Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BEAM DYNAMICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

ESTIMATION OF THE WAKEFIELD RESONANT FREQUENCY USING DIFFERENT SIMULATION TOOLS

Reliable and fast wakefield calculations are important for beam dynamics and THz generation in accelerators. We compare approaches and limitations with different available simulation tools and compare results. As an example, we analyse a cylindrical corrugated waveguide with narrower and wider radii of 5 and 6 mm, and aperture width and periodicity of 1 and 2 mm using ABCI by KEK and ANSYS HFSS simulation software. First, ABCI was used to determine the resonant frequency of the cylindri-cal corrugated waveguide with different lengths. The corresponding results were taken as a reference to exam-ine the simulation method in the ANSYS HFSS environ-ment. The eigenmode solver of ANSYS HFSS was used to determine different resonant frequencies. This was fol-lowed by examining a cylindrical corrugated waveguide that was implemented having a length of 17 mm for dif-ferent conductor settings. The corresponding waveguide was fed by a plane wave having a resonant frequency that satisfies the intersection of the light line and dispersion curve of the corresponding mode. The analysis showed that the maximum loss factor was achieved at 39.20 and 40.07 GHz using ANSYS HFSS simulation data for differ-ent conductors, whereas ABCI resulted in 38.50 GHz. The talk will present the results gathered by different simula-tion setups implemented in ANSYS HFSS.

Unutmaz, Muhammed [SLAC National Accelerator Labor↗

PERLE - ERL Test Facility at Orsay

PERLE (Powerful ERL for Experiments)[1] is a novel Energy Recovery Linac (ERL) test facility, designed to validate choices for a 50 GeV ERL foreseen in the design of the Large Hadron Electron Collider (LHeC) and the Future Circular Collider (FCC-eh), and to host dedicated nuclear and particle physics experiments. Its main thrust is to probe high current, continuous wave (CW), multi-pass operation with superconducting cavities at 802 MHz. With very high transient beam power (10 MW), PERLE offers an opportunity for controllable study of every beam dynamic effect of interest in the next generation of ERL design and becomes a ‘stepping stone’ between present state-of-art 1 MW ERLs and future 100 MW scale applications.

Bogacz, S. Alex↗

Transverse impedance measurement in RHIC and the AGS

The RHIC luminosity upgrade program aims for an increase of the polarized proton luminosity by a factor 2. To achieve this goal a significant increase in the beam intensity is foreseen. The beam coupling impedance could therefore represent a source of detrimental effects for beam quality and stability at high bunch intensities. For this reason it is essential to quantify the accelerator impedance budget and the major impedance sources, and possibly cure them. In this MD note we summarize the results of the 2013 transverse impedance measurements in the AGS and RHIC. The studies have been performed measuring the tune shift as a function of bunch intensity and deriving the total accelerator machine transverse impedance. For RHIC, we could obtain first promising results of impedance localization measurements as well.

43 PARTICLE ACCELERATORS↗

Optics solutions for pp operation with electron lenses at 100 GeV

Electron lenses for head-on compensation are currently under commissioning and foreseen to be operational for the 2015 polarized proton run. These devices will provide a partial compensation of head-on beam-beam effects and allow to double the RHIC proton luminosity. This note reviews the optics constraints related to beam-beam compensation and summarizes the current lattice options for proton operation at 100 GeV.

43 PARTICLE ACCELERATORS↗

Parameter choices for a muon recirculating linear accelerator from 5 to 63 GeV

A recirculating linear accelerator (RLA) has been proposed to accelerate muons from 5 to 63 GeV for a muon collider. It should be usable both for a Higgs factory and as a stage for a higher energy collider. First, the constraints due to the beam loading are computed. Next, an expression for the longitudinal emittance growth to lowest order in the longitudinal emittance is worked out. After finding the longitudinal expression, a simplified model that describes the arcs and their approximate expression for the time of flight dependence on energy in those arcs is found. Finally, these results are used to estimate the parameters required for the RLA arcs and the linac phase.

43 PARTICLE ACCELERATORS↗

FY2014 Parameters for Helions and Gold Ions in Booster, AGS, and RHIC

The nominal parameters for helions (helion is the bound state of two protons and one neutron, the nucleus of a helium-3 atom) and gold ions in Booster, AGS, and RHIC are given for the FY2014 running period. The parameters are found using various formulas to derive mass, helion anomalous g-factor, kinetic parameters, RF parameters, ring parameters, etc..

43 PARTICLE ACCELERATORS↗

Optics measurement and correction during beam acceleration in the Relativistic Heavy Ion Collider

To minimize operational complexities, setup of collisions in high energy circular colliders typically involves acceleration with near constant β-functions followed by application of strong focusing quadrupoles at the interaction points (IPs) for the final beta-squeeze. At the Relativistic Heavy Ion Collider (RHIC) beam acceleration and optics squeeze are performed simultaneously. In the past, beam optics correction at RHIC has taken place at injection and at final energy with some interpolation of corrections into the acceleration cycle. Recent measurements of the beam optics during acceleration and squeeze have evidenced significant beta-beats which if corrected could minimize undesirable emittance dilutions and maximize the spin polarization of polarized proton beams by avoidance of higher-order multipole fields sampled by particles within the bunch. In this report the methodology now operational at RHIC for beam optics corrections during acceleration with simultaneous beta-squeeze will be presented together with measurements which conclusively demonstrate the superior beam control. As a valuable by-product, the corrections have minimized the beta-beat at the profile monitors so reducing the dominant error in and providing more precise measurements of the evolution of the beam emittances during acceleration.

43 PARTICLE ACCELERATORS↗

An overview of Booster and AGS polarized proton operation during Run 15

This note is an overview of the Booster and AGS for the 2015 Polarized Proton RHIC run from an operations perspective. There are some notable differences between this and previous runs. In particular, the polarized source intensity was expected to be, and was, higher this year than in previous RHIC runs. The hope was to make use of this higher input intensity by allowing the beam to be scraped down more in the Booster to provide a brighter and smaller beam for the AGS and RHIC. The RHIC intensity requirements were also higher this run than in previous runs, which caused additional challenges because the AGS polarization and emittance are normally intensity dependent.

43 PARTICLE ACCELERATORS↗

Conceptual design of hollow electron lenses for beam halo control in the Large Hadron Collider

Collimation with hollow electron beams is a technique for halo control in high-power hadron beams. It is based on an electron beam (possibly pulsed or modulated in intensity) guided by strong axial magnetic fields which overlaps with the circulating beam in a short section of the ring. The concept was tested experimentally at the Fermilab Tevatron collider using a hollow electron gun installed in one of the Tevatron electron lenses. We are proposing a conceptual design for applying this technique to the Large Hadron Collider at CERN. A prototype hollow electron gun for the LHC was built and tested. The expected performance of the hollow electron beam collimator was based on Tevatron experiments and on numerical tracking simulations. Halo removal rates and enhancements of halo diffusivity were estimated as a function of beam and lattice parameters. Proton beam core lifetimes and emittance growth rates were checked to ensure that undesired effects were suppressed. Hardware specifications were based on the Tevatron devices and on preliminary engineering integration studies in the LHC machine. Required resources and a possible timeline were also outlined, together with a brief discussion of alternative halo-removal schemes and of other possible uses of electron lenses to improve the performance of the LHC.

43 PARTICLE ACCELERATORS↗

Implications of a 20-Hz Booster cycle-rate for Slip-stacking

We examine the potential impacts to slip-stacking from a change of the Booster cycle-rate from 15- to 20-Hz. We find that changing the Booster cycle-rate to 20-Hz would greatly increase the slip-stacking bucket area, while potentially requiring greater usage of the Recycler momentum aperture and additional power dissipation in the RF cavities. In particular, the losses from RF interference can be reduced by a factor of 4-10 (depending on Booster beam longitudinal parameters). We discuss the aspect ratio and beam emittance requirements for efficient slip-stacking in both cycle-rate cases. Using a different injection scheme can eliminate the need for greater momentum aperture in the Recycler.

43 PARTICLE ACCELERATORS↗

A close look at beam aborts with rise times less than 40 ms from the years 2014-2016. Case studies.

In an effort to understand the risks of operating RHIC with an additional delay of 40 ms in the abort system, all beam aborts triggered by loss monitors at store from the years 2014, 2015 and 2016 were analyzed; and particularly fast cases, selected. The results were presented at the RHIC retreat on Jul 29, 2016. All beam aborts at injection, during the ramp and at flattop but before the “ev-lumi” event were ignored since the additional delay of 40 ms is proposed for operation at store only. Many (but not all) of the 15 studied cases are of no concern. Cases with high damage potential are rare - but not rare enough. In order to make an added 40 ms during physics store conditions as safe as reasonably possible, additional permit inputs such as 10 Hz BF power supplies, RF storage cavities, power supply error states or BPMs, in addition to significantly reduced loss monitors (LM) thresholds for selected LM should be commissioned.

43 PARTICLE ACCELERATORS↗

Overview and analysis of the 2016 Gold Run in the Booster and AGS

Run 16 differed from preceding Au runs in that during most of it a 12:6:2 merge was employed in the AGS instead of an 8:4:2 merge. This was done to provide higher bunch intensities for RHIC. Since the approach to providing higher bunch intensities is, and has been, to merge more Booster bunches of the same intensity into one final bunch, detailing the longitudinal aspects of this setup seems quite relevant. So, aside from providing an overview of the Au portion of Run 16, this note also contains a series of emittance measurements in the Booster and AGS. Comparisons of these to similar measurements in previous runs are also made in hopes of gaining a better understanding of what factors contribute to the emittance of a bunch at AGS extraction. The note also tries to provide some context in which to understand the various merge schemes and describes a potential 8 to 1 type merge.

43 PARTICLE ACCELERATORS↗

Theory and Modeling of Petawatt Laser Pulse Propagation in Low Density Plasmas

Report describing accomplishments in all-optical control of self-injection in laser-plasma accelerators and in developing advanced numerical models of laser-plasma interactions. All-optical approaches to controlling electron self-injection and beam formation in laser-plasma accelerators (LPAs) were explored. It was demonstrated that control over the laser pulse evolution is the key ingredient in the generation of low-background, low-phase-space-volume electron beams. To this end, preserving a smooth laser pulse envelope throughout the acceleration process can be achieved through tuning the phase and amplitude of the incident pulse. A negative frequency chirp compensates the frequency red-shift accumulated due to wake excitation, preventing evolution of the pulse into a relativistic optical shock. This reduces the ponderomotive force exerted on quiescent plasma electrons, suppressing expansion of the bubble and continuous injection of background electrons, thereby reducing the charge in the low-energy tail by an order of magnitude. Slowly raising the density in the pulse propagation direction locks electrons in the accelerating phase, boosting their energy, keeping continuous injection at a low level, tripling the brightness of the quasi-monoenergetic component. Additionally, propagating the negatively chirped pulse in a plasma channel suppresses diffraction of the pulse leading edge, further reducing continuous injection. As a side effect, oscillations of the pulse tail may be enhanced, leading to production of low-background, polychromatic electron beams. Such beams, consisting of quasi-monoenergetic components with controllable energy and energy separation, may be useful as drivers of polychromatic x-rays based on Thomson backscattering. These all-optical methods of electron beam quality control are critically important for the development of future compact, high-repetition-rate, GeV-scale LPA using 10 TW-class, ultra-high bandwidth pulses and mm-scale, dense plasmas. These results emphasize that investment into new pulse amplification techniques allowing for ultrahigh frequency bandwidth is as important for the design of future LPA as are the current efforts directed to increasing the pulse energy.

43 PARTICLE ACCELERATORS↗

Issues of incompatibility of dipole beam separation schemes with EIC physics

This report addresses the question, can the risk of an eRHIC machine be reduced by replacing the crab-cavities through a dipole field in the IR to separate the electron and hadron beams. In the following, several scenarios to integrate a separation dipole in the IR design will be described. For each of the scenarios the challenges and problems to realize this in practice will be detailed. In addition, the impact on the detector design and the EIC physics program will also be discussed. Several physics requirements need to be integrated into the interaction region design, in order to perform the physics program as described in the EIC White Paper and in the RHIC Design Study. These requirements are also described in detail on a dedicated page of the eRHIC-wiki. The main requirements are described here.

43 PARTICLE ACCELERATORS↗

Simulation of 6 to 3 to 1 merge and squeeze of Au77+ bunches in AGS

In order to increase the intensity per Au77+ bunch at AGS extraction, a 6 to 3 to 1 merge scheme was developed and implemented by K. Zeno during the 2016 RHIC run. For this scheme, 12 Booster loads, each consisting of a single bunch, are delivered to AGS per AGS magnetic cycle. The bunch from Booster is itself the result of a 4 to 2 to 1 merge which is carried out on a flat porch during the Booster magnetic cycle. Each Booster bunch is injected into a harmonic 24 bucket on the AGS injection porch. In order to fit into the buckets and allow for the AGS injection kicker rise time, the bunch width must be reduced by exciting quadrupole oscillations just before extraction from Booster. The bunches are injected into two groups of six adjacent harmonic 24 buckets. In each group the 6 bunches are merged into 3 by bringing on RF harmonic 12 while reducing harmonic 24. This is a straightforward 2 to 1 merge (in which two adjacent bunches are merged into one). One ends up with two groups of three adjacent bunches sitting in harmonic 12 buckets. These bunches are accelerated to an intermediate porch for further merging. Doing the merge on a porch that sits above injection energy helps reduce losses that are believed to be due to the space-charge force acting on the bunched particles. (The 6 to 3 merge is done on the injection porch because the harmonic 24 frequency on the intermediate porch would be too high for the AGS RF cavities.) On the intermediate porch each group of 3 bunches is merged into one by bringing on RF harmonics 8 and 4 and then reducing harmonics 12 and 8. One ends up with 2 bunches, each the result of a 6 to 3 to 1 merge and each sitting in a harmonic 4 bucket. This puts 6 Booster loads into each bunch. Each merged bunch needs to be squeezed into a harmonic 12 bucket for subsequent acceleration. This is done by again bringing on harmonic 8 and then harmonic 12. Results of simulations of the 6 to 3 to 1 merge and the subsequent squeeze into harmonic 12 buckets are presented in this note. In particular, they provide a benchmark for what can be achieved with the available RF voltages.

43 PARTICLE ACCELERATORS↗

Double and triple-harmonic RF buckets and their use for bunch squeezing in AGS

For the past several years we have merged bunches in AGS in order to achieve the desired intensity per bunch prior to injection into RHIC. The merging is done on a flat porch at or above AGS injection energy. Because the merges involve the reduction of the RF harmonic number by a factor of 2 (for a 2 to 1 merge) and then a factor of 3 (for a 3 to 1 merge), one requires RF frequencies 6hf s , 3hf s , 2hf s and hf s , where f s is the revolution frequency on the porch and h = 4 is the fundamental harmonic number. The standard AGS RF cavities cannot operate at the lowest frequencies 2hf s and hf s ; these are provided by two modified cavities. Upon completion of the merges, the bunches are sitting in harmonic h buckets. In order to be accelerated they need to be squeezed into harmonic 3h buckets. This is accomplished by producing a double-harmonic bucket in which harmonics h and 2h act in concert, and then a triple-harmonic bucket in which harmonics h, 2h, and 3h act in concert. Simulations have shown that the squeeze presents an acceptance bottleneck which limits the longitudinal emittance that can be put into the harmonic 3h bucket. In this note the areas of the double and triple-harmonic buckets are calculated explicitly, and it is shown that these go through a minimum as the RF voltages are raised to the desired values. Several RF voltage ranges are examined, and the acceptance bottleneck is determined for each of these. Finally, the acceptance bottleneck for Au77+ bunches in AGS is calculated for several RF voltage ranges. The main result is that the RF voltages for the low-frequency harmonic h and 2h cavities both must be at least 22 kV in order to achieve an acceptance of 0:6 eV s per nucleon. If the harmonic h and 2h voltages are 15 and 22 kV, respectively, then the acceptance is reduced to 0:548 eV s per nucleon.

43 PARTICLE ACCELERATORS↗

IBS simulation with different RF configurations in RHIC

It is a crucial task to understand the beam emittance growth during RHIC cycle and the underlying causes. One would benefit not just for the current operation of RHIC, also for the design of eRHIC. This report focuses on the Intra-Beam Scattering (IBS) contribution to the emittance growth of the proton beam with two different configurations of RF system. The answers to these questions will be given in the end of the report; can IBS explain the emittance growth all alone? What’s the difference of IBS growth rates for different RF configurations?

43 PARTICLE ACCELERATORS↗

Wakefields of a Beam near a Single Plate in a Flat Dechirper

At linac-based, X-ray free electron lasers (FELs), there is interest in streaking the beam by inducing the transverse wakes in a flat dechirper, by passing the beam near to one of its two jaws. For LCLS-II - as has already been done for LCLS-I - this way of using the dechirper will e.g. facilitate two-color and fresh slice schemes of running the FEL. With the beam a distance from the near wall of say b ~ 0.25 mm and from the far wall by ≳ 5 mm, the second wall will no longer affect the results. The physics will be quite different from the two plate case: with two plates the impedance has a resonance spike whose frequency depends on the plate separation 2a; in the single plate case this parameter no longer exists. Formulas for the longitudinal, dipole, and quadrupole wakes for a beam off-axis between two dechirper plates, valid for the range of bunch lengths of interest in an X-ray FEL, are given in reference 3. By taking the proper limit, we can obtain the corresponding wakes for a beam close to one dechirper plate and far from the other. This is the task we perform in this note.

43 PARTICLE ACCELERATORS↗