Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “terminal operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

The SILEX experiment system operations

The European Space Agency is going to conduct an inter orbit link experiment which will connect a low Earth orbiting satellite and a Geostationary satellite via optical terminals. This experiment has been called SILEX (Semiconductor Inter satellite Link EXperiment). Two payloads will be built. One called PASTEL (PASsager de TELecommunication) will be embarked on the French Earth observation satellite SPOT4. The future European experimental data relay satellite ARTEMIS (Advanced Relay and TEchnology MISsion) will carry the OPALE terminal (Optical PAyload Experiment). The principal characteristic of the mission is a 50 Megabits flow of data transmitted via the optical satellite link. The relay satellite will route the data via its feeder link thus permitting a real time reception in the European region of images taken by the observation satellite. The PASTEL terminal has been designed to cover up to 9 communication sessions per day with an average of 5. The number of daily contact opportunities with the low earth orbiting satellite will be increased and the duration will be much longer than the traditional passes over a ground station. The terminals have an autonomy of 24 hours with respect to ground control. Each terminal will contain its own orbit model and that of its counter terminal for orbit prediction and for precise computation of pointing direction. Due to the very narrow field of view of the communication laser beam, the orbit propagation calculation needs to be done with a very high accuracy. The European Space Agency is responsible for the operation of both terminals. A PASTEL Mission Control System (PMCS) is being developed to control the PASTEL terminal on board SPOT4. The PMCS will interface with the SPOT4 Control Centre for the execution of the PASTEL operations. The PMCS will also interface with the ARTEMIS Mission Control System for the planning and the coordination of the operation. It is the first time that laser technology will be used to support inter-satellite links in Europe. Due to the complexity and experimental character of this new optical technology, the SILEX experiment control facilities will be designed to allow as much operational flexibility as possible.

Demelenne, B.↗

Optimal Time Advance In Terminal Area Arrivals: Throughput vs. Fuel Savings

The current operational practice in scheduling air traffic arriving at an airport is to adjust flight schedules by delay, i.e. a postponement of an aircrafts arrival at a scheduled location, to manage safely the FAA-mandated separation constraints between aircraft. To meet the observed and forecast growth in traffic demand, however, the practice of time advance (speeding up an aircraft toward a scheduled location) is envisioned for future operations as a practice additional to delay. Time advance has two potential advantages. The first is the capability to minimize, or at least reduce, the excess separation (the distances between pairs of aircraft immediately in-trail) and thereby to increase the throughput of the arriving traffic. The second is to reduce the total traffic delay when the traffic sample is below saturation density. A cost associated with time advance is the fuel expenditure required by an aircraft to speed up. We present an optimal control model of air traffic arriving in a terminal area and solve it using the Pontryagin Maximum Principle. The admissible controls allow time advance, as well as delay, some of the way. The cost function reflects the trade-off between minimizing two competing objectives: excess separation (negatively correlated with throughput) and fuel burn. A number of instances are solved using three different methods, to demonstrate consistency of solutions.

Sadovsky, Alexander V .↗

RCT Continuing Training: RCT Job Coverage and CONOPS

RCT Continuing Training covering all of the necessary steps associated with RCT, and how conduct of operations ties in with this process. The terminal objective of this training is: Given the need to perform radiological job coverage, recognize the requirements to maintain radiological work control in accordance with P121, Radiation Protection, RP-PROG-TP-200, Radiation Protection Manual, and P315, Conduct of Operations.

61 RADIATION PROTECTION AND DOSIMETRY↗

Laser-Based Relative Navigation and Guidance for Space Shuttle Proximity Operations

American manned spacecraft have used visual piloting techniques in the terminal phase of randezvous during the Gemini, Apollo, Skylab, and Space Shuttle programs. In the last several years, space- shuttle astronauts have used the Rendezvous and Proximity Operations Program (RPOP), running; on a laptop computer, as a guidance and navigation aid during proximity operations. By processing measurements to the target satellite taken by a laser sensor, RPOP provides the shuttle crew with a more accurate relative position and velocity than from any other source. The inclusion of guidance algorithms allows RPOP to determine delta-velocities to fly very efficient, repeatable trajectories. This paper will focus on the guidance and navigation algorithms in RPOP, as well as results from simulation and flight. Although developed for shuttle proximity operations, the RPOP algorithms have potential applicability to an automated vehicle.

Laser sensors↗

A Novel Three-Phase Oak Ridge AC / AC Converter for Wireless Mobility Energy Storage System (WMESS) Connectivity

In this study, a novel three-phase Oak Ridge ac to ac converter is introduced for wireless mobility energy storage system (WMESS) applications for grid support or ancillary service applications. The proposed topology can be used in bidirectional operation between ac grid and ac terminals of energy storage (output of the ESS inverter) by accomplishing unity power factor. Inherent merit of the technology is that it can directly merge ac input 60 Hz grid frequency with the high frequency by superimposing them with the Oak Ridge Converter (ORC) and through the wireless coils. Theoretical and simulation results are provided for 10 kW output power. The functionality of the proposed three-phase system is demonstrated with the coupling coils separated by 6 inches of air gap with the input / output of 277 V AC,RMS . The system overall design is presented, and simulation results demonstrate achieving 3% current total harmonic distortion (THD) and 0.99 power factor (PF) at full load of 10 kW wireless power transfer.

Asa, Erdem↗

A Novel Three Phase Oak Ridge DC / AC Converter for Wireless Grid Tied Applications

In this study, a novel three phase oak ridge dc to ac converter is introduced for wireless mobility energy storage (WMES) applications to support the grid demand during peak times. The proposed topology can be used in a bi-directional operation between ac grid and dc terminals of energy storage by accomplishing unity power factor. Inherent merit of the technology can directly merge dc input to the high frequency and 60 Hz grid frequency by superimposing through the wireless coils. Theoretical and simulation results are validated by the simulation analysis for 20 kW output power. The functionality of the proposed three phase system is established by using 6 inches air gap between the couplers with the input of 675 V DC and output of 277 V AC, RMS . The system overall design analysis is demonstrated for simulation analysis and simulation results are presented achieving 3% current total harmonic distortion (THD) and 0.99 power factor (PF) at full load 20 kW wireless power transfer.

Asa, Erdem↗

Fireworks on Weather Radar and Camera

High-sensitivity weather radars easily detect nonmeteorological phenomena characterized by weak radar returns. Fireworks are the example presented here. To understand radar observations, an experiment was conducted in which the National Severe Storms Laboratory (NSSL)’s research (3-cm wavelength) dual-polarization radar and a video camera were located at 1 km from fireworks in Norman, Oklahoma. The fireworks from the 4 July 2017 celebration were recorded by both instruments. The experiment is described. Few bursts recorded by the camera are analyzed to obtain the height of the explosion, its maximum diameter, number of stars, and the duration of the visible image. Radar volume scans are examined to characterize the height of the observation, the maximum reflectivity, and its distribution with height. The fireworks location is close to the Terminal Doppler Weather Radar (TDWR) that operates in single polarization at a 5-cm wavelength and monitors hazardous weather over the Oklahoma City airport. A third radar with data from the event is the Weather Surveillance Radar-1988 Doppler (WSR-88D) located in Norman. It has a wavelength of 10 cm and supports technical developments at the Radar Operation Center. Reflectivity factors measured by the three radars are compared to infer the size of dominant scatterers. The polarimetric characteristics of fireworks returns are analyzed. Although these differ from those of precipitation, they are indistinguishable from insect returns. Radar observation of larger fireworks in Fort Worth, Texas, with a WSR-88D is included and compared with the observations of the smaller fireworks in Norman. We expect the detectability of explosions would be similar as of fireworks. Pinpointing locations would be useful to first responders, or air quality forecasters. We note a benefit of fireworks recognition in weather radar data is that it can prevent contamination of precipitation accumulations.

54 ENVIRONMENTAL SCIENCES↗

Durable, Ultra-Thin Diaphragms for Liquid Alkaline Water Electrolysis

W. L. Gore & Associates assembled a world class team (De Nora Tech, LLC; New York University; and thyssenkrupp nucera) to develop durable, ultra-low resistance diaphragms that dramatically improve system efficiency, dynamic response, and operational flexibility. To enable the use of ultra-thin diaphragms, an optimized electrode package was chosen as part of an electrode down select study. Ultra-thin diaphragms based on microporous polymer scaffolds imbibed with zirconia nanoparticles were developed and tested. Performance and durability on par with incumbent materials was demonstrated. A transparent electrolyzer to directly observe in-situ diaphragm-bubble interactions was designed and built, and simultaneous optical and electrochemical performance tests were performed. A Pressurized Alkaline Water Electrolysis (PAWE) single cell test station was designed to support advanced R&D in high-pressure electrolysis, particularly for evaluating novel electrode and separator configurations under elevated temperature and pressure operating conditions. Due to early project termination, the original scope could not be fully achieved.

08 HYDROGEN↗

Some three-body numerical solutions for low-thrust orbiter missions.

A ?velocity at the sphere of influence' method and an asymptotic matching method of patching together two-body low thrust solutions are compared to a number of three-body numerical results for outer planet orbiter missions. The two patching methods compare well with the numerical three-body results and do not depend on any particular choice for the size of the sphere of influence. The results apply, in a strict sense, only to the operational mode used-high-thrust terminal retro into orbit. Low-thrust spirals are not considered in the three-body analysis. The terminal low-thrust phase of thrusting is almost entirely reverse to the velocity vector during the planet centered phase of the trajectory. This may lead to important simplifications for low-thrust guidance and navigation procedures.

Mackay, J. S.↗

LUMIS Interactive graphics operating instructions and system specifications

The LUMIS program has designed an integrated geographic information system to assist program managers and planning groups in metropolitan regions. Described is the system designed to interactively interrogate a data base, display graphically a portion of the region enclosed in the data base, and perform cross tabulations of variables within each city block, block group, or census tract. The system is designed to interface with U. S. Census DIME file technology, but can accept alternative districting conventions. The system is described on three levels: (1) introduction to the systems's concept and potential applications; (2) the method of operating the system on an interactive terminal; and (3) a detailed system specification for computer facility personnel.

Bryant, N. A.↗

Comparison of Estimated with Measured Maximum Instantaneous Distortion Using Flight Data from an Axisymmetric Mixed Compression Inlet

YF-12C flight-measured inlet dynamic distortion data are compared with predictions made on the basis of the method reported by Melick et al. (1976). The YF-12C aircraft is a twin engine aircraft capable of speeds above 3. The inlets have a translating spike to control the inlet throat area. A bypass system is used to control the terminal shock of the inlet for operation in the mixed compression mode. The dynamic data were obtained with the aid of 24 high frequency response total pressure sensors. The model of Melick et al. is discussed along with the computer program used to implement the model. It is found that the predictions of maximum instantaneous distortion are within 20 percent of the measured values, which had been obtained at Mach numbers of 1.8, 2.1, 2.5, and 3.0.

Brilliant, H. M.↗

Cardiopulmonary data-acquisition system

Computerized system controls and monitors bicycle and treadmill cardiovascular stress tests. It acquires and reduces stress data and displays heart rate, blood pressure, workload, respiratory rate, exhaled-gas composition, and other variables. Data are printed on hard-copy terminal every 30 seconds for quick operator response to patient. Ergometer workload is controlled in real time according to experimental protocol. Collected data are stored directly on tape in analog form and on floppy disks in digital form for later processing.

Crosier, W. G.↗

Baseband-processed SS-TDMA communication system architecture and design concepts

The architecture and system design for a commercial satellite communications system planned for the 1990's was developed by Motorola for NASA's Lewis Research Center. The system provides data communications between individual users via trunking and customer premises service terminals utilizing a central switching satellite operating in a time-division multiple-access (TDMA) mode. The major elements of the design incorporating baseband processing include: demand-assigned multiple access reservation protocol, spectral utilization, system synchronization, modulation technique and forward error control implementation. Motorola's baseband processor design, which is being proven in a proof-of-concept advanced technology development, will perform data regeneration and message routing for individual users on-board the spacecraft.

Attwood, S.↗

30/20 GHz communications systems baseband processor development

The architecture and system design concepts for a commercial satellite communications system planned for the 1990's has been developed. The system provides data communications between the individual users via trunking and customer premise service terminals utilizing a central switching satellite operating in a time-division multiple-access mode. Baseband processing is employed to route and control traffic on an individual message basis while providing significant advantages in improved link margins and system flexibility. Key technology developments required to prove the flight readiness of the baseband processor design are being verified in the baseband processor proof-of-concept model described herein.

Brown, L.↗

Integration of the TDWR and LLWAS wind shear detection system

Operational demonstrations of a prototype TDWR/LLWAS (Terminal Doppler Weather Radar/Low Level Wind shear Alarm System) integrated wind shear detection system were conducted. The integration of wind shear detection systems is needed to provide end-users with a single, consensus source of information. A properly implemented integrated system provides wind shear warnings of a higher quality than stand-alone LLWAS or TDWR systems. The algorithmic concept used to generate the TDWR/LLWAS integrated products and several case studies are discussed, indicating the viability and potential of integrated wind shear detection systems. Implications for integrating ground and airborne wind shear detection systems are briefly examined.

Cornman, Larry↗

The ASLOTS concept: An interactive, adaptive decision support concept for Final Approach Spacing of Aircraft (FASA). FAA-NASA Joint University Program

This presentation outlines a concept for an adaptive, interactive decision support system to assist controllers at a busy airport in achieving efficient use of multiple runways. The concept is being implemented as a computer code called FASA (Final Approach Spacing for Aircraft), and will be tested and demonstrated in ATCSIM, a high fidelity simulation of terminal area airspace and airport surface operations. Objectives are: (1) to provide automated cues to assist controllers in the sequencing and spacing of landing and takeoff aircraft; (2) to provide the controller with a limited ability to modify the sequence and spacings between aircraft, and to insert takeoffs and missed approach aircraft in the landing flows; (3) to increase spacing accuracy using more complex and precise separation criteria while reducing controller workload; and (4) achieve higher operational takeoff and landing rates on multiple runways in poor visibility.

Simpson, Robert W.↗

ACTS propagation terminal update

The activities at Virginia Polytechnic Institute and State University in preparation for the February 1993 launch of ACTS are summarized. ACTS propagation terminals (APT) are being constructed to receive the 20 and 27.5 GHz ACTS beacon signals. Total power radiometers operating at the same frequencies are integrated into the terminal for use in level setting. Recent progress and plans for APT's are reported.

Stutzman, Warren L.↗