DOE OSTI2011
We describe a lattice for accelerating muons from 375 GeV to 750 GeV. The lattice is a fast-ramping synchrotron with a mixture of fixed-field superconducting dipoles and warm dipoles, so as to have a high average bending field while still being able to rapidly change the average bending field as the beam momentum increases. For a 1.5 TeV center of mass muon collider, muons must be rapidly accelerated to 750 GeV. To accomplish this efficiently, we wish to make as many passes through the RF cavities as possible, while keeping the average RF gradients sufficiently high to avoid excess muon decays. A synchrotron where the magnets are very rapidly ramped has been envisioned as one option to accomplish this. The entire acceleration cycle takes place in less than 1 ms, presenting a technological challenge for the magnets. Clearly superconducting magnets cannot be ramped on this time scale, so instead room-temperature magnets will be ramped. To keep losses low, dipoles can use grain-oriented silicon steel, but quadrupoles will probably need to use more conventional steel, giving a lower maximum field for these high ramping rates. If we want to have a large average RF gradient and simultaneously make a large number of passes through the RF cavities, the average bending field must be high. To achieve such a large bending field while rapidly ramping magnets, it has been proposed to use a hybrid lattice consisting of interleaved superconducting dipoles and bipolar ramped dipoles.
43 PARTICLE ACCELERATORS↗