Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power law process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

529 records · Page 30

Safer Foundation Solar Demands Skill Collaborative

The milestones and accomplishments achieved in Safer’s Solar Demands Skill Training program required a collective effort of stakeholders. The ability to achieve the desired results and impact lives of the population we serve works best when collaborating with community stakeholders such as community-based organizations, faith-based organizations, community activists, local law enforcement, community residents, employers, and elected and appointed officials. We are working harder than ever to place clients in-demand careers and high-growth industry sectors. Our employer engagement with high growth sectors continues to increase, we have been able to deepen our relationships in this space by providing in demand stackable credential training. Launched our initiative in the green job space by partnering with organizations like ComEd, the Department of Energy, community-based organizations, faith-based organizations, and manufacturers that helped to train clients in the green jobs and renewable energy space. By the end of the year, we will have completed our tenth cohort of photovoltaic solar installation training. The training has been used as a foundation for solar panel installers to acquire new skills in in the green jobs career pathways, such as sales and customer service. It has also served as a pipeline to union-level trade positions through the skills participants obtained through partnership engagement. Safer Foundation's policy and advocacy team plays a major role in expanding opportunities for people with records to over one hundred occupations, including the trades. This reform has allowed many to secure living wage employment, reducing the high recidivism rate within Illinois. Safer continues to build our social enterprise with Reconstructive Technology Partners (RTP). RTP is introducing people with records to the construction trades such as solar, carpentry and electrical through residential remodeling of homes on smaller construction projects. Understanding the need to have a greater community presence, outreach was extended to a boots on the ground model, including, but not limited to door-to-door engagement, DE-EE0008571 Safer Foundation Page 4 of 29 local radio broadcasting and print ads in local newspapers. We continue to seek innovative ways to increase Safer Foundations' presence in the renewable energy space. Outreach efforts gave us an opportunity to share critical reentry information and opportunities about our PV installer program. Giving us reach with local and national audiences alike. We launched a systematic approach to improving client data and client tracking through an evidence-based practices initiative. That implemented an agency wide cross-functional data management system. The system supported our goal of reviewing, evaluating, and making recommendations to improve operational processes, program delivery, information sharing, and more. Played a significant part in the success of the solar program. Finally, economists around the nation agree that there is a significant labor shortage. The shortage directly threatens our ability to sustain our economic growth; if employers do not have access to the workers they need, it can lead to a shutdown in the economic recovery. The demand for Safer Foundation services is more important and impactful than ever. We will continue to build upon our 50 years of experience to address the challenges ahead and serve more people in a better way. We are confident we will accomplish beautiful things that benefit everyone involved because together, we are powerful.

14 SOLAR ENERGY↗

Progression to Compatibility Evaluations in Flowing Molten Salts

Molten salt compatibility with structural alloys has been identified as a key issue for the development of Generation 3 concentrating solar power (CSP) systems with thermal storage. To accelerate this evaluation to pumped systems, the goal of this project was to conduct thermal convection loop (TCL) experiments with a peak temperature of ≥700°C and a typical temperature gradient of ~100°C. The experiments indicated that conventional ~16wt.%Cr Ni-based alloys are compatible up to 700°C with purified (i.e. low O) or dried (low H₂O) industrial-sourced Mg-K-Na chloride salt with <10 μm/yr loss. This two-year project was conducted based on the experimental and mechanistic understanding developed more than 60 years ago at Oak Ridge National Laboratory (ORNL). The first TCL experiment met the <15 μm/yr corrosion metric for this project with specimens of Ni-based alloy 600 exposed at 580°-700°C for 1000 h and post-exposure room temperature tensile tests showed minimal degradation. The second TCL experiment successfully deployed an electrochemical sensor from Argonne National Laboratory and had a peak temperature of 750°C but only ran for ~110 h due to a furnace failure. Both experiments used highly purified industrial-sourced salt with an O content of ~3 μg O/g salt and a Mg addition of 0.04 wt.%. In the second year, the Chloride Collective developed a more economical drying procedure such that the O content was much higher (>20,000 μg O/g salt). A third TCL experiment was conducted with a sensor and a peak temperature of 700°C using dried salt from the same industrial source and increased NaCl content (~20 wt.%). In addition to a 0.05% Mg addition to the salt, a Mg coupon was added in the coldest part of the loop which dissolved during the experiment. Again, small mass changes were noted for specimens of alloys 600 and C276 but the values were slightly higher than those measured in purified salt with Mg. A thin non-continuous and non-adherent oxide layer was deposited on most specimens containing Mg, Si and Al but Cr depletion also was observed. Both years included facilities qualification crucible experiments and then capsule experiments to confirm a baseline isothermal reaction rate. The first year capsule experiment led to the conclusion that the two-stage ORNL purification process using NH₄Cl and CCl₄ left the salt with a high Cl potential and a Mg addition (~0.05wt.%) was needed to lower the potential. The second year capsule experiments at 600° and 700°C found little difference in depth of attack for 0-0.25%Mg additions. In general, the complex reactions where salt can be trapped in the porous surface layer of metal indicated that mass change is an unreliable metric and average depth of Cr depletion is a better metric for assessing the extent of attack. These results have created a new baseline that is contrary to the recent published literature for chloride salts where mass losses have been reported that can be extrapolated to very significant annual metal loss rates. Chloride salt corrosion can be controlled and the results also indicate that salt purification to low O levels may not be necessary. However, additional TCL experiments are needed at different times and temperatures to generate important engineering information such as temperature dependent corrosion rates and reaction rate laws for extrapolation to long-term behavior and isolate the effect of salt additives and impurities.

36 MATERIALS SCIENCE↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pushing the Limits of Pulse Shape Discrimination in a Large Liquid Xenon Detector

The LUX-ZEPLIN (LZ) experiment is a direct-detection dark matter experiment, optimized to search for weakly interacting massive particles (WIMPs) through WIMP-nucleon interactions. The main challenge in dark matter detection is differentiating between WIMP signals and background events. In LZ, the ratio of ionization to scintillation signals (charge-to-light) is the primary method for rejecting electronic recoil (ER) background. Pulse shape discrimination (PSD) offers a method for additional ER backgrounds rejection in liquid xenon detectors. In this paper, the discrimination power of PSD with the LZ experiment is discussed. To precisely characterize the scintillation pulse shape, an analysis framework is developed to reconstruct the detection time of individual photons. Using LZ calibration data, the photon-timing prompt fraction discriminator is optimized and achieves ER leakage as low as $15\%$. For specific background processes such as $^{124}$Xe double electron capture, the leakage is reduced further to about $5\%$. PSD is combined with charge-to-light to form two-factor discrimination (TFD). The optimized TFD performance is compared with the performance of the charge-to-light method, with the corresponding false positive rate reduced by up to a factor of two for large scintillation pulses. Finally, PSD and TFD are applied to data from LZ's WS2024 run and their performance is summarized.

Akerib, D. S. [SLAC; KIPAC, Menlo Park]↗

Pushing the limits of pulse shape discrimination in a large liquid xenon detector

Abstract The LUX-ZEPLIN (LZ) experiment is a direct-detection dark matter experiment, optimized to search for weakly interacting massive particles (WIMPs) through WIMP-nucleon interactions. The main challenge in dark matter detection is differentiating between WIMP signals and background events. In LZ, the ratio of ionization to scintillation signals (charge-to-light) is the primary method for rejecting electronic recoil (ER) background. Pulse shape discrimination (PSD) offers a method for additional ER backgrounds rejection in liquid xenon detectors. In this paper, the discrimination power of PSD with the LZ experiment is discussed. To precisely characterize the scintillation pulse shape, an analysis framework is developed to reconstruct the detection time of individual photons. Using LZ calibration data, the photon-timing tail fraction discriminator is optimized and achieves ER leakage as low as $$15\%$$ 15 % . For specific background processes such as $$^{124}$$ 124 Xe double electron capture, the leakage is reduced further to about $$5\%$$ 5 % . PSD is combined with charge-to-light to form two-factor discrimination (TFD). The optimized TFD performance is compared with the performance of the charge-to-light method, with the corresponding false positive rate reduced by up to a factor of two for large scintillation pulses. Finally, PSD and TFD are applied to data from LZ’s WS2024 run and their performance is summarized.

Akerib, D. S. [SLAC National Accelerator Laborator↗

University Coalition for Fossil Fuel Energy Research

Following a nationwide open competition, the University Coalition for Fossil Energy Research (UCFER) was established in October 2015 through a cooperative agreement between Penn State and the Department of Energy (DOE) National Energy Technology Laboratory (NETL). Penn State lead UCFER with the objective of advancing basic and applied research for clean and low-carbon energy based on fossil fuels in support of the DOE’s mission. UCFER focused on research that improves the efficiency of production and use of fossil energy resources, while minimizing the environmental impacts and reducing greenhouse gas emissions. Penn State lead a team of nine universities (Massachusetts Institute of Technology, The Pennsylvania State University, Princeton University, Texas A&M University, University of Kentucky, University of Southern California, The University of Tulsa, University of Wyoming, and Virginia Polytechnic and State University) during the competition stage, adding seven more universities in 2017 (Carnegie Mellon University, Louisiana State University, The Ohio State University, University of North Dakota, University of Pittsburgh, University of Utah, and West Virginia University). This Coalition exhibited a wide geographical distribution across the U.S. bringing a wide variety of fossil energy expertise. This national university alliance was a major collaborative effort with NETL to address specific topics of R&D in NETL’s mission area, which involved one or more of NETL’s five core competencies (Geologic and Environmental Systems, Materials Engineering and Manufacturing, Energy Conversion Engineering, Systems Engineering and Analysis, and Computational Science and Engineering). The first five to six months of the project was the definitization stage. During this period, Penn State worked closely with NETL to finalize the Coalition organizational structure and By- Laws, prepare a statement of substantial involvement and a statement of project objectives, and develop operations and membership plans. A major component of this stage included preparing an execution plan to solicit research, evaluate proposals, recommend selected projects to NETL, and award projects. In addition, a plan was prepared to monitor projects, review projects, disseminate knowledge from research projects and develop an online system for Coalition research portfolio management. This included developing a website and several databases. The first of six rounds of solicitations started in mid-2016. Projects from the sixth solicitation started February 1, 2021, and ended January 31, 2023. Projects that were selected represented twelve technology lines. Approximately $16.6 million in funding was available for the six solicitations. Most of the funding was provided by DOE, Office of Fossil Energy (DOEFE) with the DOE Fuel Cells Technologies Office (DOE-FCTO) providing funding for a few projects. Coalition universities submitted 259 proposals in response to the solicitations, requesting approximately $67.0 million in funding, and forty-three projects were selected. However, one project withdrew after the principal investigator left the university. The management of the Coalition projects was a major activity by Penn State. Managing the Coalition projects consisted of monitoring the projects, reviewing the projects through annual technical review meetings, disseminating knowledge from the research projects, and developing an online system for Coalition research portfolio management. Penn State’s OMT monitored projects to ensure that all milestones (technical, schedule, budget) were met, expenditures were allowable, cost share (when applicable) were reported, and all technical reports were submitted. The OMT also posted the technical reports electronically on a secure members-only website for access and review by the Coalition members. Disseminating knowledge from the research projects was done through a website, newsletters, various meetings, conferences, journal articles, publicity/press releases, and project summaries that were prepared after each project was completed. Penn State kept NETL apprised of UCFER progress through quarterly reports (thirtyone were submitted by Penn State), verbal and written communications, yearly updates at the annual technical review meetings, and cost accrual reports. The UCFER project had a significant impacty. The UCFER program established the first national university alliance in fossil energy research with a major collaboration effort with DOE NETL that addressed specific topics in NETL’s research and development mission areas. It generated inter-university collaborations, which was another program interest. Twenty-two out of 259 proposals contained collaborations (≈8.5%) and three of forty-two funded projects involved inter-university collaborations (≈7.0%). The forty-two funded projects provided support at fourteen universities involving 269 personnel. Research was conducted by 106 faculty, 115 graduate and undergraduate students, forty-six research staff and post-doctoral scholars, and two visiting scholars. Students and post-doctoral scholars were also on-site at NETL through CRADAs. In addition, non-Coalition participants included six universities and sixteen companies and national laboratories. The non-Coalition participants were involved as subcontractors, providers of cost share, performed unpaid consultation and sample analysis, served as advisory board members, or were providers of samples and materials for testing. UCFER also produced visibility in that fifty-six refereed journal articles were published, fifty-seven conference papers and twenty-three posters were prepared, 190 presentations were given, eight patent applications were filed, two books/book chapters were written, and ten software codes were developed. Collaboration between NETL and the individual projects was a major requirement for all funded projects. This included NETL staff time to support collaboration, consultation, technical guidance, sample preparation and analysis, internships at NETL, on-site testing and equipment usage by Coalition participants at NETL, co-mentoring students, and coauthoring journal articles and conference papers. Collaboration was impacted by COVID-19 in that not all on-site activities could be performed. NETL personnel were coauthors on eight of the conference papers (fourteen percent of the conference papers that were prepared) and seventeen of the journal articles (thirty percent of the journal articles that were prepared). A website was developed for an online proposal solicitation and review process and to provide exposure to UCFER. A website analysis highlighted the large amount of member and general public interest in UCFER by interpreting access statistics from March 2016 through June 2023. Visitors to the site originated from many different organizations, businesses, and countries. The website provided a means to disseminate information to both the general public and the UCFER members and was successfully used for outreach activities. In addition, NETL required that RFP release, proposal submission, and proposal reviews all be performed online. Penn State successfully developed these capabilities in a secure section of the website, which were used throughout the UCFER project. It is recognized that each project had its technical successes. In addition, highlighted successes were compiled and summarized from the research projects. Information was requested from the PIs of completed projects. In addition, Penn State’s Operations Management Team reviewed subcontract reports to identify project successes. Examples of information requested from PIs included (not all-inclusive): new projects that have been funded as a result of UCFER funding; new commercial products; establishment of a new center; new patent; new software; best paper awards; highly-cited work; and graduate student successes. A total of forty-eight highlighted successes were reported.

01 COAL, LIGNITE, AND PEAT↗