beam, good detection of recoil proton and multi-photon final states will allow to suppress background and collect high-statistics data sample of ?mesons. All these provide many advantages over other ?(?)experiments. The JEF experiment requires to upgrade the inner part of the forward lead glass calorimeter of the GlueX detector with high-granularity, high-resolution lead tungstate PbWO4 scintillating crystals. The calorimeter insert is currently under construction at Jeffeson Lab. The detector will be ready to take data in 2024. An overview of the JEF project will be presented.

Somov, Alexander↗