Report to NCSP on FY21 DANCE and NEUANCE measurements of 233 U(η, γ)
The experiment was performed by the end of the CY20 runcycle at LANSCE. Due to transportation issues the material arrived at LANL on 1st December. Two 233 U samples, of 20 mg and 10 mg were produced at LANL by stippling, which has proved a robust, cost-effective method for producing actinide samples in the range of 1-20 mg in a small (<1 cm) diameter with very high efficiency. The 20 mg sample was placed inside NEUANCE on FP14 on 11th December, was measured over 10 days, and the 10 mg sample was placed in the beam for 1 day. The rest of the beam time was used to measure radioactive γ sources for calibration, background measurements and tests to define the 233 U windows required during the data taking, also some measurements were done with a 235 U sample to cross-check the performance and the systematics.