Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Houston”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

A Low-Cost Design and Flight Test of the T-38 Inlet

An inlet redesign of the T-38 was completed and flight tested by NASA Johnson Space Center (JSC), Houston Texas. The redesign will allow full gross weight takeoffs from high altitude airports such as El Paso, Texas (ELP) with runway temperatures up to 99 degrees F, an increase of 9 degrees F over the current performance. This project was completed in-house using innovative test techniques. The static thrust of the T-38 was increased 20% with this new inlet.

Johnson, Greg↗

Managing the Moon Program: Lessons Learned from Project Apollo

There have been many detailed historical studies of the process of deciding on and executing the Apollo lunar landing during the 1960s and early 1970s. From the announcement of President John F Kennedy on May 25, 1961, of his decision to land an American on the Moon by the end of the decade, through the first lunar landing on July 20, 1969, on to the last of six successful Moon landings with Apollo 17 in December 1972, NASA carried out Project Apollo with enthusiasm and aplomb. While there have been many studies recounting the history of Apollo, at the time of the 30th anniversary of the first lunar landing by Apollo 11, it seems appropriate to revisit the process of large-scale technological management as it related to the lunar mission. Consequently, the NASA History Office has chosen to publish this monograph containing the recollections of key partcipants in the management process. The collective oral history presented here was recorded in 1989 at the Johnson Space Center's Gilruth Recreation Center in Houston, Texas. It includes the recollections of key participants in Apollo's administration, addressing issues such as communication between field centers, the prioritization of technological goals, and the delegation of responsibility. The following people participated: George E. Muller, Owen W. Morris, Maxime A. Faget, Robert R. Gilruth, Christopher C. Kraft, and Howard W. (Bill) Tindall. The valuable perspectives of these individuals deepen and expand our understanding of this important historical event. This is the 14th in a series of special studies prepared by the NASA History Office. The Monographs in Aerospace History series is designed to provide a wide variety of investigations relative to the history of aeronautics and space. These publications are intended to be tightly focused in terms of subject, relatively short in length, and reproduced in an inexpensive format to allow timely and broad dissemination to researchers in aerospace history.

Source record↗

STS-93 Flight Day 5 Highlights and Crew Activities

Columbia's crew began packing up experiments and preparing to return to Earth tomorrow with a touchdown planned for Kennedy Space Center at 10:20 p.m. CDT. Commander Eileen Collins and Pilot Jeff Ashby checked out the cockpit instruments, displays and flight control systems. They also test fired the 38 small steering jets. Everything was in good shape and ready for the trip back to Earth. Also, Collins and Ashby were joined by the rest of the crew for a press conference, fielding questions from reporters in Houston, Florida and Massachusetts.

Source record↗

A Study of Mars Dust Environment Simulation at NASA Johnson Space Center Energy Systems Test Area Resource Conversion Test Facility

The dust environment on Mars is planned to be simulated in a 20 foot thermal-vacuum chamber at the Johnson Space Center, Energy Systems Test Area Resource Conversion Test Facility in Houston, Texas. This vacuum chamber will be used to perform tests and study the interactions between the dust in Martian air and ISPP hardware. This project is to research, theorize, quantify, and document the Mars dust/wind environment needed for the 20 foot simulation chamber. This simulation work is to support the safety, endurance, and cost reduction of the hardware for the future missions. The Martian dust environment conditions is discussed. Two issues of Martian dust, (1) Dust Contamination related hazards, and (2) Dust Charging caused electrical hazards, are of our interest. The different methods of dust particles measurement are given. The design trade off and feasibility were studied. A glass bell jar system is used to evaluate various concepts for the Mars dust/wind environment simulation. It was observed that the external dust source injection is the best method to introduce the dust into the simulation system. The dust concentration of 30 Mg/M3 should be employed for preparing for the worst possible Martian atmosphere condition in the future. Two approaches thermal-panel shroud for the hardware conditioning are discussed. It is suggested the wind tunnel approach be used to study the dust charging characteristics then to be apply to the close-system cyclone approach. For the operation cost reduction purpose, a dehumidified ambient air could be used to replace the expensive CO2 mixture for some tests.

Chen, Yuan-Liang Albert↗

Thermographic Testing Using on the X-33 Space Launch Vehicle Program by BFGoodrich Aerospace

The X-33 program is a team effort sponsored by NASA, under Cooperative Agreement NCC8-115, and led by the Lockheed Martin Corporation. Team member BFGoodrich Aerospace Aerostructures Group (formerly Rohr) is responsible for design, manufacture, and integration of the Thermal Protection System (TPS) of the X-33 launch vehicle. The X-33 is a half-scale, experimental prototype of a vehicle called RLV (Reusable Launch Vehicle) or VentureStar(Trademark), an SSTO (single stage to orbit) vehicle, which is a proposed successor to the aging Space Shuttle. Thermographic testing has been employed by BFGoodrich Aerospace Aerostructures Group for a wide variety of uses in the testing of components of the X-33. Thermographic NDT (TNDT) has been used for inspecting large graphite-epoxy/aluminum honeycomb sandwich panels used on the Leeward Aeroshell structure of the X-33. And TNDT is being evaluated for use in inspecting carbon-carbon composite parts such as the nosecap and wing leading edge components. Pulsed Infrared Testing (PIRT), a special form of TNDT, is used for the routine inspection of sandwich panels made of brazed inconel honeycomb and facesheets. In the developmental and qualification testing of sub-elements of the X-33, thermography has been used to monitor 1) Arc Jet tests at NASA Ames Research Center in Mountainview, CA and NASA Johnson Space Center in Houston, TX, 2) High Temperature (wind) Tunnel Tests (HTT) at NASA Langley Research Center in Langley, VA, and 3) Hot Gas Tests at NASA Marshall Space Flight Center in Huntsville, AL.

Burleigh, Douglas↗

Dependence of Z-R Relations on the Rain Type Classification Scheme

The TRMM Global Validation Program is giving us a unique opportunity to compare radar datasets from different sites since they are analyzed in a relatively uniform procedure. Monthly Ze-R relations for four different sites (i.e, Melbourne Florida, Houston Texas, Darwin Australia and Kwajalein Atoll) were derived. The relations were obtained using the Window Probability Matching Method (WPMM). This version of the PMM relies on matching unconditional probabilities of rain rates, R, and radar reflectivity, Ze, using rain gauge and radar data, respectively. This procedure was done separately for convective and stratiform rain type using the Steiner classification procedure. The radar and gauge data from all sites were quality controlled using the same algorithms, which include also an automatic procedure to filter unreliable rain gauge data upon comparison to radar data. An adjusted power law Z-R for each rain type was also derived by comparing the radar-gauge coincident pairs in order to adjust the total monthly rainfall to match the gauges. The obtained PMM based Ze-R relations are found to be curved lines in log-log space rather than any straight line power law. While the PMM based Ze-R curves were always distinctly different between the convective and stratiform rain, the power law based Z-R, in few cases, was found to be the same for both types. In general, a given reflectivity was matched to a much lower rain intensity in the convective rainfall as compared to that in stratiform rainfall. These findings are inherently contradictory to previous findings based on disdrometer data and suggest some precaution for using the latter Z-R relations on radar data when the partition of stratiform and convective rainfall amount is in concern. The inverse trends in the relations might be caused by effects such as partial beam fillings, the use of different classification schemes, as well as having a distinct difference in the Z-R relations between the initial convective and the trailing transition regions as suggested by recent findings.

Amitai, Eyal↗

Operational Processing of Ground Validation Data for the Tropical Rainfall Measuring Mission

The Tropical Rainfall Measuring Mission (TRMM) satellite was successfully launched in November 1997. A primary goal of TRMM is to sample tropical rainfall using the first active spaceborne precipitation radar. To validate TRMM satellite observations, a comprehensive Ground Validation (GV) Program has been implemented for this mission. A key component of GV is the analysis and quality control of meteorological ground-based radar data from four primary sites: Melbourne, FL; Houston, TX; Darwin, Australia; and Kwajalein Atoll, RMI. As part of the TRMM GV effort, the Joint Center for Earth Systems Technology (JCET) at the University of Maryland, Baltimore County, has been tasked with developing and implementing an operational system to quality control (QC), archive, and provide data for subsequent rainfall product generation from the four primary GV sites. This paper provides an overview of the JCET operational environment. A description of the QC algorithm and performance, in addition to the data flow procedure between JCET and the TRNM science and Data Information System (TSDIS), are presented. The impact of quality-controlled data on higher level rainfall and reflectivity products will also be addressed, Finally, a brief description of JCET's expanded role into producing reference rainfall products will be discussed.

Kulie, Mark S.↗

STS-96 Post Flight Presentation

The Crew of STS-96 Discovery Shuttle, Commander Kent V. Rominger, Pilot Rick D. Husband, Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev, are shown narrating the mission highlights. Scenes include walk out to the transfer vehicle, and launch of the shuttle. Also presented are scenes of the start of the main engine, ignition of the solid rocket boosters, and the separation of the solid rocket boosters. Footage of Payette preparing the on-board camera equipment, while Barry and Jernigan perform routine checks of the equipment is seen. Also presented are various pictures of the shuttle in its orbit, the docking of the shuttle with the Mir International Space Station, and crewmembers during their space walk. Beautiful panoramic views of the Great Lake, Houston, and a combined view of Italy and Turkey are seen. The crew of Discovery is shown performing a juice ball experiment, tumbling, undocking, performing transfer operations, and deploying the STARSHINE educational satellite. The film ends with the reentry of the Discovery Space Shuttle into the Earth's atmosphere.

Source record↗

The International Space Station Assembly on Schedule

As engineers continue to prepare the International Space Station (ISS) for in-orbit assembly in the year 2002, ANSYS software has proven instrumental in resolving a structural problem in the project's two primary station modules -- Nodes 1 and 2. Proof pressure tests performed in May revealed "low temperature, post-yield creep" in some of the Nodes' gussets, which were designed to reinforce ports for loads from station keeping and reboost motion of the entire space station. An extensive effort was undertaken to characterize the creep behavior of the 2219-T851 aluminum forging material from which the gussets were made. Engineers at Sverdrup Technology, Inc. (Huntsville, AL) were responsible for conducting a combined elastic-plastic-creep analysis of the gussets to determine the amount of residual compressive stress which existed in the gussets following the proof pressure tests, and to determine the stress-strain history in the gussets while on-orbit. Boeing, NASA's Space Station prime contractor, supplied the Finite Element Analysis (FEA) model geometry and developed the creep equations from the experimental data taken by NASA's Marshall Space Flight Center and Langley Research Center. The goal of this effort was to implement the uniaxial creep equations into a three dimensional finite element program, and to determine analytically whether or not the creep was something that the space station program could live with. The objective was to show analytically that either the creep rate was at an acceptable level, or that the node module had to be modified to lower the stress levels to where creep did not occur. The elastic-plastic-creep analysis was performed using the ANSYS finite element program of ANSYS, Inc. (Houston, PA). The analysis revealed that the gussets encountered a compressive stress of approximately 30,000 pounds per square inch (psi) when unloaded. This compressive residual stress significantly lowered the maximum tension stress in the gussets which decreased the creep strain rate. The analysis also showed that the gussets would not experience a great deal of creep from future pressure tests if braces or struts proposed by Boeing were installed to redistribute stress away from them. Subsequent analysis of on-orbit station keeping and reboost loads convinced Boeing that the gussets should be removed altogether.

Source record↗

Hubble Space Telescope observations of Orion Nebula, Helix Nebula, and NGC 6822

This grant covered the major part of the work of the Principal Investigator and his collaborators as a Guaranteed Time Observer on the Hubble Space Telescope. The work done naturally divided itself into two portions the first being study of nebular objects and the second investigation of the interstellar medium between stars. The latter investigation was pursued through a contract with Princeton University, with Professor Lyman Spitzer as the supervising astronomer, assisted by Dr. Ed Fitzpatrick. Following the abrupt death of Professor Spitzer, his responsibilities were shifted to Dr. Fitzpatrick. When Dr. Fitzpatrick relocated to Villanova University the concluding work on that portion of this grant was concluded under a direct service arrangement. This program has been highly successful and the resulting publications in scientific journals are listed below. To the scientist, this is the bottom line, so that I shall simply try to describe the general nature of what was accomplished. There were three nebular programs conducted, one on the Orion Nebula, the second on the Helix Nebula, and the third on NGC 6822. The largest program was that on the Orion Nebula. This involved both HST observations and supporting groundbased observations obtained with a variety of instruments, including the Coude Feed Telescope at the Kitt Peak National observatory in Arizona, the Cerro Tololo observatory in Chile, and the Keck Observatory on Mauna Kea, Hawaii. Moreover, considerable theoretical modeling was done and all of the data analysis was performed at the Rice University in Houston, except for the PI's period of sabbatical leave (6-96 through 7-97) when he was based at the Max Planck Institute for Astronomy in Heidelberg, Germany. The Orion Nebula program was the most productive part, resulting in numerous papers, but more important in the discovery of a new class of objects, for which we coined the name "proplyds". The proplyds are protoplanetary disks surrounding very young stars still in the process of creation. The Orion Nebula is the residual material from a burst of star formation that occurred about 300,000 years ago. Each of these new stars has a surrounding disk of protoplanetary material. The same physics that renders the Nebula so highly visible means that the proto-planetary disks are also quite visible. With the wisdom of hindsight, we now see that this was to be expected and that we should have been searching specifically for this type of object. The discovery of these objects and their subsequent detailed investigation has lead to an accurate assessment of the frequency of protoplanetary disks in young stars and determination of the likelihood of survival of these disks into an era where planets actually form.

Spitzer, Lyman↗

STS-41D Post Flight Press Conference with Highlights

The crew, Commander Henry W. Hartsfield, Jr., Pilot Michael L. Coats, Mission Specialists Judith A. Resnik, Steven A. Hawley, and Richard M. Mullane, and Payload Specialist Charles D. Walker are seen participating a panel discussion. Live footage of the Press Conference begins with a brief introduction of all the crew, followed by highlights of the flight, a selection of slides and still pictures, and ends with a question and answer segment. The highlights consist of the astronauts walk out to the Astro-Van, panoramic views of the Discovery on the launch pad, main engine start, ignition of the solid rocket boosters, liftoff, and separation of the boosters. Images of the opening of the sun shield and the deployment of the three communication satellites (Satellite Business System (SBS-D), SYNCOM IV-2, and TELSTAR) are also seen. The crew is seen working on experiments, dumping the wastewater, eating supper, and sleeping. Concluding the live footage are slides, and stills of various areas around the world, including the Libyan Desert, Angola, Namibia, and Australia. The Press Conference ends with questions from Houston, NASA Headquarter, Kennedy Space Center, and Marshall Space Flight Center.

Source record↗

Workshop on Mars 2001: Integrated Science in Preparation for Sample Return and Human Exploration

The Workshop on Mars 2001: Integrated Science in Preparation for Sample Return and Human Exploration was held on October 2-4, 1999, at the Lunar and Planetary Institute in Houston, Texas. The workshop was sponsored by the Lunar and Planetary Institute, the Mars Program Office of the Jet Propulsion Laboratory, and the National Aeronautics and Space Administration. The three-day meeting was attended by 133 scientists whose purpose was to share results from recent missions, to share plans for the 2001 mission, and to come to an agreement on a landing site for this mission.

Marshall, John↗

Bone Loss in Space: Shuttle/MIR Experience and Bed Rest Countermeasure Program

Loss of bone mineral during space flight was documented in the 1970's Skylab missions. The USSR space program made similar observations in the 1980's. The Institute of Biomedical Problems in Moscow and NASA JSC in 1989 began to collect pre- and post-flight bone mineral density (BMD) using Hologic QDR 1000 DEXA scanners transferred from JSC to Moscow and Star City. DEXA whole body, hip, and lumbar spine scans were performed prior to and during the first week after return from 4- to 6-month missions (plus one 8-month mission and one 14- month mission) on the Mir space station. These data documented the extent and regional nature of bone loss during long duration space flight. Of the 18 cosmonauts participating in this study between 1990 and 1995, seven flew two missions. BMD scans prior to the second flight compared to the first mission preflight scans indicated that recovery was possibly delayed or incomplete. Because of these findings, NASA and IBMP initiated the study "Bone Mineral Loss and Recovery After Shuttle/Mir Flights" in 1995 to evaluate bone recovery during a 3-year post-flight period. All of the 14 participants thus far evaluated lost bone in at least one region of the spine and lower extremities during flight. Of the 14, only one to date has exhibited full return to baseline BNM values in all regions. The current study will continue until the last participant has reached full bone recovery in all regions, has reached a plateau, or until three years after the flight (2001 for the last mission of the program). Bone mineral density losses in space and difficulty in returning to baseline indicate a need for countermeasure development. In late 1996 NASA JSC and Baylor College of Medicine were approved to conduct two countermeasure studies during 17 weeks of bed rest. In 1997 the studies were begun in the bed rest facility established by NASA, Baylor College of Medicine, and The Methodist Hospital in Houston. To date, three bed rest controls, five resistive exercisers, and four subjects taking alendronate (a bisphoshonate that inhibits osteoclastic resorption of bone) have completed 17 weeks bed rest. In contrast to information currently available from space flight (n=28) and bed rest (n= 12) in which all individuals experienced bone loss in at least one region, one of four subjects taking alendronate and one of five subjects performing heavy resistive exercise at bed rest fully maintained bone density in all regions of the spine and lower extremities. Overall results of both countermeasures which will be presented are encouraging. The study will be completed by mid to late 2000 with 10 subjects in each of three groups.

Shackelford, L. C.↗

Space Resources Utilization Roundtable

This volume contains abstracts that have been accepted for presentation at the Space Resources Utilization Roundtable, October 27-29, 1999, in Golden, Colorado. The program committee consisted of M. B. Duke (Lunar and Planetary Institute), G. Baughman (Colorado School of Mines), D. Criswell (University of Houston), C. Graham (Canadian Mining Industry Research Organization), H. H. Schmitt (Apollo Astronaut), W. Sharp (Colorado School of Mines), L. Taylor (University of Tennessee), and a space manufacturing representative. Administration and publications support for this meeting were provided by the staff of the Publications and Program Services Department at the Lunar and Planetary Institute.

Source record↗

Second Annual HEDS-UP Forum

HEDS-UP (Human Exploration and Development of Space-University Partners) conducted its second annual forum on May 6-7, 1999, at the Lunar and Planetary Institute in Houston. This year, the topics focused on human exploration of Mars, including considerations ranging from systems analysis of the transportation and surface architecture to very detailed considerations of surface elements such as greenhouses, rovers, and EVA suits. Ten undergraduate projects and four graduate level projects were presented with a total of 13 universities from around the country. Over 200 students participated on the study teams and nearly 100 students attended the forum meeting.

Duke, Michael B.↗

STS-30 Post Flight Press Conference

Live footage shows the crewmembers of STS-30, Commander David M. Walker, Pilot Ronald J. Grabe, Mission Specialists Norman E. Thagard, Mary L. Cleave and Mark C. Lee, participating in the Post Flight Press Conference. The astronauts took turns narrating the footage taken from the inside of the cockpit during lift-off. The crew answer questions from the audience as well as some of the NASA Centers. Included are various stills of Magellan, and some ground shots of the Florida Peninsula, Bahamas, North West Nicaragua, California, the Himalayan Mountains, the Canary Islands, Houston, Dust Storms across the Sahara, and some waves in the South China Seas.

Source record↗