Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

MPACT Verification and Validation Manual (rev 1)

The MPACT code provides the capability to calculate the steady-state and transient reactor core neutron distribution for operating nuclear power plant (PWR) conditions across multiple fuel cycles. As required in the CASL SQA plan, it is the responsibility of UM and ORNL as joint owners of MPACT to ensure that verification and validation activities are performed and documented in a V&V manual with supporting publications and CASL technical reports which can be distributed for reference and distribution within VERA. This document provides the first revision of the MPACT verification and validation (V&V) manual and describes the current state of MPACT V&V and updates the framework for future MPACT V&V activities. During FY16, MPACT V&V activities in the areas of code verification have continued to mature and work has progressed on code error evaluation using the Method of Manufactured Solutions (MMS). Several specific tasks have also been completed to improve MPACT code verification to include tasks to improve the unit and regression test coverage. A joint UM/ORNL task was completed to develop standardize coding standards and workflow for the continued collaborative development of MPACT. During the past year, MPACT validation work has continued in both the areas of measured data from critical experiments as well as measured data from operating nuclear power plants. Preliminary work was also performed in FY16 on the use of post-irradiation examinations for evaluation and validation of the isotopic depletion capability in MPACT. Based on the results of V&V efforts this past year, the confidence level has increased in the ability of MPACT to model an operational Pressurized Water Reactor. Areas were identified which require increased emphasis during FY17 to include updating all the V&V problems with the new 51-group library, the completion of cycle 2 of the BEAVRS benchmark, initial validation for BWR applications, the addition of Uncertainty Quantification results into the benchmark results, and the completion of specific validation tasks for the CASL Challenge problems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GIGA-Lens: Fast Bayesian Inference for Strong Gravitational Lens Modeling

We present GIGA-Lens: a gradient-informed, GPU-accelerated Bayesian framework for modeling strong gravitational lensing systems, implemented in TensorFlow and JAX. The three components, optimization using multistart gradient descent, posterior covariance estimation with variational inference, and sampling via Hamiltonian Monte Carlo, all take advantage of gradient information through automatic differentiation and massive parallelization on graphics processing units (GPUs). We test our pipeline on a large set of simulated systems and demonstrate in detail its high level of performance. The average time to model a single system on four Nvidia A100 GPUs is 105 s. The robustness, speed, and scalability offered by this framework make it possible to model the large number of strong lenses found in current surveys and present a very promising prospect for the modeling of ${ \mathcal O }({10}^{5})$ lensing systems expected to be discovered in the era of the Vera C. Rubin Observatory, Euclid, and the Nancy Grace Roman Space Telescope.

79 ASTRONOMY AND ASTROPHYSICS↗

Sample Identifiers and Metadata to Support Data Management and Reuse in Multidisciplinary Ecosystem Sciences

Physical samples are foundational entities for research across biological, Earth, and environmental sciences. Data generated from sample-based analyses are not only the basis of individual studies, but can also be integrated with other data to answer new and broader-scale questions. Ecosystem studies increasingly rely on multidisciplinary team-science to study climate and environmental changes. While there are widely adopted conventions within certain domains to describe sample data, these have gaps when applied in a multidisciplinary context. In this study, we reviewed existing practices for identifying, characterizing, and linking related environmental samples. We then tested practicalities of assigning persistent identifiers to samples, with standardized metadata, in a pilot field test involving eight United States Department of Energy projects. Participants collected a variety of sample types, with analyses conducted across multiple facilities. We address terminology gaps for multidisciplinary research and make recommendations for assigning identifiers and metadata that supports sample tracking, integration, and reuse. Furthermore, our goal is to provide a practical approach to sample management, geared towards ecosystem scientists who contribute and reuse sample data.

54 ENVIRONMENTAL SCIENCES↗

The Euratom Fast Collar (EFC): A Safeguards Instrument Design to Address Future Fuel Measurement Challenges

Summary of this presentation: (1) EFC instrument design for {sup 235}U verification measurements issued to EURATOM to issue a call for commercial tender; (2) Achieved a fast (Cd mode) measurement with less than 2% relative uncertainty in the doubles neutron counting rate in 10 minutes using a standard source strength; (3) Assay time in fast mode consistent with the needs of an inspector; (4) Extended to realistic calibration range for modern fuel designs - Relatively insensitive to gadolinia content for fuel designs with up to 32 burnable poison rods and 15 wt % gadolinia concentration, which is a realistic maximum for modern PWR fuel; (5) Improved performance over the standard thermal neutron collar with greater than twice the efficiency of the original design; (6) Novel tube pattern to reduce the impact of accidental pile-up; and (7) Joint test of prototype unit - EURATOM-LANL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Numerical Modeling Research at the US Navy Wave Energy Test Site, Honolulu, Hawaii.

The U.S. Navy Wave Energy Test Site (WETS) in Hawaii, the United States’ first grid-connected test site of its kind, has been operational since 2015. The Hawaii Natural Energy Institute (HNEI) at the University of Hawaii is providing key research support for this facility. In this paper, we present some of the numerical modeling research on Wave Energy Converters (WECs) undertaken as part of this effort. In the first part, we describe numerical modeling results and comparison with trial data for the Northwest Energy Innovations (NWEI) Azura WEC device. In the second part, the power performance of a WEC array currently being developed by a Honolulu based company –National Power Concepts (NPC)– is described.

16 TIDAL AND WAVE POWER↗

Nevada Higher Education Benefits from US Department of Energy (DOE) Environmental Management (EM) Nevada Program's Transfer of Geologic Samples - 20442

The Nevada National Security Site (NNSS), formerly the Nevada Test Site, was the location of 100 historic atmospheric and 828 historic underground nuclear tests from 1951 to 1992. Related to this historic nuclear testing, geologic and hydrologic studies of the site were conducted utilizing the skills and the expertise of the U.S. Geological Survey (USGS) and national laboratories (Los Alamos National Laboratory, Lawrence Livermore National Laboratory), who were principal in leading the development of weapons and were responsible for specific underground testing programs. The subsurface samples and technical/scientific data associated with NNSS geologic studies (past and present) are preserved and stored at the USGS Mercury Core Library and Data Center located at the NNSS. Currently, the facility stores over 2,000,000 linear feet of cores and cuttings from more than 2,600 drill holes that can be accessed for study. Most of the samples and historic geologic work was focused directly on subsurface geologic settings that relate directly to historic underground nuclear testing. Since 1992, the United States has observed a unilateral moratorium on full-scale nuclear testing, and the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program is now responsible for hydrogeologic characterization of the potential impacts to the natural groundwater systems that may have resulted from historic underground nuclear tests. As part of this effort, the EM Nevada Program Underground Test Area (UGTA) Activity has drilled and completed over 58 deep (2,000 - 7,000 ft.) characterization wells, totaling in excess of 170,000 linear feet of cuttings and core samples. Cutting samples were collected as triplicate samples for each respective depth interval, to account for potential later nondestructive/destructive analysis and to preserve samples for regulatory purposes. Recently, it was recognized by the EM Nevada Program that opportunities may exist to reduce the cost and floor space required for the storage of geologic samples at the Mercury Core Library without impacting the integrity and representative nature of the samples necessary for project execution. An initiative was sponsored by EM Nevada Program to evaluate several options: 1) disposal of a portion of cuttings and cores in a land fill setting; 2) reduction in sample volume through skeletonizing core and cuttings from wells to a representative but much smaller number of samples; and 3) solicit potential interest in the academic community where other geoscientists could freely access the samples for studies. The Nevada state university system through the Nevada Bureau of Mines and Geology responded positively to the opportunity to receive these NNSS samples from the EM Nevada Program. In June 2019, approximately 17,000 geologic samples, representing greater than 170,000 linear feet of drilling and weighing over 20,000 pounds, were shipped from the NNSS to the Great Basin Science Sample and Records Library located in Reno, Nevada. The benefits resulting from this transfer were realized by the EM Nevada Program in terms of cost and space savings for geologic sample storage at the NNSS. The transfer did not impact the EM Nevada Program mission as access to representative geologic samples for regulatory and scientific purposes was preserved. Moreover, the Nevada Bureau of Mines and Geology acquired a significant resource of subsurface geologic samples and supporting technical data to support academic and scientific studies in a complex volcanic setting in southwest Nevada. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Future Opportunities for LWR Irradiations in US Test Reactors

After several years of relatively low activity in the field of Light Water Reactor (LWR) fuel development, the Department of Energy again began to engage in developing new fuel technologies and irradiation performance data prompted by the Fukushima Daichi nuclear accidents. New competencies for irradiation testing in material test reactors in the United States began to be developed at this time using the Advanced Test Reactor (ATR), High Flux Isotope Reactor (HFIR), Massachusetts Institute of Technology Reactor (MITR), and the Transient Reactor Test Facility (TREAT). Capsules for testing fuel and cladding materials in ATR and HFIR were deployed, a Pressurized Water Reactor (PWR) condition loop for testing fuel rods was established in ATR, cladding corrosion studies were performed using a water loop in MITR, and TREAT pulse testing capabilities were commissioned for fuel rods in water capsules. The more recent and unexpected closure of the Halden Boiling Water Reactor (HBWR) also prompted further investments in Loss of Coolant Accident (LOCA) testing capabilities at TREAT. New configurations of these test devices show further potential in enhanced steam condition control and other investigations are building toward a flowing water loop for testing transient to dryout conditions. The closure of HBWR also prompted a major project currently underway to construct additional water loops in ATR where a novel approach is being pursued to enable Boiling Water Reactor (BWR) conditions. A meaningful collaborative project was awarded to MITR which, amidst an unexpected major overhaul of the reactor, has expanded cladding corrosion test capabilities at MITR. New explorations have led to methods for unique experiments at HFIR including channel box irradiations. New device developments are also bridging toward future potential for instrumented capsule irradiation tests in ATR and HFIR. Finally, a new project referred to as the System Physics Advanced Reactor Critical facility (SPARC) is gaining traction towards a large zero-power reactor able to produce physics validation data for LWR fuel bundle designs with increased enrichment and enhanced absorbers for 24-month operation cycles. This paper provides a brief summary of the status of these irradiation testbed capabilities with an emphasis on current efforts toward future capabilities to obtain new data and maximize the performance potential of LWR fuel technologies.

Woolstenhulme, Nicolas [Idaho National Laboratory ↗

Closure Report for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR) Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the impact of lime softening waste disposal in natural environments

Highlights: • Leaching tests conducted on WTR to assess potential for trace element release. • Aluminum leaching found to be elevated with respect to risk threshold. • Release in anaerobic conditions evaluated with column test run in nitrogen chamber. • Increased release of certain elements seen from residues under anaerobic conditions. • Different leaching tests produced results on two sides of regulatory threshold. - Abstract: Drinking water treatment residues (WTR), generated from the lime softening processes, are commonly reused or disposed of in a number of applications; these include use as a soil amendment or a subsurface fill. Recently questions were posed by the Florida regulatory community on whether lime WTR that contained a small percentage of other treatment additives could appropriately be characterized as lime WTR, in terms of total element content and leachability. A study was done using a broad range of leaching tests, including a framework of tests recently adopted by the United States-Environmental Protection Agency (EPA) and tests that were modified to account for scenario specific conditions, such as the presence of natural organic matter (NOM). The results of these additional leaching tests demonstrated that certain applications, including disposal in a water body with NOM or in placement anaerobic environment, did result in increased leaching of elements such as Fe, and that a site specific assessment should be conducted prior to using WTR in these types of applications. This study illustrates the importance of leaching test selection when attempting to provide an estimation of release in practice. Although leaching tests are just one component in a beneficial use assessment and other factors including aquifer and soil properties play a significant role in the outcome, leaching tests should be tailored to most appropriately represent the scenario or reuse application being evaluated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predicting Envelope Leakage in Attached Dwellings (Fact Sheet)

The most common method of measuring air leakage is to perform single (or solo) blower door pressurization and/or depressurization test. In detached housing, the single blower door test measures leakage to the outside. In attached housing, however, this "solo" test method measures both air leakage to the outside and air leakage between adjacent units through common surfaces. Although minimizing leakage to neighboring units is highly recommended to avoid indoor air quality issues between units, reduce pressure differentials between units, and control stack effect, the energy benefits of air sealing can be significantly overpredicted if the solo air leakage number is used in the energy analysis. Guarded blower door testing is more appropriate for isolating and measuring leakage to the outside in attached housing. This method uses multiple blower doors to depressurize adjacent spaces to the same level as the unit being tested. Maintaining a neutral pressure across common walls, ceilings, and floors acts as a "guard" against air leakage between units. The resulting measured air leakage in the test unit is only air leakage to the outside. Although preferred for assessing energy impacts, the challenges of performing guarded testing can be daunting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Black carbon emissions from modern automated cordwood stoves for space heating

Wood burning stove design is improving as regulation become stricter for particulate matter emissions. Here, this study describes results of black carbon (BC) emissions from three modern automated wood stoves when tested in common failure modes using a test protocol that included cold-starts, high and low fuel loading densities, and use of overly large pieces of fuel. Emission sampling was performed using a dilution sampling system in tandem with an aethalometer to measure BC with high time resolution. Results show that the time-weighted average BC emission rates were 0.91, 4.30, and 1.74 g/h for the three stoves tested (A, B, and C respectively), the values, both higher and lower than the United States 2020 certification test emission limit of 2.5 g/h. The results demonstrate good performance overall, given the rigorous nature of the testing protocol used. The aethalometer data showed that the performance was relatively poor during cold-start, when the fuel was ignited and combusted without a coalbed, and when stoves failed to optimize air delivery due to specific loading and output conditions. During the cold-start test section, the average BC emission rate was seven times higher than the overall average for Stove A, 10 times above the average for Stove B, and two times above the average emission rate for Stove C. Calculations of the Average Angstrom Absorption Exponent (AAE) of the exhaust aerosol showed little correlation with BC concentration. The results show that automation results in a quantifiable reduction in particular BC emissions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Data reduction methods, systems, and devices

Systems, methods, and apparatus are disclosed herein for data pattern detection and data reduction. Devices include an input port configured to receive data values that include a plurality of data units. The devices may also include a data analyzer configured to determine a test statistic based on at least some of the plurality of data units, the test statistic indicating a degree of difference between a first data unit and at least a second data unit, the second data unit being received at the input port before the first data unit. The data analyzer includes the first data unit in a first data block responsive to a determination that the test statistic indicates a low degree of difference, the determination being based on a comparison with a designated difference threshold, the first data block being a same data block as a second data block that includes the second data unit.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Large-Scale Pumping Test Recommendations for the 200-ZP-1 Operable Unit

CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Area 25 and Area 26 Railroad Tracks, Nevada Test Site, Nevada, Revision 0

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 539, Areas 25 and 26 Railroad Tracks, as identified in the Federal Facility Agreement and Consent Order (FFACO). A modification to the FFACOwas approved in May 2010 to transfer the two Railroad Tracks corrective action sites (CASs) from CAU 114 into CAU539. The two CASs are located in Areas 25 and 26 of the Nevada Test Site: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks This plan provides the methodology for field activities needed to gather the necessary information for closing the two CASs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of the CAU 539 Railroad Tracks CASs using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation should support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place with use restrictions. This will be presented in a closure report that will be prepared and submitted to the NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on December 14, 2009, by representatives of U.S.Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Navarro Nevada Environmental Services, LLC (NNES); and National Security Technologies, LLC. The DQO process has been used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each Railroad Tracks CAS in CAU 539. The following text summarizes the SAFER activities that will support the closure of CAU 539: • Perform site preparation activities (e.g., utilities clearances, radiological surveys). • Collect in situ dose measurements. • Collect environmental samples from designated target populations (e.g., lead bricks) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish no further action as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. If a COC is present at a CAS, NNES will consult NDEP to determine the path forward, then either: • Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or • Establish closure in place as the corrective action and implement the appropriate use restrictions.

54 ENVIRONMENTAL SCIENCES↗

Mock-Up activities for the extraction of samples from a salt-stone disposal unit - 15502

Mock-up testing with respect to the core-drilling of simulant salt-stone grout was conducted to support the future retrieval of field-emplaced salt-stone samples from salt-stone Disposal Unit (SDU) Cell 2A. The primary objectives of extracting samples from SDU Cell 2A are to enable measurement of field-emplaced samples with respect to properties that influence long-term performance, such as saturated hydraulic conductivity, and to compare the measured properties for field-emplaced and comparable samples prepared in the laboratory. Initial mock-up activities (Phases 1 and 2) were conducted in Fiscal Years (FY) 2013 and 2014 in order to demonstrate the viability of standard core-drilling techniques that are typically employed for sampling concrete structures. The primary requirement for the core-drilling technique was that it should minimize the potential of physical or chemical sample changes that would artificially degrade key grout properties. Mock-up activities were aimed at optimizing the techniques for core-drilling, and subsequent sample extraction, using a set-up that mimicked, to the extent practical, both the physical characteristics, and operational complexities, of core-drilling salt-stone grout from the roof of the SDU. Samples extracted from the grout monolith were subsequently characterized with respect to saturated hydraulic conductivity and compressive strength, and compared to data for cast samples prepared using the same simulant salt-stone material. The comparison of these properties for the two sample types was expected to highlight potential flaws (e.g., micro-cracking) introduced by the core-drilling process. While the data for saturated hydraulic conductivity were virtually identical (approximately 2 E-09 cm/sec), the compressive strength of the core-drilled samples (approximately 3.5 MPa (500 psi)) was on average half that measured for the cast samples. It was suspected that increased water saturation and surface scoring of the core-drilled samples might account for the disparate compressive Strength data. During Phases 1 and 2 it was determined that cores could be successfully drilled and extracted to a depth of approximately 0.9 meters (3 feet) below the grout surface. Phase 3 (FY 2105) has been initiated and is primarily directed at demonstrating the ability to core-drill through approximately 1.8 meters (6 feet) of overlying grout to retrieve the desired sample from the SDU. The original drill depth of 0.6 - 0.9 meters (2-3 feet) was based on an SDU fill height of 5.6 meters (18.5 feet) and sample location of approximately 4.9 meters (16 feet); recently the allowable fill height in the SDUs has been increased to 6.5 meters (21.25 feet); hence the increased depth of overlying grout above the samples to be retrieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗