Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reserves”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Coal and bituminous reserves

Chapter 5 of this book contains sections entitled: other coal processes; underground processing of coal; and other important energy sources.

01 COAL, LIGNITE, AND PEAT↗

Spinning Reserve from Hotel Air Conditioning Load - SHORT VERSION

Even though preliminary tests were not conducted during times of highest system or hotel loading during the summer, they showed that hotel load can be curtailed by 22 to 37 percent depending on the outdoor temperature and time of day. Full response occurred in 12 to 60 seconds from when the system operator's command to shed load was issued and the load drop was very rapid.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Survey of U.S. Ancillary Services Markets

In addition to providing energy to end-consumers, power system operators are also responsible for ensuring system reliability. To this end, power markets maintain an array of ancillary services to ensure that it is always possible to balance the supply and demand for energy in real-time. A subset of these ancillary services are commonly procured through market-based mechanisms: namely, Regulation, Spinning, and Non-spinning Reserves. Regulation Reserves are maintained to respond to supply/demand imbalances over short time frames, typically on the order of several seconds to one minute. Resources that provide Regulation Reserves adjust their generation or load levels in response to automatic generation control (AGC) signals provided by the system operator. Contingency reserves are maintained to provide additional generation capacity in the event that load increases substantially or supply side resources reduce their output or are taken offline. The reserves are typically segmented into two categories, 1) Spinning or Synchronized Reserves that are provided by generation units that are actively generating and have the ability to increase or decrease their output, 2) Non-spinning or Non-synchronized Reserves that are provided by generation resources that are not actively generating, but are able to start up and provide generation within a specified timeframe. Contingency reserves typically have response times on the order of ten to 30 minutes and can also be provided by demand-side resources that are capable of reducing their load. There are seven distinct power markets in the United States, each operated by a Regional Transmission Operator (RTO) or Independent System Operator (ISO) that operates the transmission system in its territory, operates markets for energy and ancillary services, and maintains system reliability. Each power market offers its own set of ancillary services, and precise definitions, requirements, and market mechanisms differ between markets. Despite the differences between markets, both in terms of services offered and system requirements, some broad trends generally apply. Regulation Reserves typically have the highest market prices, followed by Spinning Reserves and Non-spinning Reserves. Prices for Regulation Reserves have been the highest in the PJM market, since it opened in October 2012. This is partially because PJM experienced large price spikes during the period of extreme weather conditions in early 2014. ERCOT has traditionally had the highest prices for Spinning Reserves (called Responsive Reserves in ERCOT), including several periods of sustained high prices between 2010 and 2012. This can be explained in part by the relatively high penetration of variable wind resources and a similarly high requirement relative to peak load. ERCOT has also traditionally had the highest price for Non-spinning Reserves, followed by the NYISO East region. Both have experienced several periods of prolonged high prices since their inception, an occurrence that has not been regularly seen in other markets. In ISO-NE and PJM for example, the market clearing price for Non-spinning Reserves is typically $0/MWh more than 95% of the time. Market volume (in terms of the average amount of capacity of each service that is provided to a system) typically follows the reverse order of prices, as systems maintain the most Non-spinning Reserves capacity followed by Spinning Reserves and Regulation Reserves. PJM generally has the largest market for Regulation Reserves both in terms of capacity. The size of most Regulation Reserves markets in terms of capacity stay relatively constant year-to-year, as this is dictated largely by system requirements. PJM also generally has the largest Spinning Reserves market in terms of capacity. SPP, MISO, ISO-NE and SPP (beginning in 2014) all have Spinning Reserve markets with similar average capacity levels. When combined, the markets for Non-spinning and Operating reserves in ISO-NE have a comparable capacity to the market for Primary Reserves 1 in PJM. SPP, MISO, and CAISO all have smaller markets for their respective Non-spinning Reserves products that are roughly the same size as each other in terms of capacity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

US DOE Perspectives on Advisory Board Effectiveness - 13539

Federal missions on the Oak Ridge Reservation began with the Manhattan Project, and continues today with major facilities supporting the Nation's Science and National Security missions. While most of the land area on the Oak Ridge Reservation is free of environmental impacts from these activities, significant legacy contamination is associated with specific facilities and past waste management areas. In 1989, the Oak Ridge Reservation (ORR) was placed on National Priorities List, and DOE established its Office of Environmental Management that same year. Three years later, in 1992, the Federal Facility Agreement for the reservation was signed. Three years afterward, the Oak Ridge Site Specific Advisory Board was established to augment ongoing public involvement activities related to Oak Ridge Reservation cleanup activities. One of the early and most impactful decisions the board made was to organize the End Use Working Group. This broad-based group of board members, DOE representatives, and members of the public was formed in 1997 to study future uses for contaminated areas of the reservation. The group was instrumental in building consensus in the Oak Ridge community regarding the long-term end state of reservation lands. The group's recommendations were a fundamental input into Record's of Decision subsequently developed to establish cleanup requirements across the ORR, and they continue to influence decisions being made today. In developing its recommendations on end states, the End Use Working Group came to the realization that long-term stewardship of contaminated areas of the reservation would be necessary, in some cases in perpetuity. It was from this concept that the Oak Ridge SSAB's 15-year involvement in stewardship would begin. A stewardship committee formed by the End Use Working Group wrote Volume 1 of the Stakeholder Report on Stewardship. This document-and its companion Volume 2, which was written a year later-form a crucial foundation for stewardship planning in Oak Ridge and have been referenced around the DOE complex as other sites consider stewardship planning. From these two broad-based initiatives, the board's focus has evolved to increasingly hone in on more specific, project-based recommendations and initiatives. The Oak Ridge Reservation Site Specific Advisory Board has been a highly effective forum for soliciting community input on Oak Ridge Reservation cleanup. Experience in Oak Ridge indicates that the utility of Board recommendations is far higher when the Board is asked to focus on broad programmatic issues, and less useful when the Board attempts to provide advice and recommendations on matters related to technical or project management issues. In Oak Ridge the Board has helped shape the program on many levels including definition of end-state cleanup objectives, budget development, program sequencing, waste management, and decisions concerning preservation of history related to missions implemented on the Oak Ridge Reservation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of the NURE Assessment of the U.S. Gulf Coast Uranium Province

Historic exploration and development were used to evaluate the reliability of domestic uranium reserves and potential resources estimated by the U.S. Department of Energy national uranium resource evaluation (NURE) program in the U.S. Gulf Coast Uranium Province. NURE estimated 87 million pounds of reserves in the $30/lb U{sub 3}O{sub 8} cost category in the Coast Plain uranium resource region, most in the Gulf Coast Uranium Province. Since NURE, 40 million pounds of reserves have been mined, and 38 million pounds are estimated to remain in place as of 2012, accounting for all but 9 million pounds of U{sub 3}O{sub 8} in the reserve or production categories in the NURE estimate. Considering the complexities and uncertainties of the analysis, this study indicates that the NURE reserve estimates for the province were accurate. An unconditional potential resource of 1.4 billion pounds of U{sub 3}O{sub 8}, 600 million pounds of U{sub 3}O{sub 8} in the forward cost category of $30/lb U{sub 3}O{sub 8} (1980 prices), was estimated in 106 favorable areas by the NURE program in the province. Removing potential resources from the non-productive Houston embayment, and those reserves estimated below historic and current mining depths reduces the unconditional potential resource 33% to about 930 million pounds of U{sub 3}O{sub 8}, and that in the $30/lb cost category 34% to 399 million pounds of U{sub 3}O{sub 8}. Based on production records and reserve estimates tabulated for the region, most of the production since 1980 is likely from the reserves identified by NURE. The potential resource predicted by NURE has not been developed, likely due to a variety of factors related to the low uranium prices that have prevailed since 1980.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Analysis of the Effects of Renewable Energy Intermittency on the 2030 Korean Electricity Market

Republic of Korea has unique geographical characteristics similar to those of an island, resulting in an isolated power system. For this reason, securing sufficient operating reserves for the system’s stability and reliability in the face of the intermittency of increasing variable renewable energy (VRE) is paramount, and this will pave the way to achieving the nation’s decarbonization target and carbon neutrality. However, the current reserve-operation method in Republic of Korea does not take into account energy-system conditions, such as the intermittency of the VRE. Therefore, this paper presents an analysis of the impact of changes in reserve-operation methods on the electricity market in the future Republic of Korean power system, with the increased levels of VRE that are currently envisioned. Specifically, three reserve-operation methods, including Korea’s current reserve-power-operation standards, were applied to the two power-system plans announced by the Korean government to analyze the annual generator operation and costs. The analysis results show that securing reserves proportional to the VRE would exert negative effects, such as increased power-generation costs and the curtailment of nuclear and VRE generation. These results can contribute to the estimation of operational reserves needed for high levels of VRE and to the design of new the Korean reserve market, to be introduced in 2025.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sphingosine-1-phosphate mediates epidermal growth factor-induced muscle satellite cell activation

Skeletal muscle can regenerate repeatedly due to the presence of resident stem cells, called satellite cells. Because satellite cells are usually quiescent, they must be activated before participating in muscle regeneration in response to stimuli such as injury, overloading, and stretch. Although satellite cell activation is a crucial step in muscle regeneration, little is known of the molecular mechanisms controlling this process. Recent work showed that the bioactive lipid sphingosine-1-phosphate (S1P) plays crucial roles in the activation, proliferation, and differentiation of muscle satellite cells. We investigated the role of growth factors in S1P-mediated satellite cell activation. We found that epidermal growth factor (EGF) in combination with insulin induced proliferation of quiescent undifferentiated mouse myoblast C2C12 cells, which are also known as reserve cells, in serum-free conditions. Sphingosine kinase activity increased when reserve cells were stimulated with EGF. Treatment of reserve cells with the D-erythro-N,N-dimethylsphingosine, Sphingosine Kinase Inhibitor, or siRNA duplexes specific for sphingosine kinase 1, suppressed EGF-induced C2C12 activation. We also present the evidence showing the S1P receptor S1P2 is involved in EGF-induced reserve cell activation. Moreover, we demonstrated a combination of insulin and EGF promoted activation of satellite cells on single myofibers in a manner dependent on SPHK and S1P2. Taken together, our observations show that EGF-induced satellite cell activation is mediated by S1P and its receptor. - Highlights: • EGF in combination with insulin induces proliferation of quiescent C2C12 cells. • Sphingosine kinase activity increases when reserve cells are stimulated with EGF. • EGF-induced activation of reserve cells is dependent on sphingosine kinase and ERK. • The S1P receptor S1P2 is involved in EGF-induced reserve cell activation. • EGF-induced reserve cell activation is mediated by S1P and its receptor.

60 APPLIED LIFE SCIENCES↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Elevated plasma triglycerides and growth rate are early indicators of reproductive status in post-spawning female steelhead trout (Oncorhynchus mykiss)

Abstract Many iteroparous fishes spawn after skipping one or more yearly cycles, which impacts recruitment estimates used for fisheries management and conservation. The physiological mechanisms underlying the development of consecutive and skip spawning life histories in fishes are not well understood. In salmonids, lipid energy reserves and/or growth are thought to regulate the initiation of reproductive maturation during a critical period ~1 year prior to spawning. The fasting spawning migration of summer-run steelhead trout (Oncorhynchus mykiss) results in significant depletion of energy reserves during the proposed critical period for repeat spawning. To determine whether and when lipid energy reserves and growth influence repeat spawning, measures of lipid energy reserves, growth rate and reproductive development were tracked in female steelhead trout from first to second spawning as a consecutive or skip spawner in captivity. Plasma triglyceride (TG) levels and growth rate were elevated by 10 weeks after spawning in reproductive (i.e. consecutive spawning) versus non-reproductive (i.e. skip spawning) individuals. Muscle lipid (ML) levels, condition factor and plasma estradiol levels increased at later time points. The early differences in plasma TG levels and increases in growth rate are attributable to differential rates of feeding and assimilation between the groups following spawning. A year after spawning, plasma TG levels, MLs and growth rate decreased in consecutive spawners, attributable to transfer of lipid reserves into the ovary. During the year prior to second spawning, energy reserves and plasma estradiol levels were higher in reproductive skip spawners versus consecutive spawners, reflecting the energy deficit after first spawning. These results suggest that the decision to initiate ovarian recrudescence occurs by 10 weeks after first spawning and are consistent with the differences in energy reserves acquired following spawning being a consequence of that decision. This information will increase the success of conservation projects reconditioning post-spawning summer-run steelhead trout.

Jenkins, Laura E.↗

NV Energy Electricity Storage Valuation

This study examines how grid-level electricity storage may benefit the operations of NV Energy, and assesses whether those benefits are likely to justify the cost of the storage system. To determine the impact of grid-level storage, an hourly production cost model of the Nevada Balancing Authority ("BA") as projected for 2020 was created. Storage was found to add value primarily through the provision of regulating reserve. Certain storage resources were found likely to be cost-effective even without considering their capacity value, as long as their effectiveness in providing regulating reserve was taken into account. Giving fast resources credit for their ability to provide regulating reserve is reasonable, given the adoption of FERC Order 755 ("Pay-for-performance"). Using a traditional five-minute test to determine how much a resource can contribute to regulating reserve does not adequately value fast-ramping resources, as the regulating reserve these resources can provide is constrained by their installed capacity. While an approximation was made to consider the additional value provided by a fast-ramping resource, a more precise valuation requires an alternate regulating reserve methodology. Developing and modeling a new regulating reserve methodology for NV Energy was beyond the scope of this study, as was assessing the incremental value of distributed storage.

Ellison, James F.↗

Oneida Tribe of Indians of Wisconsin Energy Optimization Model

Oneida Nation is located in Northeast Wisconsin. The reservation is approximately 96 square miles (8 miles x 12 miles), or 65,000 acres. The greater Green Bay area is east and adjacent to the reservation. A county line roughly splits the reservation in half; the west half is in Outagamie County and the east half is in Brown County. Land use is predominantly agriculture on the west 2/3 and suburban on the east 1/3 of the reservation. Nearly 5,000 tribally enrolled members live in the reservation with a total population of about 21,000. Tribal ownership is scattered across the reservation and is about 23,000 acres. Currently, the Oneida Tribe of Indians of Wisconsin (OTIW) community members and facilities receive the vast majority of electrical and natural gas services from two of the largest investor-owned utilities in the state, WE Energies and Wisconsin Public Service. All urban and suburban buildings have access to natural gas. About 15% of the population and five Tribal facilities are in rural locations and therefore use propane as a primary heating fuel. Wood and oil are also used as primary or supplemental heat sources for a small percent of the population. Very few renewable energy systems, used to generate electricity and heat, have been installed on the Oneida Reservation. This project was an effort to develop a reasonable renewable energy portfolio that will help Oneida to provide a leadership role in developing a clean energy economy. The Energy Optimization Model (EOM) is an exploration of energy opportunities available to the Tribe and it is intended to provide a decision framework to allow the Tribe to make the wisest choices in energy investment with an organizational desire to establish a renewable portfolio standard (RPS).

14 SOLAR ENERGY↗

Soboba Community Energy Solar Project – Phase 1

Since time immemorial the descendants of the Soboba people are those whom have lived on and occupied the land that is presently known as the cities of San Jacinto, Hemet, Valle Vista and Winchester. On June 19, 1883, President Chester Arthur by Executive Order established the Soboba Indian Reservation, a 3,172-acre tract which included the Soboba village and the adjacent hills. The President had limited authority as he was only able to set aside public land for the establishment of a reservation and had no authority to take private land. Thus the Soboba village; cultivated lands and major springs were part of Rancho San Jacinto Viejo and belonged to Matthew Byrne. Today the Soboba Indian Reservation lies in the lower reaches of the San Jacinto Mountains, across the San Jacinto River from the city of San Jacinto. The Soboba Band of Luiseño Indians was awarded a community solar grant through the U.S. Department of Energy. The incorporated cities of San Jacinto and Hemet, and the unincorporated community of Valle Vista border the Reservation. All three of these surrounding communities have experienced tremendous population growth over the past two decades, with slower growth during the recent economic downturn. The Tribal community that benefits from under this grant includes 1,161 enrolled members, the majority of which live on the reservation. Nearly 41% of the enrolled members are youth, age 18 and under. The elders and community leaders value preserving and maintaining the Luiseño and Cahuilla cultures and Tribal structure for future generations. The proposed project was administered from the Tribal Administration offices located on the reservation. The Soboba Tribal Government consists of five Tribal Members who are elected by the general membership to Tribal Council for a staggered two year term. The Chairman/Chairwoman is elected by a majority vote of the general membership but the positions for Vice-Chair, Tribal Secretary, Tribal Treasurer and Sergeant at Arms are decided by the elected council. The Soboba Tribal Administration encompasses several departments that serve the needs of the Tribe, the Reservation and the general public. They assist in day-to-day Tribal operations, public safety, Tribal family services, Native American assistance to needy families, cultural preservation, and Tribal environmental protection of natural resources, along with the monitoring of progress and needs of its Enterprises and the general public. The Tribe’s long term energy vision is to become self-sufficient and thereby attain greater control of its destiny, to control costs in view of rapidly rising electric utility expenses, and to maximize the use of renewable energy consistent with sustainable development practices. The project is a Renewable Energy System, specifically a ground mounted, fixed tilt, solar photovoltaic (PV) generating system with a rated capacity of 1.0MWac. The solar generated power serves the electric needs of the affected meters. It benefits every Tribal member since the cost of running the community Tribal facilities, including electric bills, comes out of the General Fund. The estimated 20 year project savings of $ 6,418,064 can be re-directed to other vital community needs, and the project will provide additional jobs for Tribal members. The project has been thoroughly researched and is ready to implement as soon as funding is approved.

14 SOLAR ENERGY↗

Soboba Community Energy Solar Project - Phase 2

This is the final technical report for the Soboba Band of Luiseno Indians' second community solar project. Since time immemorial the descendants of the Soboba people are those whom have lived on and occupied the land that is presently known as the cities of San Jacinto, Hemet, Valle Vista and Winchester. On June 19, 1883, President Chester Arthur by Executive Order established the Soboba Indian Reservation, a 3,172-acre tract which included the Soboba village and the adjacent hills. The President had limited authority as he was only able to set aside public land for the establishment of a reservation and had no authority to take private land. Thus the Soboba village; cultivated lands and major springs were part of Rancho San Jacinto Viejo and belonged to Matthew Byrne. Today the Soboba Indian Reservation lies in the lower reaches of the San Jacinto Mountains, across the San Jacinto River from the city of San Jacinto. The Soboba Band of Luiseño Indians was awarded a community solar grant through the U.S. Department of Energy. The incorporated cities of San Jacinto and Hemet, and the unincorporated community of Valle Vista border the Reservation. All three of these surrounding communities have experienced tremendous population growth over the past two decades, with slower growth during the recent economic downturn. The Tribal community that benefits from under this grant includes 1,161 enrolled members, the majority of which live on the reservation. Nearly 41% of the enrolled members are youth, age 18 and under. The elders and community leaders value preserving and maintaining the Luiseño and Cahuilla cultures and Tribal structure for future generations. The proposed project was administered from the Tribal Administration offices located on the reservation. The Soboba Tribal Government consists of five Tribal Members who are elected by the general membership to Tribal Council for a staggered two year term. The Chairman/Chairwoman is elected by a majority vote of the general membership but the positions for Vice-Chair, Tribal Secretary, Tribal Treasurer and Sergeant at Arms are decided by the elected council. The Soboba Tribal Administration encompasses several departments that serve the needs of the Tribe, the Reservation and the general public. They assist in day-to-day Tribal operations, public safety, Tribal family services, Native American assistance to needy families, cultural preservation, and Tribal environmental protection of natural resources, along with the monitoring of progress and needs of its Enterprises and the general public. The Tribe’s long term energy vision is to become self-sufficient and thereby attain greater control of its destiny, to control costs in view of rapidly rising electric utility expenses, and to maximize the use of renewable energy consistent with sustainable development practices. The project is a Renewable Energy System, specifically a ground mounted, fixed tilt, solar photovoltaic (PV) generating system with a rated capacity of 1.0MWac. The solar generated power serves the electric needs of the affected meters. It benefits every Tribal member since the cost of running the community Tribal facilities, including electric bills, comes out of the General Fund. The estimated 20 year project savings of $ 6,418,064 can be re-directed to other vital community needs, and the project will provide additional jobs for Tribal members. The project has been thoroughly researched and is ready to implement as soon as funding is approved.

14 SOLAR ENERGY↗

Bishop Paiute Single Family Solar Home Project: Phase 4 (Final Technical Report)

The Bishop Paiute Tribe is committed to energy efficiency, renewable energy, and environmental protection and has a vision to install solar energy systems on all buildings on the Reservation where technically feasible. Through completion of the Bishop Paiute Tribe Residential Solar Program – Phase 4, Bishop Paiute Tribe continued its successful model partnering with non-profit solar installer GRID Alternatives to advance its vision and build energy self-sufficiency on the Bishop Paiute Reservation. The Bishop Paiute Tribe Residential Solar Program – Phase IV deployed 67 kW-AC of new clean, renewable energy through grid-tied, net-metered rooftop solar electric systems installed on a total of 20 (one more than the planned 19) existing owner-occupied, single-family homes for low-income families on the Reservation. This represents nearly 14% of the Reservation’s total “unsolarized” homes. These systems were provided at no cost to the homeowners, who will also receive energy efficiency education to further reduce energy consumption and lower electric bills. GRID led a solar installation for three (3) of the homes where Tribal/community members, were given an opportunity in participating in on-the-roof trainings to gain new skills while installing solar for their low-income community members. Subcontractors through GRID Sub Contractor Partnership Program (GRID SPP) led solar installations for seventeen (17) of the homes. Each installation provided paid employment for a solar trainee trainees hired by the SPP subcontractors as entry level solar installers. It is estimated that the installed 67 kW-AC of solar will produce at least 120,000 kWh/year, displacing at least 30-75% of the 20 homes’ total electricity use for a combined system lifetime electricity cost savings for the low-income homeowners of about $\$$500,000. It is further estimated that the installed renewable energy systems installed will prevent greenhouse gases by about 1,000 tons, equivalent to planting approximately 25,000 trees. Following the successful completed installations, it is expected that the Reservation and surrounding communities will benefit from improved air quality via reduced wood stove use for heating. Cumulatively with other initiatives, the project will result in nearly 40% of the Reservation’s solarizable homes being solarized. Overall, the triple impact of the phase 4 of the Bishop Paiute Tribe Residential Solar Program – Phase 4 is: 1) affordable energy for low-income families; 2) on-site clean energy production, 3) hands on training and paid solar installation work for local tribal/community workers. These impacts will support and grow the Tribe’s energy, economic, environmental, and social self-sufficiency and sovereignty amongst the neediest on the Reservation.

14 SOLAR ENERGY↗

Conditional load and store in a shared memory

A method, system and computer program product for implementing load-reserve and store-conditional instructions in a multi-processor computing system. The computing system includes a multitude of processor units and a shared memory cache, and each of the processor units has access to the memory cache. In one embodiment, the method comprises providing the memory cache with a series of reservation registers, and storing in these registers addresses reserved in the memory cache for the processor units as a result of issuing load-reserve requests. In this embodiment, when one of the processor units makes a request to store data in the memory cache using a store-conditional request, the reservation registers are checked to determine if an address in the memory cache is reserved for that processor unit. If an address in the memory cache is reserved for that processor, the data are stored at this address.

97 MATHEMATICS AND COMPUTING↗

Method, apparatus and system for managing queue operations of a test bench environment

Techniques and mechanisms for performing dequeue operations for agents of a test bench environment. In an embodiment, a first group of agents are each allocated a respective ripe reservation and a second set of agents are each allocated a respective unripe reservation. Over time, queue management logic allocates respective reservations to agents and variously changes one or more such reservations from unripe to ripe. In another embodiment, an order of servicing agents allocated unripe reservations is based on relative priorities of the unripe reservations with respect to one another. An order of servicing agents allocated ripe reservations is on a first come, first served basis.

97 MATHEMATICS AND COMPUTING↗