Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Performance Assessment of a Generic Nuclear Waste Repository in Shale - 18392

A performance assessment (PA) is an important component of a comprehensive safety analysis for a nuclear waste repository. In a PA, probabilistic simulations of the total repository system are performed, and results are evaluated against performance metrics. Uncertainty and sensitivity analyses help prioritize additional research and model development. The United States Department of Energy (DOE) has been developing a state of the art PA simulation software tool-kit, Geologic Disposal Safety Assessment (GDSA) Framework, that couples increasingly higher fidelity models of subsystem processes into total system PA simulations. Over the past several years, PAs of generic repositories in three geologic media (salt, shale, and crystalline rock) have demonstrated ongoing developments in capability. The current PA of a nuclear waste repository in a generic shale formation showcases GDSA Framework, including capabilities in domain discretization (Cubit), multi-physics simulations (PFLOTRAN), uncertainty and sensitivity analysis (Dakota), and visualization (Paraview). The generic shale reference case considers the disposal of 22,000 metric tons heavy metal of commercial spent nuclear fuel (SNF) in a generic shale formation. PA simulations account for the thermal load and radionuclide inventory of the waste form, components of the engineered barrier system including waste package and buffer, and components of the natural barrier system including the host rock shale and underlying and overlying stratigraphic units. Two repository layouts are considered, one for emplacement of waste packages containing 12 pressurized water reactor (PWR) assemblies, and one for 4-PWR waste package emplacement. Model domains are half-symmetry and contain between 7 and 22 million grid cells. Grid refinement captures the detail of individual waste packages, emplacement drifts, access drifts, and shafts. Simulations are run in a high-performance computing (HPC) environment on 512 or 2048 processes. The governing equations describing coupled heat and fluid flow and reactive transport are solved with PFLOTRAN, an open-source, massively parallel multiphase flow and reactive transport code. Additional simulated processes include waste package degradation; waste form dissolution; radioactive decay and ingrowth in aqueous, solid, and adsorbed phases; and a simple biosphere based on a pumping well. Simulations are run to 106 y; dose and radionuclide concentrations are observed within aquifers at a point approximately 5 km downgradient of the repository. Dakota is used to sample likely ranges of input parameters including waste form and waste package degradation rates and properties of engineered and natural materials to quantify uncertainty in predicted concentrations and sensitivity to input parameters. Given the assumptions of the reference case, results of 12-PWR and 4-PWR simulations are very similar. Dose at the pumping well 5-km downgradient of the repository does not exceed 10-9 Sv/y. I-129 is the largest contributor to dose. The dose due to Cl-36, the next largest contributor, is orders of magnitude smaller. At the pumping well, the concentration of I-129 5-km downgradient does not exceed 10-14 mol/L. Rank correlation coefficients indicate that the maximum concentration of I-129 within the aquifer is sensitive to shale (repository host rock) porosity and aquifer permeability. These results affirm that HPC-capable codes can be used to simulate important multi-physics couplings directly in a total system performance assessment of a geologic repository, and can be used in prioritization of future research and model development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Analysis of the Johnson-Lindenstrauss Lemma with the Bivariate Gamma Distribution

Probabilistic proofs of the Johnson-Lindenstrauss lemma imply that random projection can reduce the dimension of a data set and approximately preserve pairwise distances. If a distance being approximately preserved is called a success, and the complement of this event is called a failure, then such a random projection likely results in no failures. Assuming a Gaussian random projection, the lemma is proved by showing that the no-failure probability is positive using a combination of Bonferroni's inequality and Markov's inequality. This paper modifies this proof in two ways to obtain a greater lower bound on the no-failure probability. First, Bonferroni's inequality is applied to pairs of failures instead of individual failures. Second, since a pair of projection errors has a bivariate gamma distribution, this probability of a pair of successes is bounded using an inequality from [Jensen, 1969]. If n is the number of points to be embedded and μ is the probability of success, then this leads to an increase in the lower bound on the no-failure probability of $\frac{1}{2}$ ($\genfrac{}{}{0pt}{}{n}{2}$) (1- μ ) 2 is ($\genfrac{}{}{0pt}{}{n}{2}$) is even and $\frac{1}{2}$ (($\genfrac{}{}{0pt}{}{n}{2}$)-1) (1- μ ) 2 if ($\genfrac{}{}{0pt}{}{n}{2}$) is odd. For example, if n =10 5 points are to be embedded in k =10 4 dimensions with a tolerance of ϵ=0.1, then the improvement in the lower bound is on the order of 10 -14 . We also show that further improvement is possible if the inequality in [Jensen, 1969] extends to three successes, though we do not have a proof of this result.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

RAVEN as Control Logic and Probabilistic Risk Assessment Driver for RELAP-7

The Next Generation of System Analysis Code (NGSAC) [1] aims to model and simulate the Nuclear Power Plant (NPP) thermo-hydraulic behavior with high level of accuracy. In this respect, Idaho National Laboratory (INL) is developing a NGSAC (known as RELAP-7) which will allow to model NPP responses for a set of accident scenarios (e.g., loss of off-site power).

99 GENERAL AND MISCELLANEOUS↗

NONPARAMETRIC BAYESIAN ESTIMATION OF PERIODIC LIGHT CURVES

Many astronomical phenomena exhibit patterns that have periodic behavior. An important step when analyzing data from such processes is the problem of identifying the period: estimating the period of a periodic function based on noisy observations made at irregularly spaced time points. This problem is still a difficult challenge despite extensive study in different disciplines. This paper makes several contributions toward solving this problem. First, we present a nonparametric Bayesian model for period finding, based on Gaussian Processes (GPs), that does not make assumptions on the shape of the periodic function. As our experiments demonstrate, the new model leads to significantly better results in period estimation especially when the light curve does not exhibit sinusoidal shape. Second, we develop a new algorithm for parameter optimization for GP which is useful when the likelihood function is very sensitive to the parameters with numerous local minima, as in the case of period estimation. The algorithm combines gradient optimization with grid search and incorporates several mechanisms to overcome the high computational complexity of GP. Third, we develop a novel approach for using domain knowledge, in the form of a probabilistic generative model, and incorporate it into the period estimation algorithm. Experimental results validate our approach showing significant improvement over existing methods.

79 ASTRONOMY AND ASTROPHYSICS↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility and Safety Assessment for Advanced Reactor Concepts Using Vented Fuel

Recent interest in fast reactor technology has led to renewed analysis of past reactor concepts such as Gas Fast Reactors and Sodium Fast Reactors. In an effort to make these reactors more economic, the fuel is required to stay in the reactor for extended periods of time; the longer the fuel stays within the core, the more fertile material is converted into usable fissile material. However, as burnup of the fuel-rod increases, so does the internal pressure buildup due to gaseous fission products. In order to reach the 30 year lifetime requirements of some reactor designs, the fuel pins must have a vented-type design to allow the buildup of fission products to escape. The present work aims to progress the understanding of the feasibility and safety issues related to gas reactors that incorporate vented fuel. The work was separated into three different work-scopes: 1. Quantitatively determine fission gas release from uranium carbide in a representative helium cooled fast reactor; 2. Model the fission gas behavior, transport, and collection in a Fission Product Vent System; and, 3. Perform a safety analysis of the Fission Product Vent System. Each task relied on results from the previous task, culminating in a limited scope Probabilistic Risk Assessment (PRA) of the Fission Product Vent System. Within each task, many key parameters lack the fidelity needed for comprehensive or accurate analysis. In the process of completing each task, the data or methods that were lacking were identified and compiled in a Gap Analysis included at the end of the report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

DYNAMIC AND CLASSICAL PRA: A BWR SBO CASE COMPARISON

As part of the Light-Water Sustainability Program (LWRS), the purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain the safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic (i.e., dynamic system simulators) and probabilistic (stochastic sampling strategies) approaches are combined in a dynamic PRA fashion in order to estimate safety margins. We use the scenario of a “station blackout” (SBO) wherein offsite power and onsite power are lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and compare this with traditional risk analysis modeling for this type of accident scenario. In the RISMC approach the dataset obtained consists of set of simulation runs (performed by using codes such as RELAP5/3D) where timing and ordering of events is changed accordingly to the stochastic sampling strategy adopted. On the other side, classical PRA methods, which are based on event-tree (FT) and fault-tree (FT) structures, generate minimal cut sets and probability values associated to each ET branch. The comparison of the classical and RISMC approaches is performed not only in terms of overall core damage probability but also considering statistical differences in the actual sequence of events. The outcome of this comparison analysis shows similarities and dissimilarities between the approaches but also highlights the greater amount of information that can be generated by using the RISMC approach.

97 MATHEMATICS AND COMPUTING↗

Plant-specific Model and Data Analysis using Dynamic Security Modeling and Simulation

The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluating Grid Strength under Uncertain Renewable Generation

The increasing displacement of synchronous generators with renewable resources such as wind and solar via power electronic interfaces causes a reduction in short-circuit strength and weak grid issues. The variation and uncertainty of renewable energy increase challenges for identifying weak grid conditions. This paper proposes an efficient method to analyze the impact of uncertain renewable energy on grid strength. The proposed method uses the probabilistic collocation method (PCM) to approximate the results of grid strength assessment under uncertain renewable generation, in order to reduce computational burden without compromising result accuracy when compared with traditional Monte Carlo simulation (MCS). To improve the accuracy of the approximation results, the proposed method integrates the K-means clustering technique with PCM to select the approximation samples of input variables. The efficacy of the proposed method is demonstrated by comparison with MCS on the modified IEEE 9-bus system and modified IEEE 39-bus system with multiple renewable generators.

grid strength↗

A review for identification of initiating events in event tree development process on nuclear power plants

Initiating event is defined as any event either internal or external to the nuclear power plants (NPPs) that perturbs the steady state operation of the plant, if operating, thereby initiating an abnormal event such as transient or loss of coolant accident (LOCA) within the NPPs. These initiating events trigger sequences of events that challenge plant control and safety systems whose failure could potentially lead to core damage or large early release. Selection for initiating events consists of two steps i.e. first step, definition of possible events, such as by evaluating a comprehensive engineering, and by constructing a top level logic model. Then the second step, grouping of identified initiating event's by the safety function to be performed or combinations of systems responses. Therefore, the purpose of this paper is to discuss initiating events identification in event tree development process and to reviews other probabilistic safety assessments (PSA). The identification of initiating events also involves the past operating experience, review of other PSA, failure mode and effect analysis (FMEA), feedback from system modeling, and master logic diagram (special type of fault tree). By using the method of study for the condition of the traditional US PSA categorization in detail, could be obtained the important initiating events that are categorized into LOCA, transients and external events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrating Survival Analysis with Bayesian Statistics to Forecast the Remaining Useful Life of a Centrifugal Pump Conditional to Multiple Fault Types

To improve the viability of nuclear power plants, there is a need to reduce their operational costs. Operational costs account for a significant portion of a plant’s yearly budget, due to their scheduled-based maintenance approach. In order to reduce these costs, proactive methods are required that estimate and forecast the state of a machine in real time to optimize maintenance schedules. In this research, we use Bayesian networks to develop a framework that can forecast the remaining useful life of a centrifugal pump. To do so, we integrate survival analysis with Bayesian statistics to forecast the health of the pump conditional to its current state. We complete our research by successfully using the Bayesian network on a case study. This solution provides an informed probabilistic viewpoint of the pumping system for the purpose of predictive maintenance.

42 ENGINEERING↗

Bayesian analysis of rare events

In many areas of engineering and science there is an interest in predicting the probability of rare events, in particular in applications related to safety and security. Increasingly, such predictions are made through computer models of physical systems in an uncertainty quantification framework. Additionally, with advances in IT, monitoring and sensor technology, an increasing amount of data on the performance of the systems is collected. This data can be used to reduce uncertainty, improve the probability estimates and consequently enhance the management of rare events and associated risks. Bayesian analysis is the ideal method to include the data into the probabilistic model. It ensures a consistent probabilistic treatment of uncertainty, which is central in the prediction of rare events, where extrapolation from the domain of observation is common. We present a framework for performing Bayesian updating of rare event probabilities, termed BUS. It is based on a reinterpretation of the classical rejection-sampling approach to Bayesian analysis, which enables the use of established methods for estimating probabilities of rare events. By drawing upon these methods, the framework makes use of their computational efficiency. These methods include the First-Order Reliability Method (FORM), tailored importance sampling (IS) methods and Subset Simulation (SuS). In this contribution, we briefly review these methods in the context of the BUS framework and investigate their applicability to Bayesian analysis of rare events in different settings. We find that, for some applications, FORM can be highly efficient and is surprisingly accurate, enabling Bayesian analysis of rare events with just a few model evaluations. In a general setting, BUS implemented through IS and SuS is more robust and flexible.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A method for predicting failure statistics for steady state elevated temperature structural components

This paper presents the initial development of a high temperature life prediction method that accounts for the variability in the material properties of Grade 91 steel. The method accounts for material variability by fitting a variable 3-parameter Weibull distribution to experimental rupture data and accounts for the variability of creep deformation on the steady-state stresses via a Monte Carlo approach. To ensure reasonable computational times, the model represents the material as an extremely viscous Stokes fluid with a non-Newtonian viscosity, therefore solving the stress relaxation problem with a steady, static, instead of transient, analysis. Furthermore, the complete statistical analysis combines this model for creep deformation with a probabilistic model for creep rupture to evaluate the probability of premature failure for a set of sample problems, comparing the predicted failure statistics to the design life predicted by the ASME Boiler and Pressure Vessel Code rules.

42 ENGINEERING↗

MASTODON Theory Manual

Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) is a finite element application that aims at analyzing the response of 3-D soil-structure systems to natural and man-made hazards such as earthquakes, floods and fire. MASTODON currently focuses on the simulation of seismic events and has the capability to perform extensive ‘source-to-site’ simulations including earthquake fault rupture, nonlinear wave propagation and nonlinear soil-structure interaction (NLSSI) analysis. MASTODON is being developed to be a dynamic probabilistic risk assessment framework that enables analysts to not only perform deterministic analyses, but also easily perform probabilistic or stochastic simulations for the purpose of risk assessment.

42 ENGINEERING↗

Carbon Dioxide Enhanced Oil Recovery Life Cycle (CELiC) Model

The Carbon Dioxide (CO 2 ) Enhanced Oil Recovery (EOR) Life Cycle (CELiC) Model calculates life cycle greenhouse gas (GHG) emissions for a CO 2 -EOR system, where the user can select one of three sources of the injected CO 2 : (1) extracted from a natural dome, (2) captured from a coal-fired power plant, or (3) captured from a natural gas power plant. The model has several parameters and options to allow the assessment of the system for a wide-array of products—electricity, pipeline CO 2 , crude oil, and refined fuels. The model is also capable of deterministic (i.e., point estimate) and stochastic (i.e., probabilistic) analyses and finally a deterministic time-series analysis that shows the changing GHG emissions for the CO 2 -EOR system over time.

03 NATURAL GAS↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway

Significant efforts are underway to develop and implement a risk-informed performance-based licensing framework for advanced reactors built on the establishment of an affirmative safety case. Such approaches offer the benefits of increased flexibility regarding key design and licensing decisions based on a detailed assessment and understanding of plant risk. These methods include the comprehensive analysis of scenarios that have historically been addressed through conservative and deterministic licensing analysis approaches, such as the evaluation of event sequences at frequencies of occurrence beyond the design basis. While the detailed analysis of low frequency events provides insights that can help justify alternative treatments to past conservatism, the findings are dependent on the quality and confidence associated with the analyses. The assessment of external hazards presents a unique challenge, as their potential frequency of occurrence, especially of large magnitude events, is inherently uncertain given the long return periods in question. The current project seeks to further explore the regulatory treatment of low frequency external events as part of a risk-informed performance-based framework. The goals are to identify the benefits and challenges of such approaches for advanced reactor vendors and to aid in the development of consistent and appropriate methodologies. As part of this effort, the current report summarizes initial project findings, with a focus on the evaluation of the seismic hazard. This includes an exploration of the implementation of a risk-informed performance-based approach through an example analysis. Based on the identified challenges associated with the probabilistic treatment of low frequency event sequences, additional performance-based methods were explored as complementary tools for demonstrating regulatory compliance. The report highlights key challenges and opportunities associated with the methods and outlines recommendations and future activities to assist with their implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Estimation of an origin–destination table for U.S. imports of waterborne containerized freight

This study presents a probabilistic origin–destination table for waterborne containerized imports. The analysis makes use of 2012 Port Import/Export Reporting Service data, 2012 Surface Transportation Board waybill data, a gravity model, and information on the landside transportation mode split associated with specific ports. This analysis suggests that about 70% of the origin–destination table entries have a coefficient of variation of less than 20%. This 70% of entries is associated with about 78% of the total volume. This analysis also makes evident the importance of rail interchange points in Chicago, Illinois; Memphis, Tennessee; Dallas, Texas; and Kansas City, Missouri, in supporting the transportation of containerized goods from Asia through West Coast ports to the eastern United States.

97 MATHEMATICS AND COMPUTING↗

A simple and fast algorithm for estimating the capacity credit of solar and storage

Energy storage is a leading option to enhance the resource adequacy contribution of solar energy. Detailed analysis of the capacity credit of solar energy and energy storage is limited in part due to the data intensive and computationally complex nature of probabilistic resource adequacy assessments. This paper presents a simple algorithm for calculating the capacity credit of energy-limited resources that, due to the low computational and data needs, is well suited to exploratory analysis. Validation against benchmarks based on probabilistic techniques shows that it can yield similar insights. The method is used to evaluate the impact of different solar and storage configurations, particularly with respect to the strategy for coupling storage and solar photovoltaic systems. Furthermore, application of the method to a case study of utilities in Florida, where solar is rapidly growing and demand peaks in the winter and summer, demonstrates that it can improve on rules of thumb used in practice by some utilities. If storage is required to charge only from solar, periods of high demand driven by cold weather events accompanied by lower solar production can result in a capacity credit of solar and storage that is less than the capacity credit of storage alone.

14 SOLAR ENERGY↗