Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MONEY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

High Value Risk Targets in Human System Risk

The Human System Risk Board (HSRB) has the overall responsibility for tracking the evolution of the top ~30 human system risks that it has identified to be associated with human spaceflight. The Board is also charged with maintaining a consistent, integrated process to mitigate those risks, and developing evidence-based risk posture recommendations. Each Risk Custodian Team (RCT) identifies High Value Risk Mitigation Targets (HVRMT) that have the highest likelihood or greatest impact in reducing their risk. These typically include areas where there are major gaps in knowledge or capability; or other targets that promise to yield returns worthy of investments in time, money and other resources by stakeholders interested in reducing Human System Risk. As part of the review of each risk the Board members consider and discuss the HVRMT statements, which are then approved by the Board Chair. High Value Risk Mitigation Targets can include research activities funded by the Human Research Program, but often involve recommending standards, monitoring, or other operational goals to reduce risk. This presentation will discuss common themes and highlights of the approved HVRTs to inform IWS attendees and the wider research community.

D M Buckland↗

Modular Open Systems Approach (MOSA) for a Robust Commercial Lunar Ecosystem

Modular Open Systems Approaches (MOSAs) have been adopted worldwide to solve a myriad of challenges. Open systems by their nature maximize accessibility, reduce barriers to entry, and prevent vendor lock. Similarly, modularity speeds innovation, fosters design re-use, and enables incremental development & growth. Architectures developed using a MOSA synergize the benefits of modularity and open systems to produce better products at lower developmental cost and risk, saving the consumer money while allowing greater developer profit margins. Specific to the challenge of lunar exploration, a MOSA will ensure interoperability among diverse commercial, government, and international partners. Complex spaceflight systems can be assembled, upgraded, and serviced far more easily and with greater commercial involvement with the use of a MOSA. By allowing partners to self-limit their scope to key strengths, they can focus on producing premier components without carrying the high risk and associated cost of auxiliary tasks they don’t specialize in. We survey commercial and Department of Defense (DoD) lessons learned in past decades, discuss DoD robotics’ experience in Iraq and Afghanistan (first without then with MOSAs), and analyze the flourishing commercial ecosystem that has resulted from DoD MOSA adoption. We explore the future of lunar operations to demonstrate the criticality of MOSA adoption in key areas at the right time. Two specific lunar technical fields are studied as examples: Power and In-Situ Resource Utilization (ISRU). Finally, recognizing that the lunar ISRU campaign will be an eminently collaborative operation requiring seamless partnering among diverse commercial, government, and international partners, a comprehensive technology development ecosystem is explored aimed at enabling ISRU in a way that systems and components are affordable for commercial partners to design, build, and sustain.

Mathew DeMinico↗

Going South: Warnings from the Largest Project Engineering Failure in Modern History

NASA’s successful conduct of the Apollo Program greatly enhanced the prestige of the United States and remains broadly accepted as America’s gift “for all Mankind.” NASA’s Artemis Program to return humanity to the Moon promises to again reveal America’s leadership in this field. In preparation for the initiation of Artemis and its predecessor project Constellation, NASA thoroughly examined space program precedents. There remains, however, another relevant precedent which has not been examined in this context. Though this project involved technology radically different from that managed by NASA, its scope and environment in many ways parallel NASA’s large programs. This project was initiated by a private sector team that had, ten years before, successfully completed an effort that, at a cost of $275 billion (in 2021 USD), had stimulated new technology, had brought economic growth, had established their country as the world leader in engineering innovation, and, though it was a commercial success, had been broadly accepted as their nation’s gift “to all Mankind.” The new project was inspired by popular belief that private capital could again be marshalled to enhance national prestige and make yet another major contribution to the progress of Humanity. This new effort was predicted to require eight years and $258 billion. However, after the passage of nine years, achievement of only 45% complete on the baseline design, and expenditures 96% beyond the baseline cost, the project collapsed amid bankruptcy, political scandal, and criminal prosecution. While the private sector team that carried out this project was exceptionally well educated and experienced in the field, their efforts resulted in what remains (in terms of the money wasted) the largest project engineering failure in modern history. This paper examines what went wrong.

Project Management↗

Opening Historical Airborne Data to Present Day Researchers

For more than 50 years, NASA has flown airborne sensors to carry out research, validate satellite sensors, and test new instrument capabilities. Data collected prior to 2000 are typically analog and difficult to locate and use. The Airborne Data Management Group (ADMG) facilitates rescue of these valuable data to ensure easier discovery, access, and use. But opening historical data comes at a cost of both time and money. Careful decisions are required in assessing the return on investment. - Is there interest in the science community? - Are there government data requirements? - What is the temporal / spatial value of the data? - Can data be transformed to a digital format? - What is cost of transformation? - What time period is needed for rescue? Converting the data to today’s digital storage standards increases value and provides data access. The addition of metadata makes the data easier to search for.

Deborah Smith↗

AeroFusion: Data Fusion and Uncertainty Quantification for Entry Vehicles

AeroFusion is a NASA Langley initiative to incorporate advances in data science into the aerodynamic modeling process to improve efficiency. The effort can largely be categorized in three components: reduced-order modeling techniques, surrogate modeling techniques, and uncertainty quantification. By combining various methods from these categories, AeroFusion aims to reduce the development cost of aerodynamic models, both in terms of time and money.

Steven Snyder↗

AeroFusion: Data Fusion and Uncertainty Quantification for Entry Vehicles

AeroFusion is a NASA Langley initiative to incorporate advances in data science into the aerodynamic modeling process to improve efficiency. The effort can largely be categorized in three components: reduced-order modeling techniques, surrogate modeling techniques, and uncertainty quantification. By combining various methods from these categories, AeroFusion aims to reduce the development cost of aerodynamic models, both in terms of time and money.

Steven Snyder↗

A PI’s Guide to Analog Research

Spaceflight Research in Analogs - Analog missions prepare us for near-future exploration to asteroids, Mars, and the moon. - Not all experiments can be done in space – there is not enough time, money, equipment, and crew time. - Measures, countermeasures, procedures, and equipment can be tested in analogs to address issues prior to flying them in space. - Ground-based analog studies are completed more quickly and less expensively. - Analogs provide conditions similar to some (but not all) conditions encountered in space - Analogs provide a more “controlled” environment, often more repeatable scenarios, and higher “n” than available in space

Analogs↗

The Open Data Repository - an Open Science Platform for Long-Tail Research Data

Introduction: ‘Long-tail’ research is performed by individual PIs and small research teams, producing what are often highly diverse, but relatively small da-tasets that span a variety of traditional scientific disci-plines. ‘Long-tail’ research is a fundamental part of realizing NASA’s goals in planetary sciences and a key input feeding into mission life cycles. The ‘long-tail’ has traditionally lacked the resources (available to larg-er groups and missions) to overcome barriers inhibit-ing the adoption of open science practices, including lack of acknowledgment, time, money, guidance, ex-pertise, and trust in available platforms1. Here we show how the Open Data Repository’s (ODR) data publish-ing platform could help lower some of these barriers and accelerate the adoption of open-science practices in planetary science.

‘Long-tail’ research↗

Controllable Multi-Functional Heat Exchanger for Space Applications

Team Spacering will design SpaceRing, a cooling and waste heat recycling system that addresses NASA’s interest for a cooling and power-generating unit in its prototype deep space habitat[1]. The merits of this system are as follows: - Controllable cooling is critical in maintaining a habitable environment and in the functionality of life support systems, powering electronics and other devices in a spacecraft. - Power is expensive to produce in a space environment. Converting wasted thermal energy into electricity will save energy and money for the space station. Space habitation is a highly complex endeavor. Consequently, the SpaceRing must adhere to additional constraints, which include: - Lack of natural fluid or gas convection due to micro-gravity environment - Limited range for heat source and cold sink temperature - Subject to high fluctuations of incoming thermal energy - Minimal weight due to the high cost of transporting items into space After consulting with NASA and experts in thermal studies, several design objectives were identified and are listed below in order of importance: - High cooling capacity - Reliable safety control and alert system - Maximization of energy generation from wasted heat - Optimization of cooling capability and power generation - Long operational life and minimization of maintenance In space, conventional cooling systems utilize passive heat pipe systems for small-scale heat rejection and pumped pipes with heat exchangers for large-scale heat rejection. Thermal power generation in space is mainly achieved by using thermoelectric material that produces electric energy from temperature differentials. We propose a design that combines cooling and thermoelectric power generation. Using a hot pipe connected to a heat source, a cold pipe connected to a radiator, a heat exchanger in contact with both pipes, and a pump in each pipe to move the fluid, we make an active cooling system. The thermoelectric material is inserted in the heat exchanger between the hot and cold pipes to extract energy from the maximum temperature difference coming from the two pipes. It also provides controllable cooling capacity through the use of the thermoelectric material as cooling modules. We have tested our system under target heat source and sink conditions and measured the temperatures and flow rates. Our preliminary results are promising, demonstrating the output of 25 Watts of power on average. We are in the process of running control tests to compare the heat transfer performance without the thermoelectric generators, which is vital in determining whether or not the generators introduce an unacceptable amount of thermal resistance. While some control tests have been run already, the results have been noisy. We have modified our testing environment and data acquisition methods to allow for simple comparison between the control test results and thermoelectric performance results. Lastly, we have modified the heat exchanger design slightly to include acrylic baffles. This will allow the heat to flow through the heat exchanger more efficiently. We have presented our preliminary results to NASA and will deliver the final product by the end of May 2014.

Lee Xiong↗

Lessons Learned With Risk Management: A Systems Engineer's Perspective

Risk management is a communications device that, when executed as an essential task, enables systems engineering to effectively balance risk across the project. Developing and baselining risks is an essential continuous task to ensure top project concerns both from bottom up and top down are being mitigated. Risk management provides the opportunity to avoid the consequence of the risk when mitigation steps start early enough. Just discussing risk with all the project flight elements during development, even if no risks are open, provides an excellent communication opportunity between systems engineering and those elements, ensuring concerns and worries have a platform for discussion. A well-managed risk identification process will identify concerns that are serious but not being clearly communicated, and it will enable mitigation of those potential problems before they cause a failure. Effective risk management requires considerable time and effort, but that effort will save time and money across the development. Risk management must be frequent enough to be useful and in depth enough to bring out emerging issues. It also requires a trusting relationship between the lead systems engineer and element and/or subsystem leads. The discussions need to be with the right number of individuals (typically a handful) and the right duration in time (typically an hour a month). Outside of these risk working groups, there is a formal management process to input, status, and disposition risks, and a monthly Risk Management Board meeting where key project stakeholders are informed. This paper provides good guidance on effective risk management from a systems engineering perspective and provides project lessons learned from the NASA spaceflight missions NICER, Landsat 9, LRO, and OSIRIS-REx to demonstrate the effectiveness of risk management.

Lessons Learned↗

Lessons Learned With Risk Management: A Systems Engineer’s Perspective

Risk management is a communications device that, when executed as an essential task, enables systems engineering to effectively balance risk across the project. Developing and baselining risks is an essential continuous task to ensure top project concerns both from bottom up and top down are being mitigated. Risk management provides the opportunity to avoid the consequence of the risk when mitigation steps start early enough. Just discussing risk with all the project flight elements during development, even if no risks are open, provides an excellent communication opportunity between systems engineering and those elements, ensuring concerns and worries have a platform for discussion. A well-managed risk identification process will identify concerns that are serious but not being clearly communicated, and it will enable mitigation of those potential problems before they cause a failure. Effective risk management requires considerable time and effort, but that effort will save time and money across the development. Risk management must be frequent enough to be useful and in depth enough to bring out emerging issues. It also requires a trusting relationship between the lead systems engineer and element and/or subsystem leads. The discussions need to be with the right number of individuals (typically a handful) and the right duration in time (typically an hour a month). Outside of these risk working groups, there is a formal management process to input, status, and disposition risks, and a monthly Risk Management Board meeting where key project stakeholders are informed. This paper provides good guidance on effective risk management from a systems engineering perspective and provides project lessons learned from the NASA spaceflight missions NICER, Landsat 9, LRO, and OSIRIS-REx to demonstrate the effectiveness of risk management.

Lessons Learned↗

CESO 22-4: Parabolic and Suborbital Glovebox in Support of Space Crop Production

Space crop production research approaches and technologies can be validated for microgravity using parabolic or suborbital flight opportunities, and this will save considerable risk, time, and money for implementing new strategies in spaceflight. While the durations of microgravity in these tests are insufficient to grow crops, there are numerous examples of the value of microgravity testing for subsystems such as plant water and nutrient delivery, where multiphase fluid flow can be elucidated in short durations, and horticultural operations, such as harvesting and produce sanitation where containment and contamination can be assessed. Containment in any operational test is essential, as crop operations involve fluids and biological samples, which are potential hazards. This project consists of designing, developing, and constructing a parabolic/suborbital glovebox for experiment containment. The design involves modifications and upgrades to an existing glovebox developed at the University of Louisville. The University of Louisville glovebox was used by KSC researchers for space crop parabolic flight tests in 2021, and lessons learned from that testing have driven design modifications and improvements in the KSC-generated glovebox. Requirements were identified, parts were ordered, an operational science glovebox was fabricated, and a detailed materials specification list was generated. Analyses that are required for flight, remain to be performed to meet airworthiness requirements, and that work will have to be conducted in the future before use in flight.

Food Production↗

Farming the Future: An Approach to Precision Agriculture through UAS-based Thermal Scanners

Food waste is a global issue, and it is extremely prevalent in the United States (U.S.) where one-third of the food produced goes to waste. The most common item found in landfills is food waste, which is why it is one of the most significant contributors to global warming with 8%. These negative environmental impacts also return to affect agriculture, as global warming changes climate patterns and adversely affects farming practices. In addition, the resources that were used to grow the produce are also wasted, including money, water, and time. To tackle this problem at its roots, this paper includes a design of an unmanned thermal drone that can be a farmer’s third eye. This drone will scan over farms and provide data to the farmers about the health, ripeness, and moisture content of their crops through mounted thermal cameras and artificial intelligence. The information provided via these drones will help farmers to make more informed decisions about their crops, decreasing the chances that the crops will go bad in the field. These drones will be one of the first steps in preventing food waste, which will, in turn, help to reduce global emissions that result from farming.

UAS supported agriculture↗

Results of the 2023 Mental Health Survey of the Planetary Science Community

Several recent studies have recognized mental health concerns in academia and in the research field more broadly [e.g., 1,2]. In planetary science, a 2022 survey found that the prevalence of clinically significant anxiety and depressive symptoms among our community is higher than in the general United States public, especially among graduate students, postdoctoral researchers, soft money researchers, and tenure-track faculty. Further, 76% of planetary science participants in the 2022 survey noted that their anxiety and/or depressive symptoms impacted their work, their ability to take care of things at home, and interpersonal relationships. Thus, these symptoms may play a role in decreased research quality and productivity. Interpretations of the 2022 mental health survey of planetary science also noted potential diversity, equity, and inclusion concerns. There were indications of statistically significant greater severities of anxiety, depression, and stress among women, people of color, and those who identify as LGBTQ+ compared to the dominant groups in planetary science. Furthermore, survey participants who identify as LGBTQ+ reported a greater likelihood of considering leaving the planetary science field. With the growing recognition of these mental health concerns, including evidence from the 2022 mental health survey of planetary science, the planetary science community advocated that NASA should further recognize the impact of mental health on science products and composition and work to address these issues including regular monitoring of the health of the community. With the 2023 survey, we shed light on the factors that may contribute to these mental health concerns, which may help the planetary science community and NASA on how to address the issue.

D Trang↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy M. Mclaughlin↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy McLaughlin↗

Decision Aid for Conjunction Risk Mitigation by Differential Drag

In the previous five years, the rate of conjunctions that the NASA Conjunction Assessment Risk Analysis (CARA) team processed and analyzed has more than tripled. (NASA CARA, 2024) New missions in the early development phases are now required to plan for dealing with conjunctions under the present space environment, and also projecting forward into a future likely with even further increased utilization of the space environment. Some missions are investigating the possibility of using differential drag to remediate conjunctions without expending limited fuel or for missions without propulsive capabilities. The NASA CARA team studied the historical record of conjunctions to evaluate the circumstances under which differential drag may be successfully applied and have developed a series of tables to use as a decision aid for missions considering differential drag. Currently, if a CARA-protected mission with maneuvering capabilities is predicted to have a conjunction with probability of collision (Pc) greater than 7E-5 (the default value of the ‘yellow threshold’, which may have some other value agreed by CARA and the mission during the Orbital Collison Avoidance Planning (OCAP) process), CARA will use its Maneuver Trade Space (MTS) tool to evaluate and recommend options for the timing and magnitude of a risk mitigation maneuver (RMM), based on the mission’s capabilities. If the conjunction’s Pc is greater than 1E-4, the ‘red threshold’, then an RMM must be executed per NASA Procedural Requirements (NPR) 8079.1 (NASA, 2023), although missions may execute an RMM even if the Pc is lower. The magnitude of the maneuver is typically a few cm/s, and CARA estimates how many will be required for the mission’s nominal lifetime – typically a few per year – during the OCAP process, to inform the mission’s delta-V requirement. For traditional satellites, this is usually smaller than other requirements for orbit insertion, maintenance, and disposal, but for CubeSats or other small satellite missions, a propulsion system may not provide much more than a few cm/s of delta-V or may not fit at all within the available budget of money, time, size, weight, and/or power (SWaP). Conversely, CubeSats often have deployable solar panels, which offer the capacity to have much higher areas facing some directions than others. Such a mission can instead use ‘differential drag’ to remediate a conjunction -- in other words, change its drag area (usually increasing) to deviate from the predicted collision course. This is how Planet’s Dove spacecraft maintain their formations and remediate conjunction risks without having on-board propulsion (Foster, et al., 2017) (Griffith, et al., 2021). CARA has been developing improvements to MTS to support differential-drag for NASA's missions -- where it is effective. CARA records all conjunctions of their protected payloads, with historical records starting in 2005 (with significant conjunction events starting to occur on or after 2013). From this record, approximately 7,300 had a Pc greater than 1E-4 at 3 days prior to the time of closest approach, the time analyzed for differential drag efficacy. Of those, approximately 4,300 had fully-defined covariance matrices stored for both the primary and secondary objects; this set of conjunctions is the basis for the analysis of this work. CARA’s MTS tool was used to propagate the primary satellite forward from that decision point with varying degrees of increase to ballistic coefficient (BC). Because these conjunctions came from multiple missions, the nondimensional ‘delta-BC’ factor was used to quantify and normalize the increase in ballistic coefficient, defined as follows: Delta-BC = BC_new / BC_old - 1 Positive delta-BC factors represent an increase in drag compared to the nominal attitude, while negative delta-BC factors (to a minimum of -1) represent a decrease in drag. At the conclusion of the differential-drag ‘maneuver’, the Pc was recalculated to evaluate whether or not the conjunction was mitigated (Pc < 3E-6). These results were then binned and sorted along several axes, including altitude, amount of delta-BC, and (pre-maneuver) rate of energy dissipation (EDR), to identify underlying patterns. The altitude plot is shown in Figure 1. To validate this analysis, we consulted the record of a NASA mission which uses differential drag to maintain its orbit and remediate conjunction risk. CARA’s empirical record of the mission’s orbit history suggests it achieves a delta-BC of 2.2. Of the twenty-one RMM plans that were submitted by this mission, eighteen were matched with conjunctions in the historical record; of those, twelve were successfully remediated (final measured Pc < 3E-6), and six were not. This is consistent with the expected efficacy for missions orbiting at that altitude. We are presently simulating this mission’s RMMs with MTS; this work is ongoing, but so far, the MTS results are qualitatively in agreement with the empirical results -- correctly predicting that a maneuver would or would not remediate a conjunction, if not exactly matching the final post-remediation Pc value. We found that differential drag was most successful for satellites with perigees below 560 km, and which could adopt an average delta-BC of 2 or greater (that is, increasing their ballistic coefficient by a factor of 3). However, this is a difficult threshold for a mission to clear; very few spacecraft are capable of adopting a high-drag configuration for 72 hours continuously. Planet’s Dove spacecraft use differential drag to remediate conjunctions (Griffith, et al., 2021), and they have a maximum delta-BC factor of 9, but in practice (with mission and charging constraints) they achieve a time-averaged delta-BC that is closer to 2 (Foster, et al., 2017). A mission’s differential drag utility strongly depends on the operational constraints that has the capacity to limit the time-averaged delta-BC. A mission with a high maximum delta-BC of 5 or more can have an effective delta-BC of less than 1 due to operational constraints such as instrument and solar panel pointing, especially if this constraint results in holding an intermediate drag value for most of its orbit. CARA has developed tables that can be used as decision aids to advise missions-in-development about the best way to utilize their differential drag capabilities. For missions below 560 km with the operational flexibility to devote multiple days to holding a high-drag configuration (or a sufficiently high drag ratio to compensate for limitations on that time), they are -- more likely than not -- able to successfully remediate high-risk conjunctions. Conversely, missions that do not meet these exacting criteria -- most missions -- can instead be advised to use on-board propulsion systems to perform RMMs, or to turn their minimum-area face towards the approach vector, thereby reducing Pc at the moment of conjunction due to the decreased Hard-Body Radius (HBR), that is a strongly correlated variable in the Pc calculations. (NASA, 2023)

conjunction assessment↗

Managing Inventories of Heavy Actinides

The Department of Energy (DOE) has stored a limited inventory of heavy actinides contained in irradiated targets, some partially processed, at the Savannah River Site (SRS) and Oak Ridge National Laboratory (ORNL). The 'heavy actinides' of interest include plutonium, americium, and curium isotopes; specifically 242Pu and 244Pu, 243Am, and 244/246/248Cm. No alternate supplies of these heavy actinides and no other capabilities for producing them are currently available. Some of these heavy actinide materials are important for use as feedstock for producing heavy isotopes and elements needed for research and commercial application. The rare isotope 244Pu is valuable for research, environmental safeguards, and nuclear forensics. Because the production of these heavy actinides was made possible only by the enormous investment of time and money associated with defense production efforts, the remaining inventories of these rare nuclear materials are an important part of the legacy of the Nuclear Weapons Program. Significant unique heavy actinide inventories reside in irradiated Mark-18A and Mark-42 targets at SRS and ORNL, with no plans to separate and store the isotopes for future use. Although the costs of preserving these heavy actinide materials would be considerable, for all practical purposes they are irreplaceable. The effort required to reproduce these heavy actinides today would likely cost billions of dollars and encompass a series of irradiation and chemical separation cycles for at least 50 years; thus, reproduction is virtually impossible. DOE has a limited window of opportunity to recover and preserve these heavy actinides before they are disposed of as waste. A path forward is presented to recover and manage these irreplaceable National Asset materials for future use in research, nuclear forensics, and other potential applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗