Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Flight-Test Approach for X-57 Mod II Configuration

The primary objective of the X-57 Mod II test flights is to perform a functional checkout of the research traction battery power and motor systems, perform an airworthiness assessment of the modified vehicle, and to collect baseline performance, stability, and acoustic data for comparisons with later modifications of the X-57 airplane. This paper describes the planned flight operations of the Mod II airplane, the unique considerations and decisions made in operating an electric aircraft, and the development and planning of the research test points necessary to achieve the Mod II flight objectives. Due to the constrained flight time, which resulted from limited capacity of the battery system, careful scripting of flights was required to maximize test time and execute test points efficiently.

James Reynolds↗

In Cell Thermal Creep Frames for Demonstration Project Preparations

The thrust of advanced nuclear reactor demonstrations demands the accelerated qualification of in-core materials to enable licensing processes and developing the performance data. Due to the high-operating temperatures of such reactors, long-term mechanical behavior under constant load is essential to determine the geometrical and mechanical integrity of in-core components during operation and off-normal conditions. Therefore, the thermal creep behavior of neutron-irradiated advanced reactor materials must be determined. The feasibility of using subsize specimens for the irradiation campaigns and the limited available infrastructure challenge the assessment of thermal creep behavior of advanced reactor materials. Therefore, the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) National Reactor Innovation Center (NRIC) prioritizes the development of a thermal creep testing infrastructure for multiple subsize specimens to accelerate the demonstration and deployment of advanced reactor concepts. This report describes the activities for the construction of a thermal creep testing capability at Idaho National Laboratory (INL). The overall project consists of conceptual design, out-of-cell demonstration, and in-cell demonstration phases. During fiscal year (FY)-2021, the team finished the conceptual design of a thermal creep test facility that can test multiple subsize specimens. This conceptual design consisted of the determination of technical and functional requirements, the determination of the design space, and the preparation of the technical drawings. Technical and functional requirements were categorized as required and desired capabilities and the conceptual design was performed to meet all the required capabilities with the flexibility to achieve the desired capabilities. The design space identified the operational capacity of the creep frame for different advanced reactor relevant materials with the consideration of the feasible operation in the hotcell at the Fuels and Applied Science Building (FASB) at INL. Based on the requirements and design space, the multiple specimen creep frame was designed. The official INL engineering drawing process was started and the procurement of materials for construction was initiated. For FY-2022, the out-of-cell demonstration and final installation of the multiple creep frame is planned.

36 MATERIALS SCIENCE↗

In-space propellant systems safety. Volume 1: Executive summary

Safety problems connected with in-space propellant logistics operations are considered. Safety considerations resulting from the system safety analysis in the trade studies and evaluations of alternate operating concepts in the systems operations analysis are presented.

Source record↗

A preliminary study of a propeller powered by gas jets issuing from the blade tips

Computations are made of the performance of a propeller designed to develop 56 thrust horsepower at 100 miles per hour. The fuel consumption of the jet-operated propeller would be considerably higher than that of a reciprocating engine and a propeller. The lighter weight of the jet-operated propeller will result in a lighter weight of engine plus fuel for short-range flights. A theoretical analysis is made of a propeller powered by gas jets issuing from the blade tips. In the propeller considered, the air is drawn through the hub and passes through the hollow propeller blades to the tips, where propellers heat the air and expel it through the nozzles in the blade tips. The reaction of the tips rotates the propeller. For long range flights, the weight of the jet-operated propeller with its fuel would be greater than the weight of a reciprocating engine with its propeller and fuel.

Sanders, J C↗

Evaluation of the SPAR thermal analyzer on the CYBER-203 computer

The use of the CYBER 203 vector computer for thermal analysis is investigated. Strengths of the CYBER 203 include the ability to perform, in vector mode using a 64 bit word, 50 million floating point operations per second (MFLOPS) for addition and subtraction, 25 MFLOPS for multiplication and 12.5 MFLOPS for division. The speed of scalar operation is comparable to that of a CDC 7600 and is some 2 to 3 times faster than Langley's CYBER 175s. The CYBER 203 has 1,048,576 64-bit words of real memory with an 80 nanosecond (nsec) access time. Memory is bit addressable and provides single error correction, double error detection (SECDED) capability. The virtual memory capability handles data in either 512 or 65,536 word pages. The machine has 256 registers with a 40 nsec access time. The weaknesses of the CYBER 203 include the amount of vector operation overhead and some data storage limitations. In vector operations there is a considerable amount of time before a single result is produced so that vector calculation speed is slower than scalar operation for short vectors.

Robinson, J. C.↗

Earth Radiation Budget Experiment (ERBE) scanner instrument anomaly investigation

The results of an ad-hoc committee investigation of in-Earth orbit operational anomalies noted on two identical Earth Radiation Budget Experiment (ERBE) Scanner instruments on two different spacecraft busses is presented. The anomalies are attributed to the bearings and the lubrication scheme for the bearings. A detailed discussion of the pertinent instrument operations, the approach of the investigation team and the current status of the instruments now in Earth orbit is included. The team considered operational changes for these instruments, rework possibilities for the one instrument which is waiting to be launched, and preferable lubrication considerations for specific space operational requirements similar to those for the ERBE scanner bearings.

Watson, N. D.↗

Computer network environment planning and analysis

The GSFC Computer Network Environment provides a broadband RF cable between campus buildings and ethernet spines in buildings for the interlinking of Local Area Networks (LANs). This system provides terminal and computer linkage among host and user systems thereby providing E-mail services, file exchange capability, and certain distributed computing opportunities. The Environment is designed to be transparent and supports multiple protocols. Networking at Goddard has a short history and has been under coordinated control of a Network Steering Committee for slightly more than two years; network growth has been rapid with more than 1500 nodes currently addressed and greater expansion expected. A new RF cable system with a different topology is being installed during summer 1989; consideration of a fiber optics system for the future will begin soon. Summmer study was directed toward Network Steering Committee operation and planning plus consideration of Center Network Environment analysis and modeling. Biweekly Steering Committee meetings were attended to learn the background of the network and the concerns of those managing it. Suggestions for historical data gathering have been made to support future planning and modeling. Data Systems Dynamic Simulator, a simulation package developed at NASA and maintained at GSFC was studied as a possible modeling tool for the network environment. A modeling concept based on a hierarchical model was hypothesized for further development. Such a model would allow input of newly updated parameters and would provide an estimation of the behavior of the network.

Dalphin, John F.↗

Covariance Propagation and Partial Eigendecomposition Filtering on the Continuum: The Cases of Advective Dynamics

As a motivation for this lecture, we begin by stating a paradox that challenges our fundamental understanding of covariance evolution (at least it challenged my own). Attempting to resolve this 'divergence paradox' leads us to introduce the continuum fundamental solution operator for the dynamics under consideration, which will be advection dynamics in this lecture. This operator is the object that is approximated by the discrete 'tangent linear model. We then show how the fundamental solution operator can be used to describe the solution of the continuum covariance evolution equation. This description is complete enough to resolve fully the divergence paradox.

Cohn, S.↗

Using Risk Assessment Methodologies to Meet Management Objectives

Current decision making involves numerous possible combinations of technology elements, safety and health issues, operational aspects and process considerations to satisfy program goals. Identifying potential risk considerations as part of the management decision making process provides additional tools to make more informed management decision. Adapting and using risk assessment methodologies can generate new perspectives on various risk and safety concerns that are not immediately apparent. Safety and operational risks can be identified and final decisions can balance these considerations with cost and schedule risks. Additional assessments can also show likelihood of event occurrence and event consequence to provide a more informed basis for decision making, as well as cost effective mitigation strategies. Methodologies available to perform Risk Assessments range from qualitative identification of risk potential, to detailed assessments where quantitative probabilities are calculated. Methodology used should be based on factors that include: 1) type of industry and industry standards, 2) tasks, tools, and environment 3) type and availability of data and 4) industry views and requirements regarding risk & reliability. Risk Assessments are a tool for decision makers to understand potential consequences and be in a position to reduce, mitigate or eliminate costly mistakes or catastrophic failures.

DeMott, D. L.↗

A study of electric power transmission lines for use on the lunar surface

Analytical models have been developed to study the operating characteristics of electrical transmission lines for use on the lunar surface. Important design considerations for a transmission line operating on the lunar surface are mass, temperature, and efficiency. Transmission line parameters which impact these considerations include voltage, power loss, and waveform. The electrical and thermal models developed are used to calculate transmission line mass, size, and temperature as a function of voltage, geometry, waveform, location, and efficiency. The analyses include ac and dc for above and below ground operation. Geometries studied include a vacuum-insulated, two-wire transmission line and a solid-dielectric insulated, coaxial transmission line. A brief discussion of design considerations and the models developed is followed by results for parameter studies for both dc and ac transmission lines.

Gordon, Lloyd B.↗

An Operational Resilience Metric to Evaluate Inertia and Inverter-based Generation on the Grid

In an effort to reduce carbon emissions and curtail the effects of climate change there has been considerable effort to increase the penetration of inverter-based renewable energy sources. The adoption of renewable generation over conventional inertia-based generation sources is forming considerable challenges for the operation and stability of the power system. The power system has been designed around generation units characterized by high inertia and primary frequency response (PFR), allowing them to respond to disturbances such as faults or generators tripping off line. In contrast, the modern inverter-based assets are characterized by no contribution to inertia and they typically provide stochastic generation at their maximum output, thus having no contribution to PFR during low-frequency disturbance events. Because of this, inertia in power systems is reducing, resulting in a faster rate of frequency change after a disturbance occurs. As more inverter-based generation units are added to the grid it is important to understand the stability of the system and the size of disturbance a system is capable of withstanding. This paper presents a resilience metric that evaluates the maximum size of disturbance a systems can withstand based on the system inertia and the primary frequency control of inverter and inertia-based generation. The results are shown visually and are based on the real-time operation of generation units and their characteristics such as latency, ramp rates, and energy constraints. It is demonstrated that the real-time positioning or bias of the generating units has an effect of the size of disturbance that a system can withstand, i.e. its resilience. It is expected that this type of analysis can help operators increase the resilience of power systems in the future.

13 HYDRO ENERGY↗

Viking mission operations

The Viking Flight Team and ground system must operate in an integrated manner with the two orbiters and two landers to acquire the scientific data that will significantly increase our knowledge of Mars. Viking mission requires an adaptive mode of flight operations which permits reflection of the knowledge gained as the mission progresses into subsequent data acquisition operations. This includes reflection of both the knowledge gained about Mars and knowledge as to how well each of the four vehicles and the ground data system are performing. The requirement for adaptive mission operations has imposed special considerations in the Viking mission design, landing site selection, organization of the Flight Team and in the design and development of the operational tools required by this team. A mission operations strategy has been developed which governs the multivehicle adaptive mission operations.

Young, A. T.↗

The impact of integrated water management on the Space Station propulsion system

The water usage of elements in the Space Station integrated water system (IWS) is discussed, and the parameters affecting the overall water balance and the water-electrolysis propulsion-system requirements are considered. With nominal IWS operating characteristics, extra logistic water resupply (LWR) is found to be unnecessary in the satisfaction of the nominal propulsion requirements. With the consideration of all possible operating characteristics, LWR will not be required in 65.5 percent of the cases, and for 17.9 percent of the cases LWR can be eliminated by controlling the stay time of theShuttle Orbiter orbiter.

Schmidt, George R.↗

Operational medicine in Space Station era

Medical considerations for long duration manned space missions are examined. The requirements and hardware for medical operations on the Space Station are diagrammatically presented. The physiological and psychological changes that have been observed during space flights are discussed. Crew health maintenance and medical care in the Space Station environment require earth-based and in flight continuity. It is also necessary to identify the appropriate zero-G therapeutic methods for treating a patient. Techniques for transferring patients in orbit and to earth are studied. Considerations are given to control and life support systems and data management for medical operations.

Furukawa, S.↗

Regaining Lost Separation in a Piloted Simulation of Autonomous Aircraft Operations

NASA is currently investigating a new concept of operations for the National Airspace System, designed to improve capacity while maintaining or improving current levels of safety. This concept, known as Distributed Air/Ground Traffic Management (DAG-TM), allows appropriately equipped autonomous aircraft to maneuver freely for flight optimization while resolving conflicts with other traffic and staying out of special use airspace and hazardous weather. While Airborne Separation Assurance System (ASAS) tools would normally allow pilots to resolve conflicts before they become hazardous, evaluation of system performance in sudden, near-term conflicts is needed in order to determine concept feasibility. If an acceptable safety level can be demonstrated in these situations, then operations may be conducted with lower separation minimums. An experiment was conducted in NASA Langley s Air Traffic Operations Lab to address issues associated with resolving near-term conflicts and the potential use of lower separation minimums. Sixteen commercial airline pilots flew a total of 32 traffic scenarios that required them to use prototype ASAS tools to resolve close range pop-up conflicts. Required separation standards were set at either 3 or 5 NM lateral spacing, with 1000 ft vertical separation being used for both cases. Reducing the lateral separation from 5 to 3 NM did not appear to increase operational risk, as indicated by the proximity to the intruder aircraft. Pilots performed better when they followed tactical guidance cues provided by ASAS than when they didn't follow the guidance. As air-air separation concepts are evolved, further studies will consider integration issues between ASAS and existing Airborne Collision Avoidance Systems (ACAS).These types of non-normal events will require the ASAS to provide effective alerts and resolutions prior to the time that an Airborne Collision Avoidance System (ACAS) would give a Resolution Advisory (RA). When an RA is issued, a pilot must take immediate action in order to avoid a potential near miss. The Traffic Alert and Collision Avoidance System (TCAS) II currently functions as an ACAS aboard commercial aircraft. Depending on the own aircraft s altitude, TCAS only issues RA s 15-35 seconds prior to the Closest Point of Approach (CPA). Prior to an RA, DAG-TM pilots operating autonomous aircraft must rely solely on ASAS for resolution guidance. An additional area of DAG-TM concept feasibility relates to a potential reduction in separation standards. Lower separation standards are likely needed in order to improve NAS efficiency and capacity. Current separation minimums are based in large part on the capabilities of older radar systems. Safety assessments are needed to determine the feasibility of reduced separation minimums. They will give strong consideration to surveillance system performance, including accuracy, integrity, and availability. Candidate surveillance systems include Automatic Dependent Surveillance-Broadcast (ADS-B) and multi-lateration systems. Considering studies done for Reduced Vertical Separation Minimums (RVSM) operations, it is likely that flight technical errors will also be considered. In addition to a thorough evaluation of surveillance system performance, a potential decision to lower the separation standards should also take operational considerations into account. An ASAS Safety Assessment study identified improper maneuvering in response to a conflict (due to ambiguous or improper resolution commands or a pilot s failure to comply with the resolution) as a potential safety risk. If near-term conflicts with lower separation minimums were determined to be more challenging for pilots, the severity of these risks could be even greater.

Barhydt, Richard↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Strategy for Modernizing a 40-Year-Old Accelerator Control System

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available and software that uses obsolete frameworks. The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The project team is evaluating three design concepts, and the future deployment of artificial intelligence capabilities for accelerator operations is an important consideration. An overview of the ACORN Project will be presented, including R&D used for evaluating the conceptual designs in the context of requirements for future accelerator operations.

43 PARTICLE ACCELERATORS↗