Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

SU-F-BRD-08: Guaranteed Epsilon-Optimal Treatment Plans with Minimum Number of Beams for SBRT Using RayStation

Purpose: To efficiently find quality-guaranteed treatment plans with the minimum number of beams for stereotactic body radiation therapy using RayStation. Methods: For a pre-specified pool of candidate beams we use RayStation (a treatment planning software for clinical use) to identify the deliverable plan which uses all the beams with the minimum dose to organs at risk (OARs) and dose to the tumor and other structures in specified ranges. Then use the dose matrix information for the generated apertures from RayStation to solve a linear program to find the ideal plan with the same objective and constraints allowing use of all beams. Finally we solve a mixed integer programming formulation of the beam angle optimization problem (BAO) with the objective of minimizing the number of beams while remaining in a predetermined epsilon-optimality of the ideal plan with respect to the dose to OARs. Since the treatment plan optimization is a multicriteria optimization problem, the planner can exploit the multicriteria optimization capability of RayStation to navigate the ideal dose distribution Pareto surface and select a plan of desired target coverage versus OARs sparing, and then use the proposed technique to reduce the number of beams while guaranteeing quality. For the numerical experiments two liver cases and one lung case with 33 non-coplanar beams are considered. Results: The ideal plan uses an impractically large number of beams. The proposed technique reduces the number of beams to the range of practical application (5 to 9 beams) while remaining in the epsilon-optimal range of 1% to 5% optimality gap. Conclusion: The proposed method can be integrated into a general algorithm for fast navigation of the ideal dose distribution Pareto surface and finding the treatment plan with the minimum number of beams, which corresponds to the delivery time, in epsilon-optimality range of the desired ideal plan. The project was supported by the Federal Share of program income earned by Massachusetts General Hospital on C06 CA059267, Proton Therapy Research and Treatment Center and partially by RaySearch Laboratories.

60 APPLIED LIFE SCIENCES↗

Assembly and Pre-Loading Specifications for the Series Production of the Nb 3 Sn MQXFA Quadrupole Magnets for the HL-LHC

We report the High Luminosity LHC (HL-LHC) Project is planning to install 16 cold-masses made with Nb 3 Sn quadrupole magnets in the LHC Interaction Regions to significantly increase its luminosity. Half of these cold masses are fabricated at BNL, FNAL, and LBNL under the US Accelerator Research Program (AUP). Each cold mass includes two identical Nb 3 Sn quadrupole magnets, called MQXFA with a magnetic length of 4.2 m. Currently, the AUP project has completed the fabrication and test of the first 5 pre-series magnets, and is working on the following 16 magnets for the series production. The brittleness and strain sensitivity of the Nb 3 Sn superconducting material requires a careful definition of the allowable maximum stress in the windings during magnet assembly and pre-load, and a tight control of their variation within the whole coil length. Therefore, a series of assembly and pre-load specifications have been defined with the goals of minimizing the risk of conductor degradation and providing the mechanical support required to reach the nominal current during powering. In this paper we present the specifications defined for the MQXFA magnets and applied during the different assembly phases and during the pre-load process of the first 5 pre-series magnets.

43 PARTICLE ACCELERATORS↗

Phased Demolition of an Occupied Facility

The U.S. government constructed the K-1401 facility in the late 1940's as a support building for various projects supporting the uranium gaseous diffusion process. In 2004 the U.S. Department of Energy authorized Bechtel Jacobs Company, LLC (BJC) to decontaminate and demolish the facility. The K-1401 facility was used for a variety of industrial purposes supporting the gaseous diffusion process. Many different substances were used to support these processes over the years and as a result different parts of the facility were contaminated with fluorine, chlorine trifluoride, uranium and technetium radiological contamination, asbestos, and mercury. The total facility area is 46,015 m{sup 2} (495,000 sf) including a 6,800 m{sup 2} basement (73,200 sf). In addition to the contamination areas in the facility, a large portion was leased to businesses for re-industrialization when the D and D activities began. The work scope associated with the facility included purging and steam cleaning the former fluorine and chlorine trifluoride systems, decontaminating loose radiologically contaminated and mercury spill areas, dismantling former radiological lines contaminated with uranium oxide compounds and technetium, abating all asbestos containing material, and demolishing the facility. These various situations contributed to the challenge of successfully conducting D and D tasks on the facility. In order to efficiently utilize the work force, demolition equipment, and waste hauling trucks the normal approach of decontaminating the facility of the hazardous materials, and then conducting demolition in series required a project schedule of five years, which is not cost effective. The entire project was planned with continuous demolition as the goal end state. As a result, the first activities, Phase 1, required to prepare sections for demolition, including steam cleaning fluorine and chlorine trifluoride process lines in basement and facility asbestos abatement, were conducted while the tenants who were leasing floor space in the facility moved out. Upon completion of this phase the facility was turned over to the demolition project and the most hazardous materials were removed from the facility. Phase 2 activities included removing the process gas lines from sections C/D/E while decontaminating and preparing sections A and B for demolition. Demolition preparation activities include removing transit siding and universal waste from the area. Phase 3 began with demolition activities in sections A and B1 while continuing process gas line removal from sections C/D/E, as well as conducting demolition preparation activities to these sections. Area B was split into two sections, allowing demolition activities to occur in section B1 while personnel could still access the upper floor in sections C, D, and E. Once demolition began in section B2, personnel entry was only authorized in the basement. This timeline initiated phase 4, and the project completed cleaning the process components from the basement while section B2 demolition began. The final phase, phase 5, began once the basement was cleared. Final demolition activities began on sections C, D, E, and the basement. This material will ship for disposal and is scheduled for completion during FY07. Because the project was able to successfully phase demolition activities, the total facility demolition schedule was reduced by half to 2-1/2 years. The project was able to move portions of the demolition schedule from working in series to working in parallel, allowing the job to deliver facility demolition debris to ship for disposal 'just in time' as the facility was demolished.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SU-F-T-126: Microdosimetic Evaluation of Proton Energy Distributions in the Vicinity of Metal Implants

Purpose: To evaluate the impact of titanium and surgical stainless steel implants on the microscopic dose distribution in proton treatment plans Methods: Geant4 Monte Carlo simulations were used to analyze the microdosimetric distribution of proton radiation in the vicinity of 3.1 mm thick CP Grade 4 titanium (Ti) or 316 stainless steel (SS316) plates in a water phantom. Additional simulations were performed using either water, or water with a density equivalent to the respective metals (Tiwater, SS316water) (to reflect common practice in treatment planning). Implants were placed at the COM of SOBPs of 157 MeV (range of ∼15 cm in water) protons with 30 or 60 mm modulation. Primary and secondary particle dose and fluence, frequency-weighted and dose-weighted average lineal energy, average radiation quality factor, dose equivalent and energy deposition histograms in the plate vicinity were compared. Results: Preliminary results show frequency-weighted (yf) and dose-weighted lineal energy (yd) was increased downstream of the Ti plate (yf = 3.1 keV/µm; yd = 5.5 keV/µm) and Tiwater (yf = 4.1 keV/µm; yd = 6.8 keV/µm) compared to that of water (ie, the absence of a plate) (yf = 2.5 keV/µm; yd = 4.5 keV/µm). In addition, downstream proton dose deposition was also elevated due to the presence of the Ti plate or Tiwater. The additional dose deposited at higher lineal energy implies that tissues downstream of the plate will receive a higher dose equivalent. Detailed analyses of the Ti, Tiwater, SS316, and SS316 water simulations will be presented. Conclusion: The presence of high-density materials introduces changes in the spatial distribution of radiation in the vicinity of an implant. Further work quantifying these effects could be incorporated into future treatment planning systems resulting in more accurate treatment plans. This project was sponsored with funding from the Department of Defense (DOD # W81XWH-10-2-0192).

07 ISOTOPE AND RADIATION SOURCES↗

Transportation Energy Analytics Dashboard (TEAD)

The investment decisions within the nation’s transportation sector have traditionally been prioritized and measured against safety and travel efficiency goals. Increasingly, federal, state, and local policies are requiring consideration of energy use and emissions in the design of our transportation infrastructure. Yet the processes, analytics, and knowledge to include these new metrics into transportation decisions are lacking. Although targeted studies and before and after analysis are performed from time to time, no comprehensive real-time monitoring systems provide energy and emissions to the same level as congestion and safety. To address this gap, the Center for Advanced Transportation Technology (CATT Lab) and the Maryland Transportation Institute (MTI) at the University of Maryland (UMD), in partnership with the National Renewable Energy Laboratory (NREL), have developed a Transportation Energy Analytics Dashboard, or TEAD, to raise awareness of the energy and emission impacts to the same level of observability as that of safety and mobility concerns. The overall goal of this project was to develop and demonstrate an online tool to monitor transportation energy use and emissions in real-time and to archive this data for retrospective analysis. By combining surface transportation energy and emissions evaluation capability with more traditional safety, mobility and reliability system evaluation, our goal is for TEAD to create a dynamic new paradigm in transportation systems management and performance analyses, for both real-time traffic operations, and longer-term planning for project and program investment decision-making.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measuring Irradiance for Bifacial PV Systems

The advent of bifacial PV systems drives new requirements for irradiance measurement at PV projects for monitoring and assessment purposes. While there are several approaches, there is still no uniform guidance for what irradiance parameters to measure and for the optimal selection and placement of irradiance sensors at bifacial arrays. Standards are emerging to address these topics but are not yet available. In this paper we review approaches to bifacial irradiance monitoring which are being discussed in the research literature and pursued in early systems, to provide a preliminary guide and framework for developers planning bifacial projects.

bifacial↗

Measuring Irradiance for Bifacial PV Systems: Preprint

The advent of bifacial PV systems drives new requirements for irradiance measurement at PV projects for monitoring and assessment purposes. While there are several approaches, there is still no uniform guidance for what irradiance parameters to measure and for the optimal selection and placement of irradiance sensors at bifacial arrays. Standards are emerging to address these topics but are not yet available. In this paper we review approaches to bifacial irradiance monitoring which are being discussed in the research literature and pursued in early systems, to provide a preliminary guide and framework for developers planning bifacial projects.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Technical Basis for Certification of Seismic Design Criteria for the Waste Treatment Plant, Hanford, Washington

In August 2007, Secretary of Energy Samuel W. Bodman approved the final seismic and ground motion criteria for the Waste Treatment and Immobilization Plant (WTP) at the Department of Energy's (DOE) Hanford Site. Construction of the WTP began in 2002 based on seismic design criteria established in 1999 and a probabilistic seismic hazard analysis completed in 1996. The design criteria were reevaluated in 2005 to address questions from the Defense Nuclear Facilities Safety Board (DNFSB), resulting in an increase by up to 40% in the seismic design basis. DOE announced in 2006 the suspension of construction on the pretreatment and high-level waste vitrification facilities within the WTP to validate the design with more stringent seismic criteria. In 2007, the U.S. Congress mandated that the Secretary of Energy certify the final seismic and ground motion criteria prior to expenditure of funds on construction of these two facilities. With the Secretary's approval of the final seismic criteria in the summer of 2007, DOE authorized restart of construction of the pretreatment and high-level waste vitrification facilities. The technical basis for the certification of seismic design criteria resulted from a two-year Seismic Boreholes Project that planned, collected, and analyzed geological data from four new boreholes drilled to depths of approximately 1400 feet below ground surface on the WTP site. A key uncertainty identified in the 2005 analyses was the velocity contrasts between the basalt flows and sedimentary interbeds below the WTP. The absence of directly-measured seismic shear wave velocities in the sedimentary interbeds resulted in the use of a wider and more conservative range of velocities in the 2005 analyses. The Seismic Boreholes Project was designed to directly measure the velocities and velocity contrasts in the basalts and sediments below the WTP, reanalyze the ground motion response, and assess the level of conservatism in the 2005 seismic design criteria. The characterization and analysis effort included 1) downhole measurements of the velocity properties (including uncertainties) of the basalt/interbed sequences, 2) confirmation of the geometry of the contact between the various basalt and interbedded sediments through examination of retrieved core from the core-hole and data collected through geophysical logging of each borehole, and 3) prediction of ground motion response to an earthquake using newly acquired and historic data. The data and analyses reflect a significant reduction in the uncertainty in shear wave velocities below the WTP and result in a significantly lower spectral acceleration (i.e., ground motion). The updated ground motion response analyses and corresponding design response spectra reflect a 25% lower peak horizontal acceleration than reflected in the 2005 design criteria. These results provide confidence that the WTP seismic design criteria are conservative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar Technology Center

The Department of Energy, Golden Field Office, awarded a grant to the UNLV Research Foundation (UNLVRF) on August 1, 2005 to develop a solar and renewable energy information center. The Solar Technology Center (STC) is to be developed in two phases, with Phase I consisting of all activities necessary to determine feasibility of the project, including design and engineering, identification of land access issues and permitting necessary to determine project viability without permanently disturbing the project site, and completion of a National Environmental Policy Act (NEPA) Environmental Assessment. Phase II is the installation of infrastructure and related structures, which leads to commencement of operations of the STC. The STC is located in the Boulder City designated 3,000-acre Eldorado Valley Energy Zone, approximately 15 miles southwest of downtown Boulder City and fronting on Eldorado Valley Drive. The 33-acre vacant parcel has been leased to the Nevada Test Site Development Corporation (NTSDC) by Boulder City to accommodate a planned facility that will be synergistic with present and planned energy projects in the Zone. The parcel will be developed by the UNLVRF. The NTSDC is the economic development arm of the UNLVRF. UNLVRF will be the entity responsible for overseeing the lease and the development project to assure compliance with the lease stipulations established by Boulder City. The STC will be operated and maintained by University of Nevada, Las Vegas (UNLV) and its Center for Energy Research (UNLV-CER). Land parcels in the Eldorado Valley Energy Zone near the 33-acre lease are committed to the construction and operation of an electrical grid connected solar energy production facility. Other projects supporting renewable and solar technologies have been developed within the energy zone, with several more developments in the horizon.

14 SOLAR ENERGY↗

SU-E-T-174: Evaluation of the Optimal Intensity Modulated Radiation Therapy Plans Done On the Maximum and Average Intensity Projection CTs

Purpose: To determine the difference in coverage between plans done on average intensity projection and maximum intensity projection CT data sets for lung patients and to establish correlations between different factors influencing the coverage. Methods: For six lung cancer patients, 10 phases of equal duration through the respiratory cycle, the maximum and average intensity projections (MIP and AIP) from their 4DCT datasets were obtained. MIP and AIP datasets had three GTVs delineated (GTVaip — delineated on AIP, GTVmip — delineated on MIP and GTVfus — delineated on each of the 10 phases and summed up). From the each GTV, planning target volumes (PTV) were then created by adding additional margins. For each of the PTVs an IMRT plan was developed on the AIP dataset. The plans were then copied to the MIP data set and were recalculated. Results: The effective depths in AIP cases were significantly smaller than in MIP (p < 0.001). The Pearson correlation coefficient of r = 0.839 indicates strong degree of positive linear relationship between the average percentage difference in effective depths and average PTV coverage on the MIP data set. The V2 0 Gy of involved lung depends on the PTV coverage. The relationship between PTVaip mean CT number difference and PTVaip coverage on MIP data set gives r = 0.830. When the plans are produced on MIP and copied to AIP, r equals −0.756. Conclusion: The correlation between the AIP and MIP data sets indicates that the selection of the data set for developing the treatment plan affects the final outcome (cases with high average percentage difference in effective depths between AIP and MIP should be calculated on AIP). The percentage of the lung volume receiving higher dose depends on how well PTV is covered, regardless of on which set plan is done.

60 APPLIED LIFE SCIENCES↗

Occupancy-Based Energy Management in Buildings: Final Report to Sponsors

The Lawrence Berkeley National Laboratory (LBNL), the University of California Merced (UCM), and the United Technologies Research Center (UTRC) conducted field studies and modeling analyses in the Classroom and Office Building (COB) and the Science and Engineering Building (S&E) at the University of California, Merced. In the first year, of a planned multiyear project, our goal was to study the feasibility and efficacy of occupancy-based energy management. The first-year research goals were twofold. The first was to explore the likely energy savings if we know the number and location of building occupants in a typical commercial building. The second was to model and estimate people movement in a building. Our findings suggest that a 10-14percent reduction in HVAC energy consumption is possible over typical HVAC operating conditions when we know occupancy throughout the building. With the conclusion of the first-year tasks, we plan to review these results further before this group pursues follow-on funding.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrologic impacts of engineering projects on the Tigris-Euphrates System and its marshlands.

Rising demands for fresh water supplies are leading to water management practices that are altering natural flow systems world-wide. One of the most devastated of these natural systems is the Tigris-Euphrates watershed that over the past three decades has witnessed the construction of over 60 engineering projects that eliminated seasonal flooding, reduced natural flow and dramatically reduced the areal extent (1966: 8000 km{sup 2}; 2002: 750 km{sup 2}) of the Mesopotamian Marshes downstream. We constructed a catchment-based continuous (1964-1998) rainfall runoff model for the watershed (area: 10{sup 6} km{sup 2}) using the Soil Water Assessment Tool (SWAT) model to understand the dynamics of the natural flow system, and to investigate the impacts of reduced overall flow and the related land cover and land use change downstream in the marshes. The model was calibrated (1964-1970) and validated (1971-1998) against stream flow gauge data. Using the calibrated model we calculated the temporal variations in the average monthly flow rate (AMFR), the average monthly peak flow rate (AMPFR), and annual flow volume (AFV) of the Tigris and Euphrates into the marshes at a location near Al-Basrah city (31{sup o}N, 47.5{sup o}E) throughout the modeled period. Model results indicate that the AMPFR (6301 m{sup 3}/s) and average annual flow volume (AAFV: 80 x 10{sup 9} m{sup 3}/yr) for period A (10/1/1965-09/30/1973), preceding the construction of the major dams is progressively diminished in periods B1 (10/1/1973-09/30/1989; AMPFR: 3073 m{sup 3}/s; AAFV: 55 x 10{sup 9} m{sup 3}/yr) and B2 (10/1/1989-09/30/1998; AMPFR, 2319 m{sup 3}/s; AAFV: 50 x 10{sup 9} m{sup 3}/yr) that witnessed the construction of the major dams (B1: Keban, Tabqa, Hamrin, Haditha, Mosul, Karakaya; B2: Ataturk) due to the combined effects of filling artificial lakes, evaporation and infiltration of impounded water and its utilization for irrigation purposes. To investigate the impacts of reduced flow on the areal extent of the marshes, we examined the variation in marsh size extracted from temporal satellite data (1966, 1975, 1976, 1977, 1984, 1985, 1986, 1987) acquired around the same approximate time period (July to September) of the year versus simulated AFV for the period preceding the onset (1987) of major local engineering projects (e.g., Crown of Battles River, Loyalty to the Leader Canal, Mother of Battles River) in and around the investigated marshes. Results indicate that the areal extent of the Central and Al-Hammar marshes (e.g., 1966: 7970 km2, 1977: 6680 km2, 1984: 5270 km2) decreases with a decrease in AFV (e.g., 1966: 60.8 x 109 m3, 1977: 56.9 x 109 m3, 1984: 37.6 x 109 m3). Using a relationship that describes the impact of reduced AFV on the areal extent of the marshes, we evaluated the impact of additional reductions in flow that will result from the implementation of the planned engineering projects on the Tigris-Euphrates system over the next few years. Upon completion of the ongoing South Eastern Anatolia project, with projected reductions in AFV exceeding 5 x 10{sup 9} m{sup 3}/yr, the sustainable marshes in the Central and Al-Hammar area will be reduced by at least an additional 550 km{sup 2}.

13 HYDRO ENERGY↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2014 Fourth Quarterly Report

During the last quarter of FY 2014, the following technical progress has been made toward project milestones: 1) Autodesk, Inc. (Autodesk) has implemented a new fiber length distribution (FLD) model based on an unbreakable length assumption with Reduced Order Modeling (ROM) by the Proper Orthogonal Decomposition (POD) approach in the mid-plane, dual-domain and 3D solvers. 2) Autodesk improved the ASMI 3D solver for fiber orientation prediction using the anisotropic rotary diffusion (ARD) – reduced strain closure (RSC) model. 3) Autodesk received consultant services from Prof. C.L. Tucker at the University of Illinois on numerical simulation of fiber orientation and fiber length. 4) PlastiComp, Inc. (PlastiComp) suggested to Purdue University a procedure for fiber separation using an inert-gas atmosphere in the burn-off furnace. 5) Purdue University (Purdue) hosted a face-to-face project review meeting at Purdue University on August 6-7, 2014. 6) Purdue conducted fiber orientation measurements for 3 PlastiComp plaques: fast-fill 30wt% LCF/PP edged-gated, slow-fill 50wt% LCF/PP edge-gated, and slow-fill 50wt% LCF/PP center-gated plaques, and delivered the orientation data for these plaques at the selected locations (named A, B, and C) to PNNL. 7) PNNL conducted ASMI mid-plane analyses for the above PlastiComp plaques and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. 8) PNNL planned the project review meeting (August 6-7, 2014) with Purdue. 9) PNNL performed ASMI analyses for the Toyota complex parts with and without ribs, having different wall thicknesses, and using the PlastiComp 50wt% LCF/PP, 50wt% LCF/PA66, 30wt% LCF/PP, and 30wt% LCF/PA66 materials to provide guidance for tool design and modifications needed for molding these parts. 10) Magna Exteriors and Interiors Corp. (Magna) molded plaques from the 50% LCF/PP and 50% LCF/PA66 materials received from Plasticomp in order to extract machine purgings (purge materials) from Magna’s 200-Ton Injection Molding machine targeted to mold the complex part. 11) Toyota and Magna discussed with PNNL tool modification for molding the complex part.

36 MATERIALS SCIENCE↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CEED-MS8:Initial Integration of CEED Software in ECP Applications

Key components of CEED software development involve fast finite element operator storage and evaluation, architecture optimizations, performant algorithms for all orders, global kernels for finite element operators, efficient use of the memory sub-system, optimal data locality and motion, enhanced scalability and parallelism, and fast tensor contractions. As ultimate goals of the project, CEED is exploring and identifying the best algorithms for the full range of discretizations and applying algorithmic and software development to support ECP applications’ needs. In this milestone we report on the initial integration of CEED software in the selected first-wave ECP/CEED apps and the continued exploration of other ECP applications as second-wave (milestone CEED-MS23) and third-wave (milestone CEED-MS35) ECP/CEED application candidates. An extensive evaluation of various approaches for GPU acceleration of the CEED computational motives is also a major focus of the report, both in the settings of CEED’s Nekbone and Laghos miniapps, as well as versions of CEED’s bake-off problems (introduced in milestone CEED-MS6). The first-wave ECP applications targeted for coupling with CEED software include the ExaSMR and MARBL applications. We also report on near-term collaboration with the seed-funded Urban Systems project, as well as engagements with ACME, ExaAM, GEOS and the Application Assessment and Proxy App projects. The ExaSMR project involves coupled thermal-hydraulics/neutronics, with the latter based on Monte Carlo methods and the former based on high-order discretizations of the Navier-Stokes and energy equations for accurate simulation of turbulent transport. The project requires fast and efficient turbulence simulation capabilities that will scale to exascale platforms. Work within CEED will ensure that all aspects of the Nek5000 workflow scale to the target problem space, which involves > 10 10 degrees of freedom in typical production runs. CEED’s goal is to provide implementations that perform with maximum attainable efficiency and deliver low turn-around times. A deliverable for this milestone is beta-release of the GPU-based variant of Nek5000. MARBL is targeting high-energy-density physics problems, including single fluid multi-material hydrodynamics and radiation/magnetic diffusion simulation, with applications in inertial confined fusion, pulsed power experiments, and equation of state/material strength analysis. The code uses high-order methods based arbitrary Lagrangian-Eulerian, direct Eulerian, and unstructured adaptive mesh refinement. A deliverable for this milestone is collaboration with MARBL for improved performance based on partially-assembled operators. The Urban exascale project is planning to couple real-time data with high performance simulations to study particulate transport in cities. Nek5000 will be used for large eddy and RANS (Reynolds-averaged Navier-Stokes) simulations of turbulent transport in these domains. Areas where the CEED team is aiding the Urban Canyon group include creating high-order meshes for urban geometries and developing boundary conditions appropriate for simulations close to real-life urban conditions. The software artifacts delivered as part of this milestone include GPU-enabled versions of the Nekbone and Laghos miniapps, which are provided through the CEED website, http://ceed.exascaleproject.org and the CEED GitHub organization, http://github.com/ceed. In addition to details and results from the above R&D efforts, in this document we are also reporting on other project-wide activities performed in Q4 of FY17, including: the CEED first annual meeting and participation of CEED researchers in a variety of outreach activities.

97 MATHEMATICS AND COMPUTING↗

Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Production of Salable Rare Earths Products from Coal and Coal Byproducts in the U.S. Using Advanced Separation Processes (Final Technical Report)

The entirety of the report that follows this brief Executive Summary Chapter is the product of a Funding Announcement by the US Department of Energy (DOE), Office of Fossil Energy, originally issued 09/28/2016, otherwise known as Funding Opportunity Number: DE-FOA-0001627, under the title of “Production of Rare Earth Elements from Domestic U.S. Coal and Coal By-Products” The solicitation was subsequently amended several times ending in amendment 000005. Ultimately a consortium designated “Minerals Refining and Rare Earth Consortium” (to which many of the remaining participants recited in this report joined) filed a proposal on December 8, 2016. On June 9, 2017, the contracting office of the US DOE, National Energy Technology Laboratory (NETL), alerted Dr. Keim, the Authorized Representative of the December 08, 2016, proposal, that the consortium proposal had been selected. In summary, this report presents the results of the efforts in meeting the stated project objectives as outlined in DE-FOA-0001627 to wit: “The main objective of the proposed work is to design and construct a demonstration plant that can extract rare earth elements (REEs) from domestic U.S. coal and coal by-products. The plant will produce salable rare earth elements and intermediates, including at a minimum three individual REEs (preferably heavy rare earths) at 90-99% purities, with output capacities in excess of 10 pounds per day of composite rare earth products (reported as oxides). In addition, the plant will produce high value premium solid fuels, magnetite and other materials to increase the economic viability of the plant and to create jobs. If successful, the proposed work will help develop a domestic supply chain of the critical materials that are essential for the development of renewable energy resources, high-tech industries and a strong national defense.” The principal investigators immediately launched the tasks outlined in the Statement of Project Objectives (SOPO) in accordance to its Project Management Plan (PMP) based on their collective knowledge of the subject matter and the expectations generated by preliminary laboratory results. Events and circumstances related in part to the vagaries of the coal mining, processing, and marketing industry triggered a series of carefully deliberated step-wise transitions from the original Lower Kittanning coal source in West Virginia to an ultimate stopping point with the Fire Clay Seam (Hazard No. 4) rejects from Blue Diamond Coal Company in Kentucky (Operated by Blackhawk Mining LLC). These transitional steps are discussed in substantial detail in the body of this report. Notably, substantial data of potential future significance, both in terms of sample collection, processing, and testing, were collected in the process. Unfortunately, as reported in the Techno-Economic Chapter of this report, none of these efforts resulted in an anticipated economically viable venture. Thus, the principals associated with this project elected not to transition into a “Pilot Plant” operation. A proposal for funding that pilot plant was therefore not requested. The outcome of this initiative under DE-FOA-0001627 notwithstanding, the following portions of this Executive Summary outline the activities of the investigators. That said, the reader is encouraged to examine the main body of this report in which each chapter is assembled as a free-standing product, complete with Table of Contents, for practical and easy reference purposes.

01 COAL, LIGNITE, AND PEAT↗

Brentwood Lessons Learned Project Report

The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.

30 DIRECT ENERGY CONVERSION↗