The Distributed Electrometer Chain (DCE) on the Mars 2003 Lander
The Distributed Electrometer Chain (DCE) for the Mars 2003 Lander is described.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
The Distributed Electrometer Chain (DCE) for the Mars 2003 Lander is described.
Raman spectroscopy is typically envisioned as an in situ analysis technique. Raman spectra measured remotely (10s of meters) from a planetary lander can be calibrated to spectral radiance and the Raman scattering efficiency can be determined.
The Mars Environmental Compatibility Assessment (MECA) is an instrument suite that will fly on the Mars Surveyor 2001 Lander Spacecraft. MECA is sponsored by the Human Exploration and Development of Space (HEDS) program and will evaluate potential hazards that the dust and soil of Mars might present to astronauts and their equipment on a future human mission to Mars. Four elements constitute the integrated MECA payload: a microscopy station, patch plates, an electrometer, and the wet chemistry experiment (WCE). The WCE is the first application of electrochemical sensors to study soil chemistry on another planetary body, in addition to being the first measurement of soil/water solution properties on Mars. The chemical composition and properties of the watersoluble materials present in the Martian soil are of considerable interest to the planetary science community because characteristic salts are formed by the water-based weathering of rocks, the action of volcanic gases, and biological activity. Thus the characterization of water-soluble soil materials on Mars can provide information on the geochemical history of the planet surface. Additional information is contained in the original extended abstract.
Surface features related to the wind are observed in data from the Mars Pathfinder lander and from orbit by the Viking Orbiter and Mars Global Surveyor missions. Features seen from the surface include wind tails associated with small rocks, barchanoid duneforms, ripplelike patterns, and ventifact flutes cut into some rocks. Features seen from orbit include wind tails associated with impact craters, ridges inferred to be duneforms, and modified crater rims interpreted to have been eroded and mantled by windblown material. The orientations of these features show two prevailing directions, one inferred to represent winds from the northeast which is consistent with strongest winds predicted by a general circulation model to occur during the Martian northern winter under current conditions, and a second wind pattern oriented approx. 90 degrees to the first. This latter wind could be from the W-NW or from the E-SE and was responsible for cutting the ventifacts and modifying the crater rims. The two wind regimes could reflect a change in climate related to Mars' obliquity or some other, unknown factor. Regardless of the cause, the MPF area has been subjected to a complex pattern of winds and supply of small particles, in which the original surface formed by sedimentary processes from Tiu and Ares Vallis events has been modified by repeated burial and exhumation.
The Dust Accumulation and Removal Technology (DART) experiment is designed to quantify the nature of dust settling out of the Martian atmosphere. DART is part of the Mars in-situ propellant precursor (MIP) experiment which is a payload on the Mars 2001 Surveyor Lander. At the time of this writing, high fidelity development hardware has been integrated in to the MIP experiment and completed Mars environment testing. Additional information is contained in the original extended abstract.
Mangala Valles is an outflow channel in the Memnonia region of Mars. Although its origin is still under debate, most researchers believe they represent some form of catastrophic flood system which occurred early in the evolutionary history of Mars. The scientific objective of the Mars Surveyor Program 2001 (MSP 01) landed mission is to examine the ancient climatic and geologic history of Mars; to characterized surface materials with respect to elemental and mineral composition of rock and soils; to identify the role water may have played with respect to evolutionary history of the surface; to look for samples which may contain possible evidence of ancient life; and to collect and store unaltered samples which may be eventually returned to Earth during a later mission (MSP 05 - 2005). As with the Mars Pathfinder lander, the landing site will depend on several engineering constraints. Preliminary engineering constraints for MSP 01 landing site is that the landing site lies with 30 N and -15 S of the equator (due to solar power limitations) and below 2 km elevation. Both the scientific objectives and the engineering constraints can be accommodated with a Mangala Valles landing site.
Tests of the FIDO (Field Integration Design and Operations) rover and Athena-like operational scenarios were conducted May 7-16, 2000. A group located at the Jet Propulsion Lab, Pasadena, CA, formed the Core Operations Team (COT) that designed experiments and command sequences while another team tracked, maintained, and secured the rover in the field. The COT had no knowledge of the specific field location, thus the tests were done "blind." In addition to FIDO rover instrumentation, the COT had access to LANDSAT 7, TIMS, and AVIRIS regional coverage and color descent images. Using data from the FIDO instruments, primarily a color microscopic imager (CMI), infrared point spectrometer (IPS; 1.5-2.4 microns), and a three-color stereo panoramic camera (Pancam), the COT correlated lithologic features (mineralogy, rock types) from the simulated landing site to a regional scale. The May test results provide an example of how to relate site geology from landed rover investigations to the regional geology using remote sensing. The capability to relate mineralogic signatures using the point IR spectrometer to remotely sensed, multispectral or hyperspectral data proved to be key to integration of the in-situ and remote data. This exercise demonstrated the potential synergy between lander-based and orbital data, and highlighted the need to investigate a landing site in detail and at multiple scales.
This report documents the results of an inviscid computational study conducted on several candidate aeroshell configurations for a proposed '07 Mars lander. Eleven different configurations were considered, and the aerodynamic characteristics of each of these were computed for a Mach number of 23.7 at 10, 15, and 20 degree angles of attack. The unstructured grid software FELISA with the equilibrium Mars gas option was used for these computations. The pitching moment characteristics and the lift-to-drag ratios at trim angle of attack of each of these configurations were examined to make a selection. The criterion for selection was that the configuration should be longitudinally stable, and should trim at an angle of attack where the L/D is -0.25. Based on the present study, two configurations were selected for further study
Each Viking lander measured a topographic profile during entry. Comparing to MOLA (Mars Orbiter Laser Altimeter), we find a vertical error of 1-2 km in the Viking trajectory. This introduces a systematic error of 10-20% in the Viking densities and pressures at a given altitude. Additional information is contained in the original extended abstract.
The proposed Mars Smart Lander is to be attached through its aeroshell to the main spacecraft bus, thereby producing cavities in the heat shield. To study the effects these cavities will have on the heating levels experienced by the heat shield, an experimental aeroheating investigation was performed at the NASA Langley Research Center in the 20-Inch Mach 6 Air Tunnel. The effects of Reynolds number, angle-of-attack, and cavity size and location on aero-heating levels and distributions were determined and are presented. To aid the discussion on the effects of the cavities, laminar, thin-layer Navier-Stokes flow field solutions were post-processed to calculate relevant boundary layer properties such as boundary layer height and momentum thickness, edge Mach number, and streamwise pressure gradient. It was found that the effect of the cavities varies with angle-of-attack, freestream Reynolds number, and cavity size and location. The presence of a cavity raised the downstream heating rates by as much as 325% as a result of boundary layer transition.
A multi-body flight simulation for the Mars Smart Lander has been developed that includes six degree-of-freedom rigid-body models for both the supersonically-deployed and subsonically-deployed parachutes. This simulation is designed to be incorporated into a larger simulation of the entire entry, descent and landing (EDL) sequence. The complete end-to-end simulation will provide attitude history predictions of all bodies throughout the flight as well as loads on each of the connecting lines. Other issues such as recontact with jettisoned elements (heat shield, back shield, parachute mortar covers, etc.), design of parachute and attachment points, and desirable line properties can also be addressed readily using this simulation.
Laminar and turbulent perfect-gas air, Navier-Stokes computations have been performed for a proposed Mars Smart Lander entry vehicle at Mach 6 over a free stream Reynolds number range of 6.9 x 10(exp 6)/m to 2.4 x 10(exp 7)/m (2.1 x 10(exp 6)/ft to 7.3 x 10(exp 6)/ft) for angles-of-attack of 0-deg, 11-deg, 16-deg, and 20-deg, and comparisons were made to wind tunnel heating data obtained a t the same conditions. Boundary layer edge properties were extracted from the solutions and used to correlate experimental data on the effects of heat-shield penetrations (bolt-holes where the entry vehicle would be attached to the propulsion module during transit to Mars) on boundary-layer transition. A non-equilibrium Martian-atmosphere computation was performed for the peak heating point on the entry trajectory in order to determine if the penetrations would produce boundary-layer transition by using this correlation.
Laminar and turbulent perfect-gas air, Navier-Stokes computations have been performed for a proposed Mars Smart Lander entry vehicle at Mach 6 over a free stream Reynolds number range of 6.9 x 10(exp 6/m to 2.4 x 10(exp 7)m(2.1 x 10(exp 6)/ft to 7.3 x 10(exp 6)ft) for angles-of-attack of 0-deg, 11-deg, 16-deg, and 20-deg, and comparisons were made to wind tunnel heating data obtained at the same conditions. Boundary layer edge properties were extracted from the solutions and used to correlate experimental data on the effects of heat-shield penetrations (bolt-holes where the entry vehicle would be attached to the propulsion module during transit to Mars) on boundary-layer transition. A non-equilibrium Martian-atmosphere computation was performed for the peak heating point on the entry trajectory in order to determine if the penetrations would produce boundary-layer transition by using this correlation.
The search for life outside Earth's protected atmosphere is a compelling testament to the quest by mankind to determine if "we" are alone in the universe. The phenomenal success of the NASA Galileo spacecraft has indicated that the moons of Jupiter, and most notably Europa, may indeed contain subsurface liquid under an icy surface. This speculation of a salty liquid subsurface fuels expert opinions that biological products may exist. The Revolutionary Aerospace Systems Concepts (RASC) effort at Langley Research Center, initiated by NASA Headquarters, pushes NASA and the Aerospace/Science community to target advanced evolutionary technology usage to provide a Europa Lander concept targeted for completion within the next 50 years. The study effort indicates the use of certain advanced technologies to achieve a subsurface penetrator and liquid explorer in the approximately 2040 timeframe.
A proposed Mars Smart Lander is designed to reach the surface via lifting-body atmospheric entry (alpha = 16 deg) to within 10 km of the target site. CFD (computational fluid dynamics) predictions of the forebody aeroheating environments are given for a direct entry from a 2005 launch. The solutions were obtained using an 8-species gas in thermal and chemical nonequilibrium with a radiative-equilibrium wall temperature boundary condition. Select wind tunnel data are presented from tests at NASA Langley Research Center. Turbulence effects are included to account for both smooth body transition and turbulence due to heatshield penetrations. Natural transition is based on a momentum-thickness Reynolds number value of 200. The effects of heatshield penetrations on turbulence are estimated from wind tunnel tests of various cavity sizes and locations. Both natural transition and heatshield penetrations are predicted to cause turbulence prior to the nominal trajectory peak heating time. Laminar and turbulent CFD predictions along the trajectory are used to estimate heat rates and loads. The predicted peak turbulent heat rate of 63 W/sq cm on the heatshield leeward flank is 70% higher than the laminar peak. The maximum integrated heat load for a fully turbulent heat pulse is 38% higher than the laminar load on the heatshield nose. The predicted aeroheating environments with uncertainty factors will be used to design a thermal protection system.
An aerodynamic database has been generated for the Mars Smart Lander Shelf-All configuration using computational fluid dynamics (CFD) simulations. Three different CFD codes, USM3D and FELISA, based on unstructured grid technology and LAURA, an established and validated structured CFD code, were used. As part of this database development, the results for the Mars continuum were validated with experimental data and comparisons made where applicable. The validation of USM3D and LAURA with the Unitary experimental data, the use of intermediate LAURA check analyses, as well as the validation of FELISA with the Mach 6 CF(sub 4) experimental data provided a higher confidence in the ability for CFD to provide aerodynamic data in order to determine the static trim characteristics for longitudinal stability. The analyses of the noncontinuum regime showed the existence of multiple trim angles of attack that can be unstable or stable trim points. This information is needed to design guidance controller throughout the trajectory.
The NASA Langley Research Center, in cooperation with the Jet Propulsion Laboratory, participated in a preliminary design study of the Entry, Descent and Landing phase for the Mars Smart Lander Project. This concept utilizes advances in Guidance, Navigation and Control technology to significantly reduce uncertainty in the vehicle landed location on the Mars surface. A candidate entry vehicle controller based on the Reaction Control System controller for the Apollo Lunar Excursion Module digital autopilot is proposed for use in the entry vehicle attitude control. A slight modification to the phase plane controller is used to reduce jet-firing chattering while maintaining good control response for the Martian entry probe application. The controller performance is demonstrated in a six-degree-of-freedom simulation with representative aerodynamics.
As part of the NASA/USRA program, nineteen West Virginia University students conducted a preliminary design of a manned Universal Martian Lander (UML). The WVU design considers descent to Mars from polar orbit, a six month surface stay, and ascent for rendezvous. The design begins with an unmanned UML landing at Elysium Mons followed by the manned UML landing nearby. During the six month surface stay, the eight modules are assembled to form a Martian base where scientific experiments are performed. The mission also incorporates hydroponic plant growth into a Controlled Ecological Life Support System (CELSS) for water recycling, food production, and to counteract psycho-logical effects of living on Mars. In situ fuel production for the Martian Ascent and Rendezvous Vehicle (MARV) is produced From gases in the Martian atmosphere. Following surface operations, the eight member crew uses the MARV to return to the Martian Transfer Vehicle (MTV) for the journey home to Earth.