Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

STS-77 Space Shuttle Mission Report

The STS-77 Space Shuttle Program Mission Report summarizes the Payload activities as well as the: Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME) systems performance during the seventy-seventh flight of the Space Shuttle Program, the fifty-second flight since the return-to-flight, and the eleventh flight of the Orbiter Endeavour (OV-105). STS-77 was also the last flight of OV-105 prior to the vehicle being placed in the Orbiter Maintenance Down Period (OMDP). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-78; three SSME's that were designated as serial numbers 2037, 2040, and 2038 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-080. The RSRM's, designated RSRM-47, were installed in each SRB and the individual RSRM's were designated as 360TO47A for the left SRB, and 360TO47B for the right SRB. The STS-77 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume VII, Appendix E. The requirement stated in that document is that each organizational element supporting the Program will report the results of their hardware (and software) evaluation and mission performance plus identify all related in-flight anomalies. The primary objectives of this flight were to successfully perform the operations necessary to fulfill the requirements of Spacehab-4, the SPARTAN 207/inflatable Antenna Experiment (IAE), and the Technology Experiments Advancing Missions in Space (TEAMS) payload. Secondary objectives of this flight were to perform the experiments of the Aquatic Research Facility (ARF), Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE), Biological Research in Canisters (BRIC), Get-Away-Special (GAS), and GAS Bridge Assembly (GBA). The STS-77 mission was planned as a 9-day flight plus 1 day, plus 2 contingency days, which were available for weather avoidance or Orbiter contingency operations. The sequence of events for the STS-77 mission is shown in Table 1, and the Space Shuttle Vehicle Management Office Problem Tracking List is shown in Table 11. The Government Fumished Equipment/Flight Crew Equipment (GFE/FCE) Problem Tracking List is shown in Table II. Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (G.m.t.) and mission elapsed time (MET). The six-person crew for STS-77 consisted of John H. Casper, Col., U. S. Air Force, Commander; Curtis L. Brown, Jr., Lt. Col., U. S. Air Force, Pilot; Andrew S. W. Thomas, Civilian, Ph.D., Mission Specialist 1; Daniel W. Bursch, CDR., U. S. Navy, Mission Specialist 2; Mario Runco, Jr., Civilian, Mission Specialist 3; and Marc Gameau, Civilian, PhD, Mission Specialist 4.

Fricke, Robert W., Jr.↗

The Panoramic Camera (Pancam) Investigation on the NASA 2003 Mars Exploration Rover Mission

The Panoramic Camera System (Pancam) is part of the Athena science payload to be launched to Mars in 2003 on NASA's twin Mars Exploration Rover (MER) missions. The Pancam imaging system on each rover consists of two major components: a pair of digital CCD cameras, and the Pancam Mast Assembly (PMA), which provides the azimuth and elevation actuation for the cameras as well as a 1.5 meter high vantage point from which to image. Pancam is a multispectral, stereoscopic, panoramic imaging system, with a field of regard provided by the PMA that extends across 360 of azimuth and from zenith to nadir, providing a complete view of the scene around the rover.

Bell, J. F., III↗

Fabrication of a Composite Tow-Steered Structure for Air-Launch Vehicle Applications

Generation Orbit (GO) is developing the GO Launcher-1 (GO-1), a single stage liquid rocket that is launched from a Gulfstream III carrier aircraft platform. The vehicle is designed as the next generation platform for hypersonic flight testing and suborbital microgravity research. To reduce mass and increase payload, GO partnered with NASA Langley Research Center to design, analyze, optimize, and fabricate a tow-steered manufacturing development unit of a cylindrical section of a liquid oxygen tank. The fabrication process of using the ISAAC (Integrated Structural Assembly of Advanced Composites) system is described. The structural design challenges and the concept design solutions are also presented to provide the context for the fabrication process. The in-situ nondestructive evaluation supporting the effort is also described.

Grenoble, Ray↗

Targeted self-assembly of functionalized carbon nanotubes on tumors

Provided herein is the two component self-assembly single wall nanotube system and the single wall nanotube construct that is the second component. The two component self-assembly single wall nanotube system has a morpholino oligonucleotide with a targeting moiety followed by a single wall nanotube construct with second morpholino oligonucleotides complementary to the first morpholino oligonucleotides and one or both of a therapeutic or diagnostic payload molecule linked to the single wall nanotube construct.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

The use of coherence functions to determine dynamic excitation sources on launch vehicle payloads

The problem of determining the relative contribution of simultaneous acoustic and mechanical inputs to the response of structures under combined dynamic loads was studied. An analytical technique developed by Bendat for calculating ordinary, partial, and multiple coherence functions, using an iterative nonmatrix approach was applied to data obtained from laboratory tests on a complex structural assembly. Testing was performed in an acoustically 'live' room. Up to three random inputs, having similar spectral content and varying degrees of mutual coherence, and a single output were used. Stationary and nonstationary inputs were used. It was concluded that the technique provided an effective method of identifying sources of dynamic excitation and evaluating their relative contributions to the measured output at structural resonances, for stationary random inputs. An attempt to apply the technique to nonstationary inputs did not yield consistent results.

Barrett, S.↗

Manned assembly of space structures

This presentation will describe some results which have been obtained and the experiments which have been conducted in the Marshall Space Flight Center's Neutral Buoyancy Facility (MSFC NBF). The MSFC NBF is a tank of water 40 feet deep and 70 feet in diameter. Presently there is a mockup of the Orbiter payload bay at the bottom. There also is a Remote Manipulator System at the edge of the tank.

Akin, D.↗

Spacelab dedicated discipline laboratory (DDL) utilization concept

The dedicated discipline laboratory (DDL) concept is a new approach for implementing Spacelab missions that involves the grouping of science instruments into mission complements of single or compatible disciplines. These complements are evolved in such a way that the DDL payloads can be left intact between flights. This requires the dedication of flight hardware to specific payloads on a long-term basis and raises the concern that the purchase of additional flight hardware will be required to implement the DDL program. However, the payoff is expected to result in significant savings in mission engineering and assembly effort. A study has been conducted recently to quantify both the requirements for new hardware and the projected mission cost savings. It was found that some incremental additions to the current inventory will be needed to fly the mission model assumed. Cost savings of $2M to 6.5M per mission were projected in areas analyzed in depth, and additional savings may occur in areas for which detailed cost data were not available.

Wunsch, P.↗

System technology analysis of aeroassisted orbital transfer vehicles: Moderate lift/drag (0.75-1.5), Volume 1B, part 2, study results

A complete compilation of the results from Phase 2 of a study to identify and prioritize the technology payoffs of representative space based mid lift/drag ratio (L/D) aeroassisted orbit transfer vehicles (AOTV) and the cryofueled propulsion subsystem - configuration interactions is presented. Several combinations of basing and launch vehicle options, staging scenarios, missions (delivery, servicing, or manned round trip), and target orbits were considered. Space basing of an AOTV opens up numerous configuration opportunities. The size can exceed the launch vehicle cargo bay envelope by resorting to orbital assembly and the AOTV weight can exceed the launch vehicle capability. With the absence of fully fueled tanks during a ground based launch much lighter gossamer type structures are possible that may result in performance gains. At the Space Station, payload rearranging or manifesting may prove attractive. Several major conclusions regarding aerothermodynamics, aerodynamics, payload manifesting, the propulsion subsystem, and systems issues are discussed.

Source record↗

STS-82 Flight Day 02 Highlights

On the second day of the STS-82 mission, the crew Commander Kenneth D. Bowersox, Pilot Scott J. Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Gregory J. Harbaugh, Steven L. Smith, Joseph R. Tanner, and Steven A. Hawley survey the payload bay with the Shuttle's 50-foot remote manipulator system (RMS). Hawley puts the arm through its paces to verify it's ability to capture the Hubble Space Telescope (HST). To prepare for the up coming spacewalks, the astronauts assemble on the middeck to checkout tools they will use while servicing the telescope.

Source record↗

A Wheel-On-Limb Rover for Lunar Operations

The All-Terrain Hex-Limbed Extra-Terrestrial Explorer (ATHLETE) is a new mobility platform developed for potential lunar operations. This six limbed rover is designed to traverse quickly over benign terrain by rolling, traverse rough and steep terrain by walking, as well as perform general manipulation of tools and payloads. This flexible robotic platform will provide a mobile base for pressurized lunar habitats allowing for long range surface exploration and crew transport. It will also enable in-situ construction of lunar assets providing astronauts with the ability to assemble, maintain, and service a wide range of cargo. This paper presents the design details and capabilities of this wheel-on-limb platform.

ATHLETE↗

Update on Risk Reduction Activities for a Liquid Advanced Booster for NASA's Space Launch System

The stated goals of NASA's Research Announcement for the Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction (ABEDRR) are to reduce risks leading to an affordable Advanced Booster that meets the evolved capabilities of SLS and enable competition by mitigating targeted Advanced Booster risks to enhance SLS affordability. Dynetics, Inc. and Aerojet Rocketdyne (AR) formed a team to offer a wide-ranging set of risk reduction activities and full-scale, system-level demonstrations that support NASA's ABEDRR goals. During the ABEDRR effort, the Dynetics Team has modified flight-proven Apollo-Saturn F-1 engine components and subsystems to improve affordability and reliability (e.g., reduce parts counts, touch labor, or use lower cost manufacturing processes and materials). The team has built hardware to validate production costs and completed tests to demonstrate it can meet performance requirements. State-of-the-art manufacturing and processing techniques have been applied to the heritage F-1, resulting in a low recurring cost engine while retaining the benefits of Apollo-era experience. NASA test facilities have been used to perform low-cost risk-reduction engine testing. In early 2014, NASA and the Dynetics Team agreed to move additional large liquid oxygen/kerosene engine work under Dynetics' ABEDRR contract. Also led by AR, the objectives of this work are to demonstrate combustion stability and measure performance of a 500,000 lbf class Oxidizer-Rich Staged Combustion (ORSC) cycle main injector. A trade study was completed to investigate the feasibility, cost effectiveness, and technical maturity of a domestically-produced engine that could potentially both replace the RD-180 on Atlas V and satisfy NASA SLS payload-to-orbit requirements via an advanced booster application. Engine physical dimensions and performance parameters resulting from this study provide the system level requirements for the ORSC risk reduction test article. The test article is scheduled to complete fabrication and assembly soon and continue testing through late 2019. Dynetics has also designed, developed, and built innovative tank and structure assemblies using friction stir welding to leverage recent NASA investments in manufacturing tools, facilities, and processes, significantly reducing development and recurring costs. The full-scale cryotank assembly was used to verify the structural design and prove affordable processes. Dynetics performed hydrostatic and cryothermal proof tests on the assembly to verify the assembly meets performance requirements..

Crocker, Andrew M.↗

Low-Earth Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Flight Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle as a secondary payload mounted inside the launch vehicle adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere the top of the payload adaptor was ejected to expose the LOFTID vehicle, then the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the reentry vehicle, and finally performed a collision avoidance maneuver to prevent the Centaur from re-contacting the LOFTID after atmospheric entry. The LOFTID vehicle maintained the design attitude and spin rate from separation to atmospheric entry, roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID vehicle entered the atmosphere over Alaska at >8km/sec and decelerated as designed demonstrating stable flight from hypersonic entry through subsonic parachute deployment. On-board visible light cameras captured the reactions of the heatshield through all phases of flight and co-located infrared light cameras captured the temperature distribution of the aft side of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This presentation will discuss aeroshell response to the atmospheric entry. The visible light cameras captured mechanical response of the IS to the loads applied in the different phases of entry. Events seen on the visible light cameras correlate with the response of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although some-what lower in most locations. This data will allow the improvement of the aeroshell modeling tools predictive capability. Post-flight inspection of the aeroshell after splash down and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past 15 years of HIAD technology development performed as de-signed at large scale, a scale which cannot be replicated in ground test facilities. The HIAD supported the LOFTID vehicle high in the water after touching down under parachute and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the LOFTID after splash down. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 12 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was vented prior to impact. The LOFTID aeroshell was an unqualified success and has opened up opportunities for commercial application.

LOFTID Aeroshell Flight Performance↗

Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle as a secondary payload mounted inside the launch vehicle adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere the top of the payload adaptor was ejected to expose the LOFTID vehicle, then the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the reentry vehicle, and finally performed a collision avoidance maneuver to prevent the Centaur from re-contacting the LOFTID after atmospheric entry. The LOFTID vehicle maintained the design attitude and spin rate from separation to atmospheric entry, roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID vehicle entered the atmosphere over Alaska at >8km/sec and decelerated as designed demonstrating stable flight from hypersonic entry through subsonic parachute deployment. On-board visible light cameras captured the reactions of the heatshield through all phases of flight, and co-located infrared light cameras captured the temperature distribution of the aft side of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This paper will discuss aeroshell response to the atmospheric entry. The visible light cameras captured mechanical response of the deployable aeroshell to the loads applied in the different phases of entry. Events seen on the visible light cameras correlate with the response of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although somewhat lower in most locations. This data will allow the improvement of the aeroshell modeling tools predictive capability. Post-flight inspection of the aeroshell after splash down and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past 15 years of HIAD technology development performed as designed at large scale, a scale which cannot be replicated in ground test facilities. The HIAD supported the LOFTID vehicle high in the water after touching down under parachute and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the LOFTID after splash down. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 24 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was vented prior to impact.

Entry Descent Landing Atmospheric Entry Deployable↗

NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle Integration

NASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.

Bruce R. Askins↗

Advanced space program studies: Overall executive summary

Studies were conducted to provide NASA with advanced planning analyses which relate integrated space program goals and options to credible technical capabilities, applications potential, and funding resources. The studies concentrated on the following subjects: (1) upper stage options for the space transportation system based on payload considerations, (2) space servicing and standardization of payloads, (3) payload operations, and (4) space transportation system economic analyses related to user charges and new space applications. A systems cost/performance model was developed to synthesize automated, unmanned spacecraft configurations based on the system requirements and a list of equipments at the assembly level.

Sitney, L. R.↗

Space construction technology needs

Space construction systems made feasible by an operational Space Shuttle are discussed with a view toward assembly, installation and construction support equipment. The level of construction capability will be reflected in the number of launches to accomplish a certain mission, either in terms of the mission time line or on the density of packaging in the Orbiter payload bay. It is noted that the development of construction support equipment in zero-gravity simulations should be the most productive initial activity. Crew EVAs, as well as the beam builder, cherrypicker and power distribution buses are covered in detail.

Jenkins, L. M.↗

A verified technique for calibrating space solar cells

Solar cells have been flown on high-altitude balloons for over 24 years, to produce solar cell standards that can be used to set the intensity of solar simulators. The events of a typical balloon calibration flight are reported. These are: the preflight events, including the preflight cell measurements and the assembly of the flight cells onto the solar tracker; the activities at the National Scientific Balloon Facility in Palestine, Texas, including the preflight calibrations, the mating of the tracker and cells onto the balloon, preparations for launch, and the launch; the payload recovery, which includes tracking the balloon by aircraft, terminating the flight, and retrieving the payload. In 1985, the cells flow on the balloon were also flown on a shuttle flight and measured independently. The two measurement methods are compared and shown to agree within 1 percent.

Anspaugh, Bruce↗