Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Facility Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Quality and productivity drive innovation and improvement at United Technologies Aerospace Operations, Inc.

Quality and innovation are the hallmarks of the national space program. In programs that preceded the Shuttle Program the emphasis was on meeting the risks and technical challenges of space with safety, quality, reliability, and success. At United Technologies Aerospace Operations, Inc. (UTAO), the battle has developed along four primary fronts. These fronts include programs to motivate and reward people, development and construction of optimized processes and facilities, implementation of specifically tailored management systems, and the application of appropriate measurement and control systems. Each of these initiatives is described. However, to put this quality and productivity program in perspective, UTAO and its role in the Shuttle Program are described first.

Jamar, L. G.↗

Infrared sensor test methodology and facilities

As the Air Force Systems Command designated Center of Expertise for Space Simulation Testing, AEDC has defined a test methodology for the ground testing of infrared sensor systems. This test methodology and the test facilities envisioned to implement it has been addressed in another report. The progress on the implementation of that test methodology is reported and the status of the test facilities presently existing or under construction to implement it is described.

Matty, Jere J.↗

An Experimental Simulation of Flap Flow on Multielement Airfoils at High Reynolds Number

The design of the high lift system has a major impact on the performance of an aircraft yet our understanding of the physics of this flow is still weak. Flow features include interactions between the wakes shed from the upstream elements and the pressure gradients and boundary layers of the downstream elements. Interaction of the turbulent wake of the main element and the flap can cause (1) separation of the flap boundary layer or (2) 'bursting' of the main airfoil wake. Although the first factor is at least partially understood, even the qualitative aspects of (2) remain to be determined. In order to study these phenomena at Reynolds numbers approaching those of flight, a thick high Reynolds number wake is created using a 24 foot flat plate in the long rectangular test section of a 4 ft. by 6 ft subsonic wind tunnel. The design and construction of this test section, plate, and accompanying flap is described. Results obtained in a quarter-scale model were used for design purposes and are also described. Construction of the full scale facility is complete and preliminary results are presented.

Schneider, S.↗

Improved Spacecraft Materials for Radiation Protection

Methods by which radiation shielding is optimized need to be developed and materials of improved shielding characteristics identified and validated. The galactic cosmic rays (GCR) are very penetrating and the energy absorbed by the astronaut behind the shield is nearly independent of shield composition and even the shield thickness. However, the mix of particles in the transmitted beam changes rapidly with shield material composition and thickness. This results in part from the breakup of the high-energy heavy ions of the GCR which make contributions to biological effects out of proportion to their deposited energy. So the mixture of particles in the radiation field changes with shielding and the control of risk contributions from dominant particle types is critical to reducing the hazard to the astronaut. The risk of biological injury for a given particle type depends on the type of biological effect and is specific to cell or tissue type. Thus, one is faced with choosing materials which may protect a given tissue against a given effect but leave unchanged or even increase the risk of other effects in the same tissue or increase the risks to other adjacent tissues of a different type in the same individual. The optimization of shield composition will then be tied to a specific tissue and risk to that tissue. Such peculiarities arise from the complicated mixture of particles, the nature of their biological response, and the details of their interaction with material constituents. Aside from the understanding of the biological response to specific components, one also needs an accurate understanding of the radiation emerging from the shield material. This latter subject has been a principal element of this project. In the past ten years our understanding of space radiation interactions with materials has changed radically, with a large impact on shield design. For example, the NCRP estimated that only 2 g/sq cm. of aluminum would be required to meet the annual 500 mSv limit for the exposure of the blood forming organs (this limit is strictly for LEO but can be used as a guideline for the Mars mission analysis). The current estimates require aluminum shield thicknesses above 50 g/sq cm., which is impractical. In such a heavily shielded vehicle, the neutrons produced throughout the vehicle also contribute significantly to the exposure and this demands greater care in describing the angular dependence of secondary particle production processes. As such the continued testing of databases and transport procedures in laboratory and spaceflight experiments has continued. This has been the focus of much of the last year's activity and has resulted in improved neutron prediction capability. These new methods have also improved our understanding of the surface environment of Mars. The Mars 2003 NRA HEDS related surface science requirements were driven by the need to validate predictions on the upward flux of neutrons produced in the Martian regolith and bedrock made by the codes developed under this project. The codes used in the surface environment definition are also being used to look at in situ resources for the development of construction material for Martian surface facilities. For example, synthesis of polyimides and polyethylene as binders of regolith for developing basic structural elements has been studied and targets built for accelerator beam testing of radiation shielding properties. Preliminary mechanical tests have also been promising. Improved spacecraft materials have been identified (using the criteria reported by this project at the last conference) as potentially important for future shielding materials. These are liquid hydrogen, hydrogenated nanofibers, liquid methane, LiH, Polyethylene, Polysulfone, and Polyetherimide (in order of decreasing shield performance). Some of the materials are multifunctional and are required for other onboard systems. We are currently preparing software for trade studies with these materials relative to the Mars Reference Mission as required in the project's final year.

Wilson, John W.↗

The Stellar Imager (SI)"Vision Mission"

The Stellar Imager (SI) is a "Vision" mission in the Sun-Earth Connection (SEC) Roadmap, conceived for the purpose of understanding the effects of stellar magnetic fields, the dynamos that generate them, and the internal structure and dynamics of the stars in which they exist. The ultimate goal is to achieve the best possible forecasting of solar/stellar magnetic activity and its impact on life in the Universe. The science goals of SI require an ultra-high angular resolution, at ultraviolet wavelengths, on the order of 100 micro-arcsec and thus baselines on the order of 0.5 km. These requirements call for a large, multi-spacecraft (less than 20) imaging interferometer, utilizing precision formation flying in a stable environment, such as in a Lissajous orbit around the Sun-Earth L2 point. SI's resolution will make it an invaluable resource for many other areas of astrophysics, including studies of AGN s, supernovae, cataclysmic variables, young stellar objects, QSO's, and stellar black holes. ongoing mission concept and technology development studies for SI. These studies are designed to refine the mission requirements for the science goals, define a Design Reference Mission, perform trade studies of selected major technical and architectural issues, improve the existing technology roadmap, and explore the details of deployment and operations, as well as the possible roles of astronauts and/or robots in construction and servicing of the facility.

Carpenter, Ken↗

An Overview of Follow-On Testing Activities of the A-3 Subscale Diffuser Test Project

An overview of NASA Stennis Space Center's (SSC) A-3 Subscale Diffuser Test (SDT) Project is presented. The original scope of the SDT Project, conducted from April 2007 to January 2008, collected data to support mitigation of risk associated with design and procurement activities of the A-3 Test Stand Project, an effort to construct a simulated altitude test facility at SSC in support of NASA's Constellation Program. Follow-on tests were conducted from May 2008 through August 2009, utilizing the SDT test setup as a testbed for additional risk mitigation activities. Included are descriptions of the Subscale Diffuser (SD) test article, the test facility configuration, and test approaches.

Ryan, James E.↗

Application of the Life Safety Code to a Historic Test Stand

NASA has conducted a study to assess alternatives to refurbishing existing launch vehicle modal test facilities as opposed to developing new test facilities to meet the demands of a very fiscally constrained test and evaluation environment. The results of this study showed that Marshall Space Flight Center (MSFC) Test Stand (TS) 4550 could be made compliant, within reasonable cost and schedule impacts, if safety processes and operational limitations were put in place to meet the safety codes and concerns of the Fire Marshall. Trades were performed with key selection criteria to ensure that appropriate levels of occupant safety are incorporated into test facility design modifications. In preparation for the ground vibration tests that were to be performed on the Ares I launch vehicle, the Ares Flight and Integrated Test Office (FITO) organization evaluated the available test facility options, which included the existing mothballed structural dynamic TS4550 used by Apollo and Shuttle, alternative ground vibration test facilities at other locations, and construction of a new dynamic test stand. After an exhaustive assessment of the alternatives, the results favored modifying the TS4550 because it was the lowest cost option and presented the least schedule risk to the NASA Constellation Program for Ares Integrated Vehicle Ground Vibration Test (IVGVT). As the renovation design plans and drawings were being developed for TS4550, a safety concern was discovered the original design for the construction of the test stand, originally built for the Apollo Program and renovated for the Shuttle Program, was completed before NASA s adoption of the currently imposed safety and building codes per National Fire Protection Association Life Safety Code [NFPA 101] and International Building Codes. The initial FITO assessment of the design changes, required to make TS4550 compliant with current safety and building standards, identified a significant cost increase and schedule impact. An effort was launched to thoroughly evaluate the applicable life safety requirements, examine the context in which they were derived, and determine a means by which the TS4550 modifications could be made within budget and on schedule, while still providing the occupants with appropriate levels of safety.

Askins, Bruce↗

Flight Testing a Real-Time Hazard Detection System for Safe Lunar Landing on the Rocket-Powered Morpheus Vehicle

The Hazard Detection System (HDS) is a component of the ALHAT (Autonomous Landing and Hazard Avoidance Technology) sensor suite, which together provide a lander Guidance, Navigation and Control (GN&C) system with the relevant measurements necessary to enable safe precision landing under any lighting conditions. The HDS consists of a stand-alone compute element (CE), an Inertial Measurement Unit (IMU), and a gimbaled flash LIDAR sensor that are used, in real-time, to generate a Digital Elevation Map (DEM) of the landing terrain, detect candidate safe landing sites for the vehicle through Hazard Detection (HD), and generate hazard-relative navigation (HRN) measurements used for safe precision landing. Following an extensive ground and helicopter test campaign, ALHAT was integrated onto the Morpheus rocket-powered terrestrial test vehicle in March 2014. Morpheus and ALHAT then performed five successful free flights at the simulated lunar hazard field constructed at the Shuttle Landing Facility (SLF) at Kennedy Space Center, for the first time testing the full system on a lunar-like approach geometry in a relevant dynamic environment. During these flights, the HDS successfully generated DEMs, correctly identified safe landing sites and provided HRN measurements to the vehicle, marking the first autonomous landing of a NASA rocket-powered vehicle in hazardous terrain. This paper provides a brief overview of the HDS architecture and describes its in-flight performance.

Avoidance↗

50th Anniversary of the World's First Extraterrestrial Sample Receiving Laboratory: The Apollo Program's Lunar Receiving Laboratory

The Apollo program's Lunar Receiving Laboratory (LRL), building 37 at NASA's Manned Spaceflight Center (MSC), now Johnson Space Center (JSC), in Houston, TX, was the world's first astronaut and extraterrestrial sample quarantine facility (Fig. 1). It was constructed by Warrior Construction Co. and Warrior-Natkin-National at a cost of $8.1M be-tween August 10, 1966 and June 26, 1967. In 1969, the LRL received and curated the first collection of extra-terrestrial samples returned to Earth; the rock and soil samples of the Apollo 11 mission. This year, the JSC Astromaterials Acquisition and Curation Office (here-after JSC curation) celebrates 50 years since the opening of the LRL and its legacy of laying the foundation for modern curation of extraterrestrial samples.

Calaway, M. J.↗

Investigations of Advanced Measurement Methods for High-Temperature Heat-Pipe Experiments

Various types of microreactor designs are under consideration, and among those, the heat-pipe cooled reactor designs are currently being actively investigated at Idaho National Laboratory (INL). In order to support non-nuclear testing and demonstration of technology under the Department of Energy (DOE) Microreactor Program (MRP), Single Primary Heat Extraction and Removal Emulator (SPHERE) was designed and constructed to perform high-temperature heat pipe (HP) experiments at INL. Based on the SPHERE experimental setup, this summary paper conducts the preliminary investigations among the available literature and summarizes some potential advanced measurement techniques for operando high-temperature heat pipe which can be implemented to support MRP. The primary objective for the extensive literature research is to investigate the possibilities and feasibilities for designing and construct an advanced experimental test facility with the aim of producing high-fidelity high-resolution heat pipe data during its operations.

42 ENGINEERING↗

Technology Maturation of Hot Isostatic Pressing for Nuclear Waste Treatment - 20259

ANSTO is constructing a nuclear waste treatment facility for the immobilization of intermediate-level liquid waste (ILLW) from its nuclear medicine production [1]. This facility shall deploy ANSTO Synroc process technology that converts a liquid waste stream into a durable solid wasteform. Hot Isostatic pressing (HIP) shall be employed to consolidate the dry powdered waste effectively reducing the waste volume and immobilizing the waste components. This paper presents the technology maturation for HIP technology for utilisation in a nuclear waste treatment facility. The HIP has been designed to operate in a remote shielded enclosure, fully integrated with the front-end powder production. Attention has been given in the HIP system design to ensure that it can operate and be maintained to achieve the required production output of the facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Elemental Mercury Recovery in DWPF by pH and Ionic Strength Studies Using Laboratory Scale Replica – 26141

In order to safely disposition nuclear material at large scales, the Savannah River Site (SRS) constructed the Salt Waste Processing Facility (SWPF) for the removal of actinides, the Saltstone facility for preparation of a low-level cementitious grout, and the Defense Waste Processing Facility (DWPF) for the vitrification of high-level waste (HLW). A few years after processing began, high concentrations of mercury were discovered in cementitious waste at the Saltstone facility which initiated a search for the source of mercury during processing at these SRS facilities. Mercury serves as a catalyst in the dissolution of spent nuclear fuel, aluminum-actinide alloys, for actinide recovery, but not enough is known about the behavior and properties of mercury within these process streams.

Pina, Jeanette [Savannah River National Laboratory↗

Science and engineering for space - Technologies from Space 88

This paper highlights technology development for space exploration. It draws on the proceedings of Space 88, Engineering, Construction, and Operations in Space, which includes 125 papers providing in-depth discussions of space policy, extraterrestrial basing, space stations and orbiting structures. In the space station and orbiting structures (orbital facilities) section, papers discuss the engineering, construction, and operations of orbiting space systems. Papers in the extraterrestrial basing section deal with the engineering, construction, and operations challenges faced in development of bases and operations on extraterrestrial bodies. The special interest (interacting disciplines) section provides a discussion of challenges facing us in meeting needs for space power, life support, human factors, astronomy, education, and management.

Johnson, Stewart W.↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

An inventory of aeronautical ground research facilities. Volume 1: Wind tunnels

A survey of wind tunnel research facilities in the United States is presented. The inventory includes all subsonic, transonic, and hypersonic wind tunnels operated by governmental and private organizations. Each wind tunnel is described with respect to size, mechanical operation, construction, testing capabilities, and operating costs. Facility performance data are presented in charts and tables.

Pirrello, C. J.↗

Phase 0 study for a geothermal superheated water proof of concept facility

A Phase 0 study for the selection of a representative liquid-dominated geothermal resource of moderate salinity and temperature is discussed. Selection and conceptual design of a nominal 10-MWe energy conversion system, and implementation planning for Phase 1: subsystem (component, experiments) and Phase 2: final design, construction, and operation of experimental research facilities are reported. The objective of the overall program is to demonstrate the technical and economic viability of utilizing moderate temperature and salinity liquid-dominated resources with acceptable environmental impact, and thus encourage commercial scale development of geothermal electrical power generation.

Douglass, R. H.↗

Lessons Learned From Designing and Building Low Organic Outgassing Cleanrooms for NASA OSIRIS-REx and Hayabusa2 Curation Facility

NASA Johnson Space Center Astromaterials Acquisition and Curation Office completed construction and commissioning of the OSIRIS-REx and Hayabusa2 cleanroom laboratory suites along with new precision cleaning and advanced curation laboratories consisting of ISO Class 5, 6, and 7 cleanrooms. The new curation facilities are designed for initial receiving, basic characterization, curation processing, and preliminary examination of carbonaceous asteroidal material. The facilities are also designed to enable long-term pristine sample storage to preserve the scientific integrity of each sample to enable future research by the international science community. The scientific study of organics is critical for both missions. The OSIRIS-REx mission instituted a stringent contamination control plan for low organics. Given these mission requirements and long-term storage preservation requirements, cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. Cleanroom candidate construction materials were researched for the HVAC system, floors, walls, ceiling, and plenum areas. The team chose several candidate materials that were further tested for their specific outgassing characteristics using ASTM E-595 per ASTM E-2312. The information gained provided the foundation for the final design selection of the cleanroom materials. While material selection is important before and during the facility design phase, the construction phase is where these choices are implemented by the prime construction contractor through final product and material submittals. These submittals are the last check point and changes are often submitted due to engineering/construction conflicts, especially when renovating an existing building. Any new material or equipment/product change must be identified and scrutinized for low particulate shedding and outgassing properties. In some cases, quick testing of new material is required, and compromises must be made in real-time. Careful selection and implementation of cleanroom materials significantly reduced organic and inorganic contamination beyond normal cleanroom baselines.

astromaterials curation↗

Lessons Learned From Designing and Building Low Organic Outgassing Cleanrooms for NASA OSIRIS-REx and Hayabusa2 Curation Facility

NASA Johnson Space Center Astromaterials Acquisition and Curation Office completed construction and commissioning of the OSIRIS-REx and Hayabusa2 cleanroom laboratory suites along with new precision cleaning and advanced curation laboratories consisting of ISO Class 5, 6, and 7 cleanrooms. The new curation facilities are designed for initial receiving, basic characterization, curation processing, and preliminary examination of carbonaceous asteroidal material. The facilities are also designed to enable long-term pristine sample storage to preserve the scientific integrity of each sample to enable future research by the international science community. The scientific study of organics is critical for both missions. The OSIRIS-REx mission instituted a stringent contamination control plan for low organics. Given these mission requirements and long-term storage preservation requirements, cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. Cleanroom candidate construction materials were researched for the HVAC system, floors, walls, ceiling, and plenum areas. The team chose several candidate materials that were further tested for their specific outgassing characteristics using ASTM E-595 per ASTM E-2312. The information gained provided the foundation for the final design selection of the cleanroom materials. While material selection is important before and during the facility design phase, the construction phase is where these choices are implemented by the prime construction contractor through final product and material submittals. These submittals are the last check point and changes are often submitted due to engineering/construction conflicts, especially when renovating an existing building. Any new material or equipment/product change must be identified and scrutinized for low particulate shedding and outgassing properties. In some cases, quick testing of new material is required, and compromises must be made in real-time. Careful selection and implementation of cleanroom materials significantly reduced organic and inorganic contamination beyond normal cleanroom baselines.

astromaterials curation↗