Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Project M: Scale Model of Lunar Landing Site of Apollo 17: Focus on Lighting Conditions and Analysis

This document captures the research and development of a scale model representation of the Apollo 17 landing site on the moon as part of the NASA INSPIRE program. Several key elements in this model were surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. This model supports development of Autonomous Landing and Hazard Avoidance Technology (ALHAT) and Project M for the GN&C Autonomous Flight Systems Branch. It will help project engineers visualize the landing site, and is housed in the building 16 Navigation Systems Technology Lab. The lead mentor was Dr. Timothy P. Crain. The purpose of this project was to develop an accurate scale representation of the Apollo 17 landing site on the moon. This was done on an 8'2.5"X10'1.375" reduced friction granite table, which can be restored to its previous condition if needed. The first step in this project was to research the best way to model and recreate the Apollo 17 landing site for the mockup. The project required a thorough plan, budget, and schedule, which was presented to the EG6 Branch for build approval. The final phase was to build the model. The project also required thorough research on the Apollo 17 landing site and the topography of the moon. This research was done on the internet and in person with Dean Eppler, a space scientist, from JSC KX. This data was used to analyze and calculate the scale of the mockup and the ratio of the sizes of the craters, ridges, etc. The final goal was to effectively communicate project status and demonstrate the multiple advantages of using our model. The conclusion of this project was that the mockup was completed as accurately as possible, and it successfully enables the Project M specialists to visualize and plan their goal on an accurate three dimensional surface representation.

Vanik, Christopher S.↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Improving Climate Projections Using "Intelligent" Ensembles

Recent changes in the climate system have led to growing concern, especially in communities which are highly vulnerable to resource shortages and weather extremes. There is an urgent need for better climate information to develop solutions and strategies for adapting to a changing climate. Climate models provide excellent tools for studying the current state of climate and making future projections. However, these models are subject to biases created by structural uncertainties. Performance metrics-or the systematic determination of model biases-succinctly quantify aspects of climate model behavior. Efforts to standardize climate model experiments and collect simulation data-such as the Coupled Model Intercomparison Project (CMIP)-provide the means to directly compare and assess model performance. Performance metrics have been used to show that some models reproduce present-day climate better than others. Simulation data from multiple models are often used to add value to projections by creating a consensus projection from the model ensemble, in which each model is given an equal weight. It has been shown that the ensemble mean generally outperforms any single model. It is possible to use unequal weights to produce ensemble means, in which models are weighted based on performance (called "intelligent" ensembles). Can performance metrics be used to improve climate projections? Previous work introduced a framework for comparing the utility of model performance metrics, showing that the best metrics are related to the variance of top-of-atmosphere outgoing longwave radiation. These metrics improve present-day climate simulations of Earth's energy budget using the "intelligent" ensemble method. The current project identifies several approaches for testing whether performance metrics can be applied to future simulations to create "intelligent" ensemble-mean climate projections. It is shown that certain performance metrics test key climate processes in the models, and that these metrics can be used to evaluate model quality in both current and future climate states. This information will be used to produce new consensus projections and provide communities with improved climate projections for urgent decision-making.

Baker, Noel C.↗

Improving Climate Projections Using "Intelligent" Ensembles

Recent changes in the climate system have led to growing concern, especially in communities which are highly vulnerable to resource shortages and weather extremes. There is an urgent need for better climate information to develop solutions and strategies for adapting to a changing climate. Climate models provide excellent tools for studying the current state of climate and making future projections. However, these models are subject to biases created by structural uncertainties. Performance metrics-or the systematic determination of model biases-succinctly quantify aspects of climate model behavior. Efforts to standardize climate model experiments and collect simulation data-such as the Coupled Model Intercomparison Project (CMIP)-provide the means to directly compare and assess model performance. Performance metrics have been used to show that some models reproduce present-day climate better than others. Simulation data from multiple models are often used to add value to projections by creating a consensus projection from the model ensemble, in which each model is given an equal weight. It has been shown that the ensemble mean generally outperforms any single model. It is possible to use unequal weights to produce ensemble means, in which models are weighted based on performance (called "intelligent" ensembles). Can performance metrics be used to improve climate projections? Previous work introduced a framework for comparing the utility of model performance metrics, showing that the best metrics are related to the variance of top-of-atmosphere outgoing longwave radiation. These metrics improve present-day climate simulations of Earth's energy budget using the "intelligent" ensemble method. The current project identifies several approaches for testing whether performance metrics can be applied to future simulations to create "intelligent" ensemble-mean climate projections. It is shown that certain performance metrics test key climate processes in the models, and that these metrics can be used to evaluate model quality in both current and future climate states. This information will be used to produce new consensus projections and provide communities with improved climate projections for urgent decision-making.

Baker, Noel C.↗

Advanced EVA Suit Camera System Development Project

The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was also spent creating a case for the original interface board that is already being used. This design is being done by use of Creo 2. Due to time constraints, I may not be able to complete the 3-D printing portion of this design, but I was able to use my knowledge of the interface board and Altium Design to help in the task. As a side project, I assisted another intern in selecting and programming a microprocessor to control linear actuators. These linear actuators will be used to move various increments of polyethylene for controlled radiation testing. For this, we began the software portion of the project using the Arduino's coding environment to control an Arduino Due and H-Bridge components. Along with the obvious learning of computer programs such as Altium Design and Creo 2, I also acquired more skills with networking and collaborating with others, being able to multi-task because of responsibilities to work on various projects, and how to set realistic goals in the work place. Like many internship projects, this project will be continued and improved, so I also had the chance to improve my organization and communication skills as I documented all of my meetings and research. As a result of my internship at JSC, I desire to continue a career with NASA, whether that be through another internship or possibly a co-op. I am excited to return to my university and continue my education in electrical engineering because of all of my experiences at JSC.

Mock, Kyla↗

Collaborative Systems Engineering in the Ascent Abort-2 Crew Module/Separation Ring Project

Generally speaking, systems engineering (SE) tool-sets face a dilemma balancing power and accessibility. High-powered SE tools (MagicDraw, Cradle, Core, etc.) tend to be specialized and are available only to highly trained Systems Engineers, and/or through the use of a 'back room' developer team making the output products available to the broader team. On the other hand, highly accessible tools (MS Word, Excel, etc.) do not have the power to implement SE in a rigorous manner. NASA has to test all aspects of the new human-rated Orion Multi-Purpose Crew Vehicle spacecraft prior to its first crewed mission. The test program includes uncrewed launch abort flight tests to demonstrate the capability to save the crew in the event that a launch failure occurs. Orion's second abort flight test will be a low-altitude flight test known as "Ascent Abort 2 (AA-2)." This test is currently scheduled to be carried out at Cape Canaveral Air Force Station's Space Launch Complex 46 (SLC-46) in Florida in 2019. NASA's in-house AA-2 Crew Module and Separation Ring (CSR) Team is producing the crew module and separation ring. Operating jointly as both an Advanced Exploration Systems (AES) Project and an Orion Project, the CSR project charter includes development of innovative, streamlined and generally more efficient practices for creation of flight hardware and software. One result of this tasking has been development of a collaborative and data-centric systems engineering environment within the team's shared web environment (Microsoft SharePoint). Through the use of built-in, 'out of the box capabilities' present in MS SharePoint, the CSR Systems Engineering team has created (with some limited developer support) a data-centric architecture for the project's SE implementation, including functional and interface analysis, requirements development and management, risk management, verification planning and management, test results, and end item management. Data elements are linked between data structures so as to define and control relationships between item types, link requirements to parents and children, and link tests to the requirements that they verify. The overall project team integration is increased by also linking SE content to project management content over the project life cycle, including team communication, action items, configuration management, decisional and meeting materials, and life cycle reviews. This presentation will provide an overview of the collaborative SE environment, showing how it provides the power for a number of SE tasks while still providing the accessibility and transparency to allow the full project team to collaborate and succeed. Given the project phase, we'll be able to present a nearly full lifecycle discussion, from concept through verification and approaching delivery.

Systems Engineering environments↗

Governance of the International Linear Collider Project

Governance models for the International Linear Collider Project are examined in the light of experience from similar international projects around the world. Recommendations for one path which could be followed to realize the ILC successfully are outlined. The International Linear Collider (ILC) is a unique endeavour in particle physics; fully international from the outset, it has no 'host laboratory' to provide infrastructure and support. The realization of this project therefore presents unique challenges, in scientific, technical and political arenas. This document outlines the main questions that need to be answered if the ILC is to become a reality. It describes the methodology used to harness the wisdom displayed and lessons learned from current and previous large international projects. From this basis, it suggests both general principles and outlines a specific model to realize the ILC. It recognizes that there is no unique model for such a laboratory and that there are often several solutions to a particular problem. Nevertheless it proposes concrete solutions that the authors believe are currently the best choices in order to stimulate discussion and catalyze proposals as to how to bring the ILC project to fruition. The ILC Laboratory would be set up by international treaty and be governed by a strong Council to whom a Director General and an associated Directorate would report. Council would empower the Director General to give strong management to the project. It would take its decisions in a timely manner, giving appropriate weight to the financial contributions of the member states. The ILC Laboratory would be set up for a fixed term, capable of extension by agreement of all the partners. The construction of the machine would be based on a Work Breakdown Structure and value engineering and would have a common cash fund sufficiently large to allow the management flexibility to optimize the project's construction. Appropriate contingency, clearly apportioned at both a national and global level, is essential if the project is to be realised. Finally, models for running costs and decommissioning at the conclusion of the ILC project are proposed. This document represents an interim report of the bodies and individuals studying these questions inside the structure set up and supervised by the International Committee for Future Accelerators (ICFA). It represents a request for comment to the international community in all relevant disciplines, scientific, technical and most importantly, political. Many areas require further study and some, in particular the site selection process, have not yet progressed sufficiently to be addressed in detail in this document. Discussion raised by this document will be vital in framing the final proposals due to be published in 2012 in the Technical Design Report being prepared by the Global Design Effort of the ILC.

43 PARTICLE ACCELERATORS↗

Final Technical Report for the project titled "Manganese Based Permanent Magnet with 40 MGOe at 200°C"

The objective of project was to develop MnBi based permanent magnet for high temperature application (~150°C). This objective is derived based on MnBi’s unique positive temperature dependence of coercivity, which is doubled from ~1 T at RT to ~2.5 T at 200°C. Because of its limited magnetization (<0.9 T at RT), the MnBi magnet is best suited to fill in the gap between rare earth based NdFeB-Dy or SmCo magnet (20 MGOe) and the AlNiCo magnet (10 MGOe) at 150°C. It is expected that if successfully developed, MnBi will effectively mitigate the world’s demand on Dy. Before this project, the highest LTP content in MnBi powder is about 90% if the quantity of the powder is less than 5 gram (using melt-spin method); or 80% if the quantity is greater than 100 gram (using conventional powder metallurgical method such as arc melting and annealing). After this project, large quantities (5kg/batch) with high LPT phase content (>92 wt%) can be routinely synthesized. This achievement is made possible by the newly developed synthesis method based on conventional metallurgical processing technique involving arc melting, two-stage ingot annealing, grinding, sieving, and vacuum annealing. Before this project, the finest powder particle size is about 35 μm with overall powder composition maintaining at about 85% LTP phase. The reason why LTP phase content is listed along with particle size is because LTP MnBi is easy to decompose when exposed to temperature higher than 350 °C. As result, only low energy ball milling can be used to refine the particle size; moreover, the ball milling time cannot exceed 4 hrs, or else the decomposed LTP MnBi phase will exceed 10%. After this project, the finest powder size is reduced to 1~5 μm while maintain the 90% LTP MnBi phase content. This achievement is made possible by a newly developed cryogenic ball milling system, which provides -70 °C ambient for the rolling container. Before this project, it is not clear if MnBi will ferromagnetically exchange-couple with soft magnetic phase such as Fe or Co. After this project, it is established that MnBi will ferromagnetically exchange couple with Co, but not with Fe. It is also possible for MnBi to ferromagnetically exchange couple with Fe-Co alloy, but the amount of Fe cannot be more than 50 at.%. This conclusion is made possible by a series of electronic structure calculation followed by a series of thin film experimentation. As the result, 25 MGOe energy product was demonstrated using a MnBi-Co film. Before this project, the highest energy product for a bulk MnBi magnet is about 5 MGOe with 70% green density, and near-fully dense magnet is not available. After this project, the highest energy density is about 8.6 MGOe with 95% green density. This achievement is made possible by a modified warm-compaction system developed at University of Texas at Arlington. This system has 2.1 T alignment field vs the previous 1.8 T, and the compaction ambient maintains <1 ppm oxygen partial pressure. The estimated cost of MnBi magnet is about $110/kg when conventional magnet fabrication method is used, and about $84/kg when warm extrusion method is used. In comparison the cost of NdFeB, SmCo, AlNiCo, and Sr-Ferrite magnets is $150/kg, $180/kg, $119/kg, and $20/kg, respectively. The near term future work should focus on further improve the purity of the LTP MnBi, pushing it from the current 91 wt.% to 99 wt.%. If successful, the increased 8% LTP phase will increase the remanent magnetization, which in turn, increase the energy product. In addition, high reduction ratio warm extrusion method should be investigated to further push the texture to >90%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advances in Grid Computing for the FabrIc for Frontier Experiments Project at Fermialb

The FabrIc for Frontier Experiments (FIFE) project is a major initiative within the Fermilab Scientic Computing Division charged with leading the computing model for Fermilab experiments. Work within the FIFE project creates close collaboration between experimenters and computing professionals to serve high-energy physics experiments of diering size, scope, and physics area. The FIFE project has worked to develop common tools for job submission, certicate management, software and reference data distribution through CVMFS repositories, robust data transfer, job monitoring, and databases for project tracking. Since the projects inception the experiments under the FIFE umbrella have signicantly matured, and present an increasingly complex list of requirements to service providers. To meet these requirements, the FIFE project has been involved in transitioning the Fermilab General Purpose Grid cluster to support a partitionable slot model, expanding the resources available to experiments via the Open Science Grid, assisting with commissioning dedicated high-throughput computing resources for individual experiments, supporting the eorts of the HEP Cloud projects to provision a variety of back end resources, including public clouds and high performance computers, and developing rapid onboarding procedures for new experiments and collaborations. The larger demands also require enhanced job monitoring tools, which the project has developed using such tools as ElasticSearch and Grafana. in helping experiments manage their large-scale production work ows. This group in turn requires a structured service to facilitate smooth management of experiment requests, which FIFE provides in the form of the Production Operations Management Service (POMS). POMS is designed to track and manage requests from the FIFE experiments to run particular work ows, and support troubleshooting and triage in case of problems. Recently a new certicate management infrastructure called Distributed Computing Access with Federated Identities (DCAFI) has been put in place that has eliminated our dependence on a Fermilab-specic third-party Certicate Authority service and better accommodates FIFE collaborators without a Fermilab Kerberos account. DCAFI integrates the existing InCommon federated identity infrastructure, CILogon Basic CA, and a MyProxy service using a new general purpose open source tool. We will discuss the general FIFE onboarding strategy, progress in expanding FIFE experiments presence on the Open Science Grid, new tools for job monitoring, the POMS service, and the DCAFI project.

Herner, K.↗

Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management data such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Comparison of Social and Economic Engagement Approaches: Lessons from Recent International Radioactive Waste Projects - 17478

The central challenge of any proposed radioactive waste management project is securing not only regulatory permissions, but also a social license to operate. 'Social license' generally refers to a community's acceptance or approval of a specific project. Oftentimes development of social license occurs outside of, or in parallel to, formal regulatory or permitting processes, and requires sustained commitment and proposed economic benefits to communities by proponents to acquire, build, and sustain social capital in the context of trust-based relationships. Historically, radioactive waste management projects have defaulted to demagoguery and 'siege warfare' modes of thinking and action by both proponents and opponents. While radioactive waste management projects are always inherently controversial, it is only recently that project owners and developers have experimented with alternative forms of social engagement outside of, or in addition to, formal regulatory processes. This paper compares and contrasts recent projects in Canada, Australia, the United Kingdom, and the United States, by examining distinct approaches to social engagement, with a focus on new methods that have been used to promote mutual understanding, foster rational debate, build confidence, promote economic development, and secure social license. The projects examined span the life-cycle of radioactive waste management development, from ones that are purely aspirational, to ones in early planning stages, to ones seeking a host community, to one that is focused on sustainment of existing social license. Several notable lessons and innovative practices are identified that will be of interest to radioactive waste management project owners and developers, non-governmental organizations, potential host communities, and political decision-makers for such projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chute Silo ILW Project Berkeley - 16649

Magnox, a Tier 1 Site Licensed Company (SLC), is the management and operations contractor responsible for the decommissioning of twelve of the Nuclear Decommissioning Authority's (NDA) nuclear sites in the UK. Aquila Nuclear Engineering is a specialist Tier 3, turnkey engineering company based in the UK, delivering mission critical engineering solutions to Europe's nuclear and nuclear medicine industries. Berkeley Nuclear Power Station, Berkeley, England started generating electricity in 1962, ceasing operation 27 years later in 1989. The Chute Silo ILW Project at this Reactor Site had been set up to retrieve irradiated control rods and charge chutes disposed of within a subterranean vault (silo). The project involved in-silo size reduction of waste in to 30-35 waste baskets. The waste basket was then to be retrieved via a pintle grab and hoist mechanism in to a Transfer Flask (through a silo and a Transfer Flask gamma gate). The Transfer Flask was then to transit along existing crane rails, out of the silo building and over the top of an Import/Export Facility. A Ductile Cast Iron Container (DCIC) was to be imported into Import/Export Facility and inspected/prepared to receipt the waste basket from the Transfer Flask. Once filled, the DCIC was then to be sealed and exported to an on-site storage facility. Due to an issue with the Magnox Tier 2 Framework holder in delivering a cost effective and viable solution for their Chute Silo ILW Retrieval Project, Magnox took the ground breaking decision to 'self-perform'. This involved dividing the larger project into several smaller packages. Two of these packages - for the shielded Transfer Flask and the Import/Export facility - were put out for competitive tendering directly to the Tier 3 Supply Chain. The work completed by the Tier 2 Company was shared with the Tier 3's, but Magnox expressly requested the Tier 2 proposals were scrutinised and that far more cost effective, robust and simpler solutions were provided for within the Tier 3 Tenders. Aquila won both work packages and delivered them with significant and demonstrable cost savings, on time and under budget. This was achieved by the collaborative arrangements between Aquila and Magnox, the methodologies of both company's project teams and the innovation and 'fitness for purpose' of Aquila's design pragmatism. The original Tier 2 Framework holder's price to Magnox for the Chute Silo ILW Project was between UK Pounds 2-3 M. Aquila delivered the equivalent scope for under UK Pounds 1 M. Aquila's original programme was maintained despite the award of additional scope and (Magnox) delays on site. Aquila came under the original target price for each discrete phase of the project. The above was achieved because of: - the collaborative arrangements between Aquila and Magnox; - the methodologies of both company's project teams; - the design features put forward by Aquila (welcomed and adopted by Magnox). In 2014 Aquila Nuclear Engineering received formal recognition of its achievements on this project by winning an NDA Supply Chain Award for 'Best example of supplier 'going the extra mile''. Points highlighted in the award were: - improved customer focus, leading to stronger relationships - encouraging challenge and innovation - continuous suggestions for improvement - UK Pounds 1 million savings and three months programme reduction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cameco Corporation's Vision in Motion Project - 19128

Cameco Corporation is a world leader in uranium production. Cameco is also a major supplier of uranium processing services required to produce fuel for the generation of clean energy. These operations are based in Blind River, Cobourg and Port Hope, Ontario and are collectively referred to as the Fuel Services Division. The Fuel Services Division produces uranium trioxide from uranium ore concentrate at the Blind River Refinery. Cameco produces uranium hexafluoride and uranium dioxide at the Port Hope Conversion Facility. Cameco operates a fuel manufacturing facility in Port Hope, Ontario and a metal fabrication facility located in Cobourg, Ontario. The company manufactures fuel bundles utilized in the Candu reactors. Cameco is undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is located in the Municipality of Port Hope (MPH). This undertaking is known as the Vision in Motion (VIM) project. This project is unique and timely opportunity that has been made possible because of the Port Hope Area Initiative (PHAI). The PHAI Port Hope project is being undertaken by Canadian Nuclear Laboratories (CNL) and includes the construction of a long-term waste management facility (LTWMF) in the MPH. VIM entails an extensive remediation and redevelopment of much of the PHCF and includes: - the cleanup and demolition of a number of old or underutilized buildings; - the removal of contaminated soils, building materials and stored wastes; and - modifications to existing buildings at the PHCF with associated landscaping and infrastructure. Overall, the VIM project will allow for environmental remediation, improved site operations, enhancement of site safety and security through site design and improved aesthetics. This paper will discuss the status of this project underway at the Port Hope Conversion Facility. After years of community consultation, planning, and a successful environmental assessment and licensing of the project, the VIM project at the PHCF is now underway. Physical transfer of waste materials began in June 2018. Cameco is committed to seeing the project through to completion and is working with CNL to ensure this happens within the operating time frame of the LTWMF. Cameco keeps the CNSC and MPH well informed of all project related activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback from Reactor Internals Segmentation Projects in Europe - 19141

Westinghouse has accumulated significant know-how in the reactor dismantling activities. The approach to internals segmentation and packaging has been continuously enhanced by incorporating lessons learned and best practices into each successive project. Building on the most recent successful experience at Jose Cabrera in Spain, Westinghouse has won several major awards with 13 reactors currently under contract at Chooz A (France), Barsebaeck 1-2 (Sweden), Bohunice V1 (two units in Slovakia), Neckarwestheim I, Philippsburg 1, and more recently at Unterweser, Grafenrheinfeld, Grohnde, Isar 1, Isar 2, Brokdorf (Germany). The primary challenges of a segmentation and packaging project are to separate the highly activated materials from the less-activated materials and package them into appropriate containers for disposal. The choice of the optimum cutting technology is important for a successful project implementation and depends on some specific constraints like disposal costs, project schedule, available work areas or safety. The selected technology for all recent Westinghouse projects is mechanical cutting with different types of designed cutting equipment (hydraulic shears, band saw, disc saw). All segmentation tools are remotely controlled due to the high radiation levels and ALARA and personal safety is the number one priority during the challenging site work. Training on mock-ups in the Westinghouse facility before going to the site is a very important step in order to optimize all procedures and thereby maximize the efficiency on site in order to finalize the project on time or before. The work covers the segmentation of reactor internals but also, in some cases, some replaced components during plant operation that were stored in the spent fuel pool. The cutting equipment proved to be reliable and flexible which is very valuable for the execution of such a challenging project. The Barsebaeck Unit 2 site work has been finished end of October 2017 and its lessons learned are taken into consideration for future activities. Site work is currently on-going simultaneously at Chooz A, Barsebaeck 1, Neckarwestheim I and Philippsburg 1. This paper will provide an overview of all these on-going segmentation projects and will focus on feedback from the first projects executed on site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SUBTASK 1.6 – BASIN ELECTRIC CARBON STORAGE RESEARCH PROJECT: NOVEL MONITORING TECHNIQUES

The Energy & Environmental Research Center (EERC) conducted baseline activities associated with an applied research project at Basin Electric Power Cooperative’s (Basin’s) carbon capture and storage (CCS) site in Beulah, North Dakota, to establish novel carbon storage-monitoring techniques as commercial methods under Cooperative Agreement No. DE-FE0024233, Subtask 1.6. The following report summarizes the baseline activities performed and briefly describes the subsequent (operational monitoring) activities that have been proposed to the U.S. Department of Energy (DOE) as part of the overall project to develop and demonstrate novel monitoring techniques at North America’s largest permitted CCS operation. Dakota Gasification Company (DGC), a wholly owned subsidiary of Basin, owns and operates the Great Plains Synfuels Plant (GPSP) approximately 5 miles northwest of the town of Beulah, North Dakota (Figure 1). In 2023, DGC received approval from the North Dakota Industrial Commission (NDIC) to develop a storage facility on-site for injecting a stream of carbon dioxide (CO2) captured from GPSP. DGC will transport the captured CO2 stream with approximately 6.8 miles of transmission lines that extend north of GPSP and inject >1 million tonnes (MMt) of CO2 annually (>1 MMt/yr) over a 12-year period with up to six underground injection control (UIC) Class VI-compliant injection wells completed in the Broom Creek Formation, a predominantly sandstone reservoir and saline aquifer underlying GPSP. The Broom Creek Formation lies approximately 5900 feet (ft) below ground surface (bgs) at GPSP. The commercial scale (i.e., >1 MMt/yr) of DGC’s permitted carbon storage project is ideal for developing and testing the novel monitoring techniques included within Subtask 1.6. The goals of this project are to demonstrate 1) the cost-effectiveness of novel monitoring technologies included as part of this research, 2) technology capability for tracking the CO2 plume and/or associated pressure response in the subsurface and monitoring out-of-zone migration, and 3) compliance with UIC Class VI program requirements. The research activities proposed for the overall project include 1) design of an automated, integrated, modular (AIM) monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance studies; 4) time-lapse monitoring with seismic methods; 5) advanced wellbore-monitoring methods; 6) deployment of an AIM monitoring network; 7) EM monitoring of CO2 with real-time data processing; 8) continued seasonal drone-based surveillance studies; 9) seismic monitoring with passive and active surveys; and 10) wellbore monitoring with nuclear magnetic resonance (NMR) for near-surface characterization. Completion of Activities 1.0–5.0 (baseline activities) are described in this report. Upon authorization of funding by DOE, the EERC will initiate Activities 6.0– 10.0 (operational monitoring activities). Current state-of-the-art (SOA) carbon storage-monitoring techniques require countless labor hours dedicated to the acquisition of data. Once data are gathered, these SOA techniques often rely on commercial facilities to process raw data from the field. However, it is anticipated that next-generation monitoring techniques, such as those being demonstrated, will lower acquisition footprints, be less operationally intensive, and improve data acquisition efficiencies. These new techniques are more conducive to the application of machine learning, artificial intelligence, and automation, thus providing a pathway for integration into active control systems, informing site operability, and improving the integration of data for future CCS projects across the United States. Additionally, reclaimed and active mining lands are present within the project site, creating a unique opportunity to demonstrate the effectiveness of remote sensing and surface-based geophysics monitoring techniques at similar project sites that may include disturbed, unconsolidated, or actively excavated near-surface environments. The efforts included in the overall project will produce necessary designs, learnings, and data acquired during the baseline and operational monitoring periods that are necessary for time-lapse demonstration and validation of the described monitoring techniques. In addition, it is anticipated that the monitoring technologies included in this study will be compliant with UIC Class VI requirements to enable the potential for implementation at other CCS sites across the United States.

42 ENGINEERING↗

Regional climate change projections from NA-CORDEX and their relation to climate sensitivity

Abstract The climate sensitivity of global climate models (GCMs) strongly influences projected climate change due to increased atmospheric carbon dioxide. Reasonably, the climate sensitivity of a GCM may be expected to affect dynamically downscaled projections. However, there has been little examination of the effect of the climate sensitivity of GCMs on regional climate model (RCM) ensembles. Therefore, we present projections of temperature and precipitation from the ensemble of projections produced as a part of the North American branch of the international Coordinated Regional Downscaling Experiment (NA-CORDEX) in the context of their relationship to the climate sensitivity of their parent GCMs. NA-CORDEX simulations were produced at 50-km and 25-km resolutions with multiple RCMs which downscaled multiple GCMs that spanned nearly the full range of climate sensitivity available in the CMIP5 archive. We show that climate sensitivity is a very important source of spread in the NA-CORDEX ensemble, particularly for temperature. Temperature projections correlate with driving GCM climate sensitivity annually and seasonally across North America not only at a continental scale but also at a local-to-regional scale. Importantly, the spread in temperature projections would be reduced if only low, mid, or high climate sensitivity simulations were considered, or if only the ensemble mean were considered. Precipitation projections correlate with climate sensitivity, but only at a continental scale during the cold season, due to the increasing influence of other processes at finer scales. Additionally, it is shown that the RCMs do alter the projection space sampled by their driving GCMs.

54 ENVIRONMENTAL SCIENCES↗

Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate thecomplexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of theinvestment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in acoordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Laboratory and Field Arrays (ALFA)/Lab Collaboration Project (LCP) for Marine Energy (Final Scientific/Technical Report)

The objective of the Advanced Laboratory and Field Arrays (ALFA) project was to reduce the Levelized Cost of Energy (LCOE) of Marine and Hydrokinetic (MHK) energy by leveraging research, development, and testing capabilities at Oregon State University, University of Washington, and the University of Alaska, Fairbanks. ALFA is a project within the Pacific Marine Energy Center (PMEC; formerly NNMREC), a multi-institution entity with a diverse funding base that focuses on research and development for marine renewables. The ALFA project aimed to accelerate the development of next-generation arrays of wave energy conversion (WEC) and tidal energy conversion (TEC) devices through a suite of field-focused R&D activities spanning a broad range of strategic opportunity areas identified in the Funding Opportunity Announcement: • Device and/or array operation and maintenance (O&M) logistics development; • High-fidelity resource characterization and/or modeling technique development and validation; • Array-specific component technology development (e.g. moorings and foundations, transmission, and other offshore grid components); • Array performance testing and evaluation; and • Novel cost-effective environmental monitoring techniques and instrumentation testing and evaluation. The objective of the Lab Collaboration Project (LCP) was to accelerate the development of next-generation marine energy conversion systems. The LCP aimed to achieve these project objectives in collaboration with the national laboratories by: • Developing concept generation and assessment tools; • Improving access to existing testing resources; • Validating collision risk models between fish and turbines; and • Advancing analysis and simulation capabilities for wave-WEC interactions and PTO analysis in nonlinear ocean waves. The ALFA portion of the project was comprised of six overarching technical tasks: • Task 1: Debris Modeling, Detection and Mitigation; • Task 2: Autonomous Monitoring & Intervention; • Task 3: Resource Characterization for Extreme Conditions; • Task 4: Robust Models for Design of Offshore Anchoring and Mooring Systems; • Task 5: Performance Enhancement for Marine Energy Converter (MEC) Arrays; and • Task 6: Evaluating Sampling Techniques for MHK Biological Monitoring. The LCP was divided into four overarching technical tasks: • Task 7: Project Management and Reporting • Task 8: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave- SPARC) • Task 9: Testing Access for Commercial Marine Renewable Energy Technology Developers • Task 10: Quantifying Collision Risk for Fish and Turbines • Task 11: Nonlinear Ocean Waves and PTO Control Strategy Each ALFA/LCP task listed above functioned as a separate and discreet project. A final Technical Report was written for each individual task and these reports were uploaded to OSTI, after receiving DOE approval. The following document is a compilation of each of these final, approved reports arranged as individual chapters.

13 HYDRO ENERGY↗