Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power systems planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

Anastasia Ford↗

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

lunar power↗

Power Sharing-Based Framework for Allocating Automatic Generation Control in Distributed Energy Resources: Preprint

The recent proliferation of distributed energy resources (DERs) in the power network along with the retirement of conventional generators has made it challenging to regulate system frequency. In this paper, we present a centralized control framework to leverage the potential of DERs in the distribution network in provisioning secondary frequency control services to the grid. The proposed framework is based on network volt-watt sensitivity analysis and takes into account DER operational and network-imposed constraints to allocate the automatic generation control (AGC) request among the aggregated units. The proposed framework was implemented on the IEEE 8500-node test feeder and results were validated against a standard linear programming-based scheme. Numerical results indicate that the proposed framework can successfully utilize the available power production headroom of the network to meet the AGC request while maintaining nodal voltages within acceptable limits.

distributed energy resources↗

Tightly Coupled Inertial Navigation System/Global Positioning System (TCMIG)

Many NASA applications planned for execution later this decade are seeking high performance, miniaturized, low power Inertial Management Units (IMU). Much research has gone into Micro-Electro-Mechanical System (MEMS) over the past decade as a solution to these needs. While MEMS devices have proven to provide high accuracy acceleration measurements, they have not yet proven to have the accuracy required by many NASA missions in rotational measurements. Therefore, a new solution has been formulated integrating the best of all IMU technologies to address these mid-term needs in the form of a Tightly Coupled Micro Inertial Navigation System (INS)/Global Positioning System (GPS) (TCMIG). The TCMIG consists of an INS and a GPS tightly coupled by a Kalman filter executing on an embedded Field Programmable Gate Array (FPGA) processor. The INS consists of a highly integrated Interferometric Fiber Optic Gyroscope (IFOG) and a MEMS accelerometer. The IFOG utilizes a tightly wound fiber coil to reduce volume and the high level of integration and advanced optical components to reduce power. The MEMS accelerometer utilizes a newly developed deep etch process to increase the proof mass and yield a highly accurate accelerometer. The GPS receiver consists of a low power miniaturized version of the Blackjack receiver. Such an IMU configuration is ideal to meet the mid-term needs of the NASA Science Enterprises and the new launch vehicles being developed for the Space Launch Initiative (SLI).

Watson, Michael D.↗

Advancing Energy Equity Considerations in Distribution Systems Planning

Current distribution system planning (DSP) processes do not explicitly account for energy equity considerations, such as who is most affected by power system burdens, where those burdens are concentrated, and what investments can be made to improve baseline conditions. This paper proposes an iterative framework for advancing energy equity as an objective of the DSP process, showing how measurement strategies, or metrics (informed by conceptual foundations of energy justice), can be applied to benchmark equity performance at various stages. This methodology is applied for equity-aware distributed energy resource (DER) hosting capacity analysis and outage analysis to provide critical insights on infrastructure upgrade decisions compared to a business-as-usual (BAU) case. The analysis is performed on a taxonomy feeder representing the West Coast urban/semi-urban system with augmentation of electric vehicles (EVs) and rooftop solar photovoltaic (PV) generators. The study considers disadvantaged community (DAC) and non-disadvantaged community (NDAC) load regions to enable equity-aware simulations. The results demonstrate how equity-aware planning could reveal the limitations of the traditional DSP process as DAC regions are found to have lower DER hosting capacity and higher outage vulnerability. Overall, this work provides insights on the need to incorporate energy equity as an integral part of the DSP process.

Energy Equity, Distribution System Planning, DER a↗

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone↗

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone↗

Liquid-Metal Pump Technologies for Nuclear Surface Power

Multiple liquid-metal pump options are reviewed for the purpose of determining the technologies that are best suited for inclusion in a nuclear reactor thermal simulator intended to test prototypical space nuclear system components. Conduction, induction, and thermoelectric electromagnetic pumps are evaluated based on their performance characteristics and the technical issues associated with incorporation into a reactor system. The thermoelectric pump is recommended for inclusion in the planned system at NASA MSFC based on its relative simplicity, low power supply mass penalty, flight heritage, and the promise of increased pump efficiency over earlier flight pump designs through the use of skutterudite thermoelectric elements.

Polzin, K. A.↗

The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

Source record↗

Multi-Timescale Integrated Dynamic and Scheduling Model (MIDAS-Solar)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power system operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power systems steady-state and dynamic performance. This project helps meet and exceed the Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for electric grid planning and operation. This will be accomplished by developing temporally comprehensive, closed-loop simulation models that seamlessly simulate power systems operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). Both a multi-timescale grid model and an integrated PV model will be developed in this project to accurately study the impacts of PV variability and uncertainty on system reliability at multiple timescales. Using quasi-dynamic simulation methods and data-driven security assessment (DSA) criteria will allow the dynamic characteristics of PV to be fed forward into longer-timescale scheduling models for a complete understanding of the effect of short-term PV dynamics on bulk systems operations (e.g., reserve scheduling and deployment). Upon completion of the proposed model, this project will help operators accurately assess system reliability by deploying energy and reserve scheduling under critical contingency conditions and studying interactions among all types of essential reliability services provided by modern PV power plants.

14 SOLAR ENERGY↗

Integration of Large-Scale Renewable Energy in the Bulk Power System: Lessons from International Experiences

Deployment of increasing amounts of renewable energy (RE) presents certain challenges in reliably integrating larger quantities RE into existing bulk power system infrastructures. RE Bulk power typically refers to large-scale power generation at a centralized facility and in the context of RE can include wind farms, utility-scale solar, geothermal, hydro and biomass facilities. Based on international experiences, several actions and related good practices have emerged to support the deployment of RE in the bulk power system. This paper provides a review of emerging international best practices that support the integration of large-scale RE; examples of country-level efforts in implementing these practices; and key considerations for any country pursuing bulk power sector transformation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mission Assessment of the Faraday Accelerator with Radio-frequency Assisted Discharge (FARAD)

Pulsed inductive thrusters have typically been considered for future, high-power, missions requiring nuclear electric propulsion. These high-power systems, while promising equivalent or improved performance over state-of-the-art propulsion systems, presently have no planned missions for which they are well suited. The ability to efficiently operate an inductive thruster at lower energy and power levels may provide inductive thrusters near term applicability and mission pull. The Faraday Accelerator with Radio-frequency Assisted Discharge concept demonstrated potential for a high-efficiency, low-energy pulsed inductive thruster. The added benefits of energy recapture and/or pulse compression are shown to enhance the performance of the pulsed inductive propulsion system, yielding a system that con compete with and potentially outperform current state-of-the-art electric propulsion technologies. These enhancements lead to mission-level benefits associated with the use of a pulsed inductive thruster. Analyses of low-power near to mid-term missions and higher power far-term missions are undertaken to compare the performance of pulsed inductive thrusters with that delivered by state-of-the-art and development-level electric propulsion systems.

Dankanich, John W.↗

Protoflight photovoltaic power module system-level tests in the space power facility

Work Package Four, which includes the NASA-Lewis and Rocketdyne, has selected an approach for the Space Station Freedom Photovoltaic (PV) Power Module flight certification that combines system level qualification and acceptance testing in the thermal vacuum environment: The protoflight vehicle approach. This approach maximizes ground test verification to assure system level performance and to minimize risk of on-orbit failures. The preliminary plans for system level thermal vacuum environmental testing of the protoflight PV Power Module in the NASA-Lewis Space Power Facility (SPF), are addressed. Details of the facility modifications to refurbish SPF, after 13 years of downtime, are briefly discussed. The results of an evaluation of the effectiveness of system level environmental testing in screening out incipient part and workmanship defects and unique failure modes are discussed. Preliminary test objectives, test hardware configurations, test support equipment, and operations are presented.

Rivera, Juan C.↗

Protoflight photovoltaic power module system-level tests in the Space Power Facility

Work Package Four, which includes the NASA-Lewis and Rocketdyne, has selected an approach for the Space Station Freedom Photovoltaic (PV) Power Module flight certification that combines system level qualification and acceptance testing in the thermal vacuum environment: the 'protoflight' vehicle approach. This approach maximizes ground test verification to assure system level performance and to minimize risk of on-orbit failures. The preliminary plans for system level thermal vacuum environmental testing of the protoflight PV Power Module in the NASA-Lewis Space Power Facility (SPF) are addressed. Details of the facility modifications to refurbish SPF, after 13 years of downtime, are briefly discussed. The results of an evaluation of the effectiveness of system level environmental testing in screening out incipient part and workmanship defects and unique failure modes are discussed. Preliminary test objectives, test hardware configurations, test support equipment, and operations, are presented.

Rivera, Juan C.↗

Baseline Testing of The EV Global E-Bike

The NASA John H. Glenn Research Center initiated baseline testing of the EV Global E-Bike as a way to reduce pollution in urban areas, reduce fossil fuel consumption and reduce Operating costs for transportation systems. The work was done Linder the Hybrid Power Management (HPM) Program, which includes the Hybrid Electric Transit Bus (HETB). The E-Bike is a state of the art, ground up, hybrid electric bicycle. Unique features of the vehicle's power system include the use of an efficient, 400 W. electric hub motor and a 7-speed derailleur system that permits operation as fully electric, fully pedal, or a combination of the two. Other innovative features, such as regenerative braking through ultracapacitor energy storage are planned. Regenerative braking recovers much of the kinetic energy of the vehicle during deceleration. The E-Bike is an inexpensive approach to advance the state of the art in hybrid technology in a practical application. The project transfers space technology to terrestrial use via nontraditional partners, and provides power system data valuable for future space applications. A description of the E-bike, the results of performance testing, and future vehicle development plans is the subject of this report. The report concludes that the E-Bike provides excellent performance, and that the implementation of ultracapacitors in the power system can provide significant performance improvements.

Eichenberg, Dennis J.↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗