Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator Design Technology, and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Curvature, Hydrogen, Q

The manufacturing of niobium SRF accelerator cavities is plagued by a mobile point defect, hydrogen. For efficient accelerator operation, niobium must function at both high electric and magnetic fields, and is compromised if magnetic impurities are located in the surface regions of the material. The finding that trace hydrogen in niobium can produce structures with magnetic properties is a feature that is not acceptable for a high performance cavity. X-ray diffraction has proved to be the key tool in assessing irreversible process damage to the niobium substrate. In future generations of accelerators, niobium will actually be merely the substrate for more effective superconductors that will allow for more efficient operation. The substrate analogy to the silicon wafer industry is useful since for niobium it may be possible to avoid some of the mistakes made in silicon technology. Because hydrogen attacks niobium on a number of different size scales, there is an inherent complexity in the trouble sources. There are also features in cavity design that are benign, such as local curvature considerations, requiring a fully non symmetric analysis of current flow to be appreciated.

36 MATERIALS SCIENCE↗

Report on the Radiation Effects Testing of the Infrared and Optical Transition Radiation Camera Systems

Presented in this report are the results tests performed at Argonne National Lab in collaboration with Los Alamos National Lab to assess the reliability of the critical 99 Mo production facility beam monitoring diagnostics. The main components of the beam monitoring systems are two cameras that will be exposed to radiation during accelerator operation. The purpose of this test is to assess the reliability of the cameras and related optical components when exposed to operational radiation levels. Both X-ray and neutron radiation could potentially damage camera electronics as well as the optical components such as lenses and windows. This report covers results of the testing of component reliability when exposed to X-ray radiation. With the information from this study we provide recommendations for implementing protective measures for the camera systems in order to minimize the occurrence of radiation-induced failure within a ten month production run cycle.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

United States Advanced Ultra-Supercritical Component Test Facility for 760°C Steam Power Plants ComTest Project

Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760°C). The steam turbine stop and control valve component has been designed to operate at full A-USC temperatures, and would be tested both in throttling operation and to accumulate accelerated, repetitive stroke cycles. A cycling header component has been designed to confirm the suitability of new high-temperature nickel alloys to cycling operation, expected of future coal-fired power plants. Current test plans would subject these components to A-USC operating conditions for at least 8,000 hours by September 2020. The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. This consortium is completing the Detailed Engineering phase of the project, with procurement scheduled to begin in late 2017. The effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory, along with the Ohio Development Services Agency. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides technical details on the design of the ComTest facility.

54 ENVIRONMENTAL SCIENCES↗

A Prototype Wire Position Monitoring System

The Wire Position Monitoring System (WPM) will track changes in the transverse position of LCLS Beam Position Monitors (BPMs) to 1{micro}m over several weeks. This position information will be used between applications of beam based alignment to correct for changes in component alignment. The WPM system has several requirements. The sensor range must be large enough so that precision sensor positioning is not required. The resolution needs to be small enough so that the signal can be used to monitor motion to 1{micro}m. The system must be stable enough so that system drift does not mimic motion of the component being monitored. The WPM sensor assembly consists of two parts, the magnetic sensor and an integrated lock-in amplifier. The magnetic sensor picks up a signal from the alternating current in a stretched wire. The voltage v induced in the sensor is proportional to the wire displacement from the center of the sensor. The integrated lock-in amplifier provides a DC output whose magnitude is proportional to the AC signal from the magnetic sensor. The DC output is either read on a digital voltmeter or digitized locally and communicated over a computer interface.

43 PARTICLE ACCELERATORS↗

Report on study of accelerating structures for muons in the velocity range of β=v/c=0.08-0.3 for J-PARC (g-2)/EDM experiment

We explored three types of structures for muon acceleration in the beam velocity range β = 0.08-0.3. Somewhat surprisingly, the venerable DTL looks like the best option based on its low maximal field, reasonable efficiency, and simplicity. It also provides the largest flexibility of the beam focusing options. The accelerating gradient for the DTL is the highest of the considered designs, and can be further increased if needed. The IH-APF structure, the baseline choice, is very attractive due its efficiency and potentially lower fabrication cost. However, detailed EM analysis indicated some reasons for concern, mainly related to the high maximal electric fields. We suggested to change the cavity design to CH type, which leads to a novel type of structure, CH-APF. Dr. M. Otani produced the CST model of CH-APF, and preliminary results of its EM analysis are encouraging. Unfortunately, the fabrication of CH-APF structure is likely more complicated than for IH-APF.

43 PARTICLE ACCELERATORS↗

Development of Transformative Preparation Methods to Push up High Q&G Performance of FRIB Spare HWR Cryomodule Cavities

The FRIB accelerator project construction, a top priority of US nuclear science, was completed in January 2022, and is now moving to user operation. The stable and reliable operation of the accelerating cryomodules is essential in achieving/fulfilling DOE and user expectations. So far, FRIB cryomodules meet all FRIB specifications for cavity performance. However, during the lifetime of machine operation, degradation of cryomodule performance is possible, as reported in similar operating facilities (CEBAF, SNS). If cryomodule degradation is observed at FRIB, the under-performing cryomodule will require replacement/maintenance. In effort to manage operational reliability, FRIB plans to construct a 0.53 half-wave cryomodule to serve as an active spare. In a parallel effort, FRIB will also work toward increasing operational Q and gradient of spare cryomodule cavities to gain an overall performance margin to support future operational reliability. The current FRIB cavity designs have a potential to operate at gradients higher than 8 MV/m, but are currently limited by field emission (FE) and/or high field Q slope (HFQS); known issue in buffered chemical polished (BCP) treated cavities. The proposal looks to develop transformative surface preparation treatments to improve the operational gradient of spare cryomodules higher than 10 MV/m while maintaining high Q. Thus, increasing operational margin by 30 - 50%. With the goal to improve operational reliability set, the proposal will investigate multiple objectives as possible paths forward to achieve an overall increase in cavity performance and gain a better understanding of SRF limiting mechanisms. The proposal will study the application of different chemical surface treatments to 0.53 half-wave cavities, with the addition of low temperature bakes (LTB), and measure their effects on accelerating performance. Proposed chemical treatments to be explored in this proposal include conventional EP acid mixtures, as well as innovated EP and BCP acid mixtures designed to simplify processing paths in migrating FE and HFQS. The proposed transformative treatment wet N-doping also has the potential to replicate recent advancements in SRF technology relating to nitrogen doping and high Q operation without the requirement for an ultra-high vacuum annealing furnace; currently being developed at FNAL and JLAB. In parallel, high Q performance relating to flux trapping will be investigated with the installation of a second layer of magnetic shielding in the vertical test Dewar. The research objectives presented in the proposal, and their corresponding effects on cavity performance, will provide essential knowledge and future guidance to the SRF community and provide possible paths for future SRF based projects and applications.

43 PARTICLE ACCELERATORS↗

Compact cryomodule for mobile stand-alone superconducting industrial accelerators

Superconducting RF (SRF) accelerators have the potential to be more profitable in comparison with normally conducting accelerators, as long they can be made compact, achieve operational simplicity, autonomy, trans- portability, satisfactory energy efficiency, as well as have reasonable costs. The development of SRF technologies such as Nb 3 Sn coating, conductively-cooled resonators, and high-capacity liquid-helium-free cryocoolers made SRF accelerators mobile and energetically and economically efficient at a beam power of tens of kW. One of the key elements of such an accelerator is the cryomodule, which must have minimal thermal losses to enable operation from low power cryoheads and enable conductive cooling of SRF resonator. In this research we present the design and test results of a compact cryomodule for an industrial stand-alone SRF linear accelerator proto- type, based on 650 MHz elliptical resonators, being developed at Fermi National Accelerator Laboratory.

43 PARTICLE ACCELERATORS↗

Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about 150 m{sup 2} of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m{sup 2} for a total active area of 1200 m{sup 2}. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS end-cap muon tracking system in the 2018/19 shutdown. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as 30 μm along the precision coordinate and 80 μm perpendicular to the chamber. In the prototyping towards the final configuration two similar quadruplets with dimensions 1.2 x 0.5 m{sup 2} have been built with the same structure as foreseen for the NSW upgrade. It represents the first example of a Micromegas quadruplet ever built, realized using the resistive-strip technology and decoupling the amplification mesh from the readout structure. All readout planes are segmented into strips with a pitch of 400 μm for a total of 4096 strips. In two of the four planes the strips are inclined by 1.5 deg. and provide a measurement of the second coordinate. The design and construction procedure of the Micromegas modules will be presented, as well as the design for the assembly of modules onto the New Small Wheel. Emphasis will be given on the methods developed to achieve the challenging mechanical precision. Measurements of deformation on chamber prototypes as a function of thermal gradients, gas over-pressure and internal stress (mesh tension and module fixation on supports) will be also shown in comparison to simulation. These tests were essential in the development of the final design in order to minimize the effects of deformations. During installation and operation all deformations and relative misalignments will be monitored through an optical alignment system and compensated in the tracking software. The optical alignment concept will also be outlined. 2 (authors)

43 PARTICLE ACCELERATORS↗

Status of the Development of Flight Power Processing Units for the NASAs Evolutionary Xenon Thruster - Commercial (NEXT-C) Project

A pathfinder prototype unit and two flight power processing units (PPUs) are being developed by the Aerojet Rocketdyne Corporation in Redmond, Washington and ZIN Technologies in Cleveland, Ohio, in support of the NEXT-C Project. This project is being led by the NASA Glenn Research Center in Cleveland, Ohio, and will also yield two flight thrusters. This hardware is being considered to be provided as Government Furnished Equipment for the New Frontiers Program, and is applicable to a variety of planetary science missions and astrophysics science missions. The design of the NEXT-C PPU evolves from the hardware fabricated under the NEXT technology development project. The power processing unit operates from two sources: a wide input 80 to 160 V high-power bus and a nominal 28 V low-power bus. The unit includes six power supplies. Four power supplies (beam, accelerator, discharge, and neutralizer keeper) are needed for steady state operation, while two cathode heater power supplies (neutralizer and discharge) are utilized during thruster startup. The unit in total delivers up to 7 kW of regulated power to a single gridded-ion thruster. Significant modifications to the initial design include: high-power adaptive-delay control, upgrade of design to EEE-INST-002 compliance, telemetry accuracy improvements, incorporation of telemetry to detect plume-mode operation, and simplification of the design in select areas to improve manufacturability and commercialization potential. The project is presently in the prototype phase and preparing for qualification level environmental testing.

NASAaEuro(TM)s Evolutionary Xenon Thruster↗

The BErkeley Lab Laser Accelerator (BELLA): A 10 GeV Laser Plasma Accelerator

An overview is presented of the design of a 10 GeV laser plasma accelerator (LPA) that will be driven by a PW-class laser system and of the BELLA Project, which has as its primary goal to build and install the required Ti:sapphire laser system for the acceleration experiments. The basic design of the 10 GeV stage aims at operation in the quasi-linear regime, where the laser excited wakes are largely sinusoidal and offer the possibility of accelerating both electrons and positrons. Simulations show that a 10 GeV electron beam can be generated in a meter scale plasma channel guided LPA operating at a density of about 10{sup 17} cm{sup -3} and powered by laser pulses containing 30-40 J of energy in a 50-200 fs duration pulse, focused to a spotsize of 50-100 micron. The lay-out of the facility and laser system will be presented as well as the progress on building the facility.

43 PARTICLE ACCELERATORS↗

Sub-sized specimen testing and its relationship with Gen IV Materials Qualification

Renewed interest in advanced reactor technologies which can produce inherently safe, reliable, low carbon, low cost energy requires the development of new materials which can operate in the extreme environments proposed by Gen IV reactor designs. The primary focus of the Nuclear Materials Discovery and Qualification Initiative (NMDQi) is to accelerate the process by which new materials can make their way into commercial use, enabling new technologies and innovations within the nuclear sector. Due to limitations in the production of neutron irradiated material for testing and qualification, the use of specimens far smaller than those traditionally called for in regulatory codes becomes a necessity. While the use of these sub-sized specimens is necessary to achieve materials qualification on a realistic timeline and budget, literature showing the efficacy of these samples as an appropriate surrogate for ASME/ASTM defined samples is limited. This poster will detail historical efforts to compare the mechanical behavior of small geometry samples with bulk material behavior and the potential of sub-sized specimen testing at INL for future materials qualification efforts.

36 MATERIALS SCIENCE↗

Characterization of NbTi busbar for HL LHC Interaction Region Quadrupoles

The US Accelerator Upgrade for the HiLumi-LHC (US-HL-LHC AUP) project and CERN are designing and fabricating superconducting quadrupole magnets for the interaction regions of the High Luminosity Large Hadron Collider (HLLHC). The triplet is made of three optical elements: Q1, Q2, and Q3. The Nb3Sn quadrupole magnets operate in superfluid He at 1.9 K with a nominal field gradient of 132.6 T/m. The three inner triplet elements are connected together with superconducting buses. The design and fabrication of the through and local buses is carried out at Applied Physics and Superconducting Technology Division (APS-TD) at Fermilab (FNAL). This paper reports the characterization of the bus-bar thermoelectric properties. The bus was tested with a short Nb3Sn magnet (MQXFS1e) in the vertical test facility of the APS-TD at FNAL. The test demonstrated that the bus design is adequate since no spontaneous quench took place up to 17.87 kA current value. Quench propagation velocities were investigated over a range of currents that is typical for accelerator superconducting magnets. Temperature margins were found above that required for the Hi- Lumi triplet bus. The design guarantees the protection of the bus at operational current value according to the quench detection voltage threshold (100 mV) established for the Hi-Lumi LHC interaction region.

43 PARTICLE ACCELERATORS↗

The Applied Mathematics for Power Systems (AMPS)

Increased deployment of new technologies, e.g., renewable generation and electric vehicles, is rapidly transforming electrical power networks by crossing previously distinct spatiotemporal scales and invalidating many traditional approaches for designing, analyzing, and operating power grids. This trend is expected to accelerate over the coming years, bringing the disruptive challenge of complexity, but also opportunities to deliver unprecedented efficiency and reliability. Our Applied Mathematics for Power Systems (AMPS) Center will discover, enable, and solve emerging mathematics challenges arising in power systems and, more generally, in complex engineered networks. We will develop foundational applied mathematics resulting in rigorous algorithms and simulation toolboxes for modern and future engineered networks. The AMPS Center deconstruction/reconstruction approach 'deconstructs' complex networks into sub-problems within non-separable spatiotemporal scales, a missing step in 20th century modeling of engineered networks. These sub-problems are addressed within the appropriate AMPS foundational pillar - complex systems, control theory, and optimization theory - and merged or 'reconstructed' at their boundaries into more general mathematical descriptions of complex engineered networks where important new questions are formulated and attacked. These two steps, iterated multiple times, will bridge the growing chasm between the legacy power grid and its future as a complex engineered network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mock Target Window OTR and IR Design and Testing

In order to fully verify temperature measurements made on the target window using infrared (IR) optical non-contact methods, actual comparative measurements are made with a real beam distribution as the heat source using Argonne National Laboratory’s (ANL) 35 MeV electron accelerator. Using Monte Carlo N-Particle (MCNP) simulations and thermal Finite Element Analysis (FEA), a cooled mock target window with thermocouple implants is designed to be used in such a test to achieve window temperatures up to 700°C. An uncoated and blackcoated mock window is designed to enhance the IR temperature measurements and verify optical transmitted radiation (OTR) imagery. This allows us to fully verify and characterize our temperature accuracy with our current IR camera method and any future method we may wish to explore using actual production conditions. This test also provides us with valuable conclusions/concerns regarding the calibration method we developed using our IR test stand at TA-53 in MPF-14.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Overview of the LHeC and FCC-he accelerator concepts

The Large Hadron–Electron Collider is designed to move the field of deep inelastic scattering to the energy and intensity frontier of particle physics. Exploiting energy-recovery technology, it collides a novel, intense electron beam with a proton or ion beam from the High-Luminosity Large Hadron Collider. The accelerator and interaction regions are designed for concurrent electron–proton and proton–proton operations. This paper represents the concepts of an updated design study and discusses the design challenges of the project.

Holzer, B. J.↗

Standards Development Activities at White Sands Test Facility

The development of standards and standard activities at the JSC White Sands Test Facility (WSTF) has been expanded to include the transfer of technology and standards to voluntary consensus organizations in five technical areas of importance to NASA. This effort is in direct response to the National Technology Transfer Act designed to accelerate transfer of technology to industry and promote government-industry partnerships. Technology transfer is especially important for WSTF, whose longterm mission has been to develop and provide vital propellant safety and hazards information to aerospace designers, operations personnel, and safety personnel. Meeting this mission is being accomplished through the preparation of consensus guidelines and standards, propellant hazards analysis protocols, and safety courses for the propellant use of hydrogen, oxygen, and hypergols, as well as the design and inspection of spacecraft pressure vessels and the use of pyrovalves in spacecraft propulsion systems. The overall WSTF technology transfer program is described and the current status of technology transfer activities are summarized.

Baker, D. L.↗

Marine and Hydrokinetic Energy Metocean Data-use, Sources, and Instrumentation

Marine and Hydrokinetic Energy Metocean Data-use, Sources, and Instrumentation presentation from Water Power Technologies Office Peer Review, FY14-FY16. This project aims to accelerate deployment of marine and hydrokinetic (MHK) technology by establishing: 1) relevant existing and evolving standards and guidelines, 2) meteorological and oceanic (metocean) data use 3) data sources, and 4) instrumentation guidance for siting, design, and operation of MHK devices along the U.S coastline.

13 HYDRO ENERGY↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center (GRC) is supporting the development of high-efficiency power convertors for use in Radioisotope Power Systems (RPS). Significant progress was made towards such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was cancelled in 2013 by the Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton designs. The technology development contracts each consist of up to three phases: Design, Fabricate, and Test. As of May 2018, all contracts have completed the Design Phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the Phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, NASA GRC is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects which have similarities and relevance to current contract designs. Four of which are flexure-bearing based, and another six are gas-bearing based. One of the flexure-bearing convertors has accumulated over 110,000 hours of operation, and holds the current record for maintenance-free heat-engine run-time. Another flexure-bearing convertor was recently manually shutdown after 105,620 hours of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of runtime on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Amongst the gas-bearing convertors, the longest running unit has accumulated over 70,000 hours of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously, for which the longest runtime has reached 28,000 hours.

Oriti, Salvatore M.↗