Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Better Buildings”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

558 records · Page 31

Creating A Consistent Historical NASA POWER Solar Radiation Dataset to Support Renewable Energy, Building Energy Efficiency and Agro-Climatology Decisions

Prediction of Worldwide Energy Resources (POWER) project provides irradiance dataset to support renewable energy, building energy efficiency and agricultural needs. These datasets are derived from Global Energy and Water Cycle Experiment Surface Radiation Budget (GEWEX SRB) and Clouds and the Earth’s Radiant Energy System (CERES SYN1Deg). A systematic bias has been reported between these two datasets for the years with overlapping observations. For obtaining a consistent climate data record spanning the entire time record of observations, it is crucial to understand and remove the bias in the irradiance dataset. Inconsistency in solar radiation data can lead to inaccurate conclusions about solar energy potential and obscure real trends in solar radiation patterns that would impact energy availability assessments. In this study, we adapt quantile mapping approach to remove the systematic bias and to improve reliability of shortwave and longwave irradiance data. We present a validation of the bias corrected data against ground truth. For each 1° latitude and 1° longitude grid box across the globe, we match the CDFs of the reference dataset (CERES SYN1Deg) to that of the SRB dataset, thereby, adjusting the irradiance values to match the empirical distribution of two different measurements. The performance of quantile mapping is evaluated by using the metrics such as Mean Absolute Deviation (MAD). The results indicate that the quantile mapping significantly improves the accuracy and reliability of solar irradiance dataset especially for the weather conditions associated with high cloud cover and extreme irradiance values. The initial range of MAD for the studied sites for daily data was 4 to 19 Wm-2. After correction these reduced to 3 to 7 Wm-2. The findings from this study have important implications for solar energy system design, agricultural planning, and climate modeling community. Reducing the inconsistency and biases in solar irradiance dataset can enable better planning and operation of solar energy systems, leading to increased efficiency and cost-effectiveness. Additionally, this work also contributes to the statistical post-processing techniques in the renewable energy domain and highlights the potential of historical and near-real-time NASA POWER dataset as a valuable resource for solar energy research and applications.

POWER↗

Tours of High-containment and Pristine Facilities in Support of Mars Sample Return (MSR) Sample Receiving Facility (SRF) Definition Studies

During 2019 and 2020, the NASA Tiger Team RAMA (acronym of the authors) toured several high-containment biosafety laboratories and pristine space-mission facilities worldwide to better understand their practices, capabilities, and lessons-learned to aid in planning a Sample Receiving Facility (SRF) in support of Mars Sample Return (MSR). The team also included tours of a manufacturer of mobile and modular high-containment facilities as well as manufacturers of isolators and gloveboxes. In addition, the team visited the European Space Agency (ESA)ultraclean and sterile ISO 3 / airborne molecular contamination -9 (AMC-9) isolator line to clean and assemble the most critical hardware for ESA’s ExoMars Mars Lander System, and researchers developing a novel double-walled isolator (DWI) and robotic handling techniques in support of an MSR SRF. The RAMA team visits covered several construction modalities for an MSR SRF: (1) a new traditional fixed facility; (2) use of an existing fixed Biosafety Level 4(BSL-4) facility; (3) a novel modular BSL-4 approach; and (4) a hybrid combination of fixed, modular, and existing facilities. A new fixed facility approach can be tailored to MSR’s needs and is the approach used by all U.S. BSL-4 laboratories constructed to date. However, this approach could be the most expensive modality, take the longest to implement (8-12 years), and have significant programmatic risk of delay. The utilization of an existing BSL-4 facility may be possible depending on the final contamination control and science requirements for the MSR SRF. Due to the internal dimensions of the labs visited and facility structural requirements, it is unlikely that any modification can be made to the facility to meet cleanliness requirements. Furthermore, due to possible construction delays, possible capacity issues, and potential cross contamination vectors from in-house select agents, there may also be significant programmatic risks for sharing an existing facility. Another approach is building a contemporary modular facility. This is a novel approach that has recently been used for a BSL-3/3Ag facilities. The modular elements would be installed in a traditional building or shell structure. A modular facility has many advantages over a traditional fixed facility with lower costs, shorter design/construction/ commissioning schedule, and flexibility for easier retrofits and future expansion. Lastly, a hybrid approach of combining the use of either: (1) a modular facility inside a new fixed facility or (2) a modular and/or fixed BSL-4 annex in conjunction with an existing BSL-4 space should be considered. The advantage of a hybrid approach is that the facility could leverage the strengths of other approaches. Beyond facility construction approaches, the RAMA team investigated technologies and techniques for isolating and handling Martian samples in pristine environments. For example, ESA has been studying and developing a DWI breadboard along with other sample-handling technologies. The research and development investment for clean, remote manipulation and robotics at the start of the facility design phase would be beneficial to the SRF. Additionally, under-standing the lessons learned from Thales Alenia Space during the construction and operation of the most advanced state-of-the-art precision cleaning, sterilization, and assembly glovebox isolators ever developed for spacecraft hardware are also critical for the SRF. The RAMA team lays out a summary of the 18 facilities toured, and includes 43 observations,18 findings, and 22 areas of possible follow-up that the RAMA team and others could pursue to enable further findings. The observations and findings illustrate that constructing an MSR SRF would combine the complexity of both high-containment and pristine facilities, and merging these technologies would be challenging, but achievable.

Mars Sample Return↗

Updated Electronic Testbed System

As we continue to advance in exploring space frontiers, technology must also advance. The need for faster data recovery and data processing is crucial. In this, the less equipment used, and lighter that equipment is, the better. Because integrated circuits become more sensitive in high altitude, experimental verification and quantification is required. The Center for Applied Radiation Research (CARR) at Prairie View A&M University was awarded a grant by NASA to participate in the NASA ER-2 Flight Program, the APEX balloon flight program, and the Student Launch Program. These programs are to test anomalous errors in integrated circuits due to single event effects (SEE). CARR had already begun experiments characterizing the SEE behavior of high speed and high density SRAM's. The research center built a error testing system using a PC-104 computer unit, an Iomega Zip drive for storage, a test board with the components under test, and a latchup detection and reset unit. A test program was written to continuously monitor a stored data pattern in the SRAM chip and record errors. The devices under test were eight 4Mbit memory chips totaling 4Mbytes of memory. CARR was successful at obtaining data using the Electronic TestBed System (EBS) in various NASA ER-2 test flights. These series of high altitude flights of up to 70,000 feet, were effective at yielding the conditions which single event effects usually occur. However, the data received from the series of flights indicated one error per twenty-four hours. Because flight test time is very expensive, the initial design proved not to be cost effective. The need for orders of magnitude with more memory became essential. Therefore, a project which could test more memory within a given time was created. The goal of this project was not only to test more memory within a given time, but also to have a system with a faster processing speed, and which used less peripherals. This paper will describe procedures used to build an updated Electronic Testbed System.

Brewer, Kevin L.↗

Addressing the High-Rate Deep Space Communications Shortfall in NASA’s Space Technology Mission Directorate's Envisioned Future

NASA’s Space Technology Mission Directorate (STMD) has identified key technologies needed for future crewed and robotic exploration and science missions. STMD is helping to build the civilian technology base by working with other NASA Mission Directorates, other United States government agencies, commercial industry, and academia to identify technology shortfalls and to develop plans to address them. One critical area of shortfalls lies with deep space communications and navigation. While NASA had huge success to date with the Deep Space Network (DSN), recent studies have shown that without enhancements to current systems, the DSN will be unable to support the anticipated increases in the pace of space exploration or the expected higher data rates from deep space needed soon without severely impacting other missions. High-rate communications from the Moon and beyond is needed to enable future exploration and science missions currently being developed or under consideration. For example, a robust communications infrastructure will be needed to support a sustained human presence on the Moon and its eventual industrialization. High data rate trunk lines between the Earth and the Moon are needed to reduce the number of individual links. The human exploration of Mars will also require high-rate communications between Earth and Mars. Return data rates to Earth from Mars for a single link, for example, are anticipated to be greater than 100 Mb/s; forward data rates to Mars, based on experience from the International Space Station, are anticipated to be greater than 20 Mb/s. Future deep space science missions will also require higher data rates than possible with today’s technology and the current capabilities of the DSN. To support future exploration and science needs, it will be necessary to upgrade the DSN to enhance its radio frequency (RF) capabilities. In addition, it is envisioned that NASA will gradually introduce optical communications to augment its RF systems. Optical communications will enable new science and exploration missions by providing high data rates and better navigation over long distances. This paper will briefly describe STMD’s envisioned future for deep space communications in the 2030+ timeframe and the technology roadmaps being developed for both radio frequency and optical systems.

Bernard Edwards↗

Construction and Analysis of Electronic circuits

The Aviation Environmental Technical Branch produces many various types of aeronautical research that benefits the NASA mission for space exploration and in turn, produces new technology for our nation. One of the present goals of the Aviation Environmental Technical Branch is to create better engines for airplanes by testing supersonic jet propulsion and safe fuel combustion. During the summer of 2004, I was hired by Vincent Sattenvhite Chief executive of the Aviation Environmental Technical Branch to Assist Yves Lamothe with a fuel igniter circuit. Yves Lamothe is an electrical engineer who is currently working on safe fuel combustion testing. This testing is planned to determine the minimum ignition energy for fuel and air vapors of current and alternative fuels under simulated flight conditions. An air temperature bath will provide simulated flight profile temperatures and the heat fluxes to the test chamber. I was assigned with Yves to help complete the igniter circuit which consists of a 36k voltage supply an oscilloscope, and a high voltage transistor switch. During my tenure in the L.E.C.I.R.P. program I studied the basics of electricity and circuitry along with two other projects that I completed. In the beginning of my internship, I devote all of my time to research the aspects of circuitry so that I would be prepared for the projects that I was assigned to do. I read about lessons on; the basic physical concepts of electronics, Electrical units, Basic dc circuits, direct current circuit analysis, resistance and cell batteries, various types of magnetism , Alternating current basics, inductance, and power supplies. I received work sheets and math equations from my Mentor so that I could be able to apply these concepts into my work. After I complete my studies, I went on to construct a LED chaser circuit which displays a series of light patterns using a 555 timer. I incorporated a switch and motion detector into the circuit to create basic alarm system. This project challenged my ability to interpret a schematic and expand it. While I was still completing the LED chaser circuit I Also was given A Basic Stamp Toddler Robot to build and program. The Toddler robot can walk in 36 various styles using advanced robotics. I used many different programs to create movement and direction of the robot. Also the Toddler can use infrared vision to sense objects. This enables the robot to maneuver indefinitely without running into objects. During my tenure at the NASA Glen Research Center I definite utilized the NASA mission to educate. I learned valuable information to help in my up coming year as a freshman in college.

Thomas, Ashley N.↗

MESSENGER at Mercury: Early Orbital Operations

The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft, launched in August 2004 under NASA's Discovery Program, was inserted into orbit about the planet Mercury in March 2011. MESSENGER's three flybys of Mercury in 2008-2009 marked the first spacecraft visits to the innermost planet since the Mariner 10 flybys in 1974-1975. The unprecedented orbital operations are yielding new insights into the nature and evolution of Mercury. The scientific questions that frame the MESSENGER mission led to the mission measurement objectives to be achieved by the seven payload instruments and the radio science experiment. Interweaving the full set of required orbital observations in a manner that maximizes the opportunity to satisfy all mission objectives and yet meet stringent spacecraft pointing and thermal constraints was a complex optimization problem that was solved with a software tool that simulates science observations and tracks progress toward meeting each objective. The final orbital observation plan, the outcome of that optimization process, meets all mission objectives. MESSENGER's Mercury Dual Imaging System is acquiring a global monochromatic image mosaic at better than 90%coverage and at least 250 m average resolution, a global color image mosaic at better than 90%coverage and at least 1 km average resolution, and global stereo imaging at better than 80%coverage and at least 250 m average resolution. Higher-resolution images are also being acquired of targeted areas. The elemental remote sensing instruments, including the Gamma-Ray and Neutron Spectrometer and the X-Ray Spectrometer, are being operated nearly continuously and will establish the average surface abundances of most major elements. The Visible and Infrared Spectrograph channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer is acquiring a global map of spectral reflectance from 300 to 1450 nm wavelength at a range of incidence and emission angles. Targeted areas have been selected for spectral coverage into the ultraviolet with the Ultraviolet and Visible Spectrometer (UVVS). MESSENGER's Mercury Laser Altimeter is acquiring topographic profiles when the slant range to Mercury's surface is less than 1800 km, encompassing latitudes from 201S to the north pole. Topography over the remainder of the southern hemisphere will be derived from stereo imaging, radio occultations, and limb profiles. MESSENGER's radio science experiment is determining Mercury's gravity field from Doppler signals acquired during frequent downlinks. MESSENGER's Magnetometer is measuring the vector magnetic field both within Mercury's magnetosphere and in Mercury's solar wind environment at an instrument sampling rate of up to 20 samples/s. The UVVS is determining the three-dimensional, time-dependent distribution of Mercury's exospheric neutral and ionic species via their emission lines. During each spacecraft orbit, the Energetic Particle Spectrometer measures energetic electrons and ions, and the Fast Imaging Plasma Spectrometer measures the energies and mass per charge of thermal plasma components, both within Mercury's magnetosphere and in Mercury's solar-wind environment. The primary mission observation sequence will continue for one Earth year, until March 2012. An extended mission, currently under discussion with NASA, would add a second year of orbital observations targeting a set of focused follow-on questions that build on observations to date and take advantage of the more active Sun expected during 2012-2013. MESSENGER's total primary mission cost, projected at $446 M in real-year dollars, is comparable to that of Mariner 10 after adjustment for inflation.

Planetary Science↗

MESSENGER at Mercury: Early Orbital Operations

The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft, launched in August 2004 under NASA's Discovery Program, was inserted into orbit about the planet Mercury in March 2011. MESSENGER's three flybys of Mercury in 2008-2009 marked the first spacecraft visits to the innermost planet since the Mariner 10 flybys in 1974-1975. The unprecedented orbital operations are yielding new insights into the nature and evolution of Mercury. The scientific questions that frame the MESSENGER mission led to the mission measurement objectives to be achieved by the seven payload instruments and the radio science experiment. Interweaving the full set of required orbital observations in a manner that maximizes the opportunity to satisfy all mission objectives and yet meet stringent spacecraft pointing and thermal constraints was a complex optimization problem that was solved with a software tool that simulates science observations and tracks progress toward meeting each objective. The final orbital observation plan, the outcome of that optimization process, meets all mission objectives. MESSENGER's Mercury Dual Imaging System is acquiring a global monochromatic image mosaic at better than 90% coverage and at least 250 m average resolution, a global color image mosaic at better than 90% coverage and at least 1 km average resolution, and global stereo imaging at better than 80% coverage and at least 250 m average resolution. Higher-resolution images are also being acquired of targeted areas. The elemental remote sensing instruments, including the Gamma-Ray and Neutron Spectrometer and the X-Ray Spectrometer, are being operated nearly continuously and will establish the average surface abundances of most major elements. The Visible and Infrared Spectrograph channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer is acquiring a global map of spectral reflectance from 300 to 1450 nm wavelength at a range of incidence and emission angles. Targeted areas have been selected for spectral coverage into the ultraviolet with the Ultraviolet and Visible Spectrometer (UVVS). MESSENGER's Mercury Laser Altimeter is acquiring topographic profiles when the slant range to Mercury's surface is less than 1800 km, encompassing latitudes from 20 deg. S to the north pole. Topography over the remainder of the southern hemisphere will be derived from stereo imaging, radio occultations, and limb profiles. MESSENGER's radio science experiment is determining Mercury's gravity field from Doppler signals acquired during frequent downlinks. MESSENGER's Magnetometer is measuring the vector magnetic field both within Mercury's magnetosphere and in Mercury's solar wind environment at an instrument sampling rate of up to 20 samples/s. The UVVS is determining the three-dimensional, time-dependent distribution of Mercury's exospheric neutral and ionic species via their emission lines. During each spacecraft orbit, the Energetic Particle Spectrometer measures energetic electrons and ions, and the Fast Imaging Plasma Spectrometer measures the energies and mass per charge of thermal plasma components, both within Mercury's magnetosphere and in Mercury's solar-wind environment. The primary mission observation sequence will continue for one Earth year, until March 2012. An extended mission, currently under discussion with NASA, would add a second year of orbital observations targeting a set of focused follow-on questions that build on observations to date and take advantage of the more active Sun expected during 2012-2013. MESSENGER's total primary mission cost, projected at $446 M in real-year dollars, is comparable to that of Mariner 10 after adjustment for inflation.

mercury↗

Experimental Demonstration and System Analysis for Plasmonic Force Propulsion

This project developed a higher-fidelity model of a recently envisioned small spacecraft propulsion system for precision pointing and proximity control. Plasmonic force propulsion harnesses solar light focused onto plasmon reactive subwavelength nanostructures to accelerate and expel nanoparticle propellant via strong optical forces. The goal of the project was to show that plasmonic space propulsion can provide the level of proximity and attitude control envisioned for future NASA nano/picosatellite missions, a level that is better than state-of-the-art approaches. We achieved this goal by showing that plasmonic force thrusters are feasible for a range of advanced mission concepts requiring swarm formations in a deep space environment. We performed three case studies that evaluated the performance of the plasmonic force propulsion thruster in a deep space, microsatellite swarm formation. These case studies assumed the propulsion system could generate thrust at the level predicted from our Phase 1 study (1.6 μN). Through these cases we were able to analyze the concept within a mission specific context through detailed orbital dynamics calculations. Results indicate that, with the Phase 1 estimated thrust level, the approach is promising for providing attitude control to swarm formation spacecraft. Further, we achieved goals related to technology development. Specifically, we experimentally demonstrated nanoparticle acceleration due to plasmonic forces with asymmetric nanostructures excited by focused laser light. Additionally, we investigated the thrust sensitivity and nanoparticle propellant injection dependencies upon thermal effects. As a result of our study, plasmonic force propulsion is at an early TRL 3. Active research and design has been conducted analytically and in the laboratory. Furthermore, practical applications such as the three case studies have been identified for the scientific basic principles that were observed. Future efforts related to fundamental understanding of these techniques should focus on 1) developing a standalone array of asymmetric nanostructures that can effectively interact with a stream or reservoir of particles or 2) experimentally evaluate a dielectrophoretic injector for nanoparticle propellant. The main limitation discovered about plasmonic propulsion regards performance estimates significantly below the Phase 1 estimations. Specifically, original assumptions in the Phase 1 project (notably, a linear array of asymmetric nanostructures) is not a viable approach to achieving significant acceleration, high exhaust velocity, of nanoparticles. More specifically, we assumed in Phase 1 that nanoparticles would be accelerated in series by a long linear array of asymmetric nanostructures. That is, the acceleration of the nanoparticle would build and increase with the kick received by each subsequent nanostructure. This is fundamentally flawed. The potential profile of a single nanostructure is such that it prohibits this phenomenon. The potential energy associated with the plasmon-generated dielectrophoretic force is a potential well, which is good for trapping nanoparticles, but cannot provide significant acceleration of particles to expel them out and away from the nanostructure. Further, a nanoparticle expelled from the first nanostructure would need to overcome the potential barrier for entry into the next nanostructure accelerating stage. Fundamentally, this effect means that a linear array of nanostructures is not a viable accelerating structure. Correspondingly then, acceleration can, or should, only be provided by one nanostructure, and the net acceleration and thrust force of a single nanostructure is small (~cm/s exhaust velocities, sub-nN level thrust vs. the 100’s m/s, μN originally envisioned). While our experiments demonstrated acceleration and manipulation of a nanoparticle using laser light in aqueous environment, the achievable energy and momentum addition to the nanoparticle from a single nanostructure stage is too low for useful propulsion. In terms of thrust prediction, the estimated thrust of 1.6 μN in Phase 1 is reduced to a few nN of thrust with this new insight and understanding of the concept. This thrust level is too small to achieve attitude control of swarms as originally envisioned.

Plasmonic Force↗

[EC5-Space Suit Assembly Team- Internship]

There were three main projects in this internship. The first pertained to the Bearing Dust Cycle Test, in particular automating the test to allow for easier administration. The second concerned modifying the communication system setup in the Z2 suit, where speakers and mics were adjusted to allow for more space in the helmet. And finally, the last project concerned the tensile strength testing of fabrics deemed as candidates for space suit materials and desired to be sent off for radiation testing. The major duties here are split up between the major projects detailed above. For the Bearing Dust Cycle Test, the first objective was to find a way to automate administration of the test, as the previous version was long and tedious to perform. In order to do this, it was necessary to introduce additional electronics and perform programming to control the automation. Once this was done, it would be necessary to update documents concerning the test setup, procedure, and potential hazards. Finally, I was tasked with running tests using the new system to confirm system performance. For the Z2 communication system modifications, it was necessary to investigate alternative speakers and microphones which may have better performance than those currently used in the suit. Further, new speaker and microphone positions needed to be identified to keep them out of the way of the suit user. Once this was done, appropriate hardware (such as speaker or microphone cases and holders) could be prototyped and fabricated. For the suit material strength testing, the first task was to gather and document various test fabrics to identify the best suit material candidates. Then, it was needed to prepare samples for testing to establish baseline measurements and specify a testing procedure. Once the data was fully collected, additional test samples would be prepared and sent off-site to undergo irradiation before being tested again to observe changes in strength performance. For the Bearing Dust Cycle Test, automation was achieved through use of a servo motor and code written in LabVIEW. With this a small electrical servo controller was constructed and added to the system. For the Z2 communication modifications speaker cases were developed and printed, and new speakers and mics were selected. This allowed us to move the speakers and mics to locations to remain out of the suit users way. For the suit material strength testing, five material candidates were identified and test samples were created. These samples underwent testing, and baseline test results were gathered, though these results are currently being investigated for accuracy. The main process efficiency developed during the course of this internship comes from automation of the Bearing Dust Cycle Test. In particular, many hours of human involvement and precise operation are replaced with a simple motor setup. Thus it is no longer required to man the test, saving valuable employee time. This internship has confirmed a few things for me, namely that I both want to work as an engineer for an aerospace firm and that in particular I want to work for the Johnson Space Center. I am also confirmed in my desire to work with electronics, though I was surprised to enjoy prototyping 3D CAD design as much as I did. Therefore, I will make an effort to build my skills in this area so that I can continue to design mechanical models. In fact, I found the process of hands-on prototyping to be perhaps the most fun aspect of my time working here. This internship has also furthered my excitement for continual education, and I will hopefully be pursuing a masters in my field in the near future.

Maicke, Andrew↗

Dynamics Questions Associated with the AERCam Sprint Free-Flyer

The International Space Station will require the development of small robotic vehicles for such tasks as external inspection, monitoring of extravehicular activities (EVA's) and station build-up, and providing additional lighting at EVA worksites. The Autonomous EVA Robotic Camera (AERCam) family of free-flyers is currently being developed at NASA Johnson Space Center to perform these functions; the first member of the family is the AERCam Sprint vehicle. Many interesting dynamical questions are associated with the Sprint free-flyer. For instance, the reaction of a vehicle which is nearly spherically symmetric (such as Sprint) to a stuck-on thruster is significantly more complicated than that obtained for an idealized, perfectly spherical, spacecraft model. In particular, the real spacecraft will experience a form of forced nutation, with convergence towards either its major or minor principal axis, depending on both the applied torque and the mass properties of the vehicle. Furthermore, the body-fixed jet force vector may have a significant component along this principal axis, so giving rise to a considerable net linear acceleration of the spacecraft. The large velocity that can result is very important, as it may lead to collision with the nearby Orbiter, and is completely overlooked in the idealized analysis. This report will firstly briefly describe the stuck-on thruster dynamics of the real vehicle, and outline how the small products of inertia of the spacecraft determine the time constants of the motion. Secondly, the dynamical effects of a failed-off jet on the Sprint free-flyer will be described in more detail, and compared with the stuck-on thruster case. This will help to show whether the two malfunctions should be dealt with differently in flight. Finally, the stuck-on thruster detection software (known as the uncommanded motion algorithm) that is proposed to be flown on the Sprint vehicle will be analyzed, and all possible perturbation sources that may tend to give rise to false stuck-on thruster alarms quantified. It will be shown that false alarms can be triggered by discrete events such as a failed-off thruster, a glancing collision with Orbiter structure, or thruster saturation. They can also be triggered by a combination of errors introduced by constantly present sources such as thrust level errors, thruster misalignment, inertial cross-coupling, angular rate sensor noise, and structural vibrations induced by thruster firings. Based on this fact, the original plan to have the spacecraft enter safe mode whenever the uncommanded motion algorithm is triggered does not appear to be advisable. A better approach seems to be to provide the Sprint pilot with a warning whenever uncommanded motion is detected, and then allow the crew to determine whether safing the vehicle is appropriate.

Williams, Trevor↗

NASA's Newest Orbital Debris Ground-based Telescope Assets: MCAT and UKIRT

NASA's Orbital Debris Program Office (ODPO) will break ground on Ascension Island in 2014 to build the newest optical (0.30 - 1.06 micrometers) ground-based telescope asset dedicated to the study of orbital debris. The Meter Class Autonomous Telescope (MCAT) is a 1.3m optical telescope designed to track objects in orbits ranging from Low Earth Orbit (LEO) to Geosynchronous Earth Orbit (GEO). Ascension Island is located in the South Atlantic Ocean, offering longitudinal sky coverage not afforded by the Ground-based Electro-Optical Deep Space Surveillance (GEODSS) network. With a fast-tracking dome, a suite of visible wide-band filters, and a time-delay integration (TDI) capable camera, MCAT is capable of multiple observing modes ranging from tracking cataloged debris targets to surveying the overall debris environment. Access to the United Kingdom Infrared Telescope (UKIRT) will extend our spectral coverage into the near- (0.8-5 micrometers) and mid- to far-infrared (8-25 micrometers) regime. UKIRT is a 3.8m telescope located on Mauna Kea on the Big Island of Hawaii. At nearly 14,000-feet and above the atmospheric inversion layer, this is one of the premier astronomical sites in the world and is an ideal setting for an infrared telescope. An unprecedented one-third of this telescope's time has been allocated to collect orbital debris data for NASA's ODPO over a 2-year period. UKIRT has several instruments available to obtain low-resolution spectroscopy in both the near-IR and the mid/far-IR. Infrared spectroscopy is ideal for constraining the material types, albedos and sizes of debris targets, and potentially gaining insight into reddening effects caused by space weathering. In addition, UKIRT will be used to acquire broadband photometric imaging at GEO with the Wide Field Camera (WFCAM) for studying known objects of interest as well as collecting data in survey-mode to discover new targets. Results from the first stage of the debris campaign will be presented. The combination of these ground-based telescope assets will yield spectral coverage ranging from 0.3 - 25 micrmeters, allowing orbital debris to be studied in depth across a wider wavelength range in the visible and IR than ever previously studied by ODPO. Located on opposite sides of the world and in opposite hemispheres, they offer access to nearly the entire GEO belt on any given night, allowing immediate coverage of nearly any time-critical break-up event. By expanding the methods for surveying, detecting, and characterizing orbital debris, we can better model the debris environment and ultimately gain insight into how to mitigate potential collisions for future missions.

Lederer, S. M.↗

The Development of Two Science Investigator-led Processing Systems (SIPS) for NASA's Earth Observation System (EOS)

In 2001, NASA Goddard Space Flight Center's Laboratory for Terrestrial Physics started the construction of a science Investigator-led Processing System (SIPS) for processing data from the Ozone Monitoring Instrument (OMI) which will launch on the Aura platform in mid 2004. The Ozone Monitoring Instrument (OMI) is a contribution of the Netherlands Agency for Aerospace Programs (NIVR) in collaboration with the Finnish Meteorological Institute (FMI) to the Earth Observing System (EOS) Aura mission. It will continue the Total Ozone Monitoring System (TOMS) record for total ozone and other atmospheric parameters related to ozone chemistry and climate. OMI measurements will be highly synergistic with the other instruments on the EOS Aura platform. The LTP previously developed the Moderate Resolution Imaging Spectrometer (MODIS) Data Processing System (MODAPS), which has been in full operations since the launches of the Terra and Aqua spacecrafts in December, 1999 and May, 2002 respectively. During that time, it has continually evolved to better support the needs of the MODIS team. We now run multiple instances of the system managing faster than real time reprocessings of the data as well as continuing forward processing. The new OMI Data Processing System (OMIDAPS) was adapted from the MODAPS. It will ingest raw data from the satellite ground station and process it to produce calibrated, geolocated higher level data products. These data products will be transmitted to the Goddard Distributed Active Archive Center (GDAAC) instance of the Earth Observing System (EOS) Data and Information System (EOSDIS) for long term archive and distribution to the public. The OMIDAPS will also provide data distribution to the OMI Science Team for quality assessment, algorithm improvement, calibration, etc. We have taken advantage of lessons learned from the MODIS experience and software already developed for MODIS. We made some changes in the hardware system organization, database and software to adapt the system for OMI. We replaced the fundamental database system, Sybase, with an Open Source RDBMS called PostgreSQL, and based the entire OMIDAPS on a cluster of Linux based commodity computers rather than the large SGI servers that MODAPS uses. Rather than relying on a central I/O server host, the new system distributes its data archive among multiple server hosts in the cluster. OMI is also customizing the graphical user interfaces and reporting structure to more closely meet the needs of the OMI Science Team. Prior to 2003, simulated OMI data and the science algorithms were not ready for production testing. We initially constructed a prototype system and tested using a 25 year dataset of Total Ozone Mapping Spectrometer (TOMS) and Solar Backscatter Ultraviolet Instrument (SBUV) data. This prototype system provided a platform to support the adaptation of the algorithms for OMI, and provided reprocessing of the historical data aiding in its analysis. In a recent reanalysis of the TOMS data, the OMIDAPS processed 108,000 full orbits of data through 4 processing steps per orbit, producing about 800,000 files (400 GiB) of level 2 and greater data files. More recently we have installed two instances of the OMIDAPS for integration and testing of OM1 science processes as they get delivered from the Science Team. A Test instance of the OMIDAPS has also supported a series of "Interface Confidence Tests" (ICTs) and End-to-End Ground System tests to ensure the launch readiness of the system. This paper will discuss the high-level hardware, software, and database organization of the OMIDAPS and how it builds on the MODAPS heritage system. It will also provide an overview of the testing and implementation of the production OMIDAPS.

Tilmes, Curt↗

Fabrication of Polyimide-Matrix/Carbon and Boron-Fiber Tape

The term HYCARB denotes a hybrid composite of polyimide matrices reinforced with carbon and boron fibers. HYCARB and an improved process for fabricating dry HYCARB tapes have been invented in a continuing effort to develop lightweight, strong composite materials for aerospace vehicles. Like other composite tapes in this line of development, HYCARB tapes are intended to be used to build up laminated structures having possibly complex shapes by means of automated tow placement (ATP) - a process in which a computer-controlled multiaxis machine lays down prepreg tape or tows. The special significance of the present process for making dry HYCARB for ATP is that it contributes to the reduction of the overall cost of manufacturing boron-reinforced composite-material structures while making it possible to realize increased compression strengths. The present process for making HYCARB tapes incorporates a "wet to dry" process developed previously at Langley Research Center. In the "wet to dry" process, a flattened bundle of carbon fiber tows, pulled along a continuous production line between pairs of rollers, is impregnated with a solution of a poly(amide acid) in N-methyl-2-pyrrolidinone (NMP), then most of the NMP is removed by evaporation in hot air. In the present case, the polyamide acid is, more specifically, that of LaRC. IAX (or equivalent) thermoplastic polyimide, and the fibers are, more specifically, Manganite IM7 (or equivalent) polyacrylonitrile- based carbon filaments that have a diameter of 5.2 m and are supplied in 12,000-filament tows. The present process stands in contrast to a prior process in which HYCARB tape was made by pressing boron fibers into the face of a wet carbon-fiber/ poly(amide acid) prepreg tape . that is, a prepreg tape from which the NMP solvent had not been removed. In the present process, one or more layer(s) of side-by-side boron fibers are pressed between dry prepreg tapes that have been prepared by the aforementioned gwet to dry h process. The multilayer tape is then heated to imidize the matrix material and remove most of the remaining solvent, and is pressed to consolidate the multiple layers into a dense tape. For tests, specimens of HYCARB tapes and laminated composite panels made from HYCARB tape were prepared as follows: HYCARB tapes were fabricated as described above. Each panel was made by laying down ten layers of tape, containing, variously, one, two, or three boron-fiber plies and the remainder carbon- fiber-only plies (see figure). Each panel was made by laying down ten layers of tape. Each panel was then cured by heating to a temperature of 225 C for 15 minutes, then pressing at 200 psi (A1.4 MPa) while heating to 371 C, holding at 371 C for 1 hour, then continuing to hold pressure during cooling. Control specimens that were otherwise identical except that they did not contain boron fibers also were prepared. In room-temperature flexural tests, the HYCARB specimens performed comparably to the control specimens; in room-temperature, open-hole compression tests, the HYCARB specimens performed slightly better, by amounts that increased with boron content.

Belvin, Harry L.↗

NASA LSII Lunar Simulant Project

Introduction: America has entered a new era of exploration. NASA’s Artemis program will lead humanity forward to the Moon and prepare us for the next giant leap, the exploration of Mars [1]. To champion technologies needed to live on and explore the Moon, NASA’s Space Technology Mission Directorate (STMD) established the Lunar Surface Innovation Initiative (LSII)[2].LSII's technology development portfolio includes: Utilizing the Moon’s resources; Establishing sustainable surface power; Building machinery and electronics that work in extreme environments, like super-chilly permanently shadowed craters; Mitigating lunar dust; Carrying out surface excavation, manufacturing and construction duties; and Extreme access which includes navigating and exploring the surface/subsurface. To support the development and testing of these technologies, LSII created the lunar simulant project, to create and/or acquire low-, medium-and high-fidelity lunar simulants to match the needs of STMD projects at all levels of technology readiness levels (TRL), as well as other NASA programs. There is not one bulk lunar simulant that will satisfy the needs of all projects. NASA's Approach to Simulants: Just as LSII's activities are being implemented through a combination of unique NASA work and public-private partnerships, NASA will work with commercial simulant providers to acquire simulants that meet NASA's needs. If warranted, NASA will develop simulants using government agencies, as was done with the NASA/USGS Lunar Highlands Type (NU-LHT)series of lunar simulants [3].NASA is also collaborating with the Johns Hopkins University Applied Physics Laboratory(JHUAPL) Lunar Surface Innovation Consortium (LSIC) in the development and characterization of lunar simulants [4]. Within NASA, a small team (< 10 people) is coordinating simulant activities across the agency, with team members located at several NASA centers. The overall objective of the project is to procure lunar simulants in sufficient amounts for earth-based testing of subsystems and systems in a variety of environments (i.e., laboratory, high-bay, thermal-vacuum chambers), required for Artemis missions to the Moon, as well as other missions carrying NASA lunar payloads, such as the Commercial Lunar Payload Services (CLPS)program [5]. Lunar Highlands Simulant: NASA's Artemis Program is targeting the lunar south pole region for initial human missions and the Artemis Base Camp. Hence, the LSII lunar simulant project is currently focusing on the mineralogy and properties of lunar highlands regolith [6 and 7]. Plagioclase-rich rocks (e.g., anorthosite, norite) are the dominant constituent in highlands simulants, with Shawmere, Stillwater, and White Mountain anorthosites being used in commercially available simulants. However, because these feedstocks are terrestrial in nature, they include hydrated minerals, carbon-bearing minerals, and other chemical signatures that are not present on the Moon, and these minor mineral assemblages need to be taken into account when trying to understand test procedures and results. Glass Component: While much attention has been placed on the rock/mineral component of lunar simulants, glass is just as important when creating simulants. The glass component in lunar regoliths is often greater than 50% by volume [8]. This component includes impact melt glass, dark matrix breccias, and agglutinates. However, this component is difficult, time-consuming and expensive to make. Most lunar simulants, past and current, have relied on basaltic cinder as a feedstock for glass. Getting better glass components at a lower cost, particularly agglutinates and glass with an anorthositic composition is a near-term objective that the NASA simulant project is trying to address . Characterization: It is extremely important for lunar simulants to be characterized by several analytical methods. Gruener et al. [9] and JHUAPL LSIC [10] conducted initial assessments of some of the commercially available simulants in 2019 and early 2020, before the global pandemic. Further analyses are needed to better quantify important parameters such as, modal mineralogy and glass content, particle shape, and particle size distribution. These quantified results can then be used in determining figures of merit (FOM) that show how well simulants compare to lunar regolith [11 and 12].

J E Gruener↗

Four-Quadrant Analog Multipliers Using G4-FETs

Theoretical analysis and some experiments have shown that the silicon-on-insulator (SOI) 4-gate transistors known as G4-FETs can be used as building blocks of four-quadrant analog voltage multiplier circuits. Whereas a typical prior analog voltage multiplier contains between six and 10 transistors, it is possible to construct a superior voltage multiplier using only four G4-FETs. A G4-FET is a combination of a junction field-effect transistor (JFET) and a metal oxide/semiconductor field-effect transistor (MOSFET). It can be regarded as a single transistor having four gates, which are parts of a structure that affords high functionality by enabling the utilization of independently biased multiple inputs. The structure of a G4-FET of the type of interest here (see Figure 1) is that of a partially-depleted SOI MOSFET with two independent body contacts, one on each side of the channel. The drain current comprises of majority charge carriers flowing from one body contact to the other that is, what would otherwise be the side body contacts of the SOI MOSFET are used here as the end contacts [the drain (D) and the source (S)] of the G4-FET. What would otherwise be the source and drain of the SOI MOSFET serve, in the G4-FET, as two junction-based extra gates (JG1 and JG2), which are used to squeeze the channel via reverse-biased junctions as in a JFET. The G4-FET also includes a polysilicon top gate (G1), which plays the same role as does the gate in an accumulation-mode MOSFET. The substrate emulates a fourth MOS gate (G2). By making proper choices of G4-FET device parameters in conjunction with bias voltages and currents, one can design a circuit in which two input gate voltages (Vin1,Vin2) control the conduction characteristics of G4-FETs such that the output voltage (Vout) closely approximates a value proportional to the product of the input voltages. Figure 2 depicts two such analog multiplier circuits. In each circuit, there is the following: The input and output voltages are differential, The multiplier core consists of four G4- FETs (M1 through M4) biased by a constant current sink (Ibias), and The G4-FETs in two pairs are loaded by two identical resistors (RL), which convert a differential output current to a differential output voltage. The difference between the two circuits stems from their input and bias configurations. In each case, provided that the input voltages remain within their design ranges as determined by considerations of bias, saturation, and cutoff, then the output voltage is nominally given by Vout = kVin1Vin2, where k is a constant gain factor that depends on the design parameters and is different for the two circuits. In experimental versions of these circuits constructed using discrete G4- FETs and resistors, multiplication of voltages in all four quadrants (that is, in all four combinations of input polarities) was demonstrated, and deviations of the output voltages from linear dependence on the input voltages were found to amount to no more than a few percent. It is anticipated that in fully integrated versions of these circuits, the deviations from linearity will be made considerably smaller through better matching of devices.

Mojarradi, Mohammad↗

VIPER Lunar Rover Agile Mission Systems

Agile development methods, which have gone from outlier to mainstream in software development, are poised to expand into all aspects of space mission development. Modern software development operates on a principle of continuous deployment, where progress is verified not with conventional metrics, but with a continuous build, available to key stakeholders, enabling direct examination of the state of the code base, and assessment of progress through demonstration of capability. Delivery times are measured in weeks, not months. Stakeholders are part of the process on an ongoing basis. The cost of change is comparatively low and requirements, which often are not precisely defined at the start of a project, may be iteratively refined in a series of agile development cycles. Agile methods are compatible with traditional system engineering methods and may be tailored to the space operations environment. The low cost of change and iterative development cycles of agile enable requirements to be defined as outcomes and constraints, with design details to be refined during the development cycle. We are now at a point where agile methods may be extended beyond software, to Mission Systems, including the Mission Operations System and the Ground Data System. For NASA’s VIPER Lunar Rover Mission, scheduled to land at a lunar pole in late 2023, we are developing the Mission System using agile methods. As in agile software, where the measure of progress is working code, in agile mission system development, the measure of capability is what we can demonstrate. Demonstrations over presentations. We demonstrate mission system capability using simulations. The concept of operations, from commanding, to driving the rover, to how we downlink images for evaluation for a near-real time command cycle, will be tested and proven in simulation, years before we begin the traditional simulation cycle for training. “Say it then simulate it.” We develop and refine our designs using simulations, with an emphasis on new components of the system that are not well known early. For example, the required duration of a mission planning cycle for a lunar surface asset such as VIPER, that operates twenty-four hours a day, seven days a week, with continuous communications and a unique set of constraints based on the physics of the lunar poles and the line of site to Earth, is a unique problem in mission planning that is unlikely to be solved in a series of meetings. A small number of requirements specifying the outcomes may serve as the jumping off point to an agile development cycle, with demonstration in simulations. We have already demonstrated this process with simulations of rover driver decision time. VIPER is driven using near-real time command and control to waypoints. The driver decision time between waypoints is a fundamental enabling unit of productivity to accomplish the mission timeline. We have validated driver decision time in simulations of rover driving at the lunar South Pole, using the prototype mission tools for driving, command and control. The capability to develop and refine designs using simulations as part of agile Mission System development cycle changes the nature of team interactions, creating a focus on doing, rather than analyzing and documenting. Waterfall development cycles were, in part, a product of the significant cost of change in the early days of spaceflight. When the cost of change is high, it is vital to get your requirements right at the outset, because the system will be built to those specifications, and, when change is expensive, you better get it right early. However, modern technology has greatly lowered the cost of change, enabling iterative, rapid development cycles, in which key operations concepts may be tested and refined during development. Extending agile development to the Mission System for VIPER is a significant step in moving agile development methods for space operations beyond software, to the Mission System.

Agile↗

Scientific and technical photography at NASA Langley Research Center

As part of my assignment connected with the Scientific and Technical Photography & Lab (STPL) at the NASA Langley Research Center I conducted a series of interviews and observed the day to day operations of the STPL with the ultimate objective of becoming exposed first hand to a scientific and technical photo/imaging department for which my school prepares its graduates. I was also asked to share my observations with the staff in order that these comments and observations might assist the STPL to better serve its customers. Meetings with several individuals responsible for various wind tunnels and with a group that provides photo-optical instrumentation services at the Center gave me an overview of the services provided by the Lab and possible areas for development. In summary form these are some of the observations that resulted from the interviews and daily contact with the STPL facility. (1) The STPL is perceived as a valuable and almost indispensable service group within the organization. This comment was invariably made by everyone. Everyone also seemed to support the idea that the STPL continue to provide its current level of service and quality. (2) The STPL generally is not perceived to be a highly technically oriented group but rather as a provider of high quality photographic illustration and documentation services. In spite of the importance and high marks assigned to the STPL there are several observations that merit consideration and evaluation for possible inclusion into the STPL's scope of expertise and future operating practices. (1) While the care and concern for artistic rendition of subjects is seen as laudable and sometimes valuable, the time that this often requires is seen as interfering with keeping the tunnels operating at maximum productivity. Tunnel managers would like to shorten down-time due to photography, have services available during evening hours and on short notice. It may be of interest to the STPL that tunnel managers are incorporating ever greater imaging capabilities in their facilities. To some extent this could mean a reduced demand for traditional photographic services. (2) The photographic archive is seen as a Center resource. Archiving of images, as well as data, is a matter of concern to the investigators. The early holdings of the Photographic Archives are quickly deteriorating. The relative inaccessibility of the material held in the archives is problematic. (3) In certain cases delivery or preparation of digital image files instead of, or along with, hardcopy is already being perceived by the STPL's customers as desirable. The STPL should make this option available, and the fact that it has, or will have this capability widely known. (4) The STPL needs to continue to provide expert advice and technical imaging support in terms of application information to users of traditional photographic and new electronic imaging systems. Cooperative demo projects might be undertaken to maintain or improve the capabilities of the Lab. (5) STPL personnel do not yet have significant electronic imaging or electronic communication skills and improvements in this is an area could potentially have a positive impact on the Center. (6) High speed photographic or imaging services are often mentioned by the STPL as being of primary importance to their mission but the lab supports very few projects calling for high speed imaging services. Much high speed equipment is in poor state of repair. It is interesting to note that when the operation of lasers, digital imaging or quantitative techniques are requested these are directed to another NASA department. Could joint activities be initiated to solve problems? (7). The STPL could acquire more technical assignments if examples of the areas where they posses expertise would be circulated around the center. The fact that the STPL owns high speed video capability could be 'advertised' among its customer base if there truly was an interest in building up a customer base in this area. The STPL could participate in events like TOPS as an exhibitor, as well as a documenter, of the event.

Davidhazy, Andrew↗

Additive Manufacturing, Design, Testing, and Fabrication: A Full Engineering Experience at JSC

I worked on several projects this term. While most projects involved additive manufacturing, I was also involved with two design projects, two testing projects, and a fabrication project. The primary mentor for these was Richard Hagen. Secondary mentors were Hai Nguyen, Khadijah Shariff, and fabrication training from James Brown. Overall, my experience at JSC has been successful and what I have learned will continue to help me in my engineering education and profession long after I leave. My 3D printing projects ranged from less than a 1 cubic centimeter to about 1 cubic foot and involved several printers using different printing technologies. It was exciting to become familiar with printing technologies such as industrial grade FDM (Fused Deposition Modeling), the relatively new SLA (Stereolithography), and PolyJet. My primary duty with the FDM printers was to model parts that came in from various sources to print effectively and efficiently. Using methods my mentor taught me and the Stratasys Insight software, I was able to minimize imperfections, hasten build time, improve strength for specific forces (tensile, shear, etc...), and reduce likelihood of a print-failure. Also using FDM, I learned how to repair a part after it was printed. This is done by using a special kind of glue that chemically melts the two faces of plastic parts together to form a fused interface. My first goal with SLA technology was to bring the printer back to operational readiness. In becoming familiar with the Pegasus SLA printer, I researched the leveling, laser settings, and different vats to hold liquid material. With this research, I was successfully able to bring the Pegasus back online and have successfully printed multiple sample parts as well as functional parts. My experience with PolyJet technology has been focused on an understanding of the abilities/limits, costs, and the maintenance for daily use. Still upcoming will be experience with using a composite printer that uses FDM technology to print plastic while laying an internal filament of Kevlar or carbon-fiber inside the printed material. It has been incredible being exposed to this range of technologies and I feel very fortunate to be ready for virtually any kind of printing technology I come across in the future. Design work played a part in my internship this term as well. Working with Hai Nguyen, I was able to design a set of testing tips and a test frame for use with an Arcjet. The testing tips will be made of several different materials that will possibly be used in the heat shield of the Orion space craft. These designs included technical drawings that were presented to the fabrication shop. The frame design was created from 80/20 (a popular brand of frame construction equipment) and included an order form with pricing for fabrication. An independent design was also done for the virtual reality lab. This design was to create a hand-controller based on a previous design. This final design was sent directly to a 3D printer without technical drawings. Overall, my design work has given me experience with using 80/20, helped improve my CAD (Computer Aided Design) proficiency, and increased my knowledge of how to set up technical drawings for fabrication. The final role I have played in this internship has been to assist with testing of the inflatable technology materials working Khadijah Shariff. I began the internship assisting with permeability testing with the initial plan to continue the testing independently after training. Unfortunately, the testing apparatus suffered a technical failure and had funding pulled which cancelled that portion of the project. Further testing with inflatable technology continued with tensile testing of various stitching methods. This testing took place over a two-days and concluded successfully. Final testing was to be more tensile testing but of straps used to connect various inflatable sections. Unfortunately, the needed grips for the tensile tests could not be located and put the testing on hold. It is possible this round of testing will still take place by the end of the internship if the grips can be found. Overall, this portion of the internship has helped me become familiar with one kind of permeability test as well as a popular tensile/compression testing machine. Finally, I also had the chance to be trained using a metal lathe for making very small tips for a soldering iron. These tips will be used to melt threaded brass inserts into 3D printed plastic. Working with James Brown, I was able to successfully machine a brass rod down to as little as 0.064 inches plus or minus 0.001 inches. It was very rewarding to learn how to best use the machine and become familiar with a skill that will undoubtedly be used again in the future. I have been told by several professional engineers that learning to use a lathe and mill will be invaluable skills in the field. This knocks 50 percent of that goal off and I look forward to learning the mill at some point in the future. As is apparent with this list of projects, my internship was not focused on a single over-arching goal. Instead, I was able to gain experience in a myriad of very different areas. I feel like my time here was spent bouncing from one project to the next. Though sometimes difficult to switch gears, it was very rewarding to be a part of so much in so little time. My career and education will be positively impacted by what I have learned at JSC. My experience with 3D printing has improved my ability to handle many issues that may come up in the future with multiple different technologies. The design work I took part in, especially creating technical drawings, will help me better present designs to any engineer or shop I will encounter. My testing experience has helped me become familiar with a popular kind of tensile test machine that will likely be similar to the kinds I will encounter in the future. Finally, my experience with fabrication has given me a rare opportunity, as an engineer, to take part in the fabrication of a part. This experience will help me better tailor my future designs for the manufacturing process and has given me an appreciation for detailed/delicate machining work. My experience at JSC has been successful and will continue to assist me for a long time within the engineering field.

Zusack, Steven↗