Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

BPM STABILTIY STUDIES FOR THE APS MBA UPGRADE

The Advanced Photon Source (APS) is currently in the preliminary design phase for the multi-bend achromat (MBA) lattice upgrade. Beam stability is critical for the MBA and will require long term drift defined as beam mo-tion over a seven-day timescale to be no more than 1 mi-cron at the insertion device locations and beam angle change no more than 0.25 micro-radian. Mechanical stabil-ity of beam position monitor (BPM) pickup electrodes mounted on insertion device vacuum chambers place a fun-damental limitation on long-term beam stability for inser-tion device beamlines. We present the design and imple-mentation of prototype mechanical motion system (MMS) instrumentation for quantifying this type of motion specif-ically in the APS accelerator tunnel and experiment hall floor under normal operating conditions. The MMS pres-ently provides critical position information on the vacuum chamber and BPM support systems. Initial results of the R&D prototype systems have demonstrated that the cham-ber movements far exceed the long-term drift tolerance specified for the APS Upgrade MBA storage ring.

Lill, R.↗

AN INTERNET RACK MONITOR-CONTROLLER FOR APS LINAC RF ELECTRONICS UPGRADE

To support the research and development in APS LINAC area, the existing LINAC rf control performance needs to be much improved, and thus an upgrade of the legacy LINAC rf electronics becomes necessary. The proposed upgrade plan centers on the concept of using a modern, network-attached, rackmount digital electronics platform –Internet Rack Monitor-Controller (or IRMC) to achieve the goal of modernizing the rf electronics at a lower cost. The system model of the envisioned IRMC is basically a 3-tier stack with a high-performance DSP in the mid-layer to perform the core tasks of real-time rf data processing and controls. The Digital Front-End (DFE) attachment layer at bottom bridges the applicationspecific rf front-ends to the DSP. A network communication gateway, together with an embedded event receiver (EVR) in the top layer merges the Internet Rack MonitorController node into the networks of the accelerator controls infrastructure. Although the concept is very much in trend with today’s Internet-of-Things (IoT), this implementation has actually been used in the accelerators for over two decades.

Ma, Hengjie↗

Magnetic Analysis of a Single-Aperture 11T Nb3Sn Demonstrator Dipole for LHC Upgrades

The planned upgrade of the LHC collimation system foresees additional collimators to be installed in the dispersion suppressor areas around points 2, 3, and 7. The necessary longitudinal space for the collimators could be provided by replacing some 8.33-T 15-m-long NbTi LHC main dipoles with shorter 11-T Nb3Sn dipoles compatible with the LHC lattice and main systems. To demonstrate this possibility, in 2011 Fermilab and CERN started a joint R&D program with the goal of building a 5.5-m-long tw in-aperture dipole prototype suitable for installation in the LHC by 2014. The first step of this program is the development of a 2-m-long single-aperture demonstration dipole with the nominal field of 11 T at the LHC nominal current of ~11.85 kA and 60-m m bore with ~20% margin. This paper presents the results of magnetic analysis of the single-aperture Nb3Sn demonstrator dipole for the LHC collimation system upgrade.

43 PARTICLE ACCELERATORS↗

Biorefining compounds and organocatalytic upgrading methods

The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl) furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

09 BIOMASS FUELS↗

Status of a Single-Aperture 11 T Nb3Sn Demonstrator Dipole for LHC Upgrades

The planned upgrade of the LHC collimation system includes two additional collimators to be installed in the dispersion suppressor areas of points 2, 3 and 7. The necessary longitudinal space for the collimators could be provided by replacing some 8.33 T NbTi LHC main dipoles with 11 T dipoles based on Nb3Sn superconductor and compatible with the LHC lattice and main systems. To demonstrate t his possibility Fermilab and CERN have started in 2011 a joint R&D program with the goal of building b y 2014 a 5.5-m long twin-aperture dipole prototype suitable for installation in the LHC. The first step of this program is the development of a 2-m long single-aperture demonstration dipole with the nominal field of 11 T at the LHC nominal current of ~11. 85 kA and 60 mm bore with ~20% margin. This paper describes the design, construction and test results of the single-aperture Nb3Sn demonstrator model for the LHC collimation system upgrade.

43 PARTICLE ACCELERATORS↗

Real-time software upgrade

The various technologies presented herein relate to upgrading industrial control software in real-time. During utilization of a first software to control an industrial process, a determination can be made that the first software needs to be replaced (e.g., partially or entirely) owing to a newer version of software is ready to be deployed, a vulnerability in the first software has been determined, etc. Rather than closing the industrial process down while the first software is replaced, a second software can be deployed such that the first software and the second software are operating in parallel (e.g., receiving the same operational data, process states). When a critical point (upgrade location) in the first software has been reached, control of the industrial process can be switched to the second software, thereby enabling control of the industrial process to occur without having to temporarily cease operation and/or monitoring of the industrial process.

97 MATHEMATICS AND COMPUTING↗

DEVELOPMENT OF A VERIFICATION BENCHMARK SUITE FOR THE ATR REACTOR PHYSICS UPGRADE

The result of a numerical algorithm is only as good as the effort made toward its verification. Comprehensive computer codes, especially for application to nuclear reactors, require in-depth assessment of the numerical methods used and their computational implementation. This presentation describes a suite of semi-analytical benchmarks for the ATR Reactor Physics Upgrade as part of the ATR Life Extension Project (LEP). Several neutron transport codes including deterministic codes HELIOS, NEWT and probabilistic codes MCNP6, SERPANT and MC21 are upgrade candidates. To properly evaluate code performance capabilities, code verification is an essential element. A credible verification program requires education to guide proper application, training in proper input preparation and output expectation and verification to instill confidence in the coded numerical procedures. The subset of the benchmark suite to be described here is primarily of the 1D transport variety (however, a 2D case does indeed exist) with the intent to provide unquestionably high order accurate semi-analytical numerical solutions to the transport equation. We base the analytical solutions on analytical Fourier series and discrete ordinates representations. Here we present two 1D benchmarks based on Fourier series.

99 GENERAL AND MISCELLANEOUS↗

US Contribution to the High Luminosity LHC Upgrade: Focusing Quadrupoles and Crab Cavities

In the early 2000's, the US High Energy Physics community contributing to the Large Hadron Collider (LHC) launched the LHC Accelerator R&D Program (LARP), a long-vision focused R&D program, intended contribute to a quick LHC commissioning and to bring the Nb3Sn and other technologies to a maturity level that would allow applications in HEP machines [1,2]. Around 2015, the technologies developed by LARP, CERN and other institutions were mature enough to allow the spin-off of a major upgrade project to the LHC complex, the High Luminosity LHC (HL-LHC) [3]. This paper will focus on the US contribution to HL-LHC, namely the large-aperture low-β focusing Nb3Sn quadrupoles and the Radio Frequency Dipole (RFD) Crab Cavities, located in close proximity to the ATLAS and CMS experiments. This contribution, called the HL-LHC Accelerator Upgrade Project (HL-LHC AUP), focuses on production of these quadrupoles and cavities by sharing the work among a consortium of US Laboratories (FNAL, LBNL, BNL and SLAC) and Universities and in close connection with the CERN-led HL-LHC Collaboration. The collaboration achieved commonality of specifications and uniformity of performance. Final development of design, construction and first results from the prototypes are described to indicate the status of these critical components for HL-LHC.

43 PARTICLE ACCELERATORS↗

Proposed Enhanced Imaging Station in the 6-GeV Booster-to-Storage Ring Transport Line for APS Upgrade

The high charge per micropulse of up to 17 nC in the booster to storage ring transport line (BTS) for APS Upgrade will necessitate changes in the imaging station used to evaluate beam emittance in this key region. The original Chromox screen has recently been replaced by a YAG:Ce single crystal for immediate screen spatial resolution improvement down to <10 µm. However, the optical system also needs an upgrade with lenses and a digital camera to take full advantage of this enhancement. In addition, at the high areal charge densities expected, the YAG:Ce scintillator mechanism will saturate, or quench, leading to images larger than the actual beam size. To circumvent this effect, optical transition radiation (OTR) screens will be implemented. A proposed longer-range goal of a non-intercepting beam-size monitor using optical diffraction radiation techniques during top-up injection will also be addressed.

43 PARTICLE ACCELERATORS↗

Proposed Enhanced Imaging Station in the 6-GeV Booster-to-Storage Ring Transport Line for APS Upgrade

The high charge per micropulse of up to 17 nC in the booster to storage ring transport line for APS Upgrade will necessitate changes in the imaging station used to evaluate beam emittance in this key region. The original Chromox screen has recently been replaced by a YAG:Ce single crystal for immediate screen spatial resolution improvement down to <10 µm. However, the optical system also needs an upgrade with lenses and a digital camera to take full advantage of this. In addition, at the high areal charge densities expected, the YAG:Ce scintillator mechanism will saturate, or quench, leading to images larger than the actual beam size. To circumvent this effect, optical transition radiation (OTR) screens will be implemented. A proposed longer-range goal of a non-intercepting beam-size monitor using optical diffraction radiation techniques during top-up injection will also be addressed.

43 PARTICLE ACCELERATORS↗

Catalytic Upgrading of Biomass Pyrolysis Vapors at Bench Scale with Pt/TiO2

Vapor phase upgrading can produce a liquid of lower oxygen and higher energy density than can fast pyrolysis alone. Therefore, it is anticipated that catalytic pyrolysis followed by a single stage of hydrotreating will be a more cost-effective route to hydrocarbon fuels than fast pyrolysis with multiple-stage or more-severe hydrotreating. To this end, a bench-scale bubbling fluidized bed pyrolyzer was operated at 150 g/h feed rate of pine flour with a 100 g fixed-bed catalytic upgrader. A 0.5% Pt/TiO2 catalyst produced a lower oxygen (< 20%) liquid at 40% carbon efficiency at 400 degrees C and biomass-to-catalyst ratio (B:C) of 3 for numerous cycles. The catalyst was regenerated and reused by oxidation with air and reduction with hydrogen. The oxidation and reduction times were reduced to 2 h and 1 h respectively without compromising performance or catalyst temperature control. Increasing the pyrolysis temperature from 500 degrees C to 550 degrees C allowed operation at B:C greater than 3 at comparable performance. Performance was generally similar to 2% Pt/TiO2 but at reduced catalyst cost. Projected costs are < $4/gallon of gasoline blendstock. Responses to other parameter changes and prospects for further improvements will be discussed.

09 BIOMASS FUELS↗

Catalytic Upgrading of Biomass Pyrolysis Vapors at Bench Scale with Platinum on Titania

Vapor phase upgrading can produce a liquid of lower oxygen and higher energy density than can fast pyrolysis alone. Therefore, it is anticipated that catalytic pyrolysis followed by a single stage of hydrotreating will be a more cost-effective route to hydrocarbon fuels than fast pyrolysis with multiple-stage or more-severe hydrotreating. To this end, a bench-scale bubbling fluidized bed pyrolyzer was operated at 150 g/h feed rate of pine flour with a 100 g fixed-bed catalytic upgrader. A 0.5% Pt/TiO2 catalyst produced a lower oxygen (< 20%) liquid at 40% carbon efficiency at 400 degrees C and biomass-to-catalyst ratio (B:C) of 3 for numerous cycles. The catalyst was regenerated and reused by oxidation with air and reduction with hydrogen. The oxidation and reduction times were reduced to 2 h and 1 h respectively without compromising performance or catalyst temperature control. Increasing the pyrolysis temperature from 500 degrees C to 550 degrees C allowed operation at B:C greater than 3 at comparable performance. Performance was generally similar to 2% Pt/TiO2 but at reduced catalyst cost. Projected costs are < $4/gallon of gasoline blendstock. Responses to other parameter changes and prospects for further improvements will be discussed.

09 BIOMASS FUELS↗

Biochemical upgrading of high-protein biomass and grain products

The present invention relates to methods of upgrading biomass to provide useful chemical intermediates, fuels, amino acids, nutrients, etc. In particular examples, the biomass is a by-product of ethanol production and is mainly used as high-protein feed. Described herein are methods for upgrading such biomass, such as by implementing pre-treatment conditions and by employing fermentation conditions including modified organisms.

09 BIOMASS FUELS↗

Spallation Neutron Source Proton Power Upgrade Low-Level RF Control System Development

The Proton Power Upgrade (PPU) Project is approved for the Spallation Neutron Source at Oak Ridge National Laboratory and will double the proton beam power capability from 1.4 MW to 2.8 MW with 2 MW beam power available to the first target station. A second target station is planned and will utilize the remaining beam power in the future. The proton power increase will be supported with the addition of twenty-eight new superconducting cavities powered by 700 kW peak power klystrons to increase beam energy while increases to the beam current will be done with a combination of existing RF margin, and DTL HPRF upgrades. The original low-level RF control system has proven to be reliable over the past 15 years of operations, but obsolescence issues mandate a replacement system be developed for the PPU project. The replacement system is realized in a µTCA.4 platform using a combination of commercial off-the-shelf boards and custom hardware to support the requirements of PPU. This paper presents the prototype hardware, firmware, and software development activities along with preliminary testing results of the new system.

Crofford, Mark↗

UX Focused Development Work During Recent ORNL EPICS-Based Instrument Control System Upgrade Projects

The importance of usability and easy-to-use user interfaces (UI) have been recognized across many domains. However, the user-friendliness of scientific experiment control systems often lags behind industry standards in the flourishing user experience (UX) field. Scientific control systems can certainly benefit from these new UX research methods and approaches. Recent instrument control system upgrade projects at the SNS and HFIR facilities at Oak Ridge National Laboratory demonstrate the effectiveness of UX focused development work, and further reveal the need for more utilization of such techniques coming from the UX field. The ongoing control system upgrades are targeting the key facility-level priority of higher scientific productivity, and UX is one of the important tools to help us achieve this priority. We will highlight research methods and practices, introduce our findings and deliverables, and share challenges and lessons learned in applying UX methods to scientific control systems.

Yao, Marie Xingxing↗

Biochemical upgrading of high-protein biomass and grain products

The present invention relates to methods of upgrading biomass to provide useful chemical intermediates, fuels, amino acids, nutrients, etc. In particular examples, the biomass is a by-product of ethanol production and is mainly used as high-protein feed. Described herein are methods for upgrading such biomass, such as by implementing pre-treatment conditions and by employing fermentation conditions including modified organisms.

Davis, Ryan Wesley↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

IRIS-HEP Strategic Plan for the Next Phase of Software Upgrades for HL-LHC Physics

The quest to understand the fundamental building blocks of nature and their interactions is one of the oldest and most ambitious of human scientific endeavors. CERN's Large Hadron Collider (LHC) represents a huge step forward in this quest. The discovery of the Higgs boson, the observation of exceedingly rare decays of $B$ mesons, and stringent constraints on many viable theories of physics beyond the Standard Model (SM) demonstrate the great scientific value of the LHC physics program. The next phase of this global scientific project will be the High-Luminosity LHC (HL-LHC) which will collect data starting circa 2029 and continue through the 2030s. The primary science goal is to search for physics beyond the SM and, should it be discovered, to study its implications. In the HL-LHC era, the ATLAS and CMS experiments will record around 100 times as many collisions as were used to discover the Higgs boson (and at twice the energy). Both NSF and DOE are making large detector upgrade investments so the HL-LHC can operate in this high-rate environment. Similar investment in software R&D for acquiring, managing, processing and analyzing HL-LHC data is critical to maximize the return-on-investment in the upgraded accelerator and detectors. This report presents a strategic plan for a possible second 5-year funded phase (2023 through 2028) for the Institute for Research and Innovation in Software for High Energy Physics (IRIS-HEP) which will close remaining software and computing gaps to deliver HL-LHC science.

43 PARTICLE ACCELERATORS↗