Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Weld procedure produces quality welds for thick sections of Hastelloy-X

Welding program produces premium quality, multipass welds in heavy tube sections of Hastelloy-X. It develops semiautomatic tungsten/inert gas procedures, weld wire procurement specifications material weld properties, welder-operator training, and nondestructive testing inspection techniques and procedures.

Flens, F. J.↗

Coatings qualification

Passive and thermal control coatings development and degradation equipment procurement

TEMPERATURE CONTROL↗

Compilation of Papers Summarizing Some Recent NASA Research on Manned Military Aircraft

The nine papers included in this volume were presented by NASA research staff members at the National Meeting on the Future of Manned Military Aircraft sponsored by the Institute of the Aeronautical Sciences and held in San Diego, Calif., from August 1 to August 3, 1960. Because, together, they provide a comprehensive summary of research by NASA in the areas covered, they have been compiled in this publication for the information of personnel concerned with the design and procurement of manned military aircraft.

Supersonic flight↗

Development of a Space Vehicle Electromagnetic Interference/compatibility Specification. Volume 3 - System Specification

This specification represents a new approach to controlling electromagnetic interference. In this approach the system integration contractor will be responsible for the development of discrete specification limits to be utilized on the program to which this specification is applied. The specification limits imposed upon subsystem contractors will be developed by the use of a computer program, available from the procuring agency, which is designed to consider the total system electromagnetic environment in the computation of these limits. The integration contractor will be required to mathematically model those circuits which represent required emitters and receptors of electromagnetic energy on the space vehicle. There are contained herein, a list of available computer models into which must be inserted particular parameters of the spacecraft subsystems. These functional models, when inserted into the computer program, will develop discrete specification limits based upon the requirements of the particular system modelled.

Cooperstein, B. D.↗

Lunar orbital mission plans.

Lunar orbital mission plans intended to optimize spacecraft procurement, flight schedules, science objectives and available funds

Allenby, R. J.↗

Apollo Program Management, Kennedy Space Center, Florida

The evolution of the Kennedy Space Center as the launch organization for Apollo/ Saturn V involved the concurrent solution of numerous complex problems. A significant increase in manpower was involved. Large and complex checkout and launch facilities were to be designed and constructed. Expansion of operational capabilities required the establishment and integration of a Government-Contractor operational team. From an initial cadre of approximately 200 civil service personnel of the Army Ballistic Missile Agency, transferred to NASA in 1960 following its establishment, expansion to the present civil service level of 2,900 occurred in the last seven years. Established within NASA as a directorate of the Marshall Space Flight Center, KSC achieved center status in 1962. With its designation as a Center, KSC accomplished the development and staffing of an organization that could perform procurement, resources, financial, and other management requirements formerly provided by the parent organization. In addition to continuing launch operations for established programs, KSC undertook the design and construction of large, new, and unique launch facilities for Apollo/Saturn V. With the expansion of the civil service work force, KSC integrated contractor organizations employing 23,000 personnel at the Center to perform specific operational and support missions under the technical supervision and observation of the Government team. The management techniques, organizational concepts, and continuing efforts utilized to meet the Apollo goals and challenges are discussed in this document.

Source record↗

DSIF station schedules

System manages Deep Space Instrumentation Facilities /DSIF/ equipment construction and modification planning. Versatile program applies to such tasks as employee time and task schedules, pay schedules, operations schedules, and plant and equipment procurement, construction, modification or service.

Flarity, L. D.↗

Specification guidelines for hybrid microcircuits

Guidelines establishing manufacturing and control procedures for hybrid microcircuits used in aerospace programs may have possible commercial and industrial applications. Guidelines encompass parts, materials, and process controls, as well as assembly, packaging methods, screening, and inspection procedures for procurement of custom packaged, high reliability microcircuits.

Caruso, S. V.↗

Two autowire versions for CDC-3200 and IBM-360

Microelectronics program was initiated to evaluate circuitry, packaging methods, and fabrication approaches necessary to produce completely procured logic system. Two autowire programs were developed for CDC-3200 and IBM-360 computers for use in designing logic systems.

Billingsley, J. B.↗

Identification and measurement of shrub type vegetation on large scale aerial photography

Important range-shrub species were identified at acceptable levels of accuracy on large-scale 70 mm color and color infrared aerial photographs. Identification of individual shrubs was significantly higher, however, on color infrared. Photoscales smaller than 1:2400 had limited value except for mature individuals of relatively tall species, and then only if crown margins did not overlap and sharp contrast was evident between the species and background. Larger scale photos were required for low-growing species in dense stands. The crown cover for individual species was estimated from the aerial photos either with a measuring magnifier or a projected-scale micrometer. These crown cover measurements provide techniques for earth-resource analyses when used in conjunction with space and high-altitude remotely procured photos.

Driscoll, R. S.↗

Space shuttle low cost/risk avionics study

All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.

Source record↗