Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Concept of Operations for OSIRIS-REx Optical Navigation Image Planning

Optical navigation (OpNav) is a critical subsystem of the OSIRIS-REx asteroid sample return mission, which operated in the vicinity of near-Earth asteroid (101955) Bennu from August 2018 through April 2021. A substantial amount of mission resources across multiple subsystems and institutions is required to ensure that the OpNav data are successfully acquired. The KinetX OpNav team, part of the Flight Dynamics System (FDS), is responsible for performing required analysis to develop the OpNav operations plans; requesting, reviewing and verifying the plans; and ultimately using the image data for critical navigation operations. The FDS team, responsible for the mission navigation, is operated by KinetX Aerospace with management and operations support from NASA’s Goddard Space Flight Center. The Science Processing and Operations Center (SPOC), located at the University of Arizona’s Lunar and Planetary Laboratory, is responsible for generating the planning products for all science and most OpNav data. These plans are integrated into the spacecraft sequences, tested, and commanded by the Mission Support Area (MSA) at Lockheed Martin Space. To ensure mission-critical navigation image data are successfully acquired, the plan is developed through a waterfall of planning cycles over the course of 3 months prior to onboard plan execution. During the initial strategic planning for a mission phase, detailed analysis is performed by the OpNav team to conceptualize the concept of operations (ConOps) for image data collection. This phase OpNav Narrative is included along with other strategic planning documents for the key ground segment stakeholders to review and provide feedback. The detailed OpNav plans get defined in the tactical planning cycle, which spans 8 to 3 weeks before the week-long integrated sequence is executed on-board the spacecraft. During the tactical cycle, the initial OpNav Request is submitted along with the science requests, kicking off development of the science and OpNav plans. Once the initial plan is drafted, interfaces are exercised so that the plan can be reviewed and iterated, if necessary. A rigorous schedule is followed by the planning teams during the implementation cycle, spanning the last 18 days before uplink, to ensure all the necessary integration, testing, and reviewing can occur on time. The development of the OpNav planning ConOps, including responsibilities, interfaces, timelines, and procedures, took extensive collaboration across mission elements and institutions. The process was robust throughout the 137 weeks of continuous Optical Navigation Operations at Bennu, which concluded on April 9th, 2021.

Coralie D. Adam↗

In-Situ Mosaic Production at JPL/MIPL

Multimission Image Processing Lab (MIPL) at JPL is responsible for (among other things) the ground-based operational image processing of all the recent in-situ Mars missions: (1) Mars Pathfinder (2) Mars Polar Lander (3) Mars Exploration Rovers (MER) (4) Phoenix (5) Mars Science Lab (MSL) Mosaics are probably the most visible products from MIPL (1) Generated for virtually every rover position at which a panorama is taken (2) Provide better environmental context than single images (3) Valuable to operations and science personnel (4) Arguably the signature products for public engagement

Multimission Image Processing Lab (MIPL)↗

Web Monitoring of EOS Front-End Ground Operations, Science Downlinks and Level 0 Processing

This paper addresses the efforts undertaken and the technology deployed to aggregate and distribute the metadata characterizing the real-time operations associated with NASA Earth Observing Systems (EOS) high-rate front-end systems and the science data collected at multiple ground stations and forwarded to the Goddard Space Flight Center for level 0 processing. Station operators, mission project management personnel, spacecraft flight operations personnel and data end-users for various EOS missions can retrieve the information at any time from any location having access to the internet. The users are distributed and the EOS systems are distributed but the centralized metadata accessed via an external web server provide an effective global and detailed view of the enterprise-wide events as they are happening. The data-driven architecture and the implementation of applied middleware technology, open source database, open source monitoring tools, and external web server converge nicely to fulfill the various needs of the enterprise. The timeliness and content of the information provided are key to making timely and correct decisions which reduce project risk and enhance overall customer satisfaction. The authors discuss security measures employed to limit access of data to authorized users only.

Cordier, Guy R.↗

A process yields large quantities of pure ribosome subunits

Development of process for in-vitro protein synthesis from living cells followed by dissociation of ribosomes into subunits is discussed. Process depends on dialysis or use of chelating agents. Operation of process and advantages over previous methods are outlined.

Friedman, M.↗

Planning of reach-and-grasp movements: effects of validity and type of object information

Individuals are assumed to plan reach-and-grasp movements by using two separate processes. In 1 of the processes, extrinsic (direction, distance) object information is used in planning the movement of the arm that transports the hand to the target location (transport planning); whereas in the other, intrinsic (shape) object information is used in planning the preshaping of the hand and the grasping of the target object (manipulation planning). In 2 experiments, the authors used primes to provide information to participants (N = 5, Experiment 1; N = 6, Experiment 2) about extrinsic and intrinsic object properties. The validity of the prime information was systematically varied. The primes were succeeded by a cue, which always correctly identified the location and shape of the target object. Reaction times were recorded. Four models of transport and manipulation planning were tested. The only model that was consistent with the data was 1 in which arm transport and object manipulation planning were postulated to be independent processes that operate partially in parallel. The authors suggest that the processes involved in motor planning before execution are primarily concerned with the geometric aspects of the upcoming movement but not with the temporal details of its execution.

Cues↗

Scientific Objectives, Measurement Needs, and Challenges Motivating the PARAGON Aerosol Initiative

Aerosols are involved in a complex set of processes that operate across many spatial and temporal scales. Understanding these processes, and ensuring their accurate representation in models of transport, radiation transfer, and climate, requires knowledge of aerosol physical, chemical, and optical properties and the distributions of these properties in space and time. To derive aerosol climate forcing, aerosol optical and microphysical properties and their spatial and temporal distributions, and aerosol interactions with clouds, need to be understood. Such data are also required in conjunction with size-resolved chemical composition in order to evaluate chemical transport models and to distinguish natural and anthropogenic forcing. Other basic parameters needed for modeling the radiative influences of aerosols are surface reflectivity and three-dimensional cloud fields. This large suite of parameters mandates an integrated observing and modeling system of commensurate scope. The Progressive Aerosol Retrieval and Assimilation Global Observing Network (PARAGON) concept, designed to meet this requirement, is motivated by the need to understand climate system sensitivity to changes in atmospheric constituents, to reduce climate model uncertainties, and to analyze diverse collections of data pertaining to aerosols. This paper highlights several challenges resulting from the complexity of the problem. Approaches for dealing with them are offered in the set of companion papers.

optical depth↗

Processing and Preparation of Advanced Stirling Convertors for Extended Operation at NASA Glenn Research Center

The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.

Oriti, Salvatore M.↗

Processing and Preparation of Advanced Stirling Convertors for Extended Operation

The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.

Oriti, Salvatore M.↗

PILOT: An intelligent distributed operations support system

The Real-Time Data System (RTDS) project is exploring the application of advanced technologies to the real-time flight operations environment of the Mission Control Centers at NASA's Johnson Space Center. The system, based on a network of engineering workstations, provides services such as delivery of real time telemetry data to flight control applications. To automate the operation of this complex distributed environment, a facility called PILOT (Process Integrity Level and Operation Tracker) is being developed. PILOT comprises a set of distributed agents cooperating with a rule-based expert system; together they monitor process operation and data flows throughout the RTDS network. The goal of PILOT is to provide unattended management and automated operation under user control.

Rasmussen, Arthur N.↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches may occur that need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron. However the conjunction screening process in use by the 19th was developed over 30 years ago and was not designed with automation in mind, so screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process. Many operators assume that automated maneuver planning must be real-time; however this time between planning and execution to allow for screening is possible if planned for during system design. In an effort to speed up the screening process, NASA has developed a prototype system for performing near-real-time screenings. This prototype system was necessitated to support the NASA Starling mission, a constellation of 4 cubesats that planned to fly at the same altitude as the SpaceX Starlink constellation, both performing automated maneuvering. Without screening of the planned maneuvers, the two constellations risked a collision. Once converted from a prototype to an operational system, this capability will greatly help smallsats, for example those that are planning to test propulsive capabilities, by allowing fast turnaround feedback to ensure safety form collision with other objects. This paper describes the existing CA process, the prototype real-time capability, and results from the experiment that tested the prototype.

Matthew Hejduk↗

User data management

The primary objective is to identify, develop, and demonstrate key data management technologies to support user access to Space Station data. To accomplish this objective, there are several technical challenges which must be addressed. The first is how to provide routine customer access to high volume, dynamic and distributed data bases. This access will encompass the functions of mission and payload planning and operations, data processing and analysis, and data archive and distribution. Secondly, there must be some analysis of architectures for handling high volume data streams like those expected from the Space Station. This analysis will examine the use of packetized versus non-packetized data formats, modular expansion capabilities, real-time versus non-real-time data processing, and the interfaces and architecture required to support telescience operations. The task will also determine benchmarks of performance capabilities for technology operations, such as varied data base structures, data access procedures, distributed data base design, and data base machines. Information is provided here in outline form.

Source record↗

WWAO-WSWC Workshop Report 2019 Final

EXECUTIVE SUMMARY The Western States Water Council (WSWC) and the NASA Western Water Applications Office (WWAO) hosted a joint workshop on technology transfer for water management in the Western U.S. The goals of the workshop were to understand how different agencies approach the technology transfer and research to operations (R2O) process, identify best practices, and discuss existing barriers to successful technology infusion into operational water resource management systems at the state and federal level. The workshop took place August 7-9, 2019 in Irvine, CA. Key outcomes of the meeting include the following:• U.S. Rep. Grace Napolitano provided opening remarks for the workshop, where she highlighted the critical value of water data and the importance of collaboration between state and federal agencies in working to advance the use of water data in water management, planning and policy. • A total of 33 participants (including remote participants) were part of the workshop. They included principal investigators and project teams supported by NASA (Cyanobacteria Assessment Network, Evapotranspiration for Western States, Evaporative Stress Index, the Airborne Snow Observatory, Satellite-based Snow Water Equivalent in the Sierra Nevadas, and Fallowed Area Mapping) as well as representatives from federal (USGS, NOAA, USBR, EPA) and state (CA, WY, OR, NE) agency partners. • One main outcome of the meeting was the consensus that successful transitions of new applications and new technologies into operations require careful planning, effective communication within and across institutions, resources and considerable time investments. In addition, there was broad agreement that significant lead time is often required to allow for identification of financial and technical resources to sustain operational use of new data, information and tools.• The meeting included remarks from U.S. Rep. Napolitano and discussions during presentations and breakout groups about key opportunities to develop best practices and streamline the technology transfer process. • For example, one key set of best practices that emerged revolved around the the importance of building trust and establishing clear lines of communication between the research and operational institutions. The conversations led to defining two key components of trust-building. The first aspect is purely technical. It requires effectively demonstrating that the proposed application meets the end user’s needs in terms of accuracy, format, resolution, latency, metadata and documentation. The second aspect of building trust involves developing sustained, productive and mutually-beneficial relationships with the partner operational agency. The best practices presented here span both the technical as well as the relational aspects of cultivating trust. • This workshop served as a first step in developing a broader community discussion around R2O in western water management. Many of the best practices and lessons learned described in this report represent starting places for action within the WWAO, WSWC and our colleagues’ institutions. • Effective implementation of the best practices that emerged from this workshop will require sustained investments of time, resources and transition planning. In recognition of this, the WSWC and the WWAO proposed continuation of discussions begun at the workshop through a series of semi-annual or annual workshops.

Wilardson, Tony↗

Development and operation of a real-time simulation at the NASA Ames Vertical Motion Simulator

The Vertical Motion Simulator (VMS) facility at the NASA Ames Research Center combines the largest vertical motion capability in the world with a flexible real-time operating system allowing research to be conducted quickly and effectively. Due to the diverse nature of the aircraft simulated and the large number of simulations conducted annually, the challenge for the simulation engineer is to develop an accurate real-time simulation in a timely, efficient manner. The SimLab facility and the software tools necessary for an operating simulation will be discussed. Subsequent sections will describe the development process through operation of the simulation; this includes acceptance of the model, validation, integration and production phases.

Sweeney, Christopher↗

MAST flight system operations

The integration process of the MAST flight system is surveyed. Insight is given into the planned orbital experiment process. The data flow necessary to support the flight operation is outlined.

Brumfield, M. Larry↗

Operations planning simulation model extension study. Volume 1: Long duration exposure facility ST-01-A automated payload

Ground processing and operation activities for selected automated and sortie payloads are evaluated. Functional flow activities are expanded to identify payload launch site facility and support requirements. Payload definitions are analyzed from the launch site ground processing viewpoint and then processed through the expanded functional flow activities. The requirements generated from the evaluation are compared with those contained in the data sheets. The following payloads were included in the evaluation: Long Duration Exposure Facility; Life Sciences Shuttle Laboratory; Biomedical Experiments Scientific Satellite; Dedicated Solar Sortie Mission; Magnetic Spectrometer; and Mariner Jupiter Orbiter. The expanded functional flow activities and descriptions for the automated and sortie payloads at the launch site are presented.

Marks, D. A.↗

Efficiency and economics of large scale hydrogen liquefaction

Liquid hydrogen is being considered as a substitute for conventional hydrocarbon-based fuels for future generations of commercial jet aircraft. Its acceptance will depend, in part, upon the technology and cost of liquefaction. The process and economic requirements for providing a sufficient quantity of liquid hydrogen to service a major airport are described. The design is supported by thermodynamic studies which determine the effect of process arrangement and operating parameters on the process efficiency and work of liquefaction.

Baker, C. R.↗

The Missions of the Viking Orbiters

A description of the orbiter science instruments is presented and the chronology of the two Viking missions is reviewed. The design of the Viking orbiter spacecraft is discussed, taking into account the propulsion subsystem, the attitude control subsystem, the planetary scan platform, aspects of command processing, problems of instrument operation and data processing, and data quantity limitations. Details concerning the Viking orbits and the visibility of the planet are also considered and the future of the Viking orbiter missions is evaluated. If the orbiters continue to perform well, all the orbiter science investigations will continue to acquire data for another year and perhaps somewhat longer.

Snyder, C. W.↗