Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “shutdown”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

EBR-II Static Neutronic Calculations by PHISICS / MCNP6 codes

The International Atomic Energy Agency (IAEA) launched a Coordinated Research Project (CRP) on the Shutdown Heat Removal Tests (SHRT) performed in the 80's at the Experimental fast Breeder Reactor EBR-II, USA. The scope of the CRP is to improve and validate the simulation tools for the study and the design of the liquid metal cooled fast reactors. Moreover, training of the next generation of fast reactor analysts is being also considered the other scope of the CRP. In this framework, a static neutronic model was developed, using state-of-the art neutron transport codes like SCALE/PHISICS (deterministic solution) and MCNP6 (stochastic solution). Preliminary criticality calculations have been performed using both models (deterministic and stochastic). Results show the good agreement between different models. It should also be noted that deterministic solution could still be further improved by implementing super-homogenization factors and by increasing the transport calculation order.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Convective Heat Transfer in Decay Heat Exchanger of Sodium-cooled Fast Reactor

Sodium-to-sodium heat exchangers such as the decay heat exchanger (DHX) are key components of the prototype generation [V sodium-cooled fast reactor (PGSFR). The DHX transfers the decay heat generated in the reactor core to the decay heat removal loop after a reactor shutdown. Shell-and-tube type with straight tube arrangement has been widely adopted for the sodium-to-sodium heat exchanger of the sodium-cooled fast reactor. Thus liquid metal heat transfer characteristics inside the tube and around the tube bundle have to be fully understood to design the sodium-to-sodium heat exchanger and evaluate its thermal performance accurately. Plenty of studies on the convective heat transfer of the liquid metals were conducted to present the Nusselt number (Nu) correlations with respect to the Peclet number (Pe). However, those correlations still deviated from each other considerably and few of correlations for low Pe range (less than 100) have been reported. Accordingly, it is difficult for a design code developer to choose a proper heat transfer coefficient correlation for the sodium-to-sodium heat exchanger particularly in a low flow rate range. Recently, a separate effect test for the DHX has been completed using the STELLA-1 facility at KAERI according to the STELLA program which aims at establishment of separate and integral test database (DB) for the design of the PGSFR. The heat transfer performance test of the DHX was successfully conducted under major operating conditions. The objective of this work is to suggest proper convective heat transfer correlations for tube- and shell-sides of the sodium-to-sodium heat exchanger based on the test DB obtained from STELLA-1. The Pe range of the analyzed experimental data is concentrated on less then 100. The adequacy of the suggested correlations is evaluated by applying to the DHX design code, SHXSA. Based on the DHX test DB of the STELLA-1, the proper convective heat transfer correlations for the tube- and shell-side of sodium-to-sodium heat exchangers were suggested. Two correlation combinations for each side were proposed and turned out to be reasonable through the evaluation using the SHXSA design code: Suggestion no. 1: - Lyon correlation (constant = 4) for tube-side; - Lubarsky-Kaufman correlation for shell-side. Suggestion no. 2: - Modified Lyon correlation (constant = 1.45) for tube-side; - Schad-modified correlation for shell-side The Pe ranges of the DHX test DB were 53 - 225 for the tube-side and 45 - 148 for the shell-side, but most of test conditions were concentrated on the Pe range of less than 100. Two correlation suggestions can be practically used for the design of sodium-to-sodium heat exchangers. However, by utilizing more test DB, it needs to be verified which one is closer to real phenomena. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

French Innovative Thermal Treatment Processes for The Management Radioactive Organic Liquid Waste - 19017

The nuclear industry as well as hospitals or some research laboratories produce Radioactive Organic Liquid Waste (ROLW) such as scintillation cocktails for medical imaging, labeled molecules for medical research or liquids from former activities. In order to be compatible with disposal facilities requirements, this waste must be inerted and stabilized in solid matrix. The route generally used is incineration in the Centraco facilities at the Marcoule site (Gard, France), ashes produced being cemented downstream. However, liquids whose chemical or radiological characteristics are not compatible with the incinerator operating rules (high level of {sup 14}C or halogen content, corrosive gas production etc.) cannot follow this path. The purpose of the MILOR project is then to propose alternative paths to treat all kinds of ROLW. Initiated in September 2017, this project has the technical objective of developing, over a four-year period, two pilot-scale mineralization processes. Two variants of complementary plasma technologies are evaluated: aerial plasma with the 'IDOHL' process and submerged plasma with the 'ELIPSE' process. Compared with other methods, thermal plasmas have unique characteristics such as rapid decomposition with high throughput, fast startup and shutdown, and high-energy delivery. The process called IDOHL consists of a process involving an induction plasma in which the liquids are directly introduced. It has been designed for organic liquids without mineral load and for treatment rates less than 0.5 l/h. This type of plasma allows the destruction of liquid organohalogens without any prior evaporation or treatment. Specific gas treatment systems have been developed to direct the gas produced to a dry or wet gas treatment system. One aim of the project is to subsequently install the process in a radioactive zone at Saclay DRF. The second called ELIPSE consists of a breakthrough process involving a submerged plasma at the heart of which organic liquids are also introduced. Current research has demonstrated that such a technique may enable the instantaneous and complete destruction of liquids with a wide variety of constituents, such as chlorine, fluorine, or phosphorus. The submersion solution offers many advantages: quenching and cleaning of combustion gases; filtering of the particles they contain; and cooling maintained for the entire process, which guarantees excellent corrosion control. An advantage of this type of design is that the gas treatment system can be reduced to a demister-condenser followed by a simple safety filter, thereby offering the additional advantage of an extremely compact treatment system. This design also allows the ELIPSE process to become by this way an embeddable process if required. The MILOR project, financed by the French State through investment program is a tripartite project bringing together Andra, in charge of radioactive waste management, the CEA in charge of leading scientific and technological researches to propose effective ways of treatment and the company A3i whose role is to ensure the subsequent industrial development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Remediation of Waste Management Areas at Chalk River Laboratories - 19130

The Government of Canada's nuclear legacy liabilities have resulted from ∼70 years of nuclear research and development (R and D). The majority of these liabilities are located at the CRL Site and consist of shutdown research buildings (including prototype and research reactors), plus a wide variety of buried and stored wastes, and contaminated lands. The Environmental Remediation Projects (ERP) branch are assessing the waste inventory in the Chalk River Laboratories Waste Management Areas in order to make informed and risk based decisions on remediating affected lands. This paper provides examples of contaminated sites at CRL that require remediation as well as examples of remediation activities already complete. The environmental remediation process followed at CRL and the development of the CRL site cleanup plan are outlined. Until suitable disposal facilities are available ERP will continue to characterize and assess contaminated sites, monitoring and managing the risks in place while preparing for full-scale remediation activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Postclosure Safety Assessment for the Nuclear Power Demonstration Closure Project - 19158

Following 30 years in a safe shutdown state, Canadian Nuclear Laboratories (CNL) is proposing the final decommissioning of the Nuclear Power Demonstration Waste Facility (NPDWF). A Postclosure Safety Assessment (PostSA) has been prepared as part of this process. The present PostSA represents the second assessment, following an iterative approach. The PostSA considered Normal Evolution of the facility, as well as several Disruptive Events and other cases to show robustness and account for uncertainties. The results of the PostSA show that the NPDWF is a robust design that will contain and limit release of contaminants long into the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Waste Treatment Unit Plan for Vessel and Canister Decontamination - 19283

The Integrated Waste Treatment Unit (IWTU) was designed to use a proprietary fluidized-bed steam reforming process to treat 3,400,000 L (898,184 gal) of radioactive sodium bearing waste (SBW). IWTU is currently in commissioning and startup phase prior to future processing of SBW. The current simulant SBW is introduced into the denitration mineralization reformer and transformed into a dry, granular product that is filtered and eventually transferred into a product canister. The intention of the facility is to process the SBW and store the product canisters in vaults to await shipping to a depository at a later date. The IWTU is a part of the Idaho Cleanup Project Core, located at the INL Site and operated by Fluor Idaho, LLC. During early operation and testing of the facility, it was observed that the original process equipment decontamination system did not possess the capability to recover from plant shutdowns that result from upset conditions or maintenance outages; thus, a need for a redesigned decontamination system was identified. This paper discusses current decontamination methods and their capabilities and areas where these methods fall short of decontaminating process equipment and product canisters. This paper discusses the design and purpose of the decontamination methods being tested and developed for implementation into the IWTU. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transport and Treatment of Chapelcross Gas Ducts for Clearance and Recycling - 19662

In the summer of 2018, Cyclife, the EDF group's specialist radioactive waste management and decommissioning company, transported sixteen gas ducts and associated equipment from the shutdown Chapelcross nuclear power plant to treatment facilities in the UK and Sweden. The client requested a full removal, treatment and disposal service for approximately 820 te of low level metallic waste comprising Upper Gas Duct Assemblies (including bellows), Upper Gas Duct elbows, Filter Pots and Convoluted pipework. The complex scope involved heavy lifting, transport by road and sea, processing and recycling on a large scale, thereby necessitating involvement of a wide range of suppliers at different tiers all managed by Cyclife. The purpose of the entire project was to safely handle and treat all of the components for clearance and recycling into the public domain for the manufacture of new steel products. Most of the treatment took place in Cyclife's nuclear licensed metal treatment facility in Sweden. Cyclife has a long and unique experience of arranging safe transport of large contaminated components on road and sea. The metal treatment facility in Sweden can, without special arrangements, receive components up to 30 meters long with a weight of up to 400 tonnes for decontamination, size reduction and melting. The actual treatment of the components consisted of the following steps: a) Separation of a gas duct from the gantry, b) size reduction, radiological verification measurements and clearance of the gantry, c) stepwise segmentation of the gas duct and elbow including removal of asbestos, d) decontamination, e) melting, f) radiological assessment and clearance of the metal ingots, g) management of the secondary waste for return to UK. The result of the project, upon completed treatment of all the material, demonstrates a high recycling rate of the material. 5-10% of the original mass of material will have to disposed as radioactive waste. This number include all residues, untreatable material (asbestos, mineral wool, filters etc.) and two melt batches with a too high activity content for clearance. The paper takes the reader through the entire project from the initial planning to the clearance of the metal and the return of the secondary waste to UK for disposal. It will also present and discuss pros and cons for alternative management approaches in several perspectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Designed Containers for Activated ILW from NPP Decommissioning - 20208

The paper focuses on packaging of dismantled and fragmented reactor components into containers and their transport to their storage and/or disposal facility within the immediate dismantling strategy applied on decommissioning of nuclear power plant (NPP) finally shutdown after standard operation. The main purpose of the paper is to present the process of design, manufacture, testing and use of new transport and storage containers for activated intermediate level waste (ILW) from V1 NPP decommissioning at Jaslovske Bohunice site. Legislation conditions, container selection process, requirements on their design and manufacture, scope of associated licensing documentation and technical procedures applied up to their use on site are described in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The coupled neutronics and thermo-fluid dynamics design characteristics of the XE-100 200 MW{sub TH} reactor - 18552

The Xe-100 is a high temperature helium-cooled, graphite moderated, pebble bed reactor with a 10 times through, multi-pass (MEDUL=MEhrfacDUrchLauf) fueling scheme. The design, characterized as a Generation IV reactor, is based on proven technology that has been demonstrated a number of times both experimentally and as commercial reactors. This proven foundation ensures high levels of design and technical readiness. In the overview provided of the design it is shown how the excess reactivity is limited by continuous refueling, whilst the selected core power density will ensure passive heat removal. In this way the intrinsic safety design features of a typical GEN IV design are guaranteed. It is shown that no upset event will lead to a significant amount of radiological release. The coupled core neutronic and thermo-fluid dynamics design for the Xe-100 is performed with the VSOP-A system of codes. For the equilibrium core, VSOP results demonstrate that the spherical fuel powers (maximum 1.9 kW) and operational temperatures (<900 deg. C) fall well within the envelope of the design criteria. Adequate reactivity control and long-term, cold shutdown are provided by two separate, diversely-actuated systems, while the overall negative reactivity temperature coefficient is illustrated over the total operational range. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Identification and repair of intermittent cable faults in nuclear power plants - 131

The nuclear industry uses cable circuits as an integral part of a plant's reactor protection system (RPS), instrumentation and control (I and C) and power distribution systems. The reliability of these systems is critical for continued operation of the world's aging nuclear fleet, as well as for safe shutdown of the reactor. When intermittent faults occur in cable circuits, the symptom of the problem often appears and disappears in milliseconds while the aftereffects can result in spurious alarms and automatic actuation of safety systems. Problems are compounded when component degradation causes a cable circuit to transmit inaccurate information that does not represent actual plant operating conditions. The root cause of intermittent cable circuit operation can include degradation of cable and connectors from heat, humidity, radiation, and vibration. Unlike hard faults (which are constant open or short circuits), intermittent faults are defined as a temporary change in impedance that may only last for a few milliseconds. While less disruptive than hard faults, signal spiking from intermittent faults can often lead to alarm conditions and reactor trips. A soft fault is defined as a subtle variation the electrical characteristics of the circuit that still permit the continued operation of the circuit. A soft fault may be a precursor to a hard fault due to continued degradation of the fault over time. The focus of this paper is the description of a cable testing system that can be connected to an active, low frequency circuit and continuously monitor electrical characteristics using the time domain reflectometry (TDR) technique until an intermittent impedance change occurs. This technique uses the difference in frequency response of the circuit and the TDR to isolate the TDR signature from the active circuit data . When a momentary impedance change occurs that exceeds a preconfigured limit threshold, the distance to fault data is automatically overlaid with the healthy baseline reference and stored in a database for diagnosis and repair. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis and improvement of input channel selection algorithm for reliability of control systems in nuclear power plants - 138

In most of non-safety NSSS (Nuclear Steam Supply System) control systems, a process input is composed of two channels for redundancy. In a normal situation, the average of both input channels is used in the control algorithm. If a failed channel is detected, the 'channel selection algorithm' chooses the remaining normal input channel. For a bumpless transition, many implemented control systems include the 'ramping rate' function, which makes it possible for the selected input to slowly approach the new input channel. However, it recently turned out that this function adopted for positive effects may result in unintended consequences for the related control system and the plant in certain cases. Due to a process transient in the plant according to a significant event, any related sensor input signal can rapidly change and finally exceed the pre-defined range for detecting an out-of-range event in a short time. During the process of channel conversion due to a rapid transient in the plant, the processed input from the redundant channels can be distorted if the ramping rate function is not properly implemented. As a result, it can result in a plant shutdown because the control system fails to perform the critical function to mitigate a plant transient. To solve these potential problems, we analyzed the overall causes and derived a proposed algorithm for improving reliability and performance of the control systems. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The overview in safety review of human factors engineering and control room design in chinese AP1000 nuclear power plant - 174

The first AP1000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China, which has creative and distinctive design characteristics. Human factors engineering disciplines are applied to the design of the AP1000. In addition to the elements of the program review model(including human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human performance monitoring),the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces review process, and several important issues during the reviewing are described in detail. These issues include many elements, such as operating experience review, task analysis, human system interface design, verification and validation,and so on. This paper emphasizes on the main control room design(including environment and layout). Background noise in the actual main control room may exceed too much to design value. Another important issue is about main control room habitability systems(VES) changes to satisfy post-actuation performance requirements in AP1000 design change proposal. All the wall panel displays will be closed in this design change proposal. Review process and proposal are described in the paper. Since the AP1000 unit in China is the first constructed all over the world, verification and validation are especially important and necessary. The plan of verification and validation, the results summary report of verification and validation, the report of human engineering discrepancies are focus attention. Verification and validation in human factors engineering include HSI task support verification, HFE design verification and integrated system validation. This paper introduces the review process of verification and validation, the issues found in verification and validation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Online monitoring of rod control systems in combustion engineering pressurized water reactors - 195

Current designs of Pressurized Water Reactors (PWRs) are equipped with control and shutdown rods that are inserted and withdrawn from the reactor core to control reactivity. In Combustion Engineering (CE) plants, these rods are moved using the Control Element Drive Mechanism (CEDM) and controlled by the CEDM Control System (CEDMCS). In the event of system failure, troubleshooting activities can have a substantial impact on plant resources. Furthermore, CEDM component failures have occurred without warning, which has led to increased costs for the plants. These issues, combined with the inherently complex design of the CEDMCS, create a need for an online diagnostics system that can improve system health monitoring, increase diagnostic capabilities, and decrease troubleshooting time. This paper describes an advanced analysis and diagnostics system that monitors the CEDMCS during plant operation and provides critical information to onsite personnel to help detect and prevent problems before they impact normal plant operation. This system uses existing CEDMCS test points to acquire data and needs no modifications to the CEDMCS for implementation. The online monitoring capabilities automatically collect data during normal operation and diagnose failure events, reduce troubleshooting time and provide plant personnel with valuable information which is not currently available. Additionally, the system has built-in features used to streamline routine surveillance testing, collect stationary and movement data on multiple rods simultaneously, automate analysis, and generate reports. This system was developed with input from industry CEDMCS engineers at existing commercial facilities and has been deployed in multiple operating nuclear plants. The system has demonstrated itself to be a valuable tool for CEDMCS health monitoring, not only in reducing required man-power for routine system testing, but also in detected impending coil faults and allowing plant engineers to mitigate system component failures to prevent impending plant shut downs. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Virtual sensors for robust on-line monitoring (OLM) and diagnostics - 197

Unscheduled shutdown of nuclear power facilities for recalibration and replacement of faulty sensors can be expensive and disruptive to grid management. In this work, we present virtual (software) sensors that can replace a faulty physical sensor for a short duration thus allowing recalibration to be safely deferred to a later time. The virtual sensor model uses a Gaussian process model to process input data from redundant and other nearby sensors. Predicted data includes uncertainty bounds including spatial association uncertainty and measurement noise and error. Using data from an instrumented cooling water flow loop test bed, the virtual sensor model has predicted correct sensor measurements and the associated error corresponding to a faulty sensor. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced electrical penetration components meet the high safety standards required for China's HTR-PM Shidaowan and generation mPower small modular reactors - 300

Enhanced glass-to-metal feedthroughs will be used to carry key instrumentation and control (I and C) signals in China's high-temperature, gas-cooled pebble-bed modular reactor (HTR-PM) at Shidaowan, and in Small Modular Reactor (SMR) prototyping. Chinergy Co., Ltd and Jiamusi Electric Machine Co., Ltd will use the feedthroughs, also called electrical penetration assemblies (EPAs), at the Shidaowan twin-reactor high temperature reactor (HTR). These feedthroughs are manufactured using specialized processes that make them far more robust than counterparts made with organic or ceramic materials. Improved EPAs manufactured by SCHOTT are the only feedthrough solution that can be used in the primary loop of an HTR because organic seals cannot withstand the high temperatures and pressures of this environment. Glass-to-metal seals (GTMS) are made using inorganic, non-aging materials which enable a virtually unlimited lifespan in high-temperature, high-radiation and high-pressure applications. This I and C technology package is being enhanced by the development and testing of new mineral-insulated (MI) cable connectors and EPAs made of crystallized glass-ceramic combined with superalloys. The EPAs have a maintenance-free lifespan of over 60 years, preventing any outage time related to these components and subsequently reducing costs associated with shutdowns. They are far more robust than organic seals and provide increased safety at a lower lifetime cost. Resistance against high pressure and high temperature are especially ideal qualities that make EPAs a valuable choice for environments with high standards for fire protection, such as nuclear plants, subsea oil drilling, or any other underwater application. Due to their significant offering of safety-relevant qualities, the EPAs have also been chosen by BWXT for implementation in its mPower SMR. Small modular reactor requirements are complex and very challenging but are met by the new EPA components, which will help form a strong I and C safety chain. Unlike ordinary compression glass-to-metal seals, GTMS with crystallized glass-ceramic have the ability to withstand temperatures of over 350 deg. C / 662 deg. F and operating pressures of 3500 bar. Furthermore, their lifetime is qualified for up to 60 years, including pressure and radiation requirements in accordance with the latest IEC/IEEE standards. Higher-specification EPAs and MI cable connectors have been designed into severe accident I and C instruments, including advanced hydrogen and oxygen sensors that exceed the challenging requirements of both HTR and SMR applications. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗