Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Modular space station phase B extension integrated ground operations

Requirements for development test, manufacturing, facilities, GSE, training, logistics support, and launch operations are described. The prime integrating requirement is the early establishment of a common data base and its use throughout the design, development, and operational life of the station. The common data base is defined, and the concept of its use is presented. Development requirements for the station modules and subsystems are outlined along with a master development phasing chart.

Selegue, D. F.↗

Maintenance and supply options

The object of the Maintenance and Supply Option was to develop a high level operational philosophy related to maintenance and supply operations and incorporate these concepts into the Lunar Base Study. Specific products to be generated during this task were three trade studies and a conceptual design of the Logistic Supply Module. The crew size study was performed to evaluate crew sizes from the baseline size of four to a crew size of eight and determine the preferred crew size. The second trade study was to determine the impact of extending surface stay times and recommend a preferred duration of stay time as a function of crew, consumables, and equipment support capabilities. The third trade study was an evaluation of packaging and storage methods to determine the preferred logistics approach to support the lunar base. A modified scenario was developed and served as the basis of the individual trade studies. Assumptions and guidelines were also developed from experience with Apollo programs, Space Shuttle operations, and Space Station studies. With this information, the trade studies were performed and a conceptual design for the Logistic Supply Module was developed.

Source record↗

The International Space Station as a Research Laboratory: A View to 2010 and Beyond

Assembly of International Space Station (ISS) is expected to be complete in 2010, with operations planned to continue through at least 2016. As we move nearer to assembly complete, replanning activities by NASA and ISS International Partners have been completed and the final complement of research facilities on ISS is becoming more certain. This paper will review pans for facilities in the US On-orbit Segment of ISS, including contributions from International Partners, to provide a vision of the research capabilities that will be available starting in 2010. At present, in addition to research capabilities in the Russian segment, the United States Destiny research module houses nine research facilities or racks. These facilities include five multi-purpose EXPRESS racks, two Human Research Facility (HRF) racks, the Microgravity Science Glovebox (MSG), and the Minus Eighty-degree Laboratory Freezer for ISS (MELFI), enabling a wide range of exploration-related applied as well as basic research. In the coming years, additional racks will be launched to augment this robust capability: Combustion Integrated Rack (CIR), Fluids Integrated Rack (FIR), Window Observation Rack Facility (WORF), Microgravity Science Research Rack (MSRR), Muscle Atrophy Research Exercise System (MARES), additional EXPRESS racks and possibly a second MELFI. In addition, EXPRESS Logistics Carriers (ELC) will provide attach points for external payloads. The European Space Agency s Columbus module will contain five research racks and provide four external attach sites. The research racks are Biolab, European Physiology Module (EPM), Fluid Science Lab (FSL), European Drawer System (EDS) and European Transport Carrier (ETC). The Japanese Kibo elements will initially support three research racks, Ryutai for fluid science, Saibo for cell science, and Kobairo for materials research, as well as 10 attachment sites for external payloads. As we look ahead to assembly complete, these new facilities represent a threefold increase from the current research laboratory infrastructure on ISS. In addition, the increase in resident crew size will increase from three to six in 2009, will provide the long-term capacity for completing research on board ISS. Transportation to and from ISS for crew and cargo will be provided by a fleet of vehicles from the United States, Russia, ESA and Japan, including accommodations for thermally-conditioned cargo. The completed ISS will have robust research accommodations to support the multidisciplinary research objective of scientists worldwide.

Uri, John J.↗

Capability Gaps Assessment and Identification of Critical Technology Elements for Mars Transit Habitat

The Habitation Systems Development Office (HP40) at NASA Marshall Space Flight Center supports systems engineering, integration, and project management for next generation space habitats. For in space operations and eventual transport of humans to Mars, NASA will rely on a Mars Transit Habitat (TH). The TH will be designed for an up to 1,200-day Mars mission and will carry all food and supplies needed to support four crew for this duration. In the current concept of operations, Mars TH transfers to near rectilinear halo orbit (NRHO) following launch and docks at Gateway as a visiting vehicle. While there, the TH will complete system shakedown testing and a series of analog missions which will grow from 3 to 6+ months in duration TH also augments Gateway’s habitation capabilities beyond 60-days. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. These shakedown missions will also be the first operational readiness tests of Mars TH’s long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Once shakedown missions are complete, Mars TH departs Gateway to aggregate with the Mars propulsion system in NRHO before onboarding the crew and final supplies in Earth orbit via a co-manifested Orion-logistics module. Orion and the LM return to Earth prior to the now aggregated Deep Space Transport vehicle’s journey to Mars. Development of the Mars TH requires significant technology development and maturation. Each year the agency performs a capability gaps assessment, where gaps developed by subject matter experts (SMEs) in various engineering/science disciplines are linked to architectural elements in formulation and prioritized. A gap captures the difference between the current state-of-the-art and the maturity of the capability that is needed to enable or enhance a mission as it is currently envisioned in the government reference architecture. HP40 conducted a gap analysis for Mars TH which will be summarized in this poster. Gaps classified as enabling (which means the mission cannot achieve success without gap closure) were subsequently used to identify critical technology elements (CTEs) for Mars TH. This identification of CTEs was also informed by an examination of the product breakdown structure for Mars TH and focused conversations with SMEs in specific technology areas. CTEs identified for Mars TH to date include the following (note this is not a comprehensive list – CTEs listed represent those in MSFC’s capability areas): inflatable softgoods for habitation; enhanced CO2 recovery; life support systems with greater levels of reliability and maintainability; autonomous guidance, navigation, command and control; and radiators for the Mars TH application. The habitation systems development team is currently delving deeper into each CTE to assess technology approaches being pursued, their maturity, and the degree of difficulty in maturation to meet projected Mars TH timelines. This poster will summarize work to date on the identification of enabling capability gaps linked to Mars TH and provide insight into the associated CTEs and technology maturation efforts.

technology development↗

Low temperature storage container for transporting perishables to space station

This invention is directed to the long term storage of frozen and refrigerated food and biological samples by the space shuttle to the space station. A storage container is utilized which has a passive system so that fluid/thermal and electrical interfaces with the logistics module is not required. The container for storage comprises two units, each having an inner storage shell and an outer shell receiving the inner shell and spaced about it. The novelty appears to lie in the integration of thermally efficient cryogenic storage techniques with phase change materials, including the multilayer metalized surface thin plastic film insulation and the vacuum between the shells. Additionally the fiberglass constructed shells having fiberglass honeycomb portions, and the lining of the space between the shells with foil combine to form a storage container which may keep food and biological samples at very low temperatures for very long periods of time utilizing a passive system.

Dean, William G↗

The Pressurized Logistics Module: Providing Consumables and Resupply Logistics to the Lunar Surface for a Long-duration Manned Mission

In response to President Bush s 2004 Vision for Space Exploration initiative, NASA established an agency-wide Lunar Architecture Team (LAT) to develop the high-level requirements, assumptions, ground-rules and objectives for a manned mission to the moon. During Phase II of the evaluation, the Habitation Focus Element Group was directed to conceptually develop and design a Pressurized Logistics Module (PLM). The PLM task was delivered with one major requirement: to derive a system with minimal mass and cost, and a maximum, functional, internal volumetric area in order to provide the maximum amount of consumables, supportability and logistic re-supply for a crew of four to the Lunar surface with an overall integrated maximum weight of 5200kg. The PLM was derived from the Habitation Group s "mini-Hab" option. This concept required that the PLM have an aluminum-clad graphite epoxy external truss, utilized for increased mobility and stability, which would encompass a 2.7 meter diameter pressurized aluminum-lithium cylinder. Several trade studies and analyses were performed to determine the final length and orientation of the module, the number of systems required to maintain the PLM, and the number of hatches/mating mechanisms which would successfully and efficiently meet the requirements. Of the five specific configurations assessed, the PLM was determined to have a 3 meter by 3 meter by 5 meter external truss with a 2.7 meter diameter and 5 meter long horizontal, pressurized cylinder with one hatch/mating mechanism on one end cone. Two major assumptions aided in the formulation of the technical baseline: 1) the PLM should be sustainable for up to 18 months on the Lunar Lander without connection to its final destination, the Lunar Outpost, and 2) it must be self-sufficient to withstand a maximum eight hour transit from the Lander to the Outpost. Per these assumptions, eight major systems constitute the PLM: structures, passive mating, protection, power, thermal, avionics, life support and outfitting. Including a conservative 20% growth, the overall estimated tare weight for the PLM was determined to be 2181kg. The tare weight of the design allowed the available internal volume of the cylinder with a 0.20 meter high floor to transport the maximum of either 176 single Crew Transfer Bags (CTBs) or 3019kg.

Carpenter, Amanda↗

Comparison and Validation of FLUKA and HZETRN as Tools for Investigating the Secondary Neutron Production in Large Space Vehicles

NASA's exploration goals are focused on deep space travel and Mars surface operations. To accomplish these goals, large structures will be necessary to transport crew and logistics in the initial stages, and NASA will need to keep the crew and the vehicle safe during transport and any surface activities. One of the major challenges of deep space travel is the space radiation environment and its impacts on the crew, the electronics, and the vehicle materials. The primary radiation from the sun (solar particle events) and from outside the solar system (galactic cosmic rays) interact with materials of the vehicle. These interactions lead to some of the primary radiation being absorbed, being modified, or producing secondary radiation (primarily neutrons). With all vehicles, the high energy primary radiation is of most concern. However, with larger vehicles that have large shielding masses, there is more opportunity for secondary radiation production, and this secondary radiation can be significant enough to cause concern. When considering surface operations, there is also a secondary radiation source from the surface of the planet, known as albedo, with neutrons being one of the most significant species. Given new vehicle designs for deep space and Mars missions, the secondary radiation environment and the implications of that environment is currently not well understood. Thus, several studies are necessary to fill the knowledge gaps of this secondary radiation environment. In this paper, we put forth the initial steps to increasing our understanding of neutron production from large vehicles by comparing the neutron production resulting from our radiation transport codes and providing a preliminary validation of our results against flight data. This paper will review the details of these results and discuss the finer points of the analysis.

Rojdev, Kristina↗

Shuttle to space station transfer of the materials exposure facility

The Materials Exposure Facility (MEF) is being proposed by LaRC as the first long-term space materials exposure facility with real-time interaction with materials experiments in actual conditions of orbital space flight. The MEF is proposed as a Space Station external payload dedicated to technology advancement in spacecraft materials and coatings research. This paper will define a set of potential logistics for removing the MEF from the Shuttle cargo bay and the process required for transferring the MEF to a specific external payload site on Space Station Freedom (SSF). The SSF UF-2 configuration is used for this study. The kinematics and ability to successfully perform the appropriate MEF maneuvers required were verified. During completion of this work, the Space Station was redesigned and the International Space Station Alpha (ISSA) configuration evolved. The transfer procedure for SSF was valid for ISSA; however, a verification of kinematics and clearances was essential. Also, SSF and ISSA robotic interfaces with the Orbiter were different.

Shannon, David T., Jr.↗

Extending ISS Life Beyond 2030

This paper presents an overview of the International Space Station life extension project, focusing on the analytical approach used to assess its primary structure. Also addressed are life extension approaches for other affected sub-systems, including secondary structure, materials, Environmental Control and Life Support Systems (ECLSS), Electrical Power Systems (EPS), and Logistics and Maintenance (L&M). The United States On-orbit Segment (USOS) of the International Space Station (ISS) was initially designed for a 15-year on-orbit life, but with the realization of its continued importance, efforts were made to extend its operations through 2030. The paper discusses the various analyses conducted, including future operations planning, load simulation, material degradation studies, thermal analyses, and fracture analyses. The results demonstrate the feasibility and achievability of extending the ISS's life, ensuring its on-going role as a hub for scientific research, international cooperation, and educational endeavors. With the life extension process in place, continuous operations beyond 2030 are possible to maintain an uninterrupted human presence in Low Earth Orbit, facilitating the testing of new technologies, and allow for a seamless transition to new commercially owned and operated destinations.

design life↗

Applying the OTV to lunar logistics

The Orbit Transfer Vehicle (OTV), representing the next generation of upper stages, has recently been studied in a Phase A concept definition study managed by NASA's Marshall Space Flight Center. The vehicle has been previously defined as strictly an orbit-to-orbit type transfer device. Recently its application to the task of lunar surface logistics was investigated. Transfer options to the surface were considered which included direct transfer, and transfer via lunar orbit as well as the L1 libration point. The subsystem modifications required to enable lunar landings were established for the following elements: aerobrake, main propulsion system, landing legs, primary structure, and avionics. It is concluded that the majority of the basic systems required for efficient transfer to the lunar surface are already contained in the OTV.

Willcockson, W. H.↗

A Simple Space Station Rescue Vehicle

Early in the development of the Space Station it was determined that there is a need to have a vehicle which could be used in the event that the Space Station crew need to quickly depart and return to Earth when the Space Shuttle is not available. Unplanned return missions might occur because of a medical emergency, a major Space Station failure, or if there is a long-term interruption in the delivery of logistics to the Station. The rescue vehicle ms envisioned as a simple capsule-type spacecraft which would be maintained in a dormant state at the Station for several years and be quickly activated by the crew when needed. During the assembly phase for the International Space Station, unplanned return missions will be performed by the Russian Soyuz vehicle, which can return up to three people. When the Station assembly is complete there will be a need for rescue capability for up to six people. This need might be met by an additional Soyuz vehicle or by a new vehicle which might come from a variety of sources. This paper describes one candidate concept for a Space Station rescue vehicle. The proposed rescue vehicle design has the blunt-cone shape of the Apollo command module but with a larger diameter. The rescue vehicle would be delivered to the Station in the payload bay of the Space Shuttle. The spacecraft design can accommodate six to eight people for a one-day return mission. All of the systems for the mission including deorbit propulsion are contained within the conical spacecraft and so there is no separate service module. The use of the proven Apollo re-entry shape would greatly reduce the time and cost for development and testing. Other aspects of the design are also intended to minimize development cost and simplify operations. This paper will summarize the evolution of rescue vehicle concepts, the functional requirements for a rescue vehicle, and describe the proposed design.

Petro, Andrew↗

Anomaly Resolution in the International Space Station

Topics include post flight 2A status, groundrules, anomaly resolution, Early Communications Subsystem anomaly and resolution, Logistics and Maintenance plan, case for obscuration, case for electrical short, and manual fault isolation, and post mission analysis. Photographs from flight 2A.1 are used to illustrate anomalies.

Evans, William A.↗

International Space Station USOS Crew Quarters On-orbit vs Design Performance Comparison

The International Space Station (ISS) United States Operational Segment (USOS) received the first two permanent ISS Crew Quarters (CQ) on Utility Logistics Flight Two (ULF2) in November 2008. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The CQs provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, communication equipment, redundant electrical systems, and redundant caution and warning systems. The racksized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. The deployment and initial operational checkout during integration of the ISS CQ to the Node is described. Additionally, the comparison of on-orbit to original design performance is outlined for the following key operational parameters: interior acoustic performance, air flow rate, temperature rise, and crewmember feedback on provisioning and restraint layout.

Broyan, James Lee, Jr.↗

Preliminary design of the Space Station internal thermal control system

The baseline preliminary design configuration of the Internal Thermal Control system (ITCS) of the U.S. Space Station pressurized elements (i.e., the Habitation and U.S. Laboratory modules, pressurized logistics carrier, and resources nodes) is defined. The ITCS is composed of both active and passive components. The subsystems which comprise the ITCS are identified and their functional descriptions are provided. The significant trades and analyses, which were performed during Phase B (i.e., the preliminary design phase) that resulted in the design described herein, are discussed. The ITCS interfaces with the station's central Heat Rejection and Transport System (HRTS), other systems, and externally attached pressurized payloads are described. Requirements on the ITCS with regard to redundancy and experiment support are also addressed.

Herrin, Mark T.↗

Electrochemically regenerable metabolic CO2 and moisture control system for an advanced EMU application

Regenerable CO2 and moisture removal techniques that reduce expendables and logistics requirements are needed to sustain people undertaking extravehicular activities for the Space Station. NASA has been investigating ways to advance the Electrochemically Regenerable CO2 and Moisture Absorption (ERCA) technology to replace the nonregenerable solid lithium hydroxide absorber for the advanced Portable Life Support System (PLSS). The ERCA technology, due to its use of liquid absorbent, has the ability to effectively satisfy the high metabolic CO2 and moisture removal requirements of PLSS applications. This paper defines the ERCA technology concept and its advantages for the PLSS application, reviews breadboard and subscale testdata and presents the results of design concepts for a prototype Absorber Module of improved performance and the physical characteristics of the projected flight hardware.

Lee, M. C.↗

STS-100 Crew Activity Report: Flight Day 7 Highlights

On this seventh day of the STS-100 mission, the crewmembers of Endeavour, Commander Kent Rominger, Pilot Jeffrey Ashby, and Mission Specialists Chris Hadfield, Scott Parazynski, John Phillips, Umberto Guidoni, and Yuri Valentinovich Lonchakov, are seen as they unload equipment from the Rafaello Logistics Module. Guidoni and Rominger answer questions from the Italian and European Space Agencies in an on-orbit press conference. The computer glitch that delayed tests on the Canadian Robotic Arm and another boost to the International Space Station (ISS) is described.

Source record↗

NASA’s In-Space Manufacturing Project: Update on Manufacturing Technologies and Materials to Enable More Sustainable and Safer Exploration

NASA’s In-Space Manufacturing (ISM) project seeks to develop the materials, processes, and manufacturing technologies needed to provide an on-demand manufacturing capability for deep space exploration missions. The ability to manufacture and recycle some parts on demand rather than launch them from earth has the potential to reduce logistics requirements on long duration missions and enhance crew safety. With the launch of the first 3D printer (built and operated by Made in Space through a Small Business Innovative Research – SBIR -- contract) to the International Space Station (ISS) in 2014, the ISM project demonstrated the feasibility of operating an on-demand manufacturing system in a microgravity environment. This paper will provide an update on recent advancements in ISM under three key technology areas: manufacturing, recycling, and development of a design database. ISM continues to pursue development of manufacturing technologies for space applications and use the ISS as a critical test bed to prove out these technologies before deploying them on next generation exploration systems. Activities under this focus area include: characterization of materials manufactured using the Additive Manufacturing Facility (AMF), the second generation commercial 3D-printer on ISS, also owned and operated by Made in Space; development of prototype payloads for metal manufacturing through phase II SBIR contracts with Tethers Unlimited, Made in Space, and Ultra Tech Machinery; development of a multi-material fabrication laboratory capable of processing metals and providing inspection of manufactured parts through a Broad Agency Announcement (Techshot, Interlog, and Tethers Unlimited); an in-line sensing system for ISM platforms; and development of higher strength feedstocks for 3D polymer printers. In the area of recycling, the Tethers Unlimited Refabricator payload (an integrated 3D printer and recycler for ULTEM 9085) launched to ISS in November 2018 and began operating in early 2019. This payload represents the first demonstration of on-orbit recycling; down massed specimens will assess material degradation in the polymer over multiple recycling cycles to define limits on material re-use. Other work in the recycling area includes development of common use materials intended to be reused and recycled on space missions (Tethers Unlimited and Cornerstone Research Group) and a sterilization capability for multiple-use materials (ERASMUS from Tethers Unlimited). Concurrent with manufacturing technology and materials development work is creation of a design database, a curated list of parts that can be manufactured using the suite of In-Space Manufacturing capabilities.

Tracie Prater↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗