Domain Specific Language Support for Exascale

Domain-Specific Languages (DSLs) offer an attractive path to Exascale software since they provide expressive power through appropriate abstractions and enable domain-specific optimizations. But the advantages of a DSL compete with the difficulties of implementing a DSL, even for a narrowly defined domain. The DTEC project addresses how a variety of DSLs can be easily implemented to leverage existing compiler analysis and transformation capabilities within the ROSE open source compiler as part of a research program focusing on Exascale challenges. The OSU contributions to the DTEC project are in the area of code generation from high-level DSL descriptions, as well as verification of the automatically-generated code.

97 MATHEMATICS AND COMPUTING↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2016

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. In formation was extracted from 172 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DARMA-MPI Interoperability WBS 2.3.1.04 Milestone 15 (ECP Milestone Report)

DARMA (Distributed Asynchronous Resilient Models for Applications) is a runtime library developed as part of the the Sandia ATDM (Advanced Technology Development and Mitigation) program. DARMA supports applications within 2.2.5.03 ADNN03-ASC ATDM SNL Application, which includes a number of applications featuring dynamic physics which requires load balancing and asynchronous communication for high performance. We have implemented a modern C++ programming model that can enable dynamic, asynchronous communication on top of existing data structures from a serial or MPI code. DARMA development has occurred in parallel with a verification milestone for ATDM in FY18. For FY19, DARMA will impact ATDM by enabling the performance benefits of a dynamic runtime through only incremental changes to existing verified MPI codes. The results presented here demonstrate the DARMA development process for an MPI mini-app, showing a 3-4x improvement in performance for a challenging problem relative to the parent MPI code and coming within 25 percent of the theoretically optimal performance achievable from a perfect, fine-grained load balancer for most cases.

97 MATHEMATICS AND COMPUTING↗

Wind Energy Instrumentation Atlas

The US Department of Energy (DOE) A2e program is focused on developing the next generation of predictive tools to better understand wind plant performance and help industry lower the overall cost of energy. A formal verification and validation process is required to demonstrate improved accuracy of these new models beyond those currently employed. And a critical part of model validation is utilization of a diverse set of accurate observations of atmospheric forcing and wind plant response. A number of existing data sets that will be used for this purpose, as highlighted by Schreck and Maniaci (2017) but A2e researchers also realize that new datasets will be required to meet validation objectives. As such, plans for new experiments based on model validation priorities (NALU validation plan, 2017) are currently being developed. This document is intended to serve as a reference to experimental study planners that describes the capability, accuracy and resolution of existing and developing measurement technologies to observe quantities of interest for wind plant model validation. Such systems can be broken into two major categories: those that measure the flow field and surrounding atmosphere around and within a wind plant and those that measure the turbine response within the wind plant. The A2e validation team will use this catalogue of instrument capability in conjunction with the validation plan, to choose the optimal set of instruments to be deployed, inform instrument placement and operation and estimate the types of validation that may be gathered through new field campaigns. Where existing instrumentation is deficient, the document will also help guide DOE towards potential areas where instrumentation development is required to meet validation objectives and A2e technology development funding may be required. The domain of interest is the wind plant microscale, within and surrounding a single wind plant, typically, tens of kilometers on a side in horizontal directions and to the top of the atmospheric boundary layer (about 1km) in the vertical. Some observations of dominant mesoscale forcing phenomena are required, with the highest resolution measurements occurring in the wind turbine wakes and on the turbines themselves. The simulation tools to be validated are mesoscale driven large-eddy simulations of the atmosphere with full aeroelastic response of individual turbines within the plant. Use cases vary slightly among tool users, but should focus on the primary end customers of the simulations and research insights, which would be turbine manufacturers, wind plant developers and owners. Broadly speaking their interests are maximizing energy output, while maintaining turbine reliability and lifetime.

17 WIND ENERGY↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2019

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 187 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2020

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 195 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Methods for quantifying uncertainty in fast reactor analyses.

Liquid-metal-cooled fast reactors in the form of sodium-cooled fast reactors have been successfully built and tested in the U.S. and throughout the world. However, no fast reactor has operated in the U.S. for nearly fourteen years. More importantly, the U.S. has not constructed a fast reactor in nearly 30 years. In addition to reestablishing the necessary industrial infrastructure, the development, testing, and licensing of a new, advanced fast reactor concept will likely require a significant base technology program that will rely more heavily on modeling and simulation than has been done in the past. The ability to quantify uncertainty in modeling and simulations will be an important part of any experimental program and can provide added confidence that established design limits and safety margins are appropriate. In addition, there is an increasing demand from the nuclear industry for best-estimate analysis methods to provide confidence bounds along with their results. The ability to quantify uncertainty will be an important component of modeling that is used to support design, testing, and experimental programs. Three avenues of UQ investigation are proposed. Two relatively new approaches are described which can be directly coupled to simulation codes currently being developed under the Advanced Simulation and Modeling program within the Reactor Campaign. A third approach, based on robust Monte Carlo methods, can be used in conjunction with existing reactor analysis codes as a means of verification and validation of the more detailed approaches.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SU-E-T-260: Development of a System to Verify for Connection Consistency in a Brachytherapy

Purpose: Brachytherapy has multiple manual procedures which are prone to human error, especially during the connection process of the treatment device to applicator. This is when considerable attention is required. In this study, we propose a new connection verification device concept. Methods: The system is composed of a ring magnet (anisotropic ferrite : magfine Inc), hole device (A1324LUA-T : Allegro MicroSystems Phil Inc) and an in-house check cable, which is made from magnetic material (Figure1). The magnetic field distribution is affected by the check cable position and any magnetic field variation is detected by the hole device. This system frequency is 20Hz and the average of 4 signals was used as hole device value to reduce noise. Results: The value of the hole device is altered, depending on the location of the check cable. The resolution of the check cable position is 5mm and 10mm, around a 10mm region from the hole device and over 10mm, respectively. There was a reduction in sensitivity of the hole device, in our test, which was linked to the distance of the hole device from the check cable. Conclusion: We demonstrated a new concept of connection verification in a brachytherapy. This system has the possibility to detect an incorrect connection. Moreover, the system is capable of self-optimization, such as determining the number of hole device and the magnet strength.Acknowledgement:This work was supported by JSPS Core -to-Core program Number 23003 and KAKENHI Grant Number 26860401. This work was supported by JSPS Core-to-Core program Number 23003 and KAKENHI Grant Number 26860401.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Simulated Verification of Fuel Element Inventory in a Small Reactor Core Using the Nuclear Materials Identification System (NMIS)

The International Panel on Climate Change projects that by 2050 the world energy demand may double. Although the primary focus for new nuclear power plants in industrialized nations is on large plants in the 1000-1600 MWe range, there is an increasing demand for small and medium reactors (SMRs). About half of the innovative SMR concepts are for small (<300 MWe) reactors with a 5–30-year life without on-site refueling. This type of reactor is also known as a battery-type reactor. These reactors are particularly attractive to countries with small power grids and for non-electrical purposes such as heating, hydrogen production, and seawater desalination. Traditionally, this type of reactor has been used in a nautical propulsion role. This type of reactor is designed as a permanently sealed unit to prevent the diversion of the uranium in the core by the user. However, after initial fabrication it will be necessary to verify that the newly fabricated reactor core contains the quantity of uranium that initially entered the fuel fabrication plant. In most instances, traditional inspection techniques can be used to perform this verification, but in certain situations the core design will be considered sensitive. Non-intrusive verification techniques must be utilized in these situations. The Nuclear Materials Identification System (NMIS) with imaging uses active interrogation and a fast time correlation processor to characterize fissile material. The MCNP-PoliMi computer code was used to simulate NMIS measurements of a small, sealed reactor core. Because most battery-type reactor designs are still in the early design phase, a more traditional design based on a Russian icebreaker core was used in the simulations. These simulations show how the radiography capabilities of the NMIS could be used to detect the diversion of fissile material by detecting void areas in the assembled core where fuel elements have been removed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Analysis of Energy Code Compliance in Commercial Buildings

What percent of newly constructed commercial buildings comply with the energy code? How much energy and cost could be saved if the compliance increased? Which code requirements have both low compliance rates and high savings potential? These are the questions U.S. Department of Energy (DOE) is trying to answer through its Commercial Energy Code Field Study. Previous commercial studies have been very limited and did not result in a widely accepted and tested methodology. DOE’s goal is to create a standardized methodology that can produce actionable results at a reasonable study cost, that can be used by state and local governments and utilities and provides valuable information to policy makers. The field study team implemented the pilot methodology, compiling a data set of 230 office and retail buildings in two climate zones. The approach is based on identifying lost savings on a total energy cost basis rather than simply counting the quantity of measures that do not meet code. This report is focused on the analysis of the collected data. The primary goal was to analyze the data collected during the field study and determine the actual energy cost impact of each measure in a non-compliance situation. The energy impact results allowed for ranking the measures to identify which have the highest potential for lost savings. These results combined with the time required to verify each measure will allow future compliance verification to focus on measures that had a large impact on energy use over the life of the building and those that have the greatest savings recovery potential per verification hour.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Verification and Validation of EnergyPlus Conduction Finite Difference and Phase Change Material Models for Opaque Wall Assemblies

Phase change materials (PCMs) represent a potential technology to reduce peak loads and HVAC energy consumption in buildings. There are few building energy simulation programs that have the capability to simulate PCM but their accuracy has not been completely tested. This report summarizes NREL efforts to develop diagnostic tests cases to obtain accurate energy simulations when PCMs are modeled in residential buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Paving the Way for Net Zero Energy Codes through Performance Based Approaches

The prescriptive path is the most widely used approach for commercial code compliance in the United States. However, to achieve near-term net zero energy performance that many stakeholders in the buildings industry desire, it is clear that energy codes will need to transition from prescriptive to performance-based approaches. However, that transition is not without potential pitfalls. Among the concerns expressed by stakeholders are added complexity and cost, lack of confidence in energy modeling results, gamesmanship on the part of applicants, lack or qualified reviewers, challenges in promoting de-carbonization, and the inequity of trading long lived envelope efficiency for short lived measures such as building controls. This paper will discuss multiple approaches being evaluated and implemented by Pacific Northwest National Laboratory to improve the usability of the performance-based approach for both code compliance and beyond code programs to meet aggressive energy savings targets. A 'system performance' approach provides a simpler approach compared to whole building performance, while keeping tradeoffs limited to specific building systems. A simplified whole-building performance-based approach for small commercial buildings can cost effectively achieve deeper savings for buildings that typically follow the prescriptive compliance approach. Improved reporting and verification processes applied to the traditional performance path can provide greater confidence in simulation results and facilitate adoption of performance-based approaches. Prescriptive packages provide prescriptive solutions while targeting specific performance thresholds. This paper discusses the progress being made with each of these approaches and provides examples of their implementation in energy codes and beyond code programs.

Performance Based Codes, Appendix G, PRM, TSPR, Sy↗

RELAP5-3D Results for Phase I (Exercise 2) of the OECD/NEA MHTGR-350 MW Benchmark

The coupling of the PHISICS code suite to the thermal hydraulics system code RELAP5-3D has recently been initiated at the Idaho National Laboratory (INL) to provide a fully coupled prismatic Very High Temperature Reactor (VHTR) system modeling capability as part of the NGNP methods development program. The PHISICS code consists of three modules: INSTANT (performing 3D nodal transport core calculations), MRTAU (depletion and decay heat generation) and a perturbation/mixer module. As part of the verification and validation activities, steady state results have been obtained for Exercise 2 of Phase I of the newly-defined OECD/NEA MHTGR-350 MW Benchmark. This exercise requires participants to calculate a steady-state solution for an End of Equilibrium Cycle 350 MW Modular High Temperature Reactor (MHTGR), using the provided geometry, material, and coolant bypass flow description. The paper provides an overview of the MHTGR Benchmark and presents typical steady state results (e.g. solid and gas temperatures, thermal conductivities) for Phase I Exercise 2. Preliminary results are also provided for the early test phase of Exercise 3 using a two-group cross-section library and the Relap5-3D model developed for Exercise 2.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

RELAP5-3D results for phase I (Exercise 2) of the OECD/NEA MHTGR-350 MW benchmark

The coupling of the PHISICS code suite to the thermal hydraulics system code RELAP5-3D has recently been initiated at the Idaho National Laboratory (INL) to provide a fully coupled prismatic Very High Temperature Reactor (VHTR) system modeling capability as part of the NGNP methods development program. The PHISICS code consists of three modules: INSTANT (performing 3D nodal transport core calculations), MRTAU (depletion and decay heat generation) and a perturbation/mixer module. As part of the verification and validation activities, steady state results have been obtained for Exercise 2 of Phase I of the newly-defined OECD/NEA MHTGR-350 MW Benchmark. This exercise requires participants to calculate a steady-state solution for an End of Equilibrium Cycle 350 MW Modular High Temperature Reactor (MHTGR), using the provided geometry, material, and coolant bypass flow description. The paper provides an overview of the MHTGR Benchmark and presents typical steady state results (e.g. solid and gas temperatures, thermal conductivities) for Phase I Exercise 2. Preliminary results are also provided for the early test phase of Exercise 3 using a two-group cross-section library and the Relap5-3D model developed for Exercise 2. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Response Time Analysis and Test of Protection System Instrument Channels for APR1400 and OPR1000

Safety limits are required to maintain the integrity of physical barriers designed to prevent the uncontrolled release of radioactive materials in nuclear power plants. The safety analysis establishes two critical constraints that include an analytical limit in terms of a measured or calculated variable, and a specific time after the analytical limit is reached to begin protective action. Keeping with the nuclear regulations and industry standards, satisfying these two requirements will ensure that the safety limit will not be exceeded during the design basis event, either an anticipated operational occurrence or a postulated accident. Various studies on the setpoint determination methodology for the safety-related instrumentation have been actively performed to ensure that the requirement of the analytical limit is satisfied. In particular, the protection setpoint methodology for the advanced power reactor 1400 (APP1400) and the optimized power reactor 1000 (OPR1000) has been recently developed to cover both the design basis event and the beyond design basis event. The developed setpoint methodology has also been quantitatively validated using specific computer programs and setpoint calculations. However, the safety of nuclear power plants cannot be fully guaranteed by satisfying the requirement of the analytical limit. In spite of the response time verification requirements of nuclear regulations and industry standards, it is hard to find the studies on the systematically integrated methodology regarding the response time evaluation. In cases of APR1400 and OPR1000, the response time analysis for the plant protection system is partially included in the setpoint calculation and the response time test is separately performed via the specific plant procedure. The test technique has a drawback which is the difficulty to demonstrate completeness of timing test. The analysis technique has also a demerit of resulting in extreme times that not actually possible. Thus, the establishment of the systematic response time evaluation methodology is needed to justify the conformance to the response time requirement used in the safety analysis. This paper proposes the response time evaluation methodology for APR1400 and OPR1000 using the combined analysis and test technique to confirm that the plant protection system can meet the analytical response time assumed in the safety analysis. In addition, the results of the quantitative evaluation performed for APR1400 and OPR1000 are presented in this paper. The proposed response time analysis technique consists of defining the response time requirement, determining the critical signal path for the trip parameter, allocating individual response time to each component on the signal path, and analyzing the total response time for the trip parameter, and demonstrates that the total analyzed response time does not exceed the response time requirement. The proposed response time test technique is composed of defining the response time requirement, determining the critical signal path for the trip parameter, determining the test method for each component on the signal path, performing the response time test, and demonstrates that the total test result does not exceed the response time requirement. The total response time should be tested in a single test that covers from the sensor to the final actuation device on the instrument channel. When the total channel is not tested in a single test, separate tests on groups of components or single components including the total instrument channel shall be combined to verify the total channel response. For APR1400 and OPR1000, the ramp test technique is used for the pressure and differential pressure transmitters and the step function testing technique is applied to the signal processing equipment and final actuation device. As a result, it can be demonstrated that the response time requirement is satisfied by the combined analysis and test technique. Therefore, the proposed methodology in this paper plays a crucial role in guaranteeing the safety of the nuclear power plants systematically satisfying one of two critical requirements from the safety analysis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗