Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Catalyst design for small molecule activation of energy consequence

This project targets the conversion of ubiquitous small molecules (e.g. NO, CO, H 2 O) into viable precursors to synthetic fuels. Current state of the art catalyst design has not directly targeted transition metal complexes capable of mediating the multi-electron redox processes necessary to reduce the overpotential (energy loss) required achieve efficient activation of small molecule substrates. In this vein, a new strategy has been developed for the assembly of polynuclear architectures; allowing for the construction of tunable polymetallic centers that assemble easily within a pre-organized template (conferring stability, selectivity and tunability) that can effect multi-electron redox processes for reactions. Catalyst development has commenced with the following target design elements: (1) catalysts featuring multiple transition metal ions in the same reaction space to greatly expand accessible molecular redox capabilities; (2) catalysts are assembled in a polynucleating ligand framework that permits control over the cluster morphology as well as the local steric and electronic environment of the transition metal ions within the cluster. The high-tunability of the catalyst composition (metal content) and geometric flexibility has permitted a rigorous assessment of electronic-structure-to-function relationship to be developed, further guiding synthetic efforts to realize more potent catalysts. The numerous permutations possible showcase the high degree of generality to this approach with many synthetic handles to tune redox and reaction chemistry. Trinuclear complexes have been synthesized featuring homo- and hetero-trinuclear cores featuring a variety of first row transition metal ions (Cr→Ni). The molecular clusters have been shown to successfully mediate multi-electron redox processes in a cooperative fashion without requiring strong chemical reductants or oxidants. The reactive molecular complexes are being utilized to activate and breakdown the robust bonds within typical waste stream small molecules (e.g., greenhouse gases) and convert them into value-added commodity chemicals. Ultimately, the catalysts developed by this approach will be required to convert energy acquired via renewable resources (e.g., solar or wind) into synthetic fuels as an energy storage mechanism.

10 SYNTHETIC FUELS↗

Distribution Network Capacity Market Design: Marginal Distribution Capacity Pricing Mechanism for Efficient Investment and Cost Allocation

As electricity markets begin to shift from reliance on large, centralized power plants and towards distributed energy resources (DERs), there is a growing acknowledgement that more efficient planning, operations, and oversight is needed in the distribution system. This paper addresses one step in that direction by proposing an auction mechanism that uses a detailed distribution system planning model that allocates permits to end-used customers who request capacity to install new devices at their location and network upgrade contracts to utilities or 3rd-party companies who offer to upgrade system components. The resulting plan maximizes market surplus, that is, maximizes the total benefit to consumers minus the cost of network upgrades. We apply a marginal pricing scheme to the auction’s results such that the cost of each permits or contracts is differentiated by time and location, based on the Lagrangian multipliers of binding network constraints. These prices are shown to be no greater than the bid price of any awarded contract and no less than the offered cost of any awarded upgrade contract. Furthermore, the nonlinearity of power flows in the planning model result in an additional surplus that would be collected by the entity that hosts the auction, which could then be refunded to market participants or used to cover overhead costs of running the market. We provide four example auction results in a simple three-node distribution feeder to demonstrate the properties of the design. Results suggest that larger or more realistic case studies could be a promising next step.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spatial Seal Database for Prospective Storage Resources in the USA

The goal of the Spatial Seal Database for Prospective Storage Resources in the USA is to provide relevant information and spatial extents of caprock and seal rocks. A lack of aggregated information is readily available that focuses on the caprock and seal units within sedimentary basins. The EPA class VI permit requires an assessment of the confining zone as part of submitting a permit. The data catalog of seal unit names and relevant properties with the seal spatial extent database aims to help provided important data for carbon storage based assessments. The data catalog and database are designed to show what seal data is available in a sedimentary basin and guide stakeholders to the original data source for those datasets.

Pantaleone, Scott↗

Exceedance Response Action (ERA) Level 2 Technical Report Update

The Sandia National Laboratories, California (SNL/CA) site comprises approximately 410 acres and is located in the eastern portion of Livermore, Alameda County, California. The property is owned by the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) and is being managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS). Operations at the SNL/CA facility consist of DOE statutory responsibilities for nuclear weapon research and design, development of energy technologies, and basic scientific research. Specific industrial activities occur in discrete buildings and include electroplating or anodizing, machine shop, permitted hazardous waste treatment, storage and disposal facility (TSDF), and a scrap yard. This report provides an update to the ERA Level 2 Technical Report Update previously submitted in June 2022 (2022 ERA L2 Technical Report Update) for iron, aluminum, and pH. In accordance with the California’s General Permit for Discharges of Storm Water Associated with Industrial Activities (IGP) Section XII.D.3.c, an ERA Level 2 Technical Report update is to be submitted with the annual report when a facility utilizing an Industrial Activity Best Management Practice (BMP) Demonstration (IABMPD) experiences additional exceedances of the numeric action levels.

54 ENVIRONMENTAL SCIENCES↗

ITS Version 6.7: The Integrated TIGER Series of Coupled Electron/Photon Monte Carlo Transport Codes User's Manual

ITS is a powerful software package permitting state-of-the-art Monte Carlo solution of linear time-independent coupled electron/photon radiation transport problems, with or without the presence of macroscopic electric and magnetic fields of arbitrary spatial dependence. Our goal has been to simultaneously maximize operational simplicity and physical accuracy. Through a set of preprocessor directives, the user selects one of the many ITS codes. The ease with which the make system is applied combines with an input scheme based on order-independent descriptive keywords that makes maximum use of defaults and internal error checking to provide experimentalists and theorists alike with a method for the routine but rigorous solution of sophisticated radiation transport problems. Physical rigor is provided by employing accurate cross sections, sampling distributions, and physical models for describing the production and transport of the electron/photon cascade from 1.0 GeV down to 1.0 keV. The availability of source code permits the more sophisticated user to tailor the codes to specific applications and to extend the capabilities of the codes to more complex applications. Version 6, the latest version of ITS, contains (1) improvements to the ITS 5.0 codes, and (2) conversion to Fortran 95. The general user friendliness of the software has been enhanced through memory allocation to reduce the need for users to modify and recompile the code.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The Integration and Mapping of an Open-Source National Well Resource to Inform Geologic Carbon Storage Site Selection and Risk Prevention: The CO2-Locate Database

Geologic carbon storage (GCS) offers a way to capture and permanently store CO₂ from fossil fuel operations in underground geologic structures, aiding in the transition to a carbon-neutral energy economy. However, CO₂ injection sites can experience gas leakage through existing wells that penetrate storage reservoirs, making knowledge of well locations and characteristics crucial for permitting, infrastructure reusability, and risk assessment in GCS. Currently, public wellbore data from state, federal, and tribal entities are inconsistent and fragmented, with gaps and redundancies. To address this, the National Energy Technology Laboratory (NETL) developed CO2-Locate, an open-source, geospatial database and online application. CO2-Locate integrates over 50 data sources from federal, state, and tribal entities, creating a standardized national well database. Funded by the Bipartisan Infrastructure Law, the database is publicly available through the Energy Data eXchange (EDX) and viewable via the CO2-Locate web mapping application. This tool allows users to query, filter, and visualize well data to support GCS planning, permitting, and risk assessments. This presentation covers the methods used to create CO2-Locate, including data acquisition, processing, attribute mapping, and integration, much of which is automated for future updates. The web mapping application and its role in GCS site selection will also be discussed.

Tetteh, Daniel A.↗

Off-line Tests of the DM1200 Thermal Catalytic Oxidation (TCO) Unit (Final Report)

The River Protection Project-Waste Treatment Plant (RPP-WTP) Low-Activity Waste (LAW) and High-Level Waste (HLW) feed streams are listed for a variety of hazardous organic compounds. The permitting basis for the WTP systems may necessitate the demonstration of minimum Destruction/Removal Efficiencies (DREs) of such species from any released emissions of up to 99.99%. Results from a previous study on the fate of hazardous organics in the melter itself indicated, not only that DREs for selected test compounds approached 99.99% only at extreme melter conditions, but also that organic compounds not originally present in the feed were actually produced in the melter, In order to ensure that the required DREs for hazardous organics are met, Thermal Catalytic Oxidation (TCO) units were therefore added to both the HLW and LAW off-gas treatment systems, The extent to which these species can be destroyed or removed in the TCO units is therefore an important issue in the design and permitting of the LAW and HLW off-gas treatment systems. A further consideration is that it would be desirable, if possible, to be able to achieve all of the required DRE across the TCO alone. If that is not the case, the DRE would be distributed across several unit operations, which may then become subject to additional operational constraints that may reduce process flexibility. Compliance with the DRE requirements on the basis of the TCO unit alone is also an approach that lends itself to periodic confirmation during operations, since the TCO is located at the back-end of the off-gas treatment system where radioactivity levels are lowest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Algal Oil Production

The main objective of the project is complete: development of a preliminary planning and design for a pilot-scale algal oil cultivation and processing facility, FEL-3 design with -5% / +15% cost estimate accuracy, and conversion of the algal oil to biofuel in an off-site existing bio-oil refinery. The design basis includes 10 tons per day of dried algae cultivated with CO 2 supplied by direct air capture, electricity supplied solar power, well water supply, zero liquid discharge, off-site extraction, and off-site conversion of oil to biofuel. The design and permitting package is an important milestone in the path to commercialization of algal biofuels and bioproducts as it provides the preliminary design, permitting path, long-term land lease, planning documents, and team needed for success in future engineering, construction, start-up and operations of a pilot-scale farm at a site in Paso Robles, CA. Outcomes of the business assessment include (i) identification of a product spectrum for economical algal biofuels using co-products with markets that are commensurate with production of 6-7 billion gallons per year of sustainable aviation fuel (SAF), renewable diesel, and renewable gasoline, (ii) a path toward near-term contribution of algae oil to SAF, and (iii) an approach for long-term operation of a pilot-scale farm.

09 BIOMASS FUELS↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

AOI [1] Advanced Manufacturing of Ceramic Anchors with Embedded Sensors for Process and Health Monitoring of Coal Boilers

Researchers at West Virginia University (WVU) developed methods to fabricate and test ceramic anchors with an embedded sensor technology for monitoring the health and processing conditions within pulverized coal (PC) and fluidized-bed combustion (FBC) boiler systems. The technology included the development of advanced manufacturing processes for 2D/3D printing electroceramic (conductive ceramic) sensor designs within the ceramic anchor microstructure during the manufacturing process. This advanced manufacturing process would allow for the precise control of local microstructure and composition in order to engineer layer-by-layer any protective and electrically active materials within the refractory anchor. This 3D printing technology would permit the rapid and controlled design of the refractory microstructure and embedded sensor design throughout the volume of the ceramic anchor. The work also included a method to interconnect the sensors to boiler shell through the anchor clamp, where the sensor signals will be processed by low-power electronics and transmitted wirelessly to a central processing hub. The end-goal of the program was to produce a ceramic anchor sensor system which would be ready for implementation within a coal boiler, and/or other similar refractory liner systems (such as that in the glass and metal manufacturing areas). The project objectives were to: 1) Define the chemical and microstructural stability, in addition to the electrical properties, of oxide and non-oxide ceramic composites to be embedded within the ceramic anchor compositions that may operate up to 1400ºC; 2) Develop and implement the 2D/3D printing technology to pattern and control the microstructure of the ceramic anchor and embedded sensor circuits; 3) Develop an interconnect technology which will permit easy installation of the ceramic anchors and signal collection at the boiler shell; 4) Develop low power analog electronics and wireless communication hardware to efficiently collect the sensor signal at each processing unit and transmit data to a central hub for data analysis; 5) Demonstrate the smart ceramic anchor system for temperature and liner fracture within a high-temperature processing unit, such as a boiler furnace or glass melting furnace floor/wall liner.

20 FOSSIL-FUELED POWER PLANTS↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reinforced AEM Separators Based on Triblock Copolymers for Electrode-decoupled RFBs

Washington University in St. Louis (WUSTL), in collaboration with The University of Texas at San Antonio (UTSA) and Giner Inc. developed highly selective anion exchange membranes (AEMs) and a novel electrode-decoupled redox flow battery (RFB) for grid scale energy storage as part of the ARPA-E IONICS program (with connections to the DAYS program in the later part of the project). RFBs exhibit the crucial characteristic of system-level decoupled scaling of energy and power which makes them cost effective for the multi-GWh scales envisioned for grid-scale energy storage solutions. This has led to extensive (and deserved) research interest and attention. This project aimed to enhance the design space available for redox-flow batteries (RFBs) by enabling the long-term separation of disparate cationic (elemental) actives using a highly selective membrane separator, while concurrently permitting the transport of anions to balance charge. The approach proposed was to design and develop a highly selective anion-exchange membrane (AEM), which would in turn permit the design and development of electrode-decoupled RFBs. Pairs of (different element) cationic species with redox reactions exhibiting a large difference in their standard electrode potentials were identified to develop high voltage, high power RFBs while disrupting the existing paradigm of using a single element which can ionize to more than two soluble oxidation states (e.g.: Vanadium).

25 ENERGY STORAGE↗

NEPATEC v2.0: Standardized Metadata and Text Corpus of National Environmental Policy Act Documents

The National Environmental Policy Act of 1969, as amended (NEPA), is a major environmental law in the United States, requiring Federal agencies to consider and document potential environmental impacts before deciding on a proposed action. Modernization of NEPA and permitting processes faces significant challenges due to the lack of standardized formats and interoperable systems for organizing and sharing NEPA-related information across agencies. Much of the information gathered during NEPA reviews is written into documents such as categorical exclusions, environmental assessments, and environmental impact statements, then filed in predominately independent agency file stores that may or may not be publicly accessible. The application of metadata and data standards, such as those recommended by the Council on Environmental Quality (CEQ), to NEPA documents offers a shared vocabulary and structure for key entities like projects, processes, and documents that can streamline information exchange and enhance collaboration across systems. In this work, we publicly release NEPATEC2.0, an expanded corpus of NEPA documents with associated metadata. NEPATEC2.0 encompasses approximately 120,000 documents from 60,000 projects prepared by more than 60 different agencies. Modeled to align with CEQ metadata standards, NEPATEC2.0 promotes consistency in environmental reviews and supports the ongoing effort to modernize permitting technologies by facilitating more transparent, efficient, and data-driven decision-making. Importantly, NEPATEC2.0 demonstrates the possibilities and limitations of large language model-based prompting to extract information from NEPA documents at scale.

54 ENVIRONMENTAL SCIENCES↗

Risk Management for CO 2 Storage Projects

Conference poster presented at American Association of Petroleum Geologists (AAPG) Carbon Capture, Utilization, and Storage (CCUS) Conference, Houston, Texas, April 25–27, 2023. There is no one-size-fits-all risk management approach for storage projects. Instead, risk management is about having a detailed process in place, adhering to that process throughout the project life cycle, and adapting the process depending on site-specific conditions, applicable regulatory requirements, and any additional requirements imposed by pursuing one or more financial incentive programs. The Plains CO 2 Reduction (PCOR) Partnership Initiative experience has demonstrated the value of managing risk analysis in concert with storage project regulatory permit requirements, which drive the geologic exhibits and site characterization needs for the permit and the risk analysis.

01 COAL, LIGNITE, AND PEAT↗

Y-12 National Security Complex Biological Monitoring and Abatement Program—2024 Calendar Year Report

This report provides the results of the CY 2024 sampling of East Fork Poplar Creek (EFPC) as part of the Y-12 National Security Complex (Y-12) Biological Monitoring and Abatement Program (BMAP). The results are presented in the context of historical trends. The Y-12 BMAP was developed in 1985 to demonstrate that the effluent limits established for Y-12 protected the classified uses of the receiving stream, particularly the growth and propagation of aquatic life (Loar et al. 1989). Over the years, the BMAP has become an important and valuable long-term measure of stream conditions resulting from actions and activities at the Y-12 Complex. The BMAP currently consists of three tasks: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. The benthic macroinvertebrate community monitoring task includes studies to evaluate the receiving stream’s biological integrity annually in comparison with Tennessee Water Quality Criteria following Tennessee Department of Environment and Conservation (TDEC) protocols. In addition to presenting the EFPC biological monitoring results, this report includes results from Comprehensive Environmental Response, Compensation, and Liability Act–funded BMAP programs in Bear Creek and McCoy Branch (presented in Appendixes A and B, respectively), as required in the Y-12 National Pollutant Discharge Elimination System (NPDES) permit. Additional biological testing at the Y-12 Complex includes toxicity testing of select storm drains as required in the NPDES permit. Although toxicity testing is not formally part of the BMAP, toxicity testing results from 2024 are provided in Appendix C.

54 ENVIRONMENTAL SCIENCES↗