Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Final Design Report for the RH LLW Disposal Facility (RDF) Project

The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facilitating Deployment of Community Solar PV systems on Rooftops and Vacant Land in Northeast IL - Final Report

The Cook County Community Solar project set out to unlock the potential of community solar in the Chicago region with lessons that could be applied nationally. One of the first steps was to prove out the potential market. This was done through an opportunity assessment which showed there is over 9,000 megawatts worth of site capacity available for community solar projects in Cook County – nearly enough to offset all of Cook County’s residential electricity use. The assessment also showed that almost 75% of Cook County households are not able to invest directly in solar photovoltaic systems due to a variety of issues from physical barriers such as shading, or condition of the roof, to financial barriers such as lack of roof ownership, or the up-front costs of installation. Because of these barriers, community solar is an essential part of making the benefits of renewable energy available to all of the residents of Cook County. In addition to the opportunity assessment the project team also worked with the over 200 individuals who participated in the stakeholder advisory group to develop a number of other products including: 1) an Economic & Policy Barriers Resolutions and Work Plan document which laid out best practices to address the policy barriers that existed at the time (May of 2016) 2) Value Proposition Report I and Report II which summarize the value of community solar to potential developers and subscribers, 3) The Community Solar Business Case Tool, which provides a flexible financial model that projects the costs and befits to the system developer and subscriber for a project, 4) Bill Crediting Analysis and the 5) Final Report. The Final Report contains 15 case studies which prove that community solar projects are economically feasible in Cook County with a variety of sites, solar designs, ownership and subscriber models.

14 SOLAR ENERGY↗

National Renewable Energy Laboratory (NREL) Topic 2 Final Report: End-to-End Communication and Control System to Support Clean Energy Technologies

This document is the final report of a two-year development, test, and demonstration project, 'Cohesive Application of Standards- Based Connected Devices to Enable Clean Energy Technologies.' The project was part of the National Renewable Energy Laboratory's (NREL's) Integrated Network Testbed for Energy Grid Research and Technology (INTEGRATE) initiative hosted at Energy Systems Integration Facility (ESIF). This project demonstrated techniques to control distribution grid events using the coordination of traditional distribution grid devices and high-penetration renewable resources and demand response. Using standard communication protocols and semantic standards, the project examined the use cases of high/low distribution voltage, requests for volt-ampere-reactive (VAR) power support, and transactive energy strategies using Volttron. Open source software, written by EPRI to control distributed energy resources (DER) and demand response (DR), was used by an advanced distribution management system (ADMS) to abstract the resources reporting to a collection of capabilities rather than needing to know specific resource types. This architecture allows for scaling both horizontally and vertically. Several new technologies were developed and tested. Messages from the ADMS based on the common information model (CIM) were developed to control the DER and DR management systems. The OpenADR standard was used to help manage grid events by turning loads off and on. Volttron technology was used to simulate a homeowner choosing the price at which to enter the demand response market. Finally, the ADMS used newly developed algorithms to coordinate these resources with a capacitor bank and voltage regulator to respond to grid events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SLEEC: Semantics-Rich Libraries for Effective Exascale Computation. Final Technical Report

SLEEC (Semantics-rich Libraries for Effective Exascale Computation) was a project funded by the Department of Energy X-Stack Program, award number DE-SC0008629. The initial project period was September 2012–August 2015. The project was renewed for an additional year, expiring August 2016. Finally, the project received a no-cost extension, leading to a final expiry date of August 2017. Modern applications, especially those intended to run at exascale, are not written from scratch. Instead, they are built by stitching together various carefully-written, hand-tuned libraries. Correctly composing these libraries is difficult, but traditional compilers are unable to effectively analyze and transform across abstraction layers. Domain specific compilers integrate semantic knowledge into compilers, allowing them to transform applications that use particular domain-specific languages, or domain libraries. But they do not help when new domains are developed, or applications span multiple domains. SLEEC aims to fix these problems. To do so, we are building generic compiler and runtime infrastructures that are semantics-aware but not domain-specific. By performing optimizations related to the semantics of a domain library, the same infrastructure can be made generic and apply across multiple domains.

97 MATHEMATICS AND COMPUTING↗

Solar Decathlon 2017: Final Report and Lessons Learned

Energetics Incorporated, with its project partners (collectively known as Team Energetics), has prepared the Solar Decathlon 2017 Final Report and Lessons Learned for the U.S. Department of Energy (DOE) to summarize and reflect on the administration of the planning, implementation, and close-out of Solar Decathlon 2017. This final report introduces the Solar Decathlon 2017 Program Administrator, Core Advisory Committee, event sponsors and donors, and regional stakeholders that were integral to the success of Solar Decathlon 2017. The substantial balance of this report presents evaluative metrics and lessons learned about the primary aspects of administering Solar Decathlon 2017, including Project Management, Competition and Site Management, Stakeholder Engagement, Communications, Sponsor Management, Education Programming, and Volunteer Coordination. Several appendices compliment the discussion.

14 SOLAR ENERGY↗

RFA for Solar/Geothermal Hybrid Thermal Energy Storage Modeling: Cooperative Research and Development Final Report, CRADA Number CRD-16-646

Hyperlight Energy is an innovative concentrated solar power (CSP) company whose business charter is to commercialize a disruptively low-cost, CSP collector system that is ultimately for providing heat for solar thermal/geothermal hybrid power plants, process heat applications (e.g., enhanced oil recovery), and solar thermal power generation. Hyperlight's CSP collector system utilizes a linear Fresnel reflector (LFR) configuration. This LFR configuration consists of mirrors mounted in low-cost, precision plastic extrusions, which are integrated into raft assemblies and floated on low-cost, sealed waterbeds. Hyperlight's CSP collector technology has been developed under private equity investment, government grant and commercial funding. Hyperlight has been awarded a 1.5-million DOE COLLECTS contract with an additional 1.6 million in matched funds from private investment and the California Energy Commission. This DOE project will support the final steps of product development for bulk commercialization and deployment of the Hyperlight CSP collector system. The work will culminate in a final operational deployment at a commercially relevant site. Several such site options are currently under evaluation, including two geothermal sites. Hyperlight identified a very low-cost way to put renewable energy electrons on the grid at peak times, upgrading underutilized geothermal plants with Hyperlight's low cost CSP and thermal energy storage (TES). While Hyperlight's CSP collector work is maturing quickly for commercial pilot launch, an optimal TES system for solar thermal/geothermal hybridization needs to be evaluated and ultimately developed so Hyperlight can develop commercial retrofit projects at a scale of hundreds of megawatts of renewable energy power output at sites across the United States, followed by greenfield projects in a multi-GW sized market.

15 GEOTHERMAL ENERGY↗

Alcator C-Mod (Final Technical Report)

Alcator C-Mod is the third in a series of compact high-field tokamaks built and operated on the MIT campus, the first to incorporate advanced shaping and poloidal divertors. For most of its 23 year operational history, C-Mod was the only diverted tokamak in the world program exclusively using all metal high-Z plasma facing components, and the only diverted tokamak able to operate at and above the magnetic field strength of ITER, and for many other burning plasma tokamak designs. The C-Mod facility also exclusively used RF waves for non-inductive heating and current drive, highly relevant to burning plasma applications and likely to be the main such tools in any commercial tokamak power reactor. A comprehensive summary of the key technical accomplishments from the C-Mod program is published in the review paper, M. Greenwald, et al., Phys. Plasmas 21(2014)110501. This final report contains a brief overview of those results, along with updates covering the final 3 years of operation, through September 2016. Ongoing analysis and modeling based on the archive of Alcator C-Mod data continues to provide new results, and this can be expected to continue for many years to come.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Final Technical Report for the ProNova Solutions contribution to: Compact, low-cost, light-weight, superconducting, ironless cyclotrons for hadron radiotherapy

ProNova Solutions, LLC is a collaborator with the primary PI for this project, Dr. Joseph V. Minervini, Head of the Magnets and Cryogenics group at the Massachusetts Institute of Technology, Plasma Science and Fusion Center. The purpose of the grant was to develop the conceptual design for a superconducting ironless synchrocyclotron suitable for hadron therapy. Such a design could ultimately be extended to light ions such as Helium and Carbon which are being studied at centers around the world. The ProNova efforts have been led by Co-PI Laddie Derenchuk and by Joe Matteo, company president. ProNova efforts will be described in this Final Technical Report, other goals and efforts by the MIT group can be referenced in the MIT Final Technical Report. ProNova’s primary goals as defined in the Project Narrative were to “defin[e] specifications necessary to meet the current and future demands of particle therapy based on ProNova’s clinical experience.” In addition, ProNova was to “focus on ion source, RF, vacuum, and mechanical subsystem conceptual designs”. This report will describe ProNova’s contributions to this project.

43 PARTICLE ACCELERATORS↗

Final technical report

This final report covers the final year of the project. Reports from previous years were included in the group report for that year. The objective of this part of the project was to compare results from two large-scale, nonlinear plasma simulation codes based on magnetohydrodynamics, M3D and M3D-C1, for plasma edge instabilities. This is a difficult undertaking and the comparison was only partially successful because, while the MHD equations are standard, there are a number of valid MHD models of the plasma dissipation that make different approximations to their physics and the numerical implementation of a given model can be quite different depending on the way that the rest of the equations are solved. Large differences arise, and have major effects on the predicted plasma behavior, in the case of the greatest interest to this project, the plasma edge region under conditions where the plasma edge instabilities are strongest and the background plasma changes abruptly from interior hot, dense conditions to an unconfined, cool, diffuse plasma outside the magnetic boundary surface. Experimental observations only partially measure the background plasma and there are many non-MHD processes that can have important effects (studied in the rest of the project). Comparisons for edge instabilities at very small amplitude, the so-called linear modes, had showed good agreement for a few interior plasma instabilities, but strong differences between the default models for the plasma edge.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

NDT System for Metal Components in Concrete Structures (Final Report)

Steel reinforcements embedded within concrete can corrode and crack, leading to weakening of the structures, and existing NDT (non-destructive testing) techniques do not provide the full picture. Condition assessment is critical in evaluating these structures in order to ensure safe, long-term operation of the nuclear power plants. Improved NDT techniques are needed as the nation’s generating stations age and require action based on increasingly critical inspection data. The power industry uses eddy current test (ECT) during in-service inspections to detect and monitor defects such as cracks and corrosion in metals, particularly metal pipes. However, the detection of defects in the reinforcing steel embedded in concrete is far more challenging for numerous reasons. Primary among them is the concrete layer’s thickness, which prevents the ability to have a close proximity between sensor and metallic sample. One solution to this problem is to create a higher sensitivity technique which can inspect at depth, with good spatial resolution and excellent directional sensitivity, to isolate the metal buried deep in the concrete and characterize defects in the metal. The goal of the phase II research program was to study and develop a new reinforced concrete NDT technology based on anisotropic magnetoresistive (AMR) sensors designed specifically for ECT of steel reinforcements in concrete. The first technical objective was to demonstrate the capability of inspecting steel reinforcement structures, including metal rebar and tensioning cable at or below 6” of depth embedded in concrete. Another objective was to be able to confidently identify multiple layers of reinforcements at varying depths. In addition, the technique needed to be able to provide condition assessment of the metal, providing data on the structure and positioning of the steel members, material loss, and detection of the presence of breaks. An important part of the research and development was aimed at achieving superior performance compared to existing technology. The ability to detect corrosion breaks in unbonded multi-wire and multi-strand tendons was another important objective. The final objective that led to a successful program was to build a complete prototype portable scanning system capable of demonstrating the probe performance in the field. All of these objectives were met, which provided data for the system development work going forward. RMD worked with the engineering firm Simpson Gumpertz & Heger to develop a detailed problem definition for concrete structures and the necessary sensor specifications. In addition, we developed finite element simulation models for the eddy current based NDT system through the analysis of the electromagnetic (EM) properties of sample materials and the orientation of the transmitter, sensor array (receivers), metal, and intervening materials like concrete and air. Based on the modeling and specifications, we designed and fabricated prototype sensor modules. We then acquired and fabricated test samples to characterize and optimize the sensors. Finally, we built a complete prototype for testing on actual concrete structures. This new NDT technology has high promise for greatly improving capabilities in the inspection of steel reinforcements within concrete structures, such as rebar, liners, anchors, and prestressing cables. This method could be valuable in the maintenance of nuclear power plants, and many other structures critical to our nation’s infrastructure.

42 ENGINEERING↗

Advanced Vehicle Testing and Evaluation Final Technical Report Encompassing Project Activities From October 1, 2011 to April 30, 2018

The Advanced Vehicle Testing and Evaluation (AVTE) project incorporated the conduct of advanced technology vehicle and infrastructure testing in the U.S. Department of Energy (DOE) Advanced Vehicle Testing Activity (AVTA). It was the only activity tasked by DOE to conduct independent field evaluations of vehicle technologies that use advanced technology systems and subsystems in vehicles that reduce petroleum consumption. The results are available through reports published on the AVTA website at http://avt.inl.gov/. The AVTE project provided insight into advanced vehicle technology's long-term performance, durability, maintenance, and lifecycle costs that cannot be found elsewhere. The site is a resource for DOE stakeholders and the public to gain knowledge on advanced technology vehicle progress and innovation. Vehicles tested included light and heavy-duty vehicles with conventional, hybrid, plug-in hybrid, and all-electric propulsion systems. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing. Testing and evaluations were conducted in the following phases: Development and refinement of test procedures, which established testing procedures; Baseline performance testing, which established a performance baseline; Accelerated reliability testing, which determined vehicle reliability; Fleet testing, used to evaluate vehicle economics in fleet operation, and End of test performance evaluation. Test results from all aspects of testing were posted by Idaho National Laboratory (INL) to their website. This final report documents work conducted for the entirety of contract DE-EE0005501 by Intertek Testing Services NA, Inc. (Intertek). The contract was performed from October 1, 2011 through April 30, 2018, and includes 18 amendments to the original award with the most recent Amendment 18 dated March 28, 2018. The final budget for the AVTE project totaled 20,220,873 dollars. As a cooperative agreement, Intertek was obligated to provide cost share of 4,044,175 dollars, leaving 16,176,698 dollars as the Federal share of the agreement. Actual total expenditure for the AVTE project was 20,286,850 dollars. The full 16,176,698 dollars Federal share was expended and 4,110,152 dollars of cost share was provided by Intertek. This resulted in an over-share of 65,977 dollars. There were 106 light-duty on-road vehicles vehicles tested in both fleet and accelerated reliability testing. One additional vehicle was rented to obtain performance testing only. Three heavy-duty truck and trailer combinations were tested as part of the semi-autonomous driving with heavy-duty vehicles in a platoon. Overall project scope and direction was determined between Intertek, DOE, and technical teams from Idaho National Laboratory (INL), Argonne National Laboratory (ANL), and National Renewable Energy Laboratory (NREL). The project was administered by the DOE’s National Energy Technology Laboratory (NETL).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pilot Test of Novel Electrochemical Membrane System for Carbon Dioxide Capture and Power Generation (Final Report)

The goal of this U.S. Department of Energy (DOE) sponsored project under cooperative agreement DE-FE0026580 is to verify that Fuel Cell Energy’s (FCE) Electrochemical Membrane (ECM)-based Combined Electric Power and Carbon Separation (CEPACS) system can achieve at least 90% carbon dioxide (CO 2 ) capture rate from Pulverized Coal (PC) power plant flue gas with 95% CO2 purity at a cost of electricity (COE) 30% less than baseline CO 2 capture approaches. To progress towards the DOE’s ultimate carbon capture program goals, the specific objectives of Budget Period 1 (BP1) of the project are to perform a preliminary Techno-Economic Analysis (TEA) and Environmental, Health and Safety (EH&S) Risk Assessment study, as well as to complete the detailed design of a pilot-scale ECM-based CEPACS system. This final technical report summarizes the results of the preliminary TEA and EH&S assessment of an ECM-based CEPACS system designed to capture and compress >90% of CO 2 from the flue gas of a reference 550 MW (net AC) Pulverized Coal (PC) Supercritical Steam Cycle Plant. Also included in this report is a summary of the detailed design for a pilot 3 MWe (flue gas equivalent) ECM-based CEPACS system designed to capture ≥90% of CO 2 from a PC plant flue gas slipstream and produce high-purity (≥95%) CO 2 . The pilot system is designed to process a slipstream of flue gas from the Unit 5 coal-fired boiler at the James M. Barry Electric Generating Station (Plant Barry). Plant Barry is located in Bucks, Alabama and is owned and operated by Alabama Power Company, a subsidiary of Southern Company. The TEA shows that the ECM-based CO 2 capture technology has an economic advantage over the existing CO 2 capture technology and meets the DOE’s cost target and performance goals for post-combustion CO 2 capture. The EH&S study includes the identification and quantification of the emissions from the CEPACS system. Properties of the waste including reactivity, flammability, corrosivity and toxicological effects are discussed along with the methods for minimization/elimination where applicable. The study shows that no major EH&S issues are expected to hinder commercialization of the ECM technology for large scale carbon capture applications. The detailed Front End Engineering Design (FEED) package for FCE’s MW-class ECM-based CO 2 capture pilot system is complete. It is designed in accordance with the project objectives and is now at a point where equipment/component procurement, skid final design and fabrication, and site preparation activities can begin in a follow-on project phase.

20 FOSSIL-FUELED POWER PLANTS↗

LP CO 2 Compressor Final Technical Report

This report summarizes work performed by Dresser-Rand, A Siemens Business and subcontractors, under DOE award number DE-FE0026727, in pursuit of the design, construction and test of a 10:1 pressure ratio “Low Pressure” (LP) supersonic CO 2 compressor suitable for use as a first stage in a two stage 100:1 compression system. This LP compressor, in conjunction with a corresponding 10:1 high pressure compressor, provide the overall 100:1 compression ratio required to compress CO 2 from 22 psia (as generated by a CO 2 capture system) to the 2215 psia required to transport CO 2 via a pipeline to a suitable sequestration site. The compressor demonstrates application of Dresser-Rand’s supersonic compression technology at an industrial scale using CO 2 in a closed-loop testing facility. This scope of this technical report is to summarize all phases of the program executed from August 5, 2015 to the June 30, 2018. This program included the final testing of a “high pressure” (HP) compressor that had previously been built by Dresser-Rand and the design, fabrication, assembly and test of a corresponding LP compressor. In summary, the LP compressor exceeded the target pressure ratio and efficiency goals for the program at CO 2 flowrates suitable for those expected in coal fired power plant carbon capture systems. Initial and Final Techno-Economic Analysis reports were generated to show the value this compression solution brings to carbon capture and sequestration (CC&S) systems for the Case B12B coal fired power plant model. Integration of the DATUM S compression technology into a carbon capture and sequestration system was shown to result in a 27% reduction in the Cost of Electricity for the compression system, as well as a 21,500 gallon per hour reduction in required cooling water flow for the plant.

20 FOSSIL-FUELED POWER PLANTS↗

Final TCF Report for Earth Battery: Storing Energy with Compressed Air and Heated Brine in Porous Rock

Cost-effective reductions in greenhouse gas (GHG) emissions are best achieved when all low-carbon energy resources are fully utilized. This includes base-load power: nuclear energy (NE) and fossil energy (FE), integrated with CO 2 capture, use, and storage (CCUS), and variable renewable energy (VRE) (wind and solar); but, current CCUS options don’t justify CO 2 -capture costs and existing energy-storage approaches lack the capacity and storage duration needed to fully utilize all forms of low-carbon energy without curtailment. The Earth Battery is designed to meet these challenges by synergistically integrating conventional- and renewable-energy resources, allowing each to contribute more efficiently to the grid than if operated independently. The Earth Battery stores energy underground as pressure and heat, using compressed air and/or CO 2 , together with heated brine. These fluids are stored in either saline aquifers used for CO 2 or natural gas (NG) storage or in oil and gas reservoirs, making deployment possible over much of the U.S. We can provide enormous energy-storage capacity and duration. The main goal of this study was to assess the techno-economic feasibility of the versions of the Earth Battery that use compressed air energy storage (CAES). Current CAES systems use NG turbines and store air in salt caverns, which limits geographic deployment. Conventional CAES wastes much of the heat of air compression, comprising half of the compression energy. Our technology addresses these deficiencies by using permeable sedimentary rock to store air and the heat of compression as heated brine. When electricity is needed, air and hot brine are produced, with hot brine used to pre-heat air before it is fed into the expanders. Key factors affecting round-trip efficiency are (1) pressure loss in the air-storage reservoir, which depends on permeability (> 100 mD being needed for efficient operations) and (2) temperature loss in the hot-brine storage reservoir, which decreases with time as the storage formation heats up. The original scope of this project was to conduct a techno-economic assessment of diurnal storage with the CAES Earth Battery, including (1) Adiabatic CAES, which requires no fossil fuel and (2) NG/CAES, where one or more of the expansion stages are NG fueled. During its assessment, we found NG/CAES, generates excess heat of compression that can be put into long-term (seasonal) storage and be utilized in a combined-cycle fashion with the addition of steam turbines. This resulted in our developing a new Earth Battery technology, which we call the Thermal Earth Battery. We conducted energy-system analyses for the Thermal Earth Battery for various combinations of heat sources: (1) heat of FE combustion, (2) excess heat of compression from NG/CAES, and (3) solar thermal energy (STE). The other Earth Battery class we developed compresses CO 2 , rather than air; hence, it is called Compressed CO 2 Energy Storage (CCES). Finally, we developed an improved, more efficient, more versatile version of the Allam cycle, which uses pressurized CO 2 , and developed various options for integrating renewable energy and energy storage. Our improved Allam-cycle technology minimizes cooling-water consumption, while enabling reliable, dispatchable renewable energy. Although not anticipated in our original scope of work, our Topic 1 project evolved into a highly productive discovery process wherein we developed a portfolio of Earth Battery configuration options and use cases. Our ultimate objective was to evaluate those options and use cases and determine the most optimal first best use options for our Earth Battery technology. That process resulted in identifying seasonal energy storage as a niche where no other energy storage technology could compete with us. As a result, we have identified the Thermal Earth Battery, which uses conventional steam-turbine components, and our improved Allam-cycle integrated with renewable energy and energy storage as the most promising technologies to commercialize in our Topic 2 proposal. Finally, our scope included finding a commercialization team for a Topic 2 continuation of this project, which we have successfully completed.

25 ENERGY STORAGE↗

Roll-to-Roll Advanced Materials Manufacturing DOE Laboratory Collaboration - FY2018 Final Report

High-value R2R processing is used to support a wide range of products in applications which span many industrial business sectors. The overall R2R process technology can be considered as “mature” as the process methodology and has been in use for decades. This continuous processing technique traditionally involves deposition of material(s) onto moving webs or carriers or other continuous R2R, belt-fed, or conveyor-based processes that enable successive steps to build a final version which serves to support the deposited materials. Current process technologies, which typify “roll to roll”, include tape casting, silk-screen printing, reel-to-reel vacuum deposition/coating and R2R lithography. Products supported by R2R manufacturing include micro-electronics, electro-chromic window films, PVs, fuel cells for energy conversion, battery electrodes for energy storage, and barrier materials. Due to innovation in materials and process equipment, high-quality yet very low-cost multi-layer technologies can be manufactured on a very cost-competitive basis. To move energy-related products from high-cost niche applications to the commercial sector, a means must be available to enable manufacture of these products in a cost-competitive manner that is affordable by the general consumer. Fortunately, products such as fuel cells, thin- and mid-film PVs, batteries, electrochromic and piezoelectric films, water separation membranes, and other energy saving technologies readily lend themselves to manufacture using R2R approaches.Within the DOE EERE AMO, it was recognized that establishment of a program supported at the DOE National Laboratories, along with their immense design of materials and equipment modelling capabilities enabled with use of high-performance computing, could take advantage of available R2R infrastructure to manufacture new technologies. In FY 2016, a R2R Consortium was established and provided with initial “seed” funding to take an approach that was envisioned to be supportable by advanced manufacturing R2R processes. This collaborative approach was designed to foster identification and development of materials and processes related to R2R for clean-energy product development. Using computational and experimental capabilities by acknowledged subject matter experts within the supported National Laboratory system, this collaborative project would leverage the capabilities and expertise at each of four laboratories to further the development of an enabling high-volume cost-competitive platform technology. The collaboration team that is comprised of ORNL, ANL, NREL and LBNL, coordinating with EPB and other selected industry partners, was formed in April 2016 to initially address enhancing battery electrode performance and R2R manufacturing challenges. The research efforts were to predict and measure changes and results in electrode morphology and performance based on process condition changes; to evaluate mixed, active, particle size deposition and drying for novel electrode materials; to model various process condition changes and the resulting morphology and electrode performance; and to develop and validate NDE techniques for in-line measurement of battery electrode material properties. These efforts carried through FY 2017 and completed at the end of FY 2018.The approach was to look at compositions of materials with different particle sizes to make electrode samples using a R2R manufacturing process. The shape, size, and morphology of the materials, the chemistry of the formulation, the nature of slurries, their coating rate, the rate of drying all play a role in determining the final coating architecture, quality, and performance. A commercial cathode material was selected to make a series of cathodes and anodes by single pass, dual pass and slot die methods. Analysis of all the compiled results for this battery electrode development were that the best performing cathodes included: dual-pass electrode with large particles near the foil, mixed small and large particles, and small particles only. Whereas, the best performing anodes were with a mix of small and large graphite particles. An additional core project was added in FY 2017 to conduct studies of fuel cell materials that can be produced using R2R processes. The goal of this project is to explore, understand and optimize material and process parameters to support increased throughput, increased quality, and reduced cost for high volume production of gas-diffusion electrodes (GDEs) for PEMFCs. Project work in FY 2018 were to use a R2R process to fabricate electrodes without ionomer overlayer that can produce the equivalent mass activity as spray-coated electrodes with an ionomer overlayer. Oxygen-limiting current measurements were utilized to optimize oxygen mass transport. Alcohol-rich solvents were investigated, and results were that the alcohol and water ratio can be tuned to control ionomer distribution. Water-rich solvents produce a more dispersed ink which results in better high-current density performance.

36 MATERIALS SCIENCE↗

Effects of Exhaust Gas Recirculation (EGR) on Turbulent Combustion and Emissions in Advanced Gas Turbine Combustors with High-Hydrogen-Content (HHC) Fuels (Final Report)

This Final Report documents the entire four years of the Cooperative Agreement DE-FE0011822, from October 1, 2013 through September 30, 2017, that was competitively awarded under Funding Opportunity Announcement DE-FOA-0000795 in support of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) University Turbine Systems Research (UTSR) Program. Under the UTSR Program, DOE typically issues Funding Opportunity Announcement (FOA) solicitations every 1-2 years so that U.S. colleges/universities may propose research & development (R&D) projects in specific technical topic areas (e.g., combustion, aerodynamics/heat transfer, advanced materials) that have been identified as both scientifically and industrially relevant to the gas turbine industry. The primary objectives of this Purdue University project (in collaboration with Princeton University through a sub-award) was to develop experimental methods, kinetic models, and numerical tools to help quantify and predict the impact of exhaust gas recirculation (EGR) on NOx and CO emissions, combustion kinetics, radiation heat transfer, turbulent combustion, and combustion instabilities for natural gas and high hydrogen content (HHC) fuels by using laminar and turbulent flow reactors and gas turbine combustors operating at high temperatures and pressures. This project has obtained detailed data for improving chemical kinetic models to study EGR effects and provide insight into the effects of EGR on flame speeds and turbulent flame structure, as well as assessing the impact of EGR on emissions in a high-pressure combustion test rig. The project was divided into six primary tasks: 1) Project Management and Program Planning; 2) Flow Reactor Investigation of EGR Chemical Kinetics; 3) Combustion Bomb Investigation of EGR Effects on Flame Speed; 4) Investigation of EGR Effects on Turbulent Flame Structure in Reactor-Assisted Turbulent Slot (RATS) Burner; 5) Investigation of EGR Effects in Purdue Staged Combustion Test Rig; and 6) Development and Validation of a Large Eddy Simulation (LES) Tool for Gas Turbine Combustion and Emission Modeling using HHC Fuels. Details on the execution and results of each of these tasks are provided in the main report. To assist the reader, each task is described in a chapter-like format with its own separate listing of tables, figures, and references so that the results of each task/subtask (i.e., technical sections covering various experiments and modeling work focused on a specific area) can be quickly obtained while also getting an overall feel of the project execution. This chapter-like format also allows for acknowledgement of support from other programs relative to specific tasks. In this manner, the reader can more conveniently digest the R&D results in the various task/subtask sections that may be of most interest to the reader. In addition to this Final Report, the Purdue/Princeton team was able to publish 7 journal articles and provide 7 presentations at national scientific meetings/conferences to disseminate results. A listing of these journal articles and presentations is provided at the end of this report

03 NATURAL GAS↗

Fort Yukon wood Energy Program Wood Boiler Deployment (Final Report)

The Fort Yukon Gwitchyaa Zhee Corporation (GZ) worked with partners on the development of an Integrated Biomass Energy Program for Fort Yukon. This integrated approach linked sustainable forest management with an in- village for -profit wood harvest and delivery business to displace diesel energy with wood energy for heat and power. The program was based on the concept of ecological, economic and social sustainability with a goal of displacing as much diesel and fuel oil as is technically feasible and sustainable; essentially systematically converting a village to significant amounts of wood use. Additionally, GZ worked with the Alaska Energy Authority (AEA) on the development of a rural power system upgrade (RPSU) project that replaced GZ’s existing antiquated diesel power plant and provided upgrades to the existing electrical distribution system. Due to the synergy of the two projects, the Biomass and RPSU projects were combined to provide improved operating efficiency, economy of scale and increased benefits to GZ, the Council of Athabascan Tribal Governments (CATG) and the community of Fort Yukon. The combined project is referred to as the Fort Yukon Combined heat and power (CHP) project. The purpose of the DOE Tribal Energy Program award was to support the preconstruction tasks and installation of wood boilers at the CATG clinic, and at the new GZ diesel power plant as part of an overall program to create a for- profit wood energy utility in Native Village of Fort Yukon. The CHP project provides biomass and diesel generation recovered heat via a new district heating system to the major commercial buildings in Fort Yukon. The CATG clinic will receive heat from a separate biomass boiler to their heating needs. The award from the Department of Energy (DOE) Tribal Energy Program was divided into two phases: Design/Permitting (phase 1) and Construction (phase 2). Phase 1 (Design & Permitting) is cost shared using State of Alaska Renewable Energy Funding (REF) funds through the Alaska Energy Authority (AEA). Phase 2 (Construction) was funded by DOE, AEA and US Department of Agriculture Rural Utility Service (USDA-RUS). Phase 1 of this grant, along with a separate grant from the Denali Commission provided funding for development of the wood delivery infrastructure necessary to support the CHP project. Under phase 2, This DOE grant supported final design of the boiler, bidding, purchase and transport of boilers, installation, technical support and engineering. The AEA and RUS grants supported permitting, final design, material and equipment purchase, and construction and installation of the new diesel power plant and district heating distribution system.

09 BIOMASS FUELS↗