Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Integrating Automation into a Multi-Mission Operations Center

NASA Goddard Space Flight Center's Space Science Mission Operations (SSMO) Project is currently tackling the challenge of minimizing ground operations costs for multiple satellites that have surpassed their prime mission phase and are well into extended mission. These missions are being reengineered into a multi-mission operations center built around modern information technologies and a common ground system infrastructure. The effort began with the integration of four SMEX missions into a similar architecture that provides command and control capabilities and demonstrates fleet automation and control concepts as a pathfinder for additional mission integrations. The reengineered ground system, called the Multi-Mission Operations Center (MMOC), is now undergoing a transformation to support other SSMO missions, which include SOHO, Wind, and ACE. This paper presents the automation principles and lessons learned to date for integrating automation into an existing operations environment for multiple satellites.

Surka, Derek M.↗

Enabling Advanced Automation in Spacecraft Operations with the Spacecraft Emergency Response System

True autonomy is the Holy Grail of spacecraft mission operations. The goal of launching a satellite and letting it manage itself throughout its useful life is a worthy one. With true autonomy, the cost of mission operations would be reduced to a negligible amount. Under full autonomy, any problems (no matter the severity or type) that may arise with the spacecraft would be handled without any human intervention via some combination of smart sensors, on-board intelligence, and/or smart automated ground system. Until the day that complete autonomy is practical and affordable to deploy, incremental steps of deploying ever-increasing levels of automation (computerization of once manual tasks) on the ground and on the spacecraft are gradually decreasing the cost of mission operations. For example, NASA's Goddard Space Flight Center (NASA-GSFC) has been flying spacecraft with low cost operations for several years. NASA-GSFC's SMEX (Small Explorer) and MIDEX (Middle Explorer) missions have effectively deployed significant amounts of automation to enable the missions to fly predominately in 'light-out' mode. Under light-out operations the ground system is run without human intervention. Various tools perform many of the tasks previously performed by the human operators. One of the major issues in reducing human staff in favor of automation is the perceived increased in risk of losing data, or even losing a spacecraft, because of anomalous conditions that may occur when there is no one in the control center. When things go wrong, missions deploying advanced automation need to be sure that anomalous conditions are detected and that key personal are notified in a timely manner so that on-call team members can react to those conditions. To ensure the health and safety of its lights-out missions, NASA-GSFC's Advanced Automation and Autonomy branch (Code 588) developed the Spacecraft Emergency Response System (SERS). The SERS is a Web-based collaborative environment that enables secure distributed fault and resource management. The SERS incorporates the use of intelligent agents, threaded discussions, workflow, database connectivity, and links to a variety of communications devices (e.g., two-way paging, PDA's, and Internet phones) via commercial gateways. When the SERS detects a problem, it notifies on-call team members, who then can remotely take any necessary actions to resolve the anomalies.The SERS goes well beyond a simple '911' system that sends out an error code to everyone with a pager. Instead, SERS' software agents send detailed data (i.e., notifications) to the most appropriate team members based on the type and severity of the anomaly and the skills of the on-call team members. The SERS also allows the team members to respond to the notifications from their wireless devices. This unique capability ensures rapid response since the team members no longer have to go to a PC or the control center for every anomalous event. Most importantly, the SERS enables safe experimentation with various techniques for increasing levels of automation, leading to robust autonomy. For the MIDEX missions at NASA GSFC, the SERS is used to provide 'human-in-the-loop' automation. During lights-out operations, as greater control is given to the MIDEX automated systems, the SERS can be configured to page remote personnel and keep them informed regarding actions taking place in the control center. Remote off-duty operators can even be given the option of enabling or inhibiting a specific automated response in near real time via their two-way pagers. The SERS facilitates insertion of new technology to increase automation, while maintaining the safety and security of mission resources. This paper will focus on SERS' overall functionality and how SERS has been designed to handle the monitoring and emergency response for missions with varying levels of automation. The paper will also convey some of the key lessons learned from SERS' deployment across of variety of missions, highlighting this incremental approach to achieving 'robust autonomy'.

Breed, Julie↗

Proven and Robust Ground Support Systems - GSFC Success and Lessons Learned

Over the past fifteen years, Goddard Space Flight Center has developed several successful science missions in-house: the Wilkinson Microwave Anisotropy Probe (WMAP), the Imager for Magnetopause-to-Aurora Global Exploration (IMAGE), the Earth Observing 1 (EO-1) [1], and the Space Technology 5 (ST-5)[2] missions, several Small Explorers, and several balloon missions. Currently in development are the Solar Dynamics Observatory (SDO) [3] and the Lunar Reconnaissance Orbiter (LRO)[4]. What is not well known is that these missions have been supported during spacecraft and/or instrument integration and test, flight software development, and mission operations by two in house satellite Telemetry and Command (T & C) Systems, the Integrated Test and Operations System (ITOS) and the Advanced Spacecraft Integration and System Test (ASIST). The advantages of an in-house satellite Telemetry and Command system are primarily in the flexibility of management and maintenance - the developers are considered a part of the mission team, get involved early in the development process of the spacecraft and mission operations-control center, and provide on-site, on-call support that goes beyond Help Desk and simple software fixes. On the other hand, care must be taken to ensure that the system remains generic enough for cost effective re-use from one mission to the next. The software is designed such that many features are user-configurable. Where user-configurable options were impractical, features were designed so as to be easy for the development team to modify. Adding support for a new ground message header, for example, is a one-day effort because of the software framework on which that code rests. This paper will discuss the many features of the Goddard satellite Telemetry and Command systems that have contributed to the success of the missions listed above. These features include flexible user interfaces, distributed parallel commanding and telemetry decommutation, a procedure language, the interfaces and tools needed for a high degree of automation, and instantly accessible archives of spacecraft telemetry. It will discuss some of the problems overcome during development, including secure commanding over networks or the Internet, constellation support for the three satellites that comprise the ST-5 mission, and geographically distributed telemetry end users.

Pfarr, Barbara↗

Solving A Corrosion Problem

The corrosion problem, it turned out, stemmed from the process called electrolysis. When two different metals are in contact, an electrical potential is set up between them; when the metals are surrounded by an electrolyte, or a conducting medium, the resulting reaction causes corrosion, often very rapid corrosion. In this case the different metals were the copper grounding system and the ferry's aluminum hull; the dockside salt water in which the hull was resting served as the electrolyte. After identifying the source of the trouble, the Ames engineer provided a solution: a new wire-and-rod grounding system made of aluminum like the ferry's hull so there would no longer be dissimilar metals in contact. Ames research on the matter disclosed that the problem was not unique to the Golden Gate ferries. It is being experienced by many pleasure boat operators who are probably as puzzled about it as was the Golden Gate Transit Authority.

Source record↗

Space Station Freedom payload operations in the 21st century

The modified approach to the accomodation of payload operations in light of both flight and ground systems changes to the operational concept for the Space Station Freedom is described. The challenges for the man-tended capability payload operations and those for the permanently manned capability are assessed. An overview of payload operations is presented including payload accomodations, operations modes, ground systems, the payload operations integration center, and the evolution from man-tended capability to permanent manning.

Griner, C. S.↗

GSFC Technical Outreach: The Capitol College Model

In February 2005, as part of the National Aeronautic and Space Administration (NASA) Technical Outreach Program, Goddard Space Flight Center (GSFC) awarded Capitol College of Laurel, Maryland an Educational Grant to establish a Space Operation academic curriculum to meet the future needs of mission operations engineers. This was in part due to the aerospace industry and GSFC concerns that a large number of professional engineers are projected to retire in the near term with evidence showing that current enrollment in engineering schools will not produce sufficient number of space operation trained engineers that will meet industry and government demands. Capitol College, under the agreement of the Educational Grant, established the Space Operations Institute (SOI) with a new curriculum in Space Operations that was approved and certified by the State of Maryland. The SO1 programs focuses on attracting, recruiting, and training a pipeline of highly qualified engineers with experience in mission operations, system engineering and development. The selected students are integrated as members of the engineering support team in any of the missions supported by the institute. The students are mentored by professional engineers from several aerospace companies that support GSFC. Initially, the institute was involved in providing console engineers and mission planning trainees for the Upper Atmosphere Research Satellite (UARS), the Earth Radiation Budget Satellite (ERBS) and the Total Ozone Mapping Spectrometer mission (TOMS). Subsequently, the students were also involved in the technology refresh of the TOMS ground system and other mission operations development. Further mission assignment by GSFC management included participation in the Tropical Rainfall Measuring Mission (TRMM) mission operations and ground system technology refresh. The SOI program has been very successful. Since October 2005, sixty-four students have been enrolled in the SOI program and twenty-five have already graduated from the program, nineteen of whom are employed by company's supporting GSFC. Due to the success of the program, the initial grant period was extended for another period of two years. This paper presents the process that established the SOI as a viable pipeline of mission operations engineers, the lessons learned in the process of dealing with grants, and experience gained in mentoring engineering students that are responsible for particular areas of expertise and functionality. This paper can also be considered a case study and model for integrating a student team with government and industry professionals in the real world of mission operations.

Marius, Julio L.↗

Fabrication end Deployment Testing of Meter Solar Sail Quadrants for a Scaleable Square Solar Sail Ground Test System

In order for solar sail propulsion technologies to be considered as a viable option for a wide range of near term practical missions a predictable, stable, reliable, manufactureable, scaleable, and cost effective system must be developed and tested first on earth and then on orbit. The design and development of a Scaleable Square Solar Sail System (S^4) is well underway a t AEC-Able Engineering Co. Inc., and the design and production of the Solar Sails for this system is being carried out by SRS Technologies. In April and May of 2004 a single quadrant 10-meter system was tested at NASA LARC's vacuum chamber and a four quadrant 20-meter system has been designed and built for deployment and testing in the Spring of 2005 at NASA/Glenn Research Center's Plumb Brook Facility. SRS has developed an effective and efficient design for triangular sail quadrants that are supported are three points and provide a flat reflective surface with a high fill factor. This sail design is robust enough for deployments in a one atmosphere, one gravity environment and incorporates several advanced features including adhesiveless seaming of membrane strips, compliant edge borders to allow for film membrane cord strain mismatch without causing wrinkling and low mass (3% of total sail mass) ripstop. This paper will outline the sail design and fabrication process, the lessons learned and the resulting mature production, packaging and deployment processes that have been developed. It will also highlight the scalability of the equipment and processes that were developed to fabricate and package the sails. Based on recent experience, SRS is confidant that flight worthy solar sails in the 40-120-meter size range with areal density in the 4-5g/sq m (sail minus structure) range can be produced with existing technology. Additional film production research will lead to further reductions in film thickness to less than 1 micron enabling production of sails with areal densities as low as 20 g/sq m using the current design resulting in a system areal density of as low as 5.3g/sq m. These areal densities are low enough to allow nearly all of the Solar Sail missions that have been proposed by the scientific community and the fundamental technology required to produce these sails has been demonstrated on the ground test sails that have recently been built. These demonstrations have shown that the technology is mature enough to build sails needed to support critical science missions. Solar Sails will be an enabling technology for NASA's Vision for Space Exploration by allowing communication satellite orbits that can maintain continuous communication with the polar regions of the Moon and Mars and to support solar weather monitoring to provide early warning of solar flares and storms that could threaten the safety of astronauts and other spacecraft.

Laue, Greg↗

Using Discrete Event Simulation to Model Integrated Commodities Consumption for a Launch Campaign of the Space Launch System

In May 2013, NASA's GSDO Program requested a study to develop a discrete event simulation (DES) model that analyzes the launch campaign process of the Space Launch System (SLS) from an integrated commodities perspective. The scope of the study includes launch countdown and scrub turnaround and focuses on four core launch commodities: hydrogen, oxygen, nitrogen, and helium. Previously, the commodities were only analyzed individually and deterministically for their launch support capability, but this study was the first to integrate them to examine the impact of their interactions on a launch campaign as well as the effects of process variability on commodity availability. The study produced a validated DES model with Rockwell Arena that showed that Kennedy Space Center's ground systems were capable of supporting a 48-hour scrub turnaround for the SLS. The model will be maintained and updated to provide commodity consumption analysis of future ground system and SLS configurations.

Commodities↗

Distributed science operations for JPL planetary missions

Advances in spacecraft, flight instruments, and ground systems provide an impetus and an opportunity for scientific investigation teams to take direct control of their instruments' operations and data collection while at the same time, providing a cost effective and flexible approach in support of increasingly complex science missions. Operations of science instruments have generally been integrated into planetary flight and ground systems at a very detailed level. That approach has been successful, but the cost of incorporating instrument expertise into the central mission operations system has been high. This paper discusses an approach to simplify planetary science operations by distributing instrument computing and data management tasks from the central mission operations system to each investigator's home center of observational expertise. Some early results of this operations concept will be presented based on the Mars Observer (MO) Project experience and Cassini Project plans.

Benson, Richard D.↗

Orion Crew Module / Service Module Structural Weight and Center of Gravity Simulator and Vehicle Motion Simulator Hoist Structure for Orion Service Module Umbilical Testing

An Orion Crew Module Service Module Structural Weight and Center of Gravity Simulator and a Vehicle Motion Simulator Hoist Structure for Orion Service Module Umbilical Testing were designed during a summer 2014 internship in Kennedy Space Centers Structures and Mechanisms Design Branch. The simulator is a structure that supports ballast, which will be integrated into an existing Orion mock-up to simulate the mass properties of the Exploration Mission-1 flight vehicle in both fueled and unfueled states. The simulator mimics these configurations through the use of approximately 40,000 lbf of steel and water ballast, and a steel support structure. Draining four water tanks, which house the water ballast, transitions the simulator from the fueled to unfueled mass properties. The Ground Systems Development and Operations organization will utilize the simulator to verify and validate equipment used to maneuver and transport the Orion spacecraft in its fueled and unfueled configurations. The second design comprises a cantilevered tripod hoist structure that provides the capability to position a large Orion Service Module Umbilical in proximity to the Vehicle Motion Simulator. The Ground Systems Development and Operations organization will utilize the Vehicle Motion Simulator, with the hoist structure attached, to test the Orion Service Module Umbilical for proper operation prior to installation on the Mobile Launcher. Overall, these two designs provide NASA engineers viable concepts worthy of fabricating and placing into service to prepare for the launch of Orion in 2017.

VMS↗

Artemis I: Test Flight Buys Down Risk for Humanity's Return to the Moon

The Artemis program successfully demonstrated its foundational deep space human transportation system during the Artemis I test flight in late 2022. This bold mission put the Artemis program on a course to accomplish increasingly complex missions to return humans to the Moon and to prepare for Mars and other destinations. The Artemis I uncrewed mission tested the Space Launch System (SLS) rocket and the Orion spacecraft using the ground processing, launch and recovery services provided by the Exploration Ground Systems (EGS) program at the Kennedy Space Center (KSC). The Artemis team accomplished key mission priorities that deliberately bought down risk for upcoming crewed missions as part of a build-up flight test strategy. The Artemis I mission priorities were 1) demonstrate Orion heatshield at lunar re-entry conditions; 2) operate systems in flight environment; and 3) retrieve the spacecraft. The successful performance and demonstration of these primary mission objectives from lift-off thru orbital insertion, translunar injection, outbound transit towards the Moon, entry into lunar orbit, coast in the lunar Distant Retrograde Orbit (DRO), exit from lunar orbit, transit back to Earth, atmospheric re-entry, descent, splashdown and recovery successfully showed that NASA has a foundational deep space transportation capability in place for human class missions. In addition to the primary mission objectives, a set of scientific payloads, approved Flight Test Objectives (FTOs) and Development Flight Test Objectives (DFTOs) were incorporated into the nominal mission plan and were designated as secondary, or priority 4, and were considered “bonus objectives” in terms of crewed flight risk buydown. During the mission, the team found itself in a position where it was comfortable achieving even more content than originally planned. As a result, DFTOs were added during the mission to further buy down risk to later crewed test flights. This paper presents an overview of the Artemis I test flight, including mission priorities and key test objectives, the launch campaign and as-flown mission profile, test objectives accomplished over the course of the 25.5- day mission, and implications to the crewed Artemis II and later test flight missions.

Artemis↗

Increasing the Operational Value of Event Messages

Assessing the health of a space mission has traditionally been performed using telemetry analysis tools. Parameter values are compared to known operational limits and are plotted over various time periods. This presentation begins with the notion that there is an incredible amount of untapped information contained within the mission s event message logs. Through creative advancements in message handling tools, the event message logs can be used to better assess spacecraft and ground system status and to highlight and report on conditions not readily apparent when messages are evaluated one-at-a-time during a real-time pass. Work in this area is being funded as part of a larger NASA effort at the Goddard Space Flight Center to create component-based, middleware-based, standards-based general purpose ground system architecture referred to as GMSEC - the GSFC Mission Services Evolution Center. The new capabilities and operational concepts for event display, event data analyses and data mining are being developed by Lockheed Martin and the new subsystem has been named GREAT - the GMSEC Reusable Event Analysis Toolkit. Planned for use on existing and future missions, GREAT has the potential to increase operational efficiency in areas of problem detection and analysis, general status reporting, and real-time situational awareness.

Li, Zhenping↗

Development of the command data system and ground software for the SEDSAT-1 microsatellite

SEDSAT-1 is designed to be a low cost scientific satellite which is to be used to perform a minimum of five tasks which include: (1) the acquisition of a number of important parameters associated with the tethering processes from the payloads perspective (such as accelerations incurred and imaging data of the tether during deployment), (2) to act as a remote sensing platform for making measurements of the Earth's Atmosphere (allowing research to be performed in such areas as vertical lightning observation, visible light spectrography, and cloud cover studies, (3) to act as a general purpose amateur radio communication satellite relaying information back to earth, (4) to demonstrate the feasibility of the deployment in low earth orbit of advanced technology such as the Gallium Arsenide Solar Cells, Nickel Metal Hydride batteries, and multi-chip module technology and, (5) to support student's active participation in applying the disciplines of engineering and science to space-based hardware platforms. The project includes the Three-axis Accelerometer System, TAS, Experiment which is designed to report the accelerations that the satellite undergoes during the tethering operations and during the second phase of the mission when the free floating satellite comes in contact with orbit debris. The SEASIS (SEDS Earth, Atmosphere, and Space Imaging System) is another SEDSAT experiment designed to provide images of the tether during its deployment and the earth during the second phase of the mission. To control these experiments and virtually all other satellite operations the Command Data System, CDS is employed. This system utilizes a moderate complexity micro-controller controlled by tasks operating under a real-time operating system to dynamically monitor and control the satellite. The scope of this researchers efforts has been in the general area of coordinating and assisting the student researchers with the development of the CDS and ground station interfaces. This included the low level CDS hardware design and the formulization of a general software plan and schedule for both the CDS and ground station portions of the project.

Wells, B. Earl↗

Laboratory verification optical signal coupling. IMBLMS phase B.4, appendix C, section 12

The design of optical couplers is described for use in the IMBLMS hardwire mode. One coupler transmits data from the bio-belt to the central data system and the other coupler transmits audio frequencies in the opposite direction, from the central data system to the bio-belt. The objective is to isolate the ground system at the body worn bio-belt electronics and the main ground at the central data system, or biomedical and behavioral station. The safety of the subject wearing the bio-belt measuring electronics is the purpose in isolating the wearer from the main system ground.

Source record↗

Future of Fuel Savings

Using automation to free up controllers for more strategic management of air traffic is one approach being studied by NASA as it seeks to boost airspace system capacity and efficiency, thereby saving fuel. Heinz Erzberger, a NASA Ames Research Center senior scientist, says the Advanced Airspace Concept (AAC) has been studied for several years. It could increase efficiency 15% by providing optimal routes that cut airlines direct operating costs. A 25% increase in landings on existing runways could follow an important benefit. AAC is one of the efforts to be reviewed by the Joint Planning and Development Organization, an FAA-led initiative by six federal agencies to redesign the U.S. air transportation system by 2025. The main goal is to triple air traffic capacity within 20 years to avert the sort of gridlock that would make fuel consumption only one of many travel nightmares. The automated system approach would allow aircraft to fly optimal trajectories. A trajectory would be defined in the standard three dimensions and eventually include the fourth, time. The management of air traffic by the data-linked exchange of trajectories would start at high altitude and eventually move down to lower altitudes. The automated concept is an outgrowth of the type of tools developed by NASA for use by FAA controllers in managing traffic flows over the years, including ones that optimize routings for the best fuel burn. But AAC would push automation further to reduce workload so controllers can focus on "solving strategic control problems, managing traffic flow during changing weather and ... other unusal events." One key component, the automated trajectory server (ATS), is a ground systems that would rely on software to manage flight path requests from aircrews and controllers. But, Erzberger acknowledges, "The FAA's current plan for upgrades to air traffic services does not include [allowing] the future ground system to issue separation-critical clearances of trajectory changes autonomously to aircraft via data link without explicit approval of a controller," as the AAC proposes. The AAC enables pilots or controllers to data link requests for a trajectory change to the ATS for approval after they are deconflicted with the paths of other aircraft. To divert around storms, for example, pilots could data link their trajectory preference to the ATS. Since several aircraft might request similar routes, the computer would then have to suggest alternatives. This could be accomplished without pilot-controller radio calls, a big bottleneck now. The ATS would have a built-in conflict monitor to call for a resolution (turn, climb or descend), when loss of separation is likely in 1-20 min. The AAC system would reduce controller errors by 90%, according to NASA Ames estimates. The AAC would have a back-up program to assure separation-Tactical Separation Assurance (TSAFE). It s designed to detect short-term traffic conflicts within 3-4 min. of loss of separation. The last line of defense would still be provided by traffic alert & collision avoidance systems (TCAS).

Hughes, David↗

Ground control system for the midcourse space experiment UTC clock

One goal of the Midcourse Space Experiment (MSX) spacecraft Operations Planning Center is to maintain the onboard satellite UTC clock (UTC(MSX)) to within 1 millisecond of UTC(APL) (the program requirement is 10 msec). The UTC(MSX) clock employs as its time base an APL built 5 MHz quartz oscillator, which is expected to have frequency instabilities (aging rate + drift rate + frequency offset) that will cause the clock to drift approximately two to ten milliseconds per day. The UTC(MSX) clock can be advanced or retarded by the APL MSX satellite ground control center by integer multiples of 1 millisecond. The MSX Operations Planning Center is developing software which records the drift of UTC(MSX) relative to UTC(APL) and which schedules the time of day and magnitude of UTC(MSX) clock updates up to 48 hours in advance. Because of the manner in which MSX spacecraft activities are scheduled, MSX clock updates are planned 24 to 48 hours in advance, and stored in the satellite's computer controller for later execution. Data will be collected on the drift of UTC(MSX) relative to UTC(APL) over a three to five day period. Approximately six times per day, the time offset between UTC(MSX) and UTC(APL) will be measured by APL with a resolution of less than 100 microseconds. From this data a second order analytical model of the clock's drift will be derived. This model will be used to extrapolate the offset of the MSX clock in time from the present to 48 hours in the future. MSX clock updates will be placed on the spacecraft's daily schedule whenever the predicted clock offset exceeds 0.5 milliseconds. The paper includes a discussion of how the empirical model of the MSX clock is derived from satellite telemetry data, as well as the algorithm used to schedule MSX clock updates based on the model.

Dragonette, Richard↗

IT Security Support for the Spaceport Command Control Systems Development Ground Support Development Operations

Security is one of the most if not the most important areas today. After the several attacks on the United States, security everywhere was heightened from Airports to the communication among the military branches legionnaires. With advanced persistent threats (APTs) on the rise following Stuxnet, government branches and agencies are required, more than ever, to follow several standards, policies and procedures to reduce the likelihood of a breach. Attack vectors today are very advanced and are going to continue to get more and more advanced as security controls advance. This creates a need for networks and systems to be in an updated and secured state in a launch control system environment. FISMA is a law that is mandated by the government to follow when government agencies secure networks and devices. My role on this project is to ensure network devices and systems are in compliance with NIST, as outlined in FISMA. I will achieve this by providing assistance with security plan documentation and collection, system hardware and software inventory, malicious code and malware scanning and configuration of network devices i.e. routers and IDSsIPSs. In addition I will be completing security assessments on software and hardware, vulnerability assessments and reporting, conducting patch management and risk assessments. A guideline that will help with compliance with NIST is the SANS Top 20 Critical Controls. SANS Top 20 Critical Controls as well as numerous security tools, security software and the conduction of research will be used to successfully complete the tasks given to me. This will ensure compliance with FISMA and NIST, secure systems and a secured network. By the end of this project, I hope to have carried out stated above as well as gain an immense knowledge about compliance, security tools, networks and network devices, policies and procedures.

computer information security↗

IT Security Support for the Spaceport Command Control Systems Development Ground Support Development Operations

Security is one of the most if not the most important areas today. After the several attacks on the United States, security everywhere has heightened from airports to the communication among the military branches legionnaires. With advanced persistent threats (APT's) on the rise following Stuxnet, government branches and agencies are required, more than ever, to follow several standards, policies and procedures to reduce the likelihood of a breach. Attack vectors today are very advanced and are going to continue to get more and more advanced as security controls advance. This creates a need for networks and systems to be in an updated and secured state in a launch control system environment. FISMA is a law that is mandated by the government to follow when government agencies secure networks and devices. My role on this project is to ensure network devices and systems are in compliance with NIST, as outlined in FISMA. I will achieve this by providing assistance with security plan documentation and collection, system hardware and software inventory, malicious code and malware scanning, and configuration of network devices i.e. routers and IDS's/IPS's. In addition, I will be completing security assessments on software and hardware, vulnerability assessments and reporting, and conducting patch management and risk assessments. A guideline that will help with compliance with NIST is the SANS Top 20 Critical Controls. SANS Top 20 Critical Controls as well as numerous security tools, security software and the conduction of research will be used to successfully complete the tasks given to me. This will ensure compliance with FISMA and NIST, secure systems and a secured network. By the end of this project, I hope to have carried out the tasks stated above as well as gain an immense knowledge about compliance, security tools, networks and network devices, as well as policies and procedures.

security↗