Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stakeholder”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Specification of requirements for the virtual environment for reactor applications simulation environment

In 2010, the United States Dept. of Energy initiated a research and development effort to develop modern modeling and simulation methods that could utilize high performance computing capabilities to address issues important to nuclear power plant operation, safety and sustainability. To respond to this need, a consortium of national laboratories, academic institutions and industry partners (the Consortium for Advanced Simulation of Light Water Reactors - CASL) was formed to develop an integrated Virtual Environment for Reactor Applications (VERA) modeling and simulation capability. A critical element for the success of the CASL research and development effort was the development of an integrated set of overarching requirements that provides guidance in the planning, development, and management of the VERA modeling and simulation software. These requirements also provide a mechanism from which the needs of a broad array of external CASL stakeholders (e.g. reactor / fuel vendors, plant owner / operators, regulatory personnel, etc.) can be identified and integrated into the VERA development plans. This paper presents an overview of the initial set of requirements contained within the VERA Requirements Document (VRD) that currently is being used to govern development of the VERA software within the CASL program. The complex interdisciplinary nature of these requirements together with a multi-physics coupling approach to realize a core simulator capability pose a challenge to how the VRD should be derived and subsequently revised to accommodate the needs of different stakeholders. Thus, the VRD is viewed as an evolving document that will be updated periodically to reflect the changing needs of identified CASL stakeholders and lessons learned during the progress of the CASL modeling and simulation program. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Oak Ridge Cleanup Vision: Moving to the Future by Cleaning Up the Past - 13291

The Oak Ridge Office of Environmental Management (EM) strives to be the leader in the Department of Energy's (DOE's) EM Complex regarding successful and safe project execution and stakeholder interactions that yield positive results. EM's goal has been to become 'Investment Worthy' and, in order to accomplish that important objective, has also had to improve communications both within and outside of the Department. One of our most important missions is to assist the Department in achieving the sustainability goals set forth in Executive Order 13514. In this regard, EM's primary role is to return land to beneficial use and reduce energy impacts and maintenance costs by demolishing unneeded and deteriorating structures and remediating environmental contamination. Recent accomplishments toward meeting these goals include significant progress in the decontamination and demolition of the country's largest facility, the former K-25 Gaseous Diffusion Building, constructed in 1942 to enrich uranium to help end World War II; the disposition of the first phase of Uranium-233 material from the Oak Ridge National Laboratory (ORNL) which involved the transfer of Zero Power Reactor Plates to the National Nuclear Security Administration (NNSA); and a host of other project successes associated with transuranic (TRU) waste processing, hot cell decontamination and demolition, remediation of highly contaminated soils and burial grounds, and removal of mercury from storm sewers and surface waters. With regard to successful stakeholder interactions, recent accomplishments include a new method for collaboration that has renewed EM's working relationship with the regulators, and success in completing an extensive consultation process with over a dozen parties on the historic preservation of the former Oak Ridge Gaseous Diffusion Plant, which is now called the East Tennessee Technology Park (ETTP). Regarding improved communications, EM has successfully revised Program priorities and has received buy-in from the leadership in Headquarters, the regulators, and the community. Issues EM was facing in 2009 are presented. Resulting lessons learned and subsequent changes that the Office has gone through in the past several years in order to improve performance in the safe execution of work, relationships with external stakeholders, and communications both internally and externally are discussed. Results of these efforts are provided as a summary of Program accomplishments, including a strong focus on the future. EM's motto, Moving to the Future by Cleaning up the Past, will be demonstrated through the Program's mission, which includes protecting the region's health and environment; ensuring the continuation of ongoing vital missions being conducted by DOE on the Oak Ridge Reservation; and making clean land available for future use at all three sites, with a near-term focus on Re-industrialization of ETTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise the PRACLAY gallery equipped to simulate a disposal gallery for heat-generating high-level waste evaluating fibre-optic based sensing techniques, including distributed sensing for thermal distribution and long-term reliability in harsh conditions. It also includes the potential to improve the treatment of signals from micro-seismic monitoring to enable enhanced understanding of the evolution around the gallery following its excavation due to ventilation, saturation and heating, and to image a water-bearing concretion layer. HADES URL will also be used to test wireless techniques to transmit monitoring data from the underground to the surface. The main focus of this contribution is to evaluate magneto-inductive data transmission; and to optimise energy usage. At the Bure underground facility in France, monitoring systems have been developed and will be embedded into the steel liner for the mock-up high-level waste disposal tunnel. The aim of this programme is to establish the capacity to conduct integrated monitoring activities inside the disposal cell, on the cell liner and in the near-field and to assess the capability of the monitoring to withstand construction and liner emplacement procedures. These projects, which are supported by focused development and testing of the monitoring systems, will allow the testing of both the effectiveness of these techniques applied to disposal situations and to understand the limits of these monitoring technologies. This approach should also enhance the confidence of key stakeholders in the ability to understand/confirm the changes occurring within a disposal cell. In addition, remote or 'non-intrusive' monitoring technologies are evaluated to provide a means of enhancing understanding of what is occurring in an isolated disposal cell. The projects also test solutions for embedded monitoring systems in challenging (risk of damage) situations. The outputs from this work will lead to improved understanding of these state-of-the-art techniques and allow focused development of those techniques beneficial to future monitoring programmes. It is also planned, as part of the MoDeRn programme of stakeholder engagement to show some of these monitoring demonstrations to lay stakeholders in order to receive their feed-back on the approach taken and their views on the value of this work. This feedback will help improve our understanding of how this work and future work on monitoring can be more effectively communicated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Evolution of Community Engagement Through Ongoing Services Provided by the Fernald Preserve Visitors Center - 17402

The Fernald Preserve is located on the site of a former uranium-processing plant that underwent extensive environmental remediation followed by comprehensive ecological restoration. It is managed by the US Department of Energy Office of Legacy Management and is located approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. Remedial activities and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. Although the remediation of buildings and soil contamination was completed in 2006, site aquifer remediation is ongoing and remains a topic of interest to the community. Much of the site is open to the public, with approximately 11 km (7 miles) of year-round walking trails within the 425-hectare (1050-acre) site. The Fernald Preserve Visitors Center is open Wednesdays through Saturdays and site staff are available to accommodate program requests as needed. The Visitors Center was originally requested by stakeholders involved in developing recommendations for the site's final land use. Stakeholders requested a 'multi-use educational facility' that would recognize the site's history, serve as a source of site information, and recognize the contributions of energy workers during the Cold War. This building was converted from a warehouse built to support site cleanup and was ultimately awarded a Platinum rating by the U.S. Green Building Council. The Visitors Center was designed to accommodate site history exhibits, free meeting space for nonprofit groups, and public interpretive programs. It was opened to the public in 2008, and today's ongoing visitor services are continually adapted to meet the needs of current stakeholders. Over time, the interpretive services have evolved to include more diverse onsite cultural and natural history public programs, events, and activities. Today's community engagement efforts include public and private onsite programs and exhibits, public and private offsite programs and displays, meeting space, and regular open hours for the Visitors Center. This paper presents the various methods used to engage the greater Cincinnati community at the Fernald Preserve. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A paradigm shift - the key to optimal, defensible and transparent waste management, disposal and remediation decisions - 15236

Current methods for structuring nuclear waste management, disposal, and remediation decisions are subject to three major limitations. First, they are based on a series of extraordinarily conservative assumptions. The dominant way of thinking is that, for example, conservative models yield better, safer decisions. Second, they lack methods to meaningfully address and incorporate the 'human dimension'. The dominant way of thinking is that the current approach is sufficient to bring together the values and interests of both internal and external stakeholders in making a decision. And third, they lack a formal method through which both internal and external stakeholders are encouraged collectively to 'think through' complex problems that contain multiple competing objectives so that wise, socially acceptable, and scientifically-defensible decisions are made. To overcome these limitations, a paradigm shift is needed towards a holistic, integrated approach to structure nuclear waste management, disposal and remediation decisions. The first requirement of this paradigm shift is the realization and recognition that the problems faced are decision problems, and that there is a formal theory of decision analysis that can, and should, be used to support finding the best solutions. Decision analysis, very simply, is formalized common sense. The reason it is needed for complex problems is that there are too many moving parts (variables) for humans to manage with out the formalism. Decision analysis leads to addressing problem solving using a combination of a science-based model and a costs/values model. Expectation ('realism') and uncertainty are addressed in the science-based models, whereas stakeholder values, preferences, and desires are addressed when modeling costs and value judgments. Science-based modeling tools have been developed, improved, and used since the current regulatory setting was introduced about 30 years ago. However, modeling of costs and value judgments has not often been addressed using any formal approach, despite the openings that exist in regulations (e.g., CERCLA's modifying criteria and the concept of 'as low as reasonably achievable' referenced in DOE Orders). A discussion of the need and rationale for this paradigm shift is presented, followed by a description of the technical basics of this approach to decision modeling, and ending with an explanation of the steps that are taken in this approach to structured decision-making. A software framework program called Guided Interactive Statistical Decision Tools (GiSdT - pronounced 'gist') is introduced that supports this paradigm shift. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving public communication through environmental data transparency at Los Alamos National Laboratory - 15306

The Los Alamos National Laboratory (LANL) environmental data span a wide range of media, including air, soil, sediment, water, foodstuff, and biota as well as over 1000 analytes and time periods extending over 4 decades, resulting in over 14 million records to manage and analyze. At a time of budget cuts and rapid social and technological change, the public, regulatory and compliance agencies, and stakeholders demand accelerated data delivery and efficiency, information sharing, and transparency in the dissemination and handling of samples collected in and around LANL. Meeting these requirements, while constraining the associated costs can be challenging; however, LANL has achieved this by adopting a cloud-based database called the Environmental Information Management (EIM) system and its public database counterpart, IntellusNM (Intellus) (www.intellusnm.com). To be consistent with federal initiatives to move government computing into cloud-based services, LANL chose to partner with an existing cloud-based vendor, Locus Technologies, to implement a software-as-a-service model. As an additional cost-saving measure, local regulatory and compliance agencies collaborated with LANL to incorporate their data into EIM and Intellus database. By adopting a single platform cloud-based solution to replace 12 different pre-existing environmental data systems, LANL has streamlined environmental data processes, resulting in over $15 million cost savings through 2015. EIM, LANL's internal cloud database, provides a cradle-to-grave process for data handling. EIM supports LANL's entire data process from detailed sample planning, mobile data collection using iOS mobile devices, to automated bottle labeling, generation of chain of custody, analytical lab electronic data deliverable upload, auto data validation, sample tracking, and custom regulatory and compliance reports. EIM has functionality to assess data in various ways such as the ability to design new formatted reports, a free-form structured query language tool of the entire database, exceedance reports, calculation engine, charting, trends, and statistics. EIM also has interactive geographic information system layers and analyte concentration color contour mapping capabilities. Additionally, and of greater importance to LANL, EIM supports the ability for third-party landowners to review data before release to the public, thus ensuring transparency and confidence in LANL's stewardship of human health and the environment. Intellus, the database counterpart of EIM, is the publicly available view of the entire LANL database and requires no data feeds or transformations. Intellus allows user-friendly access to LANL's environmental data as it is collected, providing the public, scientists, remediation teams, regulators, and stakeholders within hours of receipt. Full transparency in giving the public access to environmental data information provides LANL's overall solution to environmental data management for the public. By making the data easy to obtain, search, and query for interested stakeholders, the system enables confidence in LANL's stewardship of the environment. Working together identifies key topics of improvements, develop strategies and help support innovation and substantial advances within LANL's environmental data management system. (authors)

54 ENVIRONMENTAL SCIENCES↗

Implementation of Arizona's nuclear future 153192.doc10 - 15319

The Arizona Energy Education Fund (AEEF), now a 501(c) (3) non-profit entity, is an assembly of stakeholders from the private sector, government, education and energy industries dedicated to supporting K-12 (kindergarten through 12. grade), community colleges and universities through an enhanced program of smart nuclear generator expansion, isotope production, testing of breeder reactor power plants, recycling spent nuclear fuel in power generation facilities, and nuclear fuel cycle support. AEEF priorities are to collaborate with stakeholders in Arizona to develop safe plans that will make Arizona the most nuclear friendly state benefiting all stakeholders. Long-term plans include promoting: - education of K-12 students as well as the general Arizona population so that they fully understand the benefits and safe use of nuclear power; - reliable supply of medical and industrial radioisotopes; - Arizona as host of new reactor concepts which are being developed and demonstrated; - development of nuclear engineering programs in Arizona universities to drive the development of the next generation of nuclear power plants; and - supply of nuclear-generated electricity to California and Sonora, Mexico to power desalinisation plants in exchange for Colorado River water currently allocated to California and Sonora. The development described will generate significant long-term employment for Arizona while delivering a critical service to the nation. Arizona's location advantages include the lack of significant seismic activity, hurricanes, tsunamis, floods or frigid weather. Interstate highways and railroads are well developed and provide good, all-weather access to many potential development sites. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A whole wilderness of warning: Assessing economic consequences of nuclear releases - 15494

The consequences of the Fukushima Dai-ichi disaster may provide a useful analogue for assessing the consequences of an accident involving the transport of spent nuclear fuel in the United States. An unexamined, to date, aspect of the Fukushima Dai-ichi disaster is the wide disagreement about the economic consequences of the release. There exist a variety of different estimates and different models and methods for performing these estimates, but not a systematic way to address the range of issues such a disaster generated. This paper examines the sources, methods, data, and assumptions used to prepare economic consequence estimates of the disaster. This paper compares and contrasts these estimates and evaluates them for their reliability. The wide dispersion of consequence assessments as defined by various media and agency impact reports in the post-Fukushima era are evidence that such variability does not serve the industry, regulators, government or researchers well. While a protocol exists to gauge the intensity of an incident (INES Scale) no pre-existing methodology exists to measure the various socioeconomic impacts associated with a radiological disaster, be it induced by a natural disaster incident or human initiated. This paper argues that an improved method will be necessary and suggests some parameters for such a method. Nevada has started the dialogue on such a comprehensive methodology (Ballard 2012, Ballard 2014). Despite this effort by a stakeholder, the regulatory agencies involved in nuclear waste shipments in the United States appear reluctant to begin a dialogue about how to address the full range and scope of issues. Resolution of this problem will be a necessary prerequisite to any large scale shipping program. It will be necessary to adopt a standardized methodology to assess consequences of a radiological emergency and incorporate this into the environmental impact statement process for the shipping program. This analytical deficiency should be addressed by these agencies/regulators and in preparation for the potential movement of nuclear waste in the quantities necessary to service the nuclear power industry and to address the existing spent nuclear fuel (SNF) stockpiles across the United States. It will be necessary to demonstrate to stakeholders that the benefits of shipping radioactive substances this dangerous outweigh the costs of a possible accident or terrorist incident. The nuclear energy industry should support funding for these assessment studies in order to provide a basis for discussions about the costs and benefits of the shipments. The studies would provide stakeholders with clarity about the possible consequences of the program. The studies will also assist Japan in its efforts to understand what their disaster means for that country. This paper will begin the dialogue on how such analytical protocols could be constructed to pre-stage the research necessary to assess such consequences. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A paradigm shift: an introduction to structured decision making for sustainable waste management and remediation - 15649

transport of contaminants and human health risk assessment. Most often these modeling activities are carried out in a conservative fashion, usually beyond even the conservatism that is built into the associated regulations and guidance. Decisions are aimed primarily at compliance with regulatory objectives, rather than optimization. This leads to unnecessarily costly remediation and under-utilization of the nation's relatively few radioactive waste disposal facilities. Risk assessment decisions under CERCLA and RCRA might seem to perform better, but if anything this is because the focus is on shorter-term decision-making because long term fate and transport modeling is not considered necessary in most cases. However, some more complex contamination problems suffer from the same basic issues as radioactive waste disposal in terms of the need for complex fate and transport modeling and subsequent risk assessment. At least CERCLA addresses optimization in the feasibility study, but it does not address how to perform that optimization in the face of uncertainty or stakeholders who have different competing objectives. Other environmental issues that fall outside the realm of DOE Orders, NRC regulations, and regulations such as CERCLA and RCRA, have found a different path towards effective decision-making. This includes land reuse and watershed management decisions, for which there is a focus on sustainability and on stakeholder involvement throughout the decision making process. EPA is using 'structured decision analysis' to achieve the primary goal of maximizing societal welfare. These same tools and approaches can be brought into environmental and waste management decisions that need to be made by DOE. Structured decision analysis provides a formal process for capturing not only the science side of the problem, but also the costs and value judgments of the stakeholders, to reach an optimal solution. But this approach requires a paradigm shift within the DOE and NRC environmental and waste management programs. That is, it requires a willingness to engage a new approach that will provide a path towards effective optimization in the decision-making process for the complex environmental problems faced by DOE and NRC. Because of the current nature of problem solving for these types of problems, which involves many layers of conservatism, this structured decision analysis path towards optimization will also realize substantial cost savings for these programs, while maintaining or improving defensibility and transparency in the decision making process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Collaborative Advanced Technology Demonstration (ATD) - 18313

In support of the Department of Energy's Environmental Management Office of Technology Development (DOE-EM TD) Robotics Technology thrust to pull innovative commercial off the shelf (COTS) and near ready technologies to the field to expedite remaining EM mission clean up and enhance worker safety, the required FY19 Savannah River Site (SRS) H-Canyon Air Exhaust (HCAEX) tunnel inspection task will be used to demonstrate and evaluate the benefit of pulling advanced technology solutions to EM facilities. Presently a biannual visual inspection of the SRS HCAEX tunnel is required to evaluate the structural integrity of the tunnel. While the ability to see inside the tunnel in recent years has been highly invaluable, it is desirable to have a better understanding of the tunnel environment to support a more thorough structural integrity analysis and for long term planning purposes. This higher order of understanding can be accomplished through state of the art COTS sensors and those currently in development and near ready. The ATD will identify and develop for deployment advanced technologies to be hosted on the FY19 inspection platform to acquire high value data desired by the stakeholder. This presentation will include an overview of the ATD mission, background on the tunnel and harsh remote environment in which the inspection robot will work and the high priority inspection needs identified by the H-Canyon facility stakeholders. Discussion will include previous and planned robotic platform modifications to facilitate work in the tunnel and a discussion on the advanced technologies identified to be implemented for the inspection. The ATD will be completed over approximately a 2-year period and has already begun in the form of planning, identification of stakeholder needs, specification of a robust platform and identification of the high priority sensor needs to be pursued. This presentation will be a status of the ATD at approximately the 7-month mark. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Nuclear Regulatory Commission Historical Perspectives of Very Low-Level Radioactive Waste - 18367

The United States Nuclear Regulatory Commission (NRC), in Title 10 of the Code of Federal Regulations Part 61 (10 CFR Part 61), 'Licensing Requirements for Land Disposal of Radioactive Waste', provides licensing procedures, performance objectives, and technical requirements for the issuance of licenses for the land disposal of low-level radioactive waste. Low-level radioactive waste is divided into four categories based on its potential risk and need for isolation. Class A is the lowest category of low-level radioactive waste and poses the least risk. A large percentage of Class A low-level waste contains very low radionuclide concentrations and does not pose a significant health and safety risk. In the current regulatory framework, this waste, referred to as low-activity or very low-level waste, is managed in the same manner as much more hazardous waste. In 1986 and 1990, as a result of the Low-Level Radioactive Waste Policy Amendments Act of 1985, the NRC issued the Below Regulatory Concern (BRC) policy statement. This policy statement established an implementation plan regarding the expeditious handling of rulemaking petitions 'to exempt specific radioactive waste streams from regulation due to the presence of radionuclides in sufficiently low concentrations or quantities as to be below regulatory concern.' The BRC policy statement provided a consistent risk framework when considering regulatory exemption decisions, such as: (1) the release for unrestricted public use of lands and structures containing residual radioactivity; (2) the distribution of consumer products containing small amounts of radioactive material; (3) the disposal of very low-level radioactive waste at other than licensed disposal sites; and (4) the recycling of slightly contaminated equipment and materials. Due to concerns with the BRC policy that were raised by Congress, the States, the public, and others, Congress enacted the Energy Policy Act of 1992, which revoked the NRC's 1986 and 1990 BRC policy statements and led to the NRC's formal withdrawal of the BRC policy in 1993. Stakeholders raised concerns on NRC's potential deregulation of radioactive material. Additionally, in March 2005, the NRC staff proposed a rule to amend 10 CFR Part 20, 'Standards for Protection Against Radiation,' to include radiological criteria for controlling the disposition of solid materials with very small amounts of residual radioactivity. The NRC staff also proposed a limited disposition approach for the disposition of solid material, limiting the release of solid material meeting a 0.01 milli-Sievert per year (mSv/yr) [1 milli-rem (mrem/yr)] dose criterion, from licensed control. In June 2005, the Commission disapproved publication of the proposed rule and deferred the rulemaking until a later time, stating that the NRC's existing approach of reviewing specific cases on an individual basis was fully protective of public health and safety. This rulemaking effort was discontinued by the Commission in 2016. Recently, several nuclear power plant licensees have announced early decommissioning of their facilities. Some stakeholders have expressed concerns about the capacity and disposal costs associated with using the four existing low-level waste disposal sites for very low levels of radioactive waste (i.e., waste at the low end of the Class A category). A more risk-informed, performance based approach to waste disposal would allow more flexibility in managing this waste commensurate with its risk and hazard. A new approach would also allow the NRC to align with international standards for this type of waste. The NRC is presently conducting a scoping study to identify the actions the agency should take to strengthen its regulatory framework for very low-level waste disposal. The Very Low-Level Waste (VLLW) scoping study will consider divergent stakeholder comments; lessons learned from the BRC policy statements and the proposed rule on radiological criteria for controlling the disposition of solid materials; and best practices of other countries with respect to VLLW disposal. The NRC will also engage other government agencies to discuss regulatory options for VLLW. This paper offers a historical overview of past NRC initiatives to manage the lower end of Class A waste in a manner that is risk informed and performance based. It examines previous endeavors and discusses the regulatory challenges that arose. It also addresses lessons learned and introduces NRC's current effort regarding very low-level radioactive waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Demonstration of Monitoring Strategies and Technologies -Modern2020 Project - 19317

The Modern2020 project aims at providing the means for developing and implementing an effective and efficient repository operational monitoring program, taking into account the requirements of specific national programs. The work allows advanced national radioactive waste disposal programs to design monitoring systems suitable for deployment when repositories start operating in the next decade and supports less developed programs and other stakeholders by illustrating how the national context can be taken into account in designing dedicated monitoring programs tailored to their national needs. The work has been established to understand what should be monitored within the frame of the wider safety cases and to provide methodology on how monitoring information can be used to support decision-making and to plan for responding to monitoring results. Several developments on innovative repository monitoring techniques (wireless data transmission, alternative power supply sources, new sensors, geophysical methods) has been done from the proof of feasibility stage to the technology development and demonstration phase. Innovative technical solutions facilitate the integration and flexibility of required monitoring components to ease the final implementation and adaptation of the monitoring system. Full-scale in-situ demonstrations of innovative monitoring techniques were done in way to evaluate the performance of the state-of-the-art, the innovative techniques and their comparison with conventional ones. Finally, we will introduce the experiences of the local public stakeholders that have been involved in the Modern2020 project by focusing on the participation in practice of the Belgian, French, Finnish and Swedish local stakeholders, This paper provides an overview of the European Commission Horizon2020 Modern2020 project's main goals and progress to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Communicating Technical Information: Different Approaches for Different Audiences - 19399

The Canadian Nuclear Safety Commission (CNSC), Canada's independent nuclear regulator, has a 70- year history of regulating nuclear safety in Canada. Part of the CNSC's mandate is to disseminate objective scientific, technical and regulatory information to the public. The CNSC prides itself on being transparent with the public, and openly sharing scientific, technical and regulatory information on its regulatory activities with stakeholders. We value the public's feedback, and have a robust public participation program to allow for public involvement in the CNSC's activities. However, different audiences have different needs based on their level of technical knowledge and expertise. The CNSC's experience with stakeholder interactions has demonstrated the need to balance the dissemination of technical information through different communication platforms, in order to satisfy the needs of various intended audiences. This paper will focus on the radioactive waste management communications methods that the CNSC has implemented for two distinct audiences: 1. Audiences with little or no technical background: Communications with this audience requires techniques to make highly technical concepts more understandable. The focus is on educating about matters related to radioactive waste management, and informing about the safety aspects behind the regulation of radioactive waste. 2. Audiences with previous knowledge and experience with nuclear matters: Communications with this audience requires techniques to ensure that as much technical information and data as possible is available to inform stakeholders. The focus is on giving access to studies, research and raw data, in order to allow this audience to inform themselves, and potentially bring new perspectives to the CNSC's attention that could be used in regulatory oversight activities. In its capacity to disseminate scientific and technical information to the public as required by legislation, the CNSC holds a unique position compared with other Canadian regulatory bodies. The CNSC is one of the only Canadian regulators which: - Has a public hearing process which enables the public and Indigenous groups to express their issues and concerns directly to the decision-maker (the Commission) - Publishes regular regulatory oversight reports (report card on industry) that assess the safety performance of all its licensees - Publishes responses to all public comments received during consultation periods in our environmental assessment processes as well as our regulatory framework processes, including draft regulatory documents, discussions papers and proposed regulations - Has an independent environmental monitoring program, allowing the public access to environmental data. The program also seeks public and Indigenous input with respect to proposed environmental sampling campaigns, including suggestions on the samples to be taken and sampling locations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustainable Transactions - The Fine Art of the Forever Deal - 19569

The U.S. Department of Energy Office of Legacy Management (LM) has various real property interests at the 92 sites within its current portfolio. Because of its unique mission, LM does not own most of the sites for which it has responsibility for long-term surveillance and maintenance (LTS and M). In addition to the sites it does own, LM works with various federal, state, local, and private entities to execute its obligations. Each site has its own narrative with respect to the real property assets: how they were acquired, how they are sustained, and how they were or will be dispositioned. Since the regulatory time frame for LTS and M activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's mission as a federal land manager and steward. In addition, more than half of the sites currently in LM's inventory do not allow unrestricted use because of residual contamination from historical activities, and institutional controls are required to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. Thus, the overall real property interests and transactions associated with these sites not only have to address the environmental concerns associated with protection of human health and the environment but also how best to position LM's real property assets to support the mission for future generations. These types of transactions are often complex, requiring the negotiation of numerous documents to achieve and sustain protection of human health and the environment while allowing for future use. Such planning needs to be flexible enough to envision that the original transaction will likely change over time due to changing regulations, communities, stakeholders, and site conditions as operation and maintenance activities are performed. Planning for the integration of these requirements with the needs of the end users, stakeholders, and communities is paramount to a successful project, and various transactional considerations impact how best to achieve this goal. As such, these transactions have to be sustainable. Real property interests change over time, with new owners, operators, regulators, and stakeholders. Determining the sustainability of these real property interests, therefore, calculates the sustainability of each asset's physical attributes and also the sustainability of the various legal instruments and arrangements that are put in place at each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 128: Best Practices in Project Communications

This panel focused on a sustainable, holistic and integrated approach to structure nuclear waste management, disposal and remediation decisions. This panel had participation from internal and external stakeholders and demonstrate use of tools and techniques to effectively communicate factors that inform decisions. The desired outcome was to effectively communicate how risk is evaluated at complex sites, highlight holistic site level approaches that are protective of human health and the environment, and incorporate policy and technical concerns related to achieving alternative end points. This discussion included existing decision-making tools in conjunction with case studies. Panelists with presentations: Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos National Laboratory (David Nickless); Best Practice In Project Communications (Alan Paulley); Stakeholder and Public Engagement (Mark Lesinski); Stakeholder Engaged Structured Decision Making (Kelly Black)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Commercial Ready Autonomous Robotic Platforms to Enhance Worker Safety and Efficiency - 20053

This paper will explore the challenges and triumphs of implementing advanced robotic systems and the supporting technology for the waste management industry. Deployment-ready solutions for autonomous robotic platforms are new to the radioactive waste management industry and have been slow to implement across the complex. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground-based autonomous robotic platforms to enhance workforce safety and efficiency. The first objective of the project is to demonstrate safe operation of autonomous instrumented robots, followed by a scaling up of capabilities for the platform to meet any additional requests of internal stakeholders. Autonomous robotics platforms offer a fantastic range of capabilities that will aid in decreasing long-term liability of radioactive waste management industry by enhancing clean-up efforts and worker safety. Over the past five years, deployment-ready solutions for autonomous robotic platforms have come a long way. Autonomous robotic platforms are increasingly available to purchase from many vendors, often for prices under $100,000. Additionally, the vendors who produce these products are efficient in accommodating customized solutions to unique challenges, such as those often found in the radioactive waste management industry. However, the newness of this technology to the radioactive waste management industry and has resulted in a slow implementation across the complex. This paper will explore the challenges and triumphs of implementing advanced robotic systems and supporting technology for the waste management industry. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground based autonomous robotic platforms to enhance workforce safety and efficiency. While the company has utilized robots in many parts of the tank farms mission, this was first attempted in the deployment of an autonomous platform that required no operator with only minor maintenance and created challenges not yet encountered. These challenges included stakeholder buy-in, operational safety, procurement uncertainties, adaption of 'off the shelf products, overcoming the 'Fukushima complexity' perception, security concerns, and the initial criteria down select. Hanford Tank Operations Contractor's management identified the need for a workforce protecting low cost robotics solution in the fall of 2017. The project scope generated was part of the response to the Tank Vapor Assessment Team recommendation to enhance the safety of the workforce by utilizing new technology. Since the projects inception, it has been incorporated into the Tank Stewardship Plan. This project was unique to Hanford Tank Operations Contractor, as the company does not frequently incorporate advanced technology for field deployment quickly. The project was also progressive to the Hanford Tank Operations Contractor as it functions as a partnership project with a local university. The first objective of the project is to demonstrate safe operations of autonomous instrumented robotics, monitoring and collecting data, and the wireless transmission of data to a central computing system. Following the completion of this first objective, the project will scale up capabilities of the platform to meet the requests of additional internal stakeholders throughout the tank farms - including completion of specific in-field tasks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗