Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Numerical analysis of the influence of scale effects and microstructure on hydrogen diffusion in polycrystalline aggregates

Predicting resistance to environmental degradation, especially hydrogen embrittlement (HE) has become a major concern for life assessment and risk analysis of structural materials. The microstructure of the materials plays a significant role in HE. Despite the large documentation about the subject, the contribution of hydrogen diffusion on this process stays unclear. In this work, we analyze the effects of the microstructure on hydrogen diffusion, especially the influence of grain boundaries considered as high diffusivity paths and possible sites of damage occurrence. Electrochemical permeation was simulated using finite elements method (FEM). Scale effects between the RVE (Representative Volume Element) and the size of the membrane are discussed. Domains of applicability for standard homogenization methods, especially Hashin Shtrikman model are studied using results from microstructural based FEM. Domains of invariance of diffusion behavior and concentration profiles for grain shapes and the size of the membrane are also analyzed. Thus, the difficulty to extract diffusion properties by permeation test for heterogeneous microstructures is highlighted and discussed.

hydrogen, permeation, diffusion, microstructure, g↗

Geomechanical risk assessment for subsurface fluid disposal operations

Numerical models are commonly used to estimate the state of stress in the subsurface for various engineering applications. These estimates are subject to considerable uncertainty, and yet, the estimates are almost always deterministic, yielding no information about the certainty of the prediction. For some applications, unquantified uncertainties in stress are often acceptable, because the risks related to geomechanics may be of low relative importance compared to other risks (e.g. recoverable resource volume), for which uncertainties are often quantified. Furthermore, many geomechanics-related risks in the petroleum industry are relatively short lived (e.g. well bore stability), and decrease in importance with time. In contrast, for waste water injection or geologic carbon sequestration (GCS), geomechanics-related risks (e.g. seal integrity, induced seismicity) are on par with resource-related risks and are of long-term concern, with the risk generally increasing in importance for a significant period of time. For these reasons, the deterministic stress estimation and risk analysis approaches generally applied in the petroleum industry are insufficient for GCS applications. This paper describes a Bayesian approach to geomechanical uncertainty quantification and risk assessment. The method is demonstrated using data from an active enhanced oil recover/geologic carbon sequestration field as a case study

Burghardt, Jeffrey A.↗

Satellite solar power - Will it pay off

A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.

Hazelrigg, G. A., Jr.↗

Systems Engineering and Integration (SE and I)

The issue of technology advancement and future space transportation vehicles is addressed. The challenge is to develop systems which can be evolved and improved in small incremental steps where each increment reduces present cost, improves, reliability, or does neither but sets the stage for a second incremental upgrade that does. Future requirements are interface standards for commercial off the shelf products to aid in the development of integrated facilities; enhanced automated code generation system slightly coupled to specification and design documentation; modeling tools that support data flow analysis; and shared project data bases consisting of technical characteristics cast information, measurement parameters, and reusable software programs. Topics addressed include: advanced avionics development strategy; risk analysis and management; tool quality management; low cost avionics; cost estimation and benefits; computer aided software engineering; computer systems and software safety; system testability; and advanced avionics laboratories - and rapid prototyping. This presentation is represented by viewgraphs only.

Chevers, ED↗

Situational Awareness of Grid Anomalies (SAGA)

The modern power industry becomes more vulnerable to cyber events due to the growing interconnectivity, interdependence, and complexity of the electric power grid. High-fidelity modeling and simulation tools that support the preventative risk analysis on potential cyber-relevant events is essential for ensuring the situational awareness of the system operator as it provides an inexpensive and risk-free environment to test the system responses under various cyber-relevant events and hereby can support research on cyber anomaly detection, optimal protective resource allocation, and mitigation measures. In this webinar, we will share NREL's cybersecurity research capabilities by highlighting the development of a scalable cyber-physical event test bed and demonstration with real hardware in the loop. The developed cyber-physical event test bed is backboned by an integrated transmission, distribution, and communication dynamic co-simulation framework and a plug-and-play cyber event generation module. It is designed to be modular and compatible with parallel computing, and thereby supports large-scale system simulations at an affordable computation cost. The test bed can capture millisecond-to-minutes dynamic frequency and voltage responses under cyber events from the bulk transmission system to the active distribution systems and distributed energy resources at the grid edge.

co-simulation↗

Land use and air quality in urban environments: Human health risk assessment due to inhalation of airborne particles

Highlights: • Biomonitors showed intraurban differences in particles bound metals. • The PM{sub 10} limit (150 µg/m{sup 3}) was exceeded in almost all land uses categories. • Industrial sites had an unacceptable carcinogenic risk (> 1 × 10{sup −4}). • Adults and elder are the most susceptible age groups. • Land use influence health risk due to particle inhalation. Particle matter (PM) and its associated compounds are a serious problem for urban air quality and a threat to human health. In the present study, we assessed the intraurban variation of PM, and characterized the human health risk associated to the inhalation of particles measured on PM filters, considering different land use areas in the urban area of Cordoba city (Argentina) and different age groups. To assess the intraurban variation of PM, a biomonitoring network of T. capillaris was established in 15 sampling sites with different land use and the bioaccumulation of Co, Cu, Fe, Mn, Ni, Pb and Zn was quantified. After that, particles were collected by instrumental monitors placed at the most representative sampling sites of each land use category and an inhalation risk was calculated. A remarkable intraurban difference in the heavy metals content measured in the biomonitors was observed, in relation with the sampling site land use. The higher content was detected at industrial areas as well as in sites with intense vehicular traffic. Mean PM{sub 10} levels exceeded the standard suggested by the U.S. EPA in all land use areas, except for the downtown. Hazard Index values were below EPA's safe limit in all land use areas and in the different age groups. In contrast, the carcinogenic risk analysis showed that all urban areas exceeded the acceptable limit (1 × 10{sup −6}), while the industrial sampling sites and the elder group presented a carcinogenic risk higher that the unacceptable limit. These findings validate the use of T. capillaris to assess intraurban air quality and also show there is an important intraurban variation in human health risk associated to different land use.

54 ENVIRONMENTAL SCIENCES↗

Patterns of Failure for Rhabdomyosarcoma of the Perineal and Perianal Region

Purpose: To analyze prognostic factors and patterns of failure for rhabdomyosarcoma of the perineal and perianal region (PRMS), with an emphasis on radiation therapy for locoregional control. Methods and Materials: Detailed records of all 14 patients treated for PRMS at Memorial Sloan-Kettering Cancer Center between 1998 and 2012 were reviewed. The Kaplan-Meier method was used to assess the event-free survival (EFS) and overall survival (OS), and a competing-risks analysis was used to assess the cumulative incidence of local, regional, and distant failures. Results: Median age was 15.8 years (range, 1.1-31.9 years). High-risk features were identified: 9 of 14 patients (64%) had group 3 disease and 3 of 14 (21%) had group 4; 11 of 14 tumors (78%) were alveolar; 12 of 14 tumors (86%) were ≥5 cm; and 9 of 14 patients (64%) had involved lymph nodes (N1). Of those aged ≥10 years at diagnosis, 9 of 10 (90%) had alveolar histology, all had tumors ≥5 cm, and 8 of 10 (80%) presented with N1 disease. The rates of local, regional, and distant failure at 5 years were 17%, 31%, and 52%, respectively. Although 3 of the 4 patients with regional failure received nodal irradiation, only one of the nodal failures occurred in the radiation therapy field. The 5-year EFS was 33%, and OS was 39%. Age ≥10 years was associated with poor outcomes: EFS was 13% in patients aged ≥10 years, compared with 75% in those aged <10 years (P=.04); the OS was 13% in patients aged ≥10 years, compared with 100% in those aged <10 years (P=.04). Conclusions: Patients with PRMS, especially those aged ≥10 years, present with poor prognostic features and continue to have poor outcomes. Given the high incidence of regional node recurrence, we recommend prophylactic ilioinguinal lymph node irradiation for all patients aged ≥10 years. For children aged <10 years, nodal evaluation is essential to determine the role for lymph node irradiation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Risk Assessment of Cascading Outages: Part I - Overview of Methodologies

This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which will extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses diffeent approaches to this and suggests directions for future development of methodologies.

Vaiman, Marianna↗

Risk Assessment of Cascading Outages: Methodologies and Challenges

Abstract- This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses different approaches to this and suggests directions for future development of methodologies. The second paper summarizes the state of the art in modeling tools for risk assessment of cascading outages.

Vaiman, Marianna↗

Predicting Space Weather Effects on Close Approach Events

The NASA Robotic Conjunction Assessment Risk Analysis (CARA) team sends ephemeris data to the Joint Space Operations Center (JSpOC) for conjunction assessment screening against the JSpOC high accuracy catalog and then assesses risk posed to protected assets from predicted close approaches. Since most spacecraft supported by the CARA team are located in LEO orbits, atmospheric drag is the primary source of state estimate uncertainty. Drag magnitude and uncertainty is directly governed by atmospheric density and thus space weather. At present the actual effect of space weather on atmospheric density cannot be accurately predicted because most atmospheric density models are empirical in nature, which do not perform well in prediction. The Jacchia-Bowman-HASDM 2009 (JBH09) atmospheric density model used at the JSpOC employs a solar storm active compensation feature that predicts storm sizes and arrival times and thus the resulting neutral density alterations. With this feature, estimation errors can occur in either direction (i.e., over- or under-estimation of density and thus drag). Although the exact effect of a solar storm on atmospheric drag cannot be determined, one can explore the effects of JBH09 model error on conjuncting objects' trajectories to determine if a conjunction is likely to become riskier, less risky, or pass unaffected. The CARA team has constructed a Space Weather Trade-Space tool that systematically alters the drag situation for the conjuncting objects and recalculates the probability of collision for each case to determine the range of possible effects on the collision risk. In addition to a review of the theory and the particulars of the tool, the different types of observed output will be explained, along with statistics of their frequency.

Space Weather↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation Assisted Risk Assessment: Blast Overpressure Modeling

A probabilistic risk assessment (PRA) approach has been developed and applied to the risk analysis of capsule abort during ascent. The PRA is used to assist in the identification of modeling and simulation applications that can significantly impact the understanding of crew risk during this potentially dangerous maneuver. The PRA approach is also being used to identify the appropriate level of fidelity for the modeling of those critical failure modes. The Apollo launch escape system (LES) was chosen as a test problem for application of this approach. Failure modes that have been modeled and/or simulated to date include explosive overpressure-based failure, explosive fragment-based failure, land landing failures (range limits exceeded either near launch or Mode III trajectories ending on the African continent), capsule-booster re-contact during separation, and failure due to plume-induced instability. These failure modes have been investigated using analysis tools in a variety of technical disciplines at various levels of fidelity. The current paper focuses on the development and application of a blast overpressure model for the prediction of structural failure due to overpressure, including the application of high-fidelity analysis to predict near-field and headwinds effects.

Lawrence, Scott L.↗

In-Situ Gamma-Ray Assay of the 235-F Plutonium Fuel Form Facility at the Savannah River Site - 16293

The Plutonium Fuel Form (PuFF) Facility is located in Building 235-F near the geographic center of the Savannah River Site. Between 1978 and 1984, the facility was used to produce approximately 165 kilograms of iridium-encapsulated Pu-238 spheres and pellets for use as radioisotope thermal generators, primarily for the space program. The facility is divided between two cell lines, the east cell line used to process powdered Pu-238 oxide raw material into fuel forms and the west cell line used to encapsulate the fuel forms in iridium. Scoping in-situ gamma-ray assays were performed in the PuFF Facility in 2006 and estimated that hundreds of grams of Pu-238 holdup were within the facility. Using this holdup estimate as a source term, SRS has performed a risk analysis that indicated a seismic event that induces a full-facility fire in 235-F could lead to a 28,800 rem dose to a co-located worker. Based on this risk assessment, SRS is taking steps to decontaminate the facility. One of the first steps taken has been to improve upon the quality of the in-situ gamma-ray assay data. Carts and collimators were specially designed to survey the equipment in the PuFF Facility. The cell interiors were assayed along with the furnaces and storage coolers that protrude beneath the cells. While the previous scoping work consisted of 32 measurements, the current series of measurements included nearly 400 measurements using both high-purity germanium and lanthanum bromide detectors. Data analysis for the current set of measurements was conducted with greater rigor as well. MCNP5 was used to evaluate a variety of possible physical distributions for the Pu-238 source term and estimate cross-talk between neighboring cells. Data analysis was performed using three gamma-rays emitted by Pu-238 (99.85 keV, 152.7 keV, and 766.4 keV) providing three independent estimates of the mass of Pu-238 holdup in each of the cells. This also allowed the application of matrix correction factors to adjust gamma-ray attenuation. The weighted mean of these three results was used as the best estimate of Pu-238 holdup in the PuFF facility. This work lowered the estimate of holdup in the PuFF facility by approximately 100 grams compared to the previous estimate, a 0.55's difference. The uncertainty in the Pu-238 holdup was also reduced substantially relative to the 2006 scoping assay. Further radiological measurements are planned for the near future including in-situ gamma-ray assays of wing cabinets in the east cell line maintenance area, the transfer tube between the two cell lines, and some of the furnaces and storage coolers. A germanium gamma imager, the GeGI, will also be used to map out the distribution of the Pu-238 source term in the PuFF Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Cost Hydrogen Production Platform

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost models assume a natural gas cost of $5/MMBtu (HHV). Praxair has, in Phases I and II of this program, shown that significant improvements in cost, plant layout, system integration and overall system optimization are achievable. Phase III of the program, submitted in January 2007, was to focus on demonstrating both the technical feasibility and economic viability of the design developed in Phases I and II through a full-scale prototype design, construction, installation, analysis and operation at a hydrogen fueling station. Due to funding limitations, Phase III of the program was not approved by the DOE.

08 HYDROGEN↗

Intervention in Countries with Unsustainable Energy Policies: Is it Ever Justifiable?

This paper explores whether it is ever justifiable for the international community to forcibly intervene in countries that have unsustainable energy policies. The literature on obligations to future generations suggests, philosophically, that intervention might be justified under certain circumstances. Additionally, the world community has intervened in the affairs of other countries for humanitarian reasons, such as in Kosovo, Somalia, and Haiti. However, intervention to deal with serious energy problems is a qualitatively different and more difficult problem. A simple risk analysis framework is used to organize the discussion about possible conditions for justifiable intervention. If the probability of deaths resulting from unsustainable energy policies is very large, if the energy problem can be attributed to a relatively small number of countries, and if the risk of intervention is acceptable (i.e., the number of deaths due to intervention is relatively small), then intervention may be justifiable. Without further analysis and successful solution of several vexing theoretical questions, it cannot be stated whether unsustainable energy policies being pursued by countries at the beginning of the 21st century meet the criteria for forcible intervention by the international community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Experiences with Text Mining Large Collections of Unstructured Systems Development Artifacts at JPL

Often repositories of systems engineering artifacts at NASA's Jet Propulsion Laboratory (JPL) are so large and poorly structured that they have outgrown our capability to effectively manually process their contents to extract useful information. Sophisticated text mining methods and tools seem a quick, low-effort approach to automating our limited manual efforts. Our experiences of exploring such methods mainly in three areas including historical risk analysis, defect identification based on requirements analysis, and over-time analysis of system anomalies at JPL, have shown that obtaining useful results requires substantial unanticipated efforts - from preprocessing the data to transforming the output for practical applications. We have not observed any quick 'wins' or realized benefit from short-term effort avoidance through automation in this area. Surprisingly we have realized a number of unexpected long-term benefits from the process of applying text mining to our repositories. This paper elaborates some of these benefits and our important lessons learned from the process of preparing and applying text mining to large unstructured system artifacts at JPL aiming to benefit future TM applications in similar problem domains and also in hope for being extended to broader areas of applications.

text mining↗

Uncertainty quantification in MELCOR Safety analysis of ARIES reactor designs

MELCOR-TMAP is a combined thermal-hydraulics and tritium tracking code developed to simulate severe accident scenarios in fission and fusion power plants. Here, we demonstrate the results of MELCOR-TMAP analyses on historical ARIES program reference designs. By coupling MELCOR-TMAP with the open source RAVEN probabilistic risk analysis framework’s Bayesian UQ capabilities, we also demonstrate key uncertainties in material properties with the highest impact on tritium inventory and plant risk.

70 - PLASMA PHYSICS AND FUSION TECHNOLOGY↗