Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEACTIVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Building 235-F Goldsim Fate And Transport Model

Savannah River National Laboratory (SRNL) personnel, at the request of Area Completion Projects (ACP), evaluated In-Situ Disposal (ISD) alternatives that are under consideration for deactivation and decommissioning (D&D) of Building 235-F and the Building 294-2F Sand Filter. SRNL personnel developed and used a GoldSim fate and transport model, which is consistent with Musall 2012, to evaluate relative to groundwater protection, ISD alternatives that involve either source removal and/or the grouting of portions or all of 235-F. This evaluation was conducted through the development and use of a Building 235-F GoldSim fate and transport model. The model simulates contaminant release from four 235-F process areas and the 294-2F Sand Filter. In addition, it simulates the fate and transport through the vadose zone, the Upper Three Runs (UTR) aquifer, and the Upper Three Runs (UTR) creek. The model is designed as a stochastic model, and as such it can provide both deterministic and stochastic (probabilistic) results. The results show that the median radium activity concentrations exceed the 5 ?Ci/L radium MCL at the edge of the building for all ISD alternatives after 10,000 years, except those with a sufficient amount of inventory removed. A very interesting result was that grouting was shown to basically have minimal effect on the radium activity concentration. During the first 1,000 years grouting may have some small positive benefit relative to radium, however after that it may have a slightly deleterious effect. The Pb-210 results, relative to its 0.06 ?Ci/L PRG, are essentially identical to the radium results, but the Pb-210 results exhibit a lesser degree of exceedance. In summary, some level of inventory removal will be required to ensure that groundwater standards are met.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative approach to reduction of waste streams for cutting operations in remote environments

SRNL proposes to develop and demonstrate an approach using the SRNL rotary microfilter (RMF) technology for reducing waste streams in remote cutting operations during decontamination operations. SRNL offers to collaborate with Tokyo Electric Power Company (TEPCO) in evaluation, testing, and utilization of SRNL’s radiation-hardened rotary microfilter in the deactivation and decommissioning (D&D) operations of the Fukushima Daiichi Nuclear Power Station (NPS). Refinement of the scope and associated costs will be conducted in consultation with TEPCO.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FIU Project 3: Waste and D&D Engineering and Technology Development [Slides]

This project focuses on delivering solutions under deactivation and decommissioning (D&D) in support of DOE EM-4.11 as well as IT development for environmental applications (KM-IT for EM-4.11) and waste & material management (WIMS for EM-4.22). All technology development related activities will also engage the Office of Technology Development (EM-3.2). This work is also relevant to infrastructure management activities being carried out at DOE sites such as Oak Ridge, Savannah River, Hanford, Idaho and Portsmouth. As appropriate and within the parameters of the DOE-FIU Cooperative Agreement (CA), coordination at the proper level will occur with the sites and national laboratories involved in the project research efforts as well as with the points-of-contact at DOE HQ (e.g., HQ Project Leads, HQ Field Liaisons, Office of Technology Development, CA Technical Monitor, COR, etc.).

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Depowering of Batteries to Reduce Cost of Ownership

(1) Executive Summary: End of life batteries (EOLBs) present a cost and safety liability for their owners and stakeholders. This is due flammability, energy, and power with EOLBs. Current approaches include cumbersome, expensive packaging, specialized shipping, regulated storage, and they are responsible for over half of the cost of recycling. They all expensively and inadequately address symptoms. OnTo has developed and proven a simple way to resolve the problem systemically, through depowering of lithium-ion batteries (and most any battery other than lead). The low-cost process removes flammability, power, and energy in EOLBs through non-toxic chemical processing. The opportunity for commerce of inert scrap is at least $5 billion greater than the commerce in hazardous scrap, all made possible through OnTo’s technology for efficiency and safety. (2) Depowering Improves Safety and Decreases Cost of Battery Ownership: OnTo’s depowering technology will remove half of the cost of EOLB management and recycling. Without this technology, EOLB recycling will always be a liability. EOLB is hazardous due to inherent flammability of electrolyte and lithium. The shipping and commerce of EOLBs is costly and dangerous all along the chain of custody from owner, dealership/shop, shipper, second-life sorter, (shipper again), and finally to the destination facility recycler. OnTo’s depowering service renders inert most any EOLB packs, modules, and cells. The technology uses a brief, non-toxic treatment applicable to most any chemistry. The industry needs a safe, simple, modular, and inexpensive method to render EOLBs as inert scrap. OnTo’s deactivation system is scalable to the needs of any customer along the EOLB chain of custody. (3) Evidence of Successful Depowering: Untreated batteries will catch fire and explode under abuse conditions such as heat or crush. Slide 2 below shows that untreated batteries will blow-up and expel their internal components with heating, after OnTo’s depowering treatment, the same battery is inert with the same heat treatment (Fig. 7 in the slide). Depowering also removes electrolyte reactivity, eliminating the production of HF and other toxins (Fig 6. in the slide) The depowering process is applicable to large, 26 Ah cells. Fig. 5 in the slide shows the removal of all the electrolyte from whole cells. Removal of flammable material from an EOLB contributes to the inert behavior. OnTo developed this technology through a project supported by the US Department of Energy EERE program, with partners including Seattle King County Metro Transit. While OnTo has generated evidence of successful depowering of batteries, in 2020, a follow-on voucher opportunity for third party analysis of depowered cells and materials was approved through CalTestBed. The expertise of the battery and materials research groups at Lawrence Berkeley National Laboratory will characterize these depowered cells to provide better understanding of the materials level changes in depowering. (4) Pilot Plant for Depowering EOLBs: Making the spoke work in hub-and-spoke While other companies are marketing the hub-and-spoke approach for recycling EOLBs, they rely on dangerous, expensive shredding methods with flimsy IP protection. OnTo offers the only patented, proven ability to depower EOLBs from most any chemistry – at half of the capital cost required for shredding, while eliminating the liability, danger, and waste streams inherent with shredding. The proposed commercial pilot facility is (5) OnTo Technology LLC Company: OnTo develops advanced battery recycling innovations that produce manufacturing quality electrode materials from recycled batteries. Their patented Cathode-healing™ and Deactivation/Depowering processes improve safety and reduce the cost of recycling. OnTo’s breakthrough technologies produce advanced materials for manufacturing batteries useful in applications from portable power to electric vehicles. Contact: Steve Sloop OnTo Technology LLC, 63221 Service Road, STE F, Bend, OR 97703, ssloop@onto-technology.com , 541-389-7897

deactivation↗

Li-ion Identification For the Next Generation of Cathode Recycling

OnTo’s end-to-end solution will demonstrate (in partnership/collaboration with relevant industries) collection of lithium-ion batteries through recycling of cathode material. The DISCC project will prototype 1) deactivation of batteries 2) identification 3) sorting using automated techniques, 4) cutting with waterjet technology and 5) Cathode-Healing™ to produce valuable cathodes from scrap batteries.

25 ENERGY STORAGE↗

Radiation Hardened Foam Cold Test Plan - Phase II: Foam Characterization Testing and Environmental Chamber Testing of FoamBag Fixative Foam

This document outlines the Phase II test objectives and implementation plan for a down-select foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of a polyurethane resin foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed at FIU and SRNL test and lab facilities. Results from the cold tests will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the area and transported to a designated disposal facility. Phase I testing was previously conducted using Hilti CP620 fixative foam. Results from Phase I testing indicate Hilti CP-620 fixative foam is incompatible with SRS site hot taps as an effective foam delivery method into Hastelloy C-22 piping. Phase II testing will be conducted using FoamBag TM fixative foam as an alternative fixative foam option. Phase II testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of FoamBag TM in Hastelloy C-22 piping, (2) evaluation of the adhesion of FoamBag TM in piping under various moisture conditions, (3) determination of the heat profile of FoamBag TM during curing, (4) determination of the internal pipe pressure after FoamBag TM deployment and curing, (5) conduct a leak test to determine if FoamBag TM is effective at creating a full seal within piping, (6) headspace testing of FoamBag TM to determine if there are any associated off-gas hazards during FoamBag TM curing, (7) conduct environmental chamber testing of FoamBag TM to understand how environmental parameters impacts FoamBag TM curing, and (8) conduct fire testing to evaluate FoamBag TM fire retardant characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identifying Controlling Variables for Mercury Vapors in Alpha-4 at Y-12: Two Year Data Collection Update

Multiple sensor packages were deployed at Alpha-4 by SRNL, in collaboration with United Cleanup Oak Ridge LLC (UCOR), to monitor mercury vapor concentrations and meteorological parameters. These sensors collected data, inside and outside of the legacy-use facility, for approximately two years. Though data gaps still exist, particularly in colder months, several controlling variables were identified that govern mercury vapor concentrations within Alpha-4. Temperature, barometric pressure gradients, humidity, and wind speed have been identified as controlling variables. A strong positive correlation was seen between mercury vapor concentrations and temperature which generally followed diurnal fluctuations. Temperatures below approximately 10 degrees Celsius did not show any spikes above the PEL, indicating more work can be performed at any time during the winter months – more data should be collected to confirm consistency in this finding. Additionally, spikes in mercury vapor concentrations above that of the permissible exposure limit (PEL; 100 µg/m 3 ) occurred primarily in late afternoon or evening/overnight hours (between 3 PM and 6 AM), which suggests D&D operations might be best scheduled during morning or daytime hours prior to the late afternoon. However, a limited number of spikes did occur outside of the identified window, although this may be attributed to disturbances in air flow and mercury vapor release from work activities performed inside of the Alpha-4 building. The analysis conducted allows for a strong predictive capability for estimating mercury vapor concentrations based upon accurate meteorological parameters. Still, additional data collection, particularly in the winter months, could help to strengthen the predictive power and validate the identified data trends. Further, increased temporal resolution could also help to better characterize the incipient stages of the increases and decreases in the mercury vapor concentration. Continued monitoring support by SRNL at Y-12 is underway at Alpha-4 to further close remaining data gaps and support deactivation and decommissioning work. Within a collaborative effort with UCOR, the SRNL team is collecting mercury vapor data to study the efficacy of a novel mercury suppressant, FerroBlack® which was recently deployed at Alpha-4. In addition, modifications to the current monitoring setup to increase measurement resolution is also being investigated.

54 ENVIRONMENTAL SCIENCES↗

In –Situ Spectroscopic Investigation of Immobilized Organometallic Catalysts

Immobilized organometallic catalysts, in principle, can give high rates and selectivities like homogeneous catalysts with the ease of separation enjoyed by heterogeneous catalysts. However, the science of immobilized organometallics has not been developed because the field lies at the interface between the homogeneous and heterogeneous catalysis communities. By assembling an interdisciplinary research team that can probe all aspects of immobilized organometallic catalyst design, the entire reacting system can be considered, where the transition metal complex, the complex-support interface and the properties of the support can all be considered simultaneously from both experimental and theoretical points of view. Researchers at Georgia Tech and the University of Virginia are studying the fundamental principles that can be used to understand and design future classes of immobilized organometallic catalysts. In the framework of the overall collaborative project with Georgia Tech, our work focused on (a) the X-ray absorption spectroscopy of an immobilized Pd-SCS-O complex (b) the mode of metal leaching from supported Pd catalysts during Heck catalysis and (c) the mode of deactivation of Jacobsen’s Co-salen catalysts during the hydrolytic kinetic resolution of terminal epoxides. Catalysts containing supported Pd pincer complexes, functionalized supports containing mercapto and amine groups, and oligomeric Co-salen catalysts were synthesized at Georgia Tech and sent to the University of Virginia. Incorporation of Pd onto several different kinds of supports (silica, mercapto-functionalized silica, zeolite Y) was performed at the University of Virginia.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Overview of the design, construction, and operation of interstate liquid petroleum pipelines.

The U.S. liquid petroleum pipeline industry is large, diverse, and vital to the nation's economy. Comprised of approximately 200,000 miles of pipe in all fifty states, liquid petroleum pipelines carried more than 40 million barrels per day, or 4 trillion barrel-miles, of crude oil and refined products during 2001. That represents about 17% of all freight transported in the United States, yet the cost of doing so amounted to only 2% of the nation's freight bill. Approximately 66% of domestic petroleum transport (by ton-mile) occurs by pipeline, with marine movements accounting for 28% and rail and truck transport making up the balance. In 2004, the movement of crude petroleum by domestic federally regulated pipelines amounted to 599.6 billion tonmiles, while that of petroleum products amounted to 315.9 billion ton-miles (AOPL 2006). As an illustration of the low cost of pipeline transportation, the cost to move a barrel of gasoline from Houston, Texas, to New York Harbor is only 3 cents per gallon, which is a small fraction of the cost of gasoline to consumers. Pipelines may be small or large, up to 48 inches in diameter. Nearly all of the mainline pipe is buried, but other pipeline components such as pump stations are above ground. Some lines are as short as a mile, while others may extend 1,000 miles or more. Some are very simple, connecting a single source to a single destination, while others are very complex, having many sources, destinations, and interconnections. Many pipelines cross one or more state boundaries (interstate), while some are located within a single state (intrastate), and still others operate on the Outer Continental Shelf and may or may not extend into one or more states. U.S. pipelines are located in coastal plains, deserts, Arctic tundra, mountains, and more than a mile beneath the water's surface of the Gulf of Mexico (Rabinow 2004; AOPL 2006). The network of crude oil pipelines in the United States is extensive. There are approximately 55,000 miles of crude oil trunk lines (usually 8 to 24 inches in diameter) in the United States that connect regional markets. The United States also has an estimated 30,000 to 40,000 miles of small gathering lines (usually 2 to 6 inches in diameter) located primarily in Texas, Oklahoma, Louisiana, and Wyoming, with small systems in a number of other oil producing states. These small lines gather the oil from many wells, both onshore and offshore, and connect to larger trunk lines measuring 8 to 24 inches in diameter. There are approximately 95,000 miles of refined products pipelines nationwide. Refined products pipelines are found in almost every state in the United States, with the exception of some New England states. These refined product pipelines vary in size from relatively small, 8- to 12-inch-diameter lines, to up to 42 inches in diameter. The overview of pipeline design, installation, and operation provided in the following sections is only a cursory treatment. Readers interested in more detailed discussions are invited to consult the myriad engineering publications available that provide such details. The two primary publications on which the following discussions are based are: Oil and Gas Pipeline Fundamentals (Kennedy 1993) and the Pipeline Rules of Thumb Handbook (McAllister 2002). Both are recommended references for additional reading for those requiring additional details. Websites maintained by various pipeline operators also can provide much useful information, as well as links to other sources of information. In particular, the website maintained by the U.S. Department of Energy's Energy Information Administration (EIA) (http://www.eia.doe.gov) is recommended. An excellent bibliography on pipeline standards and practices, including special considerations for pipelines in Arctic climates, has been published jointly by librarians for the Alyeska Pipeline Service Company (operators of the Trans-Alaska Pipeline System [TAPS]) and the Geophysical Institute/International Arctic Research Center, both located in Fairbanks (Barboza and Trebelhorn 2001), available electronically at http://www.gi.alaska.edu/services/library/pipeline.html codes. The Association of Oil Pipe Lines (AOPL) and the American Petroleum Institute (API) jointly provide an overview covering the life cycle of design, construction, operations, maintenance, economic regulation, and deactivation of liquid pipelines (AOPL/API 2007).

02 PETROLEUM↗

Novel Attrition-Resistant Fischer Tropsch Catalyst

There is a strong national interest in the Fischer-Tropsch synthesis process because it offers the possibility of making liquid hydrocarbon fuels from reformed natural gas or coal and biomass gasification products. This project explored a new approach that had been developed to produce active, attrition-resistant Fischer-Tropsch catalysts that are based on glass-ceramic materials and technology. This novel approach represented a promising solution to the problem of reducing or eliminating catalyst attrition and maximizing catalytic activity, thus reducing costs. The technical objective of the Phase I work was to demonstrate that glass-ceramic based catalytic materials for Fischer-Tropsch synthesis have resistance to catalytic deactivation and reduction of particle size superior to traditional supported Fischer-Tropsch catalyst materials. Additionally, these novel glass-ceramic-based materials were expected to exhibit catalytic activity similar to the traditional materials. If successfully developed, the attrition-resistant Fischer-Tropsch catalyst materials would be expected to result in significant technical, economic, and social benefits for both producers and public consumers of Fischer-Tropsch products such as liquid fuels from coal or biomass gasification. This program demonstrated the anticipated high attrition resistance of the glass-ceramic materials. However, the observed catalytic activity of the materials was not sufficient to justify further development at this time. Additional testing documented that a lack of pore volume in the glass-ceramic materials limited the amount of surface area available for catalysis and consequently limited catalytic activity. However, previous work on glass-ceramic catalysts to promote other reactions demonstrated that commercial levels of activity can be achieved, at least for those reactions. Therefore, we recommend that glass-ceramic materials be considered again as potential Fischer-Tropsch catalysts if it can be demonstrated that materials with adequate pore volume can be produced. During the attrition resistance tests, it was learned that the glass-ceramic materials are very abrasive. Attention should be paid in any further developmental efforts to the potential for these hard, abrasive materials to damage reactors.

01 COAL, LIGNITE, AND PEAT↗

TECHNOLOGY REQUIREMENTS FOR IN SITU DECOMMISSIONING WORKSHOP REPORT

In recognition of the increasing attention being focused on In Situ Decommissioning (ISD or entombment) as an acceptable and beneficial decommissioning end state, the Department of Energy's (DOE) Office of Environmental Management (EM) is developing guidance for the implementation of ISD of excess facilities within the DOE complex. Consistent with the overarching DOE goals for increased personnel and environmental safety, reduced technical uncertainties and risks, and overall gains in efficiencies and effectiveness, EM's Office of Deactivation and Decommissioning and Facility Engineering (EM-23) initiated efforts to identify the technical barriers and technology development needs for the optimal implementation of ISD. Savannah River National Laboratory (SRNL), as the EM Corporate Laboratory, conducted an ISD Technology Needs Workshop to identify the technology needs at DOE sites. The overall goal of the workshop was to gain a full understanding of the specific ISD technical challenges, the technologies available, and those needing development. The ISD Workshop was held December 9-10, 2008 in Aiken, SC. Experienced decommissioning operations personnel from Richland Operations Office (RL), Idaho National Laboratory (INL) and Savannah River Site (SRS) along with scientists and engineers specific expertise were assembled to identify incremental and 'game changing' solutions to ISD technology challenges. The workshop and follow-up activities yielded 14 technology needs statements and the recommendation that EM-23 prioritize and pursue the following specific technology development and deployment actions. For each action, the recommended technology acquisition mechanisms (competitive solicitation (CS) or direct funding (TCR)) are provided. Activities that are time critical for ISD projects, or require unique capabilities that reside in the DOE Laboratory system will be funded directly to those institutions. Activities that have longer lead times and where the private sector, universities or other agencies are expected to have greater expertise will be accomplished through an open, competitive solicitation process. Several areas will require joint efforts from the two classes of resources.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ASSESSMENT OF THE POTENTIAL FOR HYDROGEN GENERATION DURING GROUTING OPERATIONS IN THE R AND P REACTOR VESSELS

The R- and P-reactor buildings were retired from service and are now being prepared for deactivation and decommissioning (D&D). D&D activities will consist primarily of immobilizing contaminated components and structures in a grout-like formulation. Aluminum corrodes very rapidly when it comes in contact with the alkaline grout materials and as a result produces hydrogen gas. To address this potential deflagration/explosion hazard, the Materials Science and Technology Directorate (MS&T) of the Savannah River National Laboratory (SRNL) has been requested to review and evaluate existing experimental and analytical studies of this issue to determine if any process constraints on the chemistry of the fill material and the fill operation are necessary. Various options exist for the type of grout material that may be used for D&D of the reactor vessels. The grout formulation options include ceramicrete (pH 6-8), low pH portland cement + silica fume grout (pH 10.4), or portland cement grout (pH 12.5). The assessment concluded that either ceramicrete or the silica fume grout may be used to safely grout the R- and P- reactor vessels. The risk of accumulation of a flammable mixture of hydrogen between the grout-air interface and the top of the reactor is very low. Conservative calculations estimate that either ceramicrete or the silica fume grout may be used to safely grout the R- and P- reactor vessels. The risk of accumulation of a flammable mixture of hydrogen between the grout-air interface and the top of the reactor is very low. Although these calculations are conservative, there are some measures that may be taken to further minimize the potential for hydrogen evolution. (1) Minimize the temperature of the grout as much as practical. Lower temperatures will mean lower hydrogen generation rates. Grout temperatures less than 100 C should however, still provide an adequate safety margin for the pH 8 and pH 10.4 grout formulations. (2) Minimize the fill rate as much as practical. Lowering the fill rate takes advantage of passivation of the aluminum components and hence lower hydrogen generation rates. Fill rates that are less than 2 inches/min will reduce the chance of significant hydrogen build-up. (3) Ventilate the building as much as practical (e.g., leave doors open) to further disperse hydrogen. The volumetric hydrogen generation rates however, are low for the pH 8 and pH 10.4 grout, i.e., less than 0.32 ft{sup 3}/min. Portland cement grout, on the other hand, for the same range of process parameters does not provide a significant margin of safety against the accumulation of flammable gas in the reactor vessel during grouting operations. It is recommended that this grout not be utilized for this task. If further walk-down inspections of the reactor vessels suggest an increase in the actual areal density of aluminum, the calculations should be re-visited.

08 HYDROGEN↗

100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.

36 MATERIALS SCIENCE↗

ASSESSMENT OF THE POTENTIAL FOR HYDROGEN GENERATION DURING GROUTING OPERATIONS IN THE R- AND P-REACTOR VESSELS

The R- and P-reactor buildings were retired from service and are now being prepared for deactivation and decommissioning (D&D). D&D activities will consist primarily of immobilizing contaminated components and structures in a grout-like formulation. Aluminum corrodes very rapidly when it comes in contact with the alkaline grout materials and as a result produces hydrogen gas. To address this potential deflagration/explosion hazard, the Materials Science and Technology Directorate (MS&T) of the Savannah River National Laboratory (SRNL) has been requested to review and evaluate existing experimental and analytical studies of this issue to determine if any process constraints on the chemistry of the fill material and the fill operation are necessary. Various options exist for the type of grout material that may be used for D&D of the reactor vessels. The grout formulation options include ceramicrete (pH 6-8), low pH portland cement + silica fume grout (pH 10.4), or Portland cement grout (pH 12.5). The assessment concluded that either ceramicrete or the silica fume grout may be used to safely grout the P-reactor vessel. The risk of accumulation of a flammable mixture of hydrogen between the grout-air interface and the top of the reactor is very low. Portland cement grout, on the other hand, for the same range of process parameters does not provide a significant margin of safety against the accumulation of flammable gas in the reactor vessel during grouting operations in the P-reactor vessel. It is recommended that this grout not be utilized for this task. The R-reactor vessel contains significantly less aluminum and thus a Portland cement grout may be considered as well. For example, if the grout fill rate is less than 1 inch/min and the grout temperature is maintained at 70 C or less, the risk of hydrogen accumulation in the R-reactor vessel is very low for the Portland cement. Alternatively, if the grout fill rate is less than 0.5 inch/min and the grout is maintained at a temperature of 80 C, the risk will again be very low. Although these calculations are conservative, there are some measures that may be taken to further minimize the potential for hydrogen evolution. (1) Minimize the temperature of the grout as much as practical. Lower temperatures will mean lower hydrogen generation rates. For P-reactor, grout temperatures less than 100 C should provide an adequate safety margin for the pH 8 and pH 10.4 grout formulations. For R-reactor, grout temperatures less than 70 C or 80 C will provide an adequate safety margin for the Portland cement. The other grout formulations are also viable options for R-reactor. (2) Minimize the grout fill rate as much as practical. Lowering the fill rate takes advantage of passivation of the aluminum components and hence lower hydrogen generation rates. For P-reactor, fill rates that are less than 2 inches/min for the ceramicrete and the silica fume grouts will reduce the chance of significant hydrogen accumulation. For R-reactor, fill rates less than 1 inch/min will again minimize the risk of hydrogen accumulation. (3) Ventilate the building as much as practical (e.g., leave doors open) to further disperse hydrogen. The volumetric hydrogen generation rates in the P-reactor vessel, however, are low for the pH 8 and pH 10.4 grout, (i.e., less than 0.32 ft{sup 3}/min). If further walk-down inspections of the reactor vessels suggest an increase in the actual areal density of aluminum, the calculations should be re-visited.

08 HYDROGEN↗

100 Area D4 Project Building Completion Report - July 2007 to December 2008

This report documents the decontamination, decommissioning, and demolition of the 105-NB, 163-N, 183-N, 183-NA, 183-NB, 183-NC, 184-N, 184-NA, 184-NB, 184-NC, 184-ND, 184-NE, 184-NF, 1312-N, 1330-N, 1705-N, 1705-NA, 1706-N, 1712-N, 1714-N, 1714-NA, 1714-NB, 1802-N, MO-050, MO-055, MO-358, MO-390, MO-900, MO-911, and MO-950 facilities in the 100 Area of the Hanford Site. The D4 activities for these facilities include utility disconnection, planning, characterization, engineering, removal of hazardous and radiological contaminated materials, equipment removal, decommissioning, deactivation, decontamination, demolition of the structure, and removal of the remaining slabs.

100 Area↗

ASSESSMENT OF THE POTENTIAL FOR HYDROGEN GENERATION DURING GROUTING OPERATIONS IN THE R AND P REACTOR VESSELS

The R- and P-reactor buildings were retired from service and are now being prepared for deactivation and decommissioning (D and D). D and D activities consist primarily of immobilizing contaminated components and structures in a grout-like formulation. Aluminum corrodes very rapidly when it comes in contact with the alkaline grout materials and as a result produces hydrogen gas. To address this potential deflagration/explosion hazard, the Materials Science and Technology Directorate (MS and T) of the Savannah River National Laboratory (SRNL) has been requested to review and evaluate existing experimental and analytical studies of this issue to determine if any process constraints on the chemistry of the fill material and the fill operation are necessary. Various options exist for the type of grout material that may be used for D and D of the reactor vessels. The grout formulation options include ceramicrete (pH 6-8), low pH portland cement + silica fume grout (pH 10.4), or Portland cement groupt (pH 12.5). The assessment concluded that either ceramicrete or the silica fume grout may be used to safely grout the P-reactor vessel. The risk of accumulation of a flammable mixture of hydrogen between the grout-air interface and the top of the reactor is very low. Portland cement grout, on the other hand, for the same range of process parameters does not provide a margin of safety against the accumulation of flammable gas in the reactor vessel during grouting operations in the P-reactor vessel. It is recommended that this grout not be utilized for this task. The R-reactor vessel cotnains significantly less aluminum based on current facility process knowledge, surface observations, and drawings. Therefore, a Portland cement grout may be considered for grouting operations as well as the other grout formulations. For example, if the grout fill rate is less than 1 inch/min and the grout temperature is maintained at 70 C or less, the risk of hydrogen accumulation during fill operations in the R-reactor vessel is low for the Portland cement. Alternatively, if the grout fill rate is less than 0.5 inch/min and the grout is maintained at a temperature of 80 C, the risk is again low. Although these calculations are conservative, there are some measures that may be taken to further minimize the potential for hydrogen evolution. (1) Minimize the temperature of the grout as much as practical. Lower temperatures will mean lower hydrogen generation rates. For P-reactor, grout temperatures less than 100 C should provide an adequate safety margin for the pH 8 and pH 10.4 grout formulations. For R-reactor, grout temperatures less than 70 C or 80 C will provide an adequate safety margin for the Portland cement. The other grout formulations are also viable options for R-reactor. (2) Minimize the grout fill rate as much as practical. Lowering the fill rate takes advantage of passivation of the aluminum components and hence lower hydrogen generation rates. For P-reactor, fill rates that are less than 2 inches/min for the ceramicrete and the silica fume grouts will reduce the chance of significant hydrogen accumulation. For R-reactor, fill rates less than 1 inch/min will again minimize the risk of hydrogen accumulation. (3) Ventilate the building as much as practical (e.g., leave doors open) to further disperse hydrogen. The volumetric hydrogen generation rates in the P-reactor vessel, however, are low for the pH 8 and pH 10.4 grout, (i.e., less than 0.97 ft{sup 3}/min). If further walk-down inspections of the reactor vessels suggest an increase in the actual areal density of aluminum, the calculations should be re-visited.

08 HYDROGEN↗

Enhanced Hydrogen Production Integrated with CO2 Separation in a Single-Stage Reactor

High purity hydrogen is commercially produced from syngas by the Water Gas Shift Reaction (WGSR) in high and low temperature shift reactors using iron oxide and copper catalysts respectively. However, the WGSR is thermodynamically limited at high temperatures towards hydrogen production necessitating excess steam addition and catalytic operation. In the calcium looping process, the equilibrium limited WGSR is driven forward by the incessant removal of CO{sub 2} by-product through the carbonation of calcium oxide. At high pressures, this process obviates the need for a catalyst and excess steam requirement, thereby removing the costs related to the procurement and deactivation of the catalyst and steam generation. Thermodynamic analysis for the combined WGS and carbonation reaction was conducted. The combined WGS and carbonation reaction was investigated at varying pressures, temperatures and S/C ratios using a bench scale reactor system. It was found that the purity of hydrogen increases with the increase in pressure and at a pressure of 300 psig, almost 100% hydrogen is produced. It was also found that at high pressures, high purity hydrogen can be produced using stoichiometric quantities of steam. On comparing the catalytic and non catalytic modes of operation in the presence of calcium oxide, it was found that there was no difference in the purity of hydrogen produced at elevated pressures. Multicyclic reaction and regeneration experiments were also conducted and it was found that the purity of hydrogen remains almost constant after a few cycles.

08 HYDROGEN↗

Rhodium Catalysts in the Oxidation of CO by O 2 and NO: Shape, Composition, and Hot Electron Generation

It is well known that the activity, selectivity, and deactivation behavior of heterogeneous catalysts are strongly affected by a wide variety of parameters, including but not limited to nanoparticle size, shape, composition, support, pretreatment conditions, oxidation state, and electronic state. Enormous effort has been expended in an attempt to understand the role of these factors on catalytic behavior, but much still remains to be discovered. In this work, we have focused on deepening the present understanding of the role of nanoparticle shape, nanoparticle composition, and hot electrons on heterogeneous catalysis in the oxidation of carbon monoxide by molecular oxygen and nitric oxide. These reactions were chosen because they are important for environmental applications, such as in the catalytic converter, and because there is a wide range of experimental and theoretical insight from previous single crystal work as well as experimental data on nanoparticles obtained using new state-of-the-art techniques that aid greatly in the interpretation of results on complex nanoparticle systems. In particular, the studies presented in this work involve three types of samples: ~ 6.5 nm Rh nanoparticles of different shapes, ~ 15 nm Rh 1-x Pd x core-shell bimetallic polyhedra nanoparticles, and Rh ultra-thin film (~ 5 nm) catalytic nanodiodes. The colloidal nanoparticle samples were synthesized using a co-reduction of metal salts in alcohol and supported on silicon wafers using the Langmuir-Blodgett technique. This synthetic strategy enables tremendous control of nanoparticle size, shape, and composition. Nanoparticle shape was controlled through the use of different organic polymer capping layers. Bimetallic core-shell nanoparticles were synthesized by careful choice of metal salt precursors. Rh/TiO x and Rh/GaN catalytic nanodiodes were fabricated using a variety of thin film device fabrication techniques, including reactive DC magnetron sputtering, electron beam evaporation, and rapid thermal annealing. The combination of these techniques enabled control of catalytic nanodiode morphology, geometry, and electrical properties.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗