Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

WRAP-RIB antenna technology development

The wrap-rib deployable antenna concept development is based on a combination of hardware development and testing along with extensive supporting analysis. The proof-of-concept hardware models are large in size so they will address the same basic problems associated with the design fabrication, assembly and test as the full-scale systems which were selected to be 100 meters at the beginning of the program. The hardware evaluation program consists of functional performance tests, design verification tests and analytical model verification tests. Functional testing consists of kinematic deployment, mesh management and verification of mechanical packaging efficiencies. Design verification consists of rib contour precision measurement, rib cross-section variation evaluation, rib materials characterizations and manufacturing imperfections assessment. Analytical model verification and refinement include mesh stiffness measurement, rib static and dynamic testing, mass measurement, and rib cross-section characterization. This concept was considered for a number of potential applications that include mobile communications, VLBI, and aircraft surveillance. In fact, baseline system configurations were developed by JPL, using the appropriate wrap-rib antenna, for all three classes of applications.

Freeland, R. E.↗

Solid state laser systems for space application

Since the last report several things have happened to effect the research effort. In laser metrology, measurements using Michelson type interferometers with an FM modulated diode laser source have been performed. The discrete Fourier transform technique has been implemented. Problems associated with this technique as well as the overall FM scheme were identified. The accuracy of the technique is not at the level we would expect at this point. We are now investigating the effect of various types of noise on the accuracy as well as making changes to the system. One problem can be addressed by modifying the original optical layout. Our research effort was also expanded to include the assembly and testing of a diode pumped\Nd:YAG laser pumped\Ti sapphire laser for possible use in sounding rocket applications. At this stage, the diode pumped Nd:YAG laser has been assembled and made operational.

Kay, Richard B.↗

STS-99 Countdown Status Briefing

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. This tape presents a pre-launch briefing for the press held on Jan. 28, 2000. Statements were given by Doug Lyons, Shuttle Test Director; Scott Higginbotham, STS-99 Payload Director and Ed Priselac, Shuttle Weather Officer. Doug Lyons reported on the checkout of the equipment. Scott Higgenbotham reviewed the steps required to assemble and test the SRTM instrumentation and equipment. Ed Priselac gave the weather forecast for the expected launch day. The questions concerned a possible problem with a part onboard the shuttle and the likely impact this might have on the launch.

Source record↗

Phase Transformation and Creep Behavior in Ti50Pd30Ni20 High Temperature Shape Memory Alloy in Compression

The creep behavior and the phase transformation of Ti50Pd30Ni20 High Temperature Shape Memory Alloy (HTSMA) is investigated by standard creep tests and thermomechanical tests. Ingots of the alloy are induction melted, extruded at high temperature, from which cylindrical specimens are cut and surface polished. A custom high temperature test setup is assembled to conduct the thermomechanical tests. Following preliminary monotonic tests, standard creep tests and thermally induced phase transformation tests are conducted on the specimen. The creep test results suggest that over the operating temperatures and stresses of this alloy, the microstructural mechanisms responsible for creep change. At lower stresses and temperatures, the primary creep mechanism is a mixture of dislocation glide and dislocation creep. As the stress and temperature increase, the mechanism shifts to predominantly dislocation creep. If the operational stress or temperature is raised even further, the mechanism shifts to diffusion creep. The thermally induced phase transformation tests show that actuator performance can be affected by rate independent irrecoverable strain (transformation induced plasticity + retained martensite) as well as creep. The rate of heating and cooling can adversely impact the actuators performance. While the rate independent irrecoverable strain is readily apparent early in the actuators life, viscoplastic strain continues to accumulate over the lifespan of the HTSMA. Thus, in order to get full actuation out of the HTSMA, the heating and cooling rates must be sufficiently high enough to avoid creep.

Kumar, Parikshith K.↗

Fuel cell technology program

A fuel cell technology program was established to advance the state-of-the-art of hydrogen-oxygen fuel cells using low temperature, potassium hydroxide electrolyte technology as the base. Program tasks are described consisting of baseline cell design and stack testing, hydrogen pump design and testing, and DM-2 powerplant testing and technology extension efforts. A baseline cell configuration capable of a minimum of 2000 hours of life was defined. A 6-cell prototype stack, incorporating most of the scheme cell features, was tested for a total of 10,497 hours. A 6-cell stack incorporating all of the design features was tested. The DM-2 powerplant with a 34 cell stack, an accessory section packaged in the basic configuration anticipated for the space shuttle powerplant and a powerplant control unit, was defined, assembled, and tested. Cells were used in the stack and a drag-type hydrogen pump was installed in the accessory section. A test program was established, in conjunction with NASA/JSC, based on space shuttle orbiter mission. A 2000-hour minimum endurance test and a 5000-hour goal were set and the test started on August 8, 1972. The 2000-hour milestone was completed on November 3, 1972. On 13 March 1973, at the end of the thirty-first simulated seven-day mission and 5072 load hours, the test was concluded, all goals having been met. At this time, the DM-2 was in excellent condition and capable of additional endurance.

Source record↗

A Channelized 2nd IF/LO Downconverter for the E0S Microwave Limb Sounder

The Earth Observing System (EOS) Microwave Limb Sounder (MLS) is scheduled for launch in 2004 on the EOS Aura spacecraft. The design, assembly and test of the flight 2nd Intermediate Frequency/ Local Oscillator (2nd IF/LO) subsystem for this instrument has been completed and is presented here. The 2nd IF/LO subsystem consists of 5 separate microwave assemblies, 1 for each of the 5 millimeter wave radiometer front ends, providing a total of 33 separate IF channels. Some key requirements of the subsystem are as follows: provide frequency multiplexing of overlapping or closely spaced 1st IF channels while maintaining low ripple in the passbands; generate 19 different 2nd LO frequencies, in the range of 4-20 GHz, with low phase noise and a placement resolution of 400 KHz; downconvert the 1st IF's to a common 2nd IF frequency centered at 900 MHz; minimize cost and schedule by using common designs for the 5 different assemblies wherever possible.

intermediate frequency/local oscillator (IF/LO)↗

Test Results of the First Pre-Series Quadrupole Magnets for the LHC Hi-Lumi Upgrade

The future high luminosity (Hi-Lumi) upgrade of the Large Hadron Collider (LHC) at CERN will include eight (plus two spares) 10.2 m-long Cryo-assemblies which will be components of the triplets for two LHC insertion regions. Each cold mass in the Cryo-assemblies will consist of two 4.2 m-long Nb 3 Sn high gradient quadrupole magnets, designated MQXFA, with aperture 150 mm and operating gradient 132.2 T/m, for a total of twenty magnets. Before assembling and testing the final cold masses at Fermilab, the component quadrupoles are being tested first at the vertical superconducting magnet test facility of the Superconducting Magnet Division (SMD) at Brookhaven National Laboratory (BNL), in superfluid He at 1.9 K and up to 18.0 kA, in accordance with operational requirements of the LHC. The tests of the first two full-length prototype quadrupole magnets MQXFAP1 and MQXFAP2 at BNL have been reported previously. The first two pre-series magnets, the first two that will be used in the LHC, have also now been tested. This paper reports on the quench test and training results of these two magnets. The test results of these magnets will be important for validating the final MQXFA design for operational magnets.

43 PARTICLE ACCELERATORS↗

Field Emission Analysis in SRF Cavities for PIP-II Using GEANT4

Field emission (FE) remains a significant hurdle for achieving optimal performance and reliability in superconducting radiofrequency (SRF) cavities used in accelerator cryomodules. A thorough understanding of the generation and propagation of FE-induced radiation is therefore essential to mitigate this problem. The absence of standardized measurement protocols further complicates the comparison of radiation data across different testing phases and facilities. This highlights the need for a precise quantitative method to diagnose and analyze FE-induced radiation. Such efforts could prove beneficial for improving cavity preparation and cleanroom assembly techniques during the prototype and production stages of Fermilab's Proton Improvement Plan-II (PIP-II) project. This study presents the initial steps of detailed Geant4 simulations aimed at analyzing FE-induced radiation in the low-beta 650 MHz 5-cell elliptical (LB650) cavity. Our goal is to combine these results with radiation diagnostics to enhance diagnostic accuracy and optimize detector positioning. This integrated approach ultimately aims to improve the preparation, assembly, and testing procedures for PIP-II SRF cavities, ensuring the delivery of FE-free cryomodules.

Wijethunga, Sajini A.K. [Fermilab] (ORCID:00000002↗

Advanced on-site power plant development technology program

A 30-cell stack was tested for 7200 hours. At 6000 hours the stack was successfully refilled with acid with no loss of performance. A second stack containing the advanced Configuration B cell package was fabricated and assembled for testing in 1985. A 200-kW brassboard inverter was successfully evaluated, verifying the design of the two-bridge ASCR circuit design. A fuel processing catalyst train was tested for 2000 hours verifying the catalyst for use in a 200-kW development reformer. The development reformer was fabricated for evaluation in 1985. The initial test plan was prepared for a 200-kW verification test article.

Kemp, F. S.↗

Field Emission Analysis in SRF Cavities for PIP-II Using GEANT4

Field emission (FE) remains a significant hurdle for achieving optimal performance and reliability in super-conducting radiofrequency (SRF) cavities used in accelerator cryomodules. A thorough understanding of the generation and propagation of FE-induced radiation is therefore essential to mitigate this problem. The absence of standardized measurement protocols further complicates the comparison of radiation data across different testing phases and facilities. This highlights the need for a precise quantitative method to diagnose and analyze FE-induced radiation. Such efforts could prove beneficial for improving cavity preparation and cleanroom assembly techniques during the prototype and production stages of Fermilab's Proton Improvement Plan-II (PIP-II) project. This study presents the initial steps of detailed Geant4 simulations aimed at analyzing FE-induced radiation in the low-beta 650 MHz 5-cell elliptical (LB650) cavity. Our goal is to combine these results with radiation diagnostics to enhance diagnostic accuracy and optimize detector positioning. This integrated approach ultimately aims to improve the preparation, assembly, and testing procedures for PIP-II SRF cavities, ensuring the delivery of FE-free cryomodules.

Wijethunga, S. A.K. [Fermilab] (ORCID:000000028765↗

Wireless Interrogation of High Temperature Surface Acoustic Wave Dynamic Strain Sensor

Dynamic strain sensing is necessary for high-temperature harsh-environment applications, including powerplants, oil wells, aerospace, and metal manufacturing. Monitoring dynamic strain is important for structural health monitoring and condition-based maintenance in order to guarantee safety, increase process efficiency, and reduce operation and maintenance costs. Sensing in high-temperature (HT), harsh-environments (HE) comes with challenges including mounting and packaging, sensor stability, and data acquisition and processing. Wireless sensor operation at HT is desirable because it reduces the complexity of the sensor connection, increases reliability, and reduces costs. Surface acoustic wave resonators (SAWRs) are compact, can operate wirelessly and battery-free, and have been shown to operate above 1000°C, making them a potential option for HT HE dynamic strain sensing. This paper presents wirelessly interrogated SAWR dynamic strain sensors operating around 288.8MHz at room temperature and tested up to 400°C. The SAWRs were calibrated with a high-temperature wired commercial strain gauge. The sensors were mounted onto a tapered-type Inconel constant stress beam and the assembly was tested inside a box furnace. The SAWR sensitivity to dynamic strain excitation at 25°C, 100°C, and 400°C was .439 μV/με, 0.363μV/με, and .136 μV/με, respectively. Furthermore, the experimental outcomes verified that inductive coupled wirelessly interrogated SAWRs can be successfully used for dynamic strain sensing up to 400°C.

47 OTHER INSTRUMENTATION↗

Design and Calibration of Custom Flowfield/Rake for the F-15B Propulsion Flight Test Fixture

The Propulsion Flight Test Fixture (PFTF) system at NASA Dryden Flight Research Center (DFRC) provides an innovative and cost effective method of flight testing advanced propulsion concepts and components in a relevant environment using DFRC's F-15B #836. The PFTF attaches to the centerline pylon of the aircraft and Has an integrated 6 axis force balance for flight testing of propulsion experiments The PTFF has undergone two previous flight validation test phases: (1)The Local Mach Investigation (LMT) flights, in which an air data boom was attached to a cylinder with a conical nose cap . This flight test phase quantified the local Mach number and the local flow angle at a single point under the F-155B/PFTF. (2) The Cone Drag Experiment (CDE), in which the cylinder / nosecap assembly was tested in order to validate the PFTF's integral 6-component force balance. The next test phase with the PFTF is the flight test of the channeled centerbody axisymmetric inlet. However, for the flight data from this test to be valid, more information must be gathered concerning the quality of the flow through the aerodynamic interface plane of the inlet. The flow angularity and Mach number must be known at multiple locations on the interface plane. Flight data will be gathered using a custom-design flowfield rake to probe the flow underneath the F-15B at the design flight conditions.

Flynn, Darin C.↗

Brassboard Astrometric Beam Combiner (ABC) Development for the Space Interferometry Mission (SIM)

The Astrometric Beam Combiner (ABC) is a critical element of the Space Interferometry Mission (SIM) that performs three key functions: coherently combine starlight from two siderostats; individually detect starlight for angle tracking; and disperse and detect the interferometric fringes. In addition, the ABC contains: a stimulus, cornercubes and shutters for in-orbit calibration; several tip/tilt mirror mechanisms for in-orbit alignment; and internal metrology beam launcher for pathlength monitoring. The detailed design of the brassboard ABC (which has the form, fit and function of the flight unit) is complete, procurement of long-lead items is underway, and assembly and testing is expected to be completed in Spring 2009. In this paper, we present the key requirements for the ABC, details of the completed optical and mechanical design as well as plans for assembly and alignment.

PlanetQuest↗

POTATO: A Unified Assessment System for HL-LHC Outer Tracker Module Productions

The CMS detector s silicon tracker will be replaced in preparation for the upcoming High-Luminosity LHC (HL LHC) upgrade. The inner tracker will include a new pixel detector while the outer tracker (OT) will feature 5,592 pixel strip (PS) and 7,608 strip strip (2S) sensor modules with production distributed across 7 sites worldwide, requiring standardized grading and testing. One testing apparatus the burn-in box replicates the temperature cycling conditions that successful modules must withstand. The Phase-II Outer Tracker Analyzer of Test Outputs (POTATO) standardizes module evaluation and grading among testing sites. Given burn-in box test output, POTATO analyzes the results and assigns a letter grade to a module and its sub-components. POTATO's grading process must adapt to evolving standards for module evaluation; hence, we detail work on POTATO's database and grading functionality that will facilitate the unified assessment of Phase-II OT module assembly and testing worldwide. Once completed, POTATO will allow technicians to interact with a database of all graded modules and efficiently assess the global module assembly effort.

Clark, Olivia J. [U. Tennessee, Knoxville]↗

Preload Characterization of Short Models of MQXF the Nb 3 Sn Low-β Quadrupole for the Hi-Lumi LHC

MQXF is the Nb3Sn Low-β Quadrupole magnet that the HL-LHC project is planning to install in the LHC interaction regions in 2026 as part of an upgrade to increase the LHC inte-grated luminosity by about a factor of ten. The magnet will be fab-ricated in two different lengths: 4.2 m for MQXFA, built in the US by the Accelerator Upgrade Project (AUP), and 7.15 m for MQXFB, fabricated by CERN. In order to qualify the magnet de-sign and characterize its performance with different conductors, cable geometries and pre-load configuration, five short model magnets, called MQXFS, were fabricated, assembled and tested. The latest model, MQXFS6, uses a new powder-in-tube (PIT) su-perconducting wire, featuring a bundle barrier surrounding the filaments. The coil and the support structure were equipped with strain gauges and optical fibres to monitor strain during assembly, cool-down and excitation. In this paper we further develop the conventional azimuthal preload analysis and introduce a new set of tools for MQXF coil pack characterization which we use to an-alyse the behaviour of MQXFS6 room temperature preload and to reanalyse all the short models tested at CERN. A comparison is made between all the studied magnets revealing new characteriz-ing preload parameters.

43 PARTICLE ACCELERATORS↗

Hybrid hydrostatic/ball bearings in high-speed turbomachinery

A high speed, high pressure liquid hydrogen turbopump was designed, fabricated, and tested under a previous contract. This design was then modified to incorporate hybrid hydrostatic/ball bearings on both the pump end and turbine end to replace the original conventional ball bearing packages. The design, analysis, turbopump modification, assembly, and testing of the turbopump with hybrid bearings is presented here. Initial design considerations and rotordynamic performance analysis was made to define expected turbopump operating characteristics and are reported. The results of testing the turbopump to speeds of 9215 rad/s (88,000 rpm) using a wide range of hydrostatic bearing supply pressures are presented. The hydrostatic bearing test data and the rotordynamic behavior of the turbopump was closely analyzed and are included in the report. The testing of hybrid hydrostatic/ball bearings on a turbopump to the high speed requirements has indicated the configuration concept is feasible. The program has presented a great deal of information on the technology requirements of integrating the hybrid bearing into high speed turbopump designs for improved bearing life.

Nielson, C. E.↗

Scalable Thin Light-Emitting Diode (LED) Light Sheet Platform

The goal of the Scalable Thin Light-Emitting Diode (LED) Light Sheet Platform project is to derisk the manufacturing scalability for a high chip count heterogeneous smart lighting platform, with the potential to enable significant energy savings through dynamic directional light control and custom. Specifically, the project derisks the scalability of a disruptive new computer controlled microassembly fabrication process SRI International is developing, to address fundamental cost barriers to mass production of high chip count systems. This is key for enabling mass adoption and thus maximum societal energy savings impact. The LED light sheet technology is a smart illumination platform that can be applied to lighting, signage, and display. It has features and a form factor similar to bendable or conformal OLED light sheets but uses more efficient LEDs with a remote phosphor layer that is very close to the LED to deliver a luminous efficacy that exceeds 125 lumen/Watt and enable > 50% Lighting Application Efficiency (LAE) energy savings. During Budget Period 1 (BP1), all of the BP1 milestones were successfully completed: (M2.0.1) Design demonstrator details that will meet the final project goals, (M6.1.1) Show lighting output model can predict illuminance, spatial, spectral distribution for specific light-sheet designs and use case, (M3.2.1) Automated loading supports 200 chip arrays, and (M3.3.1) Finish first interconnect process run for 200 chip array. The BP1 Go/No-Go Decision Point (G/NG 1) 200 chip demonstrator sample was in the process of final assembly and test at the end of BP1 on December 31, 2023. The objective was successfully achieved on January 16, 2024, when a wired 200-chip sample underwent confirmation testing that demonstrated a 93.75% first pass electrical yield that successfully exceeded the 75% first-pass electrical yield BP1 G/NG requirement. In addition, all 93.75% of the sample devices lit up, further demonstrating the ability to assemble and transfer small LED chips without damaging their functionality.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SOAREX-8 Suborbital Experiments 2015 - A New Paradigm for Small Spacecraft Communication

In 2015 NASA plans to launch a payload to 280 Km altitude on a sounding rocket from the Wallops Flight Facility. This payload will contain several novel technologies that work together to demonstrate methodologies for space sample return missions and for nanosatellite communications in general. The payload will deploy and test an Exo-Brake, which slows the payload aerodynamically, providing eventual de-orbit and recovery of future ISS samples through a Small Payload Quick Return project. In addition, this flight addresses future Mars mission entry technology, space-to-space communications using the Iridium Short Messaging Service (SMS), GPS tracking, and wireless sensors using the ZigBee protocol. SOAREX-8 is being assembled and tested at Ames Research Center (ARC) and the NASA Engineering and Safety Center (NESC) is funding sensor and communications work. Open source Arduino technology and software are used for system control. The ZigBee modules used are XBee units that connect analog sensors for temperature, air pressure and acceleration measurement wirelessly to the payload telemetry system. Our team is developing methods for power distribution and module mounting, along with software for sensor integration, data assembly and downlink. We have demonstrated relaying telemetry to the ground using the Iridium satellite constellation on a previous flight, but the upcoming flight will be the first time we integrate useful flight test data from a ZigBee wireless sensor network. Wireless sensor data will measure the aerodynamic efficacy of the Exo-Brake permitting further on orbit flight tests of improved designs. The Exo-Brake is 5 sq m in area and will be stored in a container and deployed during ascent once the payload is jettisoned from the launch vehicle. We intend to further refine the hardware and continue testing on balloon launches, future sounding rocket flights and on nanosatellite missions. The use of standards-based and open source hardware/software has allowed for this project to be completed with a very modest budget and a challenging schedule. There is a wealth of hardware and software available for both the Arduino platform and the XBee, all low-cost or open-source. Along with the Exo-Brake hardware and deployment discussion, this paper will describe in detail the system architecture emphasizing the successful use of open source hardware and software to minimize effort and cost. Testing procedures, radio frequency interference (RFI) mitigation, success criteria and expected results will also be discussed. The use of Iridium short messaging capability for space-to-space links, standards-based wireless sensor networks, and other innovative communications technology are also presented.

aerobrake↗