Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Nowcasting in the GPM Era

The Global Precipitation Measurement (GPM) Mission is an international satellite mission to unify and advance global precipitation measurements from a constellation of dedicated and operational microwave sensors. The GPM concept centers on the deployment of a Core Spacecraft in a non-Sun-synchronous orbit at 65deg inclination carrying a dual-frequency precipitation radar (DPR) and a multi-frequency passive microwave radiometer (GMI) with high-frequency capabilities to serve as a precipitation physics observatory and calibration standard for the constellation radiometers. The baseline GPM constellation is envisioned to comprise conical-scanning microwave imagers (e.g., GMI, SSMIS, AMSR, MIS, MADRAS, GPM-Brazil) augmented with cross-track microwave temperaturelhumidity sounders (e.g., MHS, ATMS) over land. In addition to the Core Satellite, the GPM Mission will contribute a second GMI to be flown in a low-inclination (approx.40deg) non-Sun-synchronous orbit to improve near real-time monitoring of hurricanes. GPM is a science mission with integrated applications goals aimed at (1) advancing the knowledge of the global waterlenergy cycle variability and freshwater availability and (2) improving weather, climate, and hydrological prediction capabilities through more accurate and frequent measurements of global precipitation. The GPM Mission is currently a partnership between NASA and the Japan Aerospace Exploration Agency (JAXA), with opportunities for additional partners in satellite constellation and ground validation activities. Within the framework of the inter-governmental Group ob Earth Observations (GEO) and Global Earth Observation System of Systems (GEOSS), GPM has been identified as a cornerstone for the Precipitation Constellation (PC) being developed under the auspices of Committee of Earth Observation Satellites (CEOS). The GPM Core Observatory is scheduled for launch in 201 3, followed by the launch of the GPM Low-Inclination Observatory in 2014. An overview of the GPM mission status, measurement capabilities, ground validation plans, and anticipated contributions to scientific research and societal applications with a special emphasis on nowcasting will be presented.

Hou, Arthur Y.↗

Nowcasting in the GPM Era

The Global Precipitation Measurement (GPM) Mission is an international satellite mission to unify and advance global precipitation measurements from a constellation of dedicated and operational microwave sensors. The GPM concept centers on the deployment of a Core Spacecraft in a non-Sun-synchronous orbit at 65' inclination carrying a dual-frequency precipitation radar (DPR) and a multi-frequency passive microwave radiometer (GMI) with high-frequency capabilities to serve as a precipitation physics observatory and calibration standard for the constellation radiometers. The baseline GPM constellation is envisioned to comprise conical-scanning microwave imagers (e.g., GMI, SSMIS, AMSR, MIS, MADRAS, GPM-Brazil) augmented with cross-track microwave temperaturelhumidity sounders (e.g., MHS, ATMS) over land. In addition to the Core Satellite, the GPM Mission will contribute a second GMI to be flown in a low-inclination (-40') non-Sun-synchronous orbit to improve near real-time monitoring of hurricanes. GPM is a science mission with integrated applications goals aimed at (1) advancing the knowledge of the global waterlenergy cycle variability and freshwater availability and (2) improving weather, climate, and hydrological prediction capabilities through more accurate and frequent measurements of global precipitation. The GPM Mission is currently a partnership between NASA and the Japan Aerospace Exploration Agency (JAXA), with opportunities for additional partners in satellite constellation and ground validation activities. Within the framework of the inter-governmental Group ob Earth Observations (GEO) and Global Earth Observation System of Systems (GEOSS), GPM has been identified as a cornerstone for the Precipitation Constellation (PC) being developed under the auspices of Committee of Earth Observation Satellites (CEOS). The GPM Core Observatory is scheduled for launch in 201 3, followed by the launch of the GPM Low-Inclination Observatory in 2014. An overview of the GPM mission status, measurement capabilities, ground validation plans, and anticipated contributions to scientific research and societal applications with a special emphasis on nowcasting will be presented.

Hou, Arthur Y.↗

Smart and Intelligent Sensors

John C. Stennis Space Center (SSC) provides rocket engine propulsion testing for NASA's space programs. Since the development of the Space Shuttle, every Space Shuttle Main Engine (SSME) has undergone acceptance testing at SSC before going to Kennedy Space Center (KSC) for integration into the Space Shuttle. The SSME is a large cryogenic rocket engine that uses Liquid Hydrogen (LH2) as the fuel. As NASA moves to the new ARES V launch system, the main engines on the new vehicle, as well as the upper stage engine, are currently base lined to be cryogenic rocket engines that will also use LH2. The main rocket engines for the ARES V will be larger than the SSME, while the upper stage engine will be approximately half that size. As a result, significant quantities of hydrogen will be required during the development, testing, and operation of these rocket engines.Better approaches are needed to simplify sensor integration and help reduce life-cycle costs. 1.Smarter sensors. Sensor integration should be a matter of "plug-and-play" making sensors easier to add to a system. Sensors that implement new standards can help address this problem; for example, IEEE STD 1451.4 defines transducer electronic data sheet (TEDS) templates for commonly used sensors such as bridge elements and thermocouples. When a 1451.4 compliant smart sensor is connected to a system that can read the TEDS memory, all information needed to configure the data acquisition system can be uploaded. This reduces the amount of labor required and helps minimize configuration errors. 2.Intelligent sensors. Data received from a sensor be scaled, linearized; and converted to engineering units. Methods to reduce sensor processing overhead at the application node are needed. Smart sensors using low-cost microprocessors with integral data acquisition and communication support offer the means to add these capabilities. Once a processor is embedded, other features can be added; for example, intelligent sensors can make a health assessment to inform the data acquisition client when sensor performance is suspect. 3.Distributed sample synchronization. Networks of sensors require new ways for synchronizing samples. Standards that address the distributed timing problem (for example, IEEE STD 1588) provide the means to aggregate samples from many distributed smart sensors with sub-microsecond accuracy. 4. Reduction in interconnect. Alternative means are needed to reduce the frequent problems associated with cabling and connectors. Wireless technologies offer the promise of reducing interconnects and simultaneously making it easy to quickly add a sensor to a system.

Lansaw, John↗

Landsat Data Continuity Mission (LDCM) Ascent and Operational Orbit Design

For the past 40-years, Landsat Satellites have collected Earth's continental data and enabled scientists to assess change in the Earth's landscape. The Landsat Data Continuity Mission (LDCM) is the next generation satellite supporting the Landsat science program. LDCM will fly a 16-day ground repeat cycle, Sun-synchronous, frozen orbit with a mean local time of the descending node ranging between 10:10 am and 10:15 am. This paper presents the preliminary ascent trajectory design from the injection orbit to its final operational orbit. The initial four burn ascent design is shown to satisfy all the LDCM mission goals and requirement and to allow for adequate flexibility in re-planning the ascent.

Mann, Laurie M.↗

On TTEthernet for Integrated Fault-Tolerant Spacecraft Networks

There has recently been a push for adopting integrated modular avionics (IMA) principles in designing spacecraft architectures. This consolidation of multiple vehicle functions to shared computing platforms can significantly reduce spacecraft cost, weight, and de- sign complexity. Ethernet technology is attractive for inclusion in more integrated avionic systems due to its high speed, flexibility, and the availability of inexpensive commercial off-the-shelf (COTS) components. Furthermore, Ethernet can be augmented with a variety of quality of service (QoS) enhancements that enable its use for transmitting critical data. TTEthernet introduces a decentralized clock synchronization paradigm enabling the use of time-triggered Ethernet messaging appropriate for hard real-time applications. TTEthernet can also provide two forms of event-driven communication, therefore accommodating the full spectrum of traffic criticality levels required in IMA architectures. This paper explores the application of TTEthernet technology to future IMA spacecraft architectures as part of the Avionics and Software (A&S) project chartered by NASA's Advanced Exploration Systems (AES) program.

Loveless, Andrew↗

Joint Polar Satellite System

The Joint Polar Satellite System (JPSS) is a joint NOAA/NASA mission comprised of a series of polar orbiting weather and climate monitoring satellites which will fly in a sun-synchronous orbit, with a 1330 equatorial crossing time. JPSS resulted from the decision to reconstitute the National Polar-orbiting Operational Environmental Satellite System (NPOESS) into two separate programs, one to be run by the Department of Defense (DOD) and the other by NOAA. This decision was reached in early 2010, after numerous development issues caused a series of unacceptable delays in launching the NPOESS system.

Trenkle, Timothy↗

Orbital Variations and Impacts on Observations from SNPP, NOAA 18-20, and AQUA Sun-Synchronous Satellites

The AQUA, SNPP, and NOAA 18-20 PM sun-synchronous satellites were designed with similar local time, local solarzenith angles, and overlapping temporal coverage. Although the satellites are expected to have fixed local equator-crossing time, during the satellite lifetime, the equator-crossing times of these satellites drift. For NOAA 18-19, the driftin equator-crossing time is significant (few hours) and no correction has been done over the lifetime. For SNPP andAQUA, correction in the orbital inclination angle was periodically performed to maintain the equator-crossing timearound the designed value. The impact of systematic drift of the local observation time during the satellite life cycle canbe significant and should be accounted for when using multi-year time series of satellite products in long-termenvironmental studies. In this paper, the equator-crossing time drift of AQUA, SNPP, and NOAA 18-20, the correctionof SNPP and AQUA equator-crossing time via orbital inclination angle change, and the consequent local solar zenithangle variation are evaluated. The impact of such drift on low-latitude mean brightness temperature trend derived fromthe similar ~11 μm thermal emissive channel of AQUA MODIS CH31, SNPP Visible Infrared Imaging RadiometerSuite (VIIRS) CH15 and NOAA 18-19 HIRS CH08 are analyzed. The drift in the mean brightness temperature measuredby these sensors is combined as a function of local time and analyzed using diurnal cycle analysis. The mean brightnesstemperature drift for SNPP VIIRS is reconciled within the context of much larger temperature drift of NOAA 18-19.

Shao, Xi↗

Precision Synchronization for Free-Space Quantum Networking

Precision synchronization is vital for robust long-distance quantum networking over fiber and free-space channels for which high-fidelity entanglement swapping between separate sources via an optical Bell state measurement requires temporal overlap of photonic qubits arriving from either source. This challenge is particularly distinct in satellite-based entanglement distribution in which relative motion, channel effects, and propagation delay must be addressed. This work presents a precision synchronization method for free space entanglement distribution, and reports on risk reduction testing in a quantum networking testbed at MIT Lincoln Laboratory. Primary consideration is for a dual-uplink architecture in which photons from entanglement sources at two ground locations interact in an optical Bell-state measurement implemented on a satellite in a low-earth orbit. The control approach uses independent entanglement sources at each ground location supplemented with a synchronization signal for feedback control from a timing discriminant measured at the spacecraft. The approach is being implemented in a laboratory testbed using 1-GHz repetition rate 1550-nm band entanglement sources generating ~10-MHz source entanglement rates with few-ps photon pulse lengths. The paper describes both fundamental architectural considerations and practical implementation details.

quantum↗

Propeller Source Noise Separation from Flight Test Measurements of the Joby Aviation Aircraft

The Vold-Kalman order-tracking filter is applied to full-scale acoustic flight test measurements of the Joby Aviation eVTOL aircraft. Using synchronized acquisition of the aircraft position, time-varying rotation rates of each propeller, and any given single-channel acoustic signal, harmonic and nonharmonic acoustic content can be separated. Furthermore, this time-domain technique can also separate harmonic content amongst individual propellers, providing additional physical insight into the total acoustic field. A 60 kt level flyover and hover are used to exemplify the effectiveness of the method. Results clearly demonstrate the ability to rank propulsors in terms of their relative importance without the use of phased arrays. Frequency- and order-domain results are provided, as well as noise hemispheres to illustrate directivity and individual propeller contributions. Differences can be associated with interactional or installation effects due to the similarities in propeller states for each condition. Simulated signals that track the measured time-varying shaft rates were used to assess the proper filter pole count and bandwidth.

evtol↗

Inter-Calibrating CERES Instrument Fluxes Utilizing the CERES Instrument Geostationary Scan Mode Observations

The NASA Clouds and the Earth’s Radiant Energy System (CERES) project provides the scientific community observed top-of-atmosphere (TOA) fluxes to monitor the Earth’s energy imbalance and validate climate models. The CERES instruments onboard the Terra, Aqua, SNPP and NOAA-20 satellites need to be inter-calibrated to provide a continuous and consistent TOA flux record contained in the CERES Energy Balanced and Filled (EBAF) product. The SNPP and NOAA-20 satellites are positioned a half an orbit apart within the same sun-synchronous orbit (1:30 PM equatorial crossing time) thus preventing any direct time-matched observations. The CERES project designed the geostationary scan mode (GEOscan) to inter-calibrate the Geostationary Earth Radiation Budget (GERB) broadband measurement onboard the Meteosat 8-11 satellites. By rotating the orientation of the CERES instrument scan to match the angular configuration of the geostationary scan mode, the comparison of both angle and time matched observations suitable for inter-calibration is possible. To determine if the GEOscan mode is useful for inter-calibrating two CERES instruments placed in the same 16-day repeating orbit, the CERES project placed the Terra and Aqua CERES instruments in GEOscan mode once every 6 days over a rotation of five geostationary domains beginning in February 2023. The GEO imager narrowband to broadband derived radiances are used as transfer radiometers to compare the Terra and Aqua CERES observed radiances. Since both the Terra and Aqua CERES instruments are in GEOscan mode over the same GEO domain and day, the GEO imager calibration is expected to be consistent between the Terra and Aqua overpass times. Any GEO imager narrowband to broadband regional biases should be similar for the Terra and Aqua overpasses. The GEOscan mode Terra and Aqua CERES inter-calibration coefficients for both shortwave and longwave broadband radiances will be compared against the CERES instrument team’s coefficients to determine the viability of this approach. Improvements in the GEO imager narrowband to broadband approaches will also be investigated and verified within this framework.

Kyle Itterly↗

ATS C-2 satellite VLBI experiment

A proposal is presented to conduct a satellite VLBI experiment using the ATS C-2 spacecraft. The main objectives of the experiment are: (1) precision spacecraft position determination with the VLBI technique and comparison of the L-band interferometric technique with the L-band R and R technique from the viewpoint of operational simplicity and precision, (2) comparison of the single differential Doppler and the wideband VLBI technique for such uses as tracking, geodesy, etc., (3) derivation of real time ionospheric corrections and phase scintillation effects utilizing simultaneous two-frequency (L- and C-band) tracking of the spacecraft in both time delay and Doppler interferometry, (4) development of techniques for precise time dissemination, particularly to marine users, through wideband time-delay interferometry, (5) development of techniques to use synchronous satellites as stable platforms in space in the area of marine geodesy, (6) station location and calibration, and (7) aid to L-band navigation experiments which utilize precise spacecraft position and time in deriving the user's position.

Ramasastry, J.↗

Digitized synchronous demodulator

A digitized synchronous demodulator is constructed entirely of digital components including timing logic, an accumulator, and means to digitally filter the digital output signal. Indirectly, it accepts, at its input, periodic analog signals which are converted to digital signals by traditional analog-to-digital conversion techniques. Broadly, the input digital signals are summed to one of two registers within an accumulator, based on the phase of the input signal and medicated by timing logic. At the end of a predetermined number of cycles of the inputted periodic signals, the contents of the register that accumulated samples from the negative half cycle is subtracted from the accumulated samples from the positive half cycle. The resulting difference is an accurate measurement of the narrow band amplitude of the periodic input signal during the measurement period. This measurement will not include error sources encountered in prior art synchronous demodulators using analog techniques such as offsets, charge injection errors, temperature drift, switching transients, settling time, analog to digital converter missing code, and linearity errors.

Woodhouse, Christopher E.↗

Time-Resolved Data Acquisition for In Situ Subsurface Planetary Geochemistry

The current gamma-ray/neutron instrumentation development effort at NASA Goddard Space Flight Center aims to extend the use of active pulsed neutron interrogation techniques to probe the subsurface geochemistry of planetary bodies in situ. All previous NASA planetary science missions, that used neutron and/or gamma-ray spectroscopy instruments, have relied on a constant neutron source produced from galactic cosmic rays. One of the distinguishing features of this effort is the inclusion of a high intensity 14.1 MeV pulsed neutron generator synchronized with a custom data acquisition system to time each event relative to the pulse. With usually only one opportunity to collect data, it is difficult to set a priori time-gating windows to obtain the best possible results. Acquiring time-tagged, event-by-event data from nuclear induced reactions provides raw data sets containing channel/energy, and event time for each gamma ray or neutron detected. The resulting data set can be plotted as a function of time or energy using optimized analysis windows after the data are acquired. Time windows can now be chosen to produce energy spectra that yield the most statistically significant and accurate elemental composition results that can be derived from the complete data set. The advantages of post-processing gamma-ray time-tagged event-by-event data in experimental tests using our prototype instrument will be demonstrated.

Bodnarik, Julia Gates↗

Time-resolved Neutron-gamma-ray Data Acquisition for in Situ Subsurface Planetary Geochemistry

The current gamma-ray/neutron instrumentation development effort at NASA Goddard Space Flight Center aims to extend the use of active pulsed neutron interrogation techniques to probe the subsurface elemental composition of planetary bodies in situ. Previous NASA planetary science missions, that used neutron and/or gamma-ray spectroscopy instruments, have relied on neutrons produced from galactic cosmic rays. One of the distinguishing features of this effort is the inclusion of a high intensity 14.1 MeV pulsed neutron generator synchronized with a custom data acquisition system to time each event relative to the pulse. With usually only one opportunity to collect data, it is difficult to set a priori time-gating windows to obtain the best possible results. Acquiring time-tagged, event-by-event data from nuclear induced reactions provides raw data sets containing channel/energy, and event time for each gamma ray or neutron detected. The resulting data set can be plotted as a function of time or energy using optimized analysis windows after the data are acquired. Time windows can now be chosen to produce energy spectra that yield the most statistically significant and accurate elemental composition results that can be derived from the complete data set. The advantages of post-processing gamma-ray time-tagged event-by-event data in experimental tests using our prototype instrument will be demonstrated.

Pulsed neutrongenerator↗

Throughput analysis of the IEEE 802.4 token bus standard under heavy load

It has become clear in the last few years that there is a trend towards integrated digital services. Parallel to the development of public Integrated Services Digital Network (ISDN) is service integration in the local area (e.g., a campus, a building, an aircraft). The types of services to be integrated depend very much on the specific local environment. However, applications tend to generate data traffic belonging to one of two classes. According to IEEE 802.4 terminology, the first major class of traffic is termed synchronous, such as packetized voice and data generated from other applications with real-time constraints, and the second class is called asynchronous which includes most computer data traffic such as file transfer or facsimile. The IEEE 802.4 token bus protocol which was designed to support both synchronous and asynchronous traffic is examined. The protocol is basically a timer-controlled token bus access scheme. By a suitable choice of the design parameters, it can be shown that access delay is bounded for synchronous traffic. As well, the bandwidth allocated to asynchronous traffic can be controlled. A throughput analysis of the protocol under heavy load with constant channel occupation of synchronous traffic and constant token-passing times is presented.

Pang, Joseph↗

TPSAS-NF1676L-10737-DND

The Clouds and the Earth's Radiant Energy System (CERES) project provides the community a quality climate TOA and surface fluxes and cloud properties and are key elements in evaluating the ability of climate models to predict both past and future climate states. One important aspect of successful climate monitoring is satellite calibration. The CERES instantaneous broadband calibration radiance stability is 0.1% per year, whereas the accuracy of the longwave (LW) and shortwave (SW) is better than 0.5% and 1% respectively. CERES uses the 3-hourly GEO fluxes and clouds to provide diurnally averaged daily and monthly TOA flux means from the CERES measurements onboard the Terra (10:30 AM local equator crossing time) and Aqua (13:30 PM) sun-synchronous satellites. The GEO radiances are calibrated against MODIS as a reference to provide consistent GEO retrieved cloud properties and derived broadband fluxes. These fluxes are then carefully normalized against the well-calibrated CERES fluxes to ensure climate quality fluxes, free of GEO artifacts. With the upcoming release of Edition3 products, CERES has just recalibrated all the CERES instruments to ensure that both Terra and Aqua fluxes are on the same radiometric scale and the removal of all known instrument trends. CERES will also recalibrate all GEO satellites using the entire GEO time record. CERES employs collocated, coincident ray-matched GEO/MODIS radiances as its primary technique, calibrating GEO radiances beginning in the year 2000. The advantage of the ray-matching technique is that it provides a full dynamic range of radiances to check the linearity of the GEO visible instrument. CERES uses deep convective clouds and invariant desert sites to validate the primary technique. All three methods can assess the stability of the GEO visible instrument. Examples of the CERES GEO calibration techniques and validation efforts will be shown at the conference. Special emphasis will be given to the newly incorporated desert site methodology.

R. Bhatt↗

Design and Principles Enabling the Space Reference FOM

A first complete draft of the Simulation Interoperability Standards Organization (SISO) Space Reference Federation Object Model (FOM) has now been produced. This paper provides some insights into its capabilities and discusses the opportunity for reuse in other domains. The focus of this first version of the standard is execution control, time management and coordinate systems, well-known reference frames, as well as some basic support for physical entities. The biggest part of the execution control is the coordinated start-up process. This process contains a number of steps, including checking of required federates, handling of early versus late joiners, sharing of federation wide configuration data and multi-phase initialization. An additional part of Execution Control is the coordinated and synchronized transition between Run mode, Freeze mode and Shutdown. For time management, several time lines are defined, including real-time, scenario time, High Level Architecture (HLA) logical time and physical time. A strategy for mixing simulations that use different time steps is introduced, as well as an approach for finding common boundaries for fully synchronized freeze. For describing spatial information, a mechanism with a set of reference frames is specified. Each reference frame has a position and orientation related to a parent reference frame. This makes it possible for federates to perform calculations in reference frames that are convenient to them. An operation on the Moon can be performed using lunar coordinates whereas an operation on Earth can be performed using Earth coordinates. At the same time, coordinates in one reference frame have an unambiguous relationship to a coordinate in another reference frame. While the Space Reference FOM is originally being developed for Space operations, the authors believe that many parts of it can be reused for any simulation that has a focus on physical processes with one or more coordinate systems, and require high fidelity and repeatability.

Moeller, Bjoern↗

Shuttle bit rate synchronizer

A shuttle bit rate synchronizer brassboard unit was designed, fabricated, and tested, which meets or exceeds the contractual specifications. The bit rate synchronizer operates at signal-to-noise ratios (in a bit rate bandwidth) down to -5 dB while exhibiting less than 0.6 dB bit error rate degradation. The mean acquisition time was measured to be less than 2 seconds. The synchronizer is designed around a digital data transition tracking loop whose phase and data detectors are integrate-and-dump filters matched to the Manchester encoded bits specified. It meets the reliability (no adjustments or tweaking) and versatility (multiple bit rates) of the shuttle S-band communication system through an implementation which is all digital after the initial stage of analog AGC and A/D conversion.

Huey, D. C.↗