Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Data Acquisition and Control Systems Laboratory

The Data Acquisition and Control Systems (DACS) Laboratory is a facility at Stennis Space Center that provides an off test-stand capability to develop data-acquisition and control systems for rocket-engine test stands. It is also used to train new employees in state-of-the-art systems, and provides a controlled environment for troubleshooting existing systems, as well as the ability to evaluate the application of new technologies and process improvements. With the SSC propulsion testing schedules, without the DACS Laboratory, it would have been necessary to perform most of the development work on actual test systems, thereby subjecting both the rocket-engine testing and development programs to substantial interference in the form of delays, restrictions on modifications of equipment, and potentially compromising software configuration control. The DACS Laboratory contains a versatile assortment of computer hardware and software, digital and analog electronic control and data-acquisition equipment, and standard electronic bench test equipment and tools. Recently completed Control System development and software verification projects include support to the joint NASA/Air Force Integrated Powerhead Demonstration (IPD) LOX & LH2 PreBurner and Turbopump ground testing programs. In other recent activities, the DACS Laboratory equipment and expertise have supported the off-stand operation of high-pressure control valves to correct valve leak problems prior to installation on the test stand. Future plans include expanding the Laboratory's capabilities to provide cryogenic control valve characterization prior to installation, thereby reducing test stand activation time.

Holland, Randy↗

Controlled Aeroelastic Response and Airfoil Shaping Using Adaptive Materials and Integrated Systems

This paper presents an overview of several activities of the Aeroelasticity Branch at the NASA Langley Research Center in the area of applying adaptive materials and integrated systems for controlling both aircraft aeroelastic response and airfoil shape. The experimental results of four programs are discussed: the Piezoelectric Aeroelastic Response Tailoring Investigation (PARTI); the Adaptive Neural Control of Aeroelastic Response (ANCAR) program; the Actively Controlled Response of Buffet Affected Tails (ACROBAT) program; and the Airfoil THUNDER Testing to Ascertain Characteristics (ATTACH) project. The PARTI program demonstrated active flutter control and significant rcductions in aeroelastic response at dynamic pressures below flutter using piezoelectric actuators. The ANCAR program seeks to demonstrate the effectiveness of using neural networks to schedule flutter suppression control laws. Th,e ACROBAT program studied the effectiveness of a number of candidate actuators, including a rudder and piezoelectric actuators, to alleviate vertical tail buffeting. In the ATTACH project, the feasibility of using Thin-Layer Composite-Uimorph Piezoelectric Driver and Sensor (THUNDER) wafers to control airfoil aerodynamic characteristics was investigated. Plans for future applications are also discussed.

Pinkerton, Jennifer L.↗

HyTES: Thermal Imaging Spectrometer Development

The Jet Propulsion Laboratory has developed the Hyperspectral Thermal Emission Spectrometer (HyTES). It is an airborne pushbroom imaging spectrometer based on the Dyson optical configuration. First low altitude test flights are scheduled for later this year. HyTES uses a compact 7.5-12 micrometer m hyperspectral grating spectrometer in combination with a Quantum Well Infrared Photodetector (QWIP) and grating based spectrometer. The Dyson design allows for a very compact and optically fast system (F/1.6). Cooling requirements are minimized due to the single monolithic prism-like grating design. The configuration has the potential to be the optimal science-grade imaging spectroscopy solution for high altitude, lighter-than-air (HAA, LTA) vehicles and unmanned aerial vehicles (UAV) due to its small form factor and relatively low power requirements. The QWIP sensor allows for optimum spatial and spectral uniformity and provides adequate responsivity which allows for near 100mK noise equivalent temperature difference (NEDT) operation across the LWIR passband. The QWIP's repeatability and uniformity will be helpful for data integrity since currently an onboard calibrator is not planned. A calibration will be done before and after eight hour flights to gage any inconsistencies. This has been demonstrated with lab testing. Further test results show adequate NEDT, linearity as well as applicable earth science emissivity target results (Silicates, water) measured in direct sunlight.

remote sensing↗

Initial Validation of a Simulation System for Studying Interoperability in Future Air Traffic Management Systems

Future air traffic management systems will need to accommodate large numbers of increasingly diverse air vehicles with different operating paradigms. To support this trend, they will digitally share copious amounts of information via a common communication architecture. Operators will deploy programs that create and negotiate flight plans via the architecture’s communication protocols. These programs will autonomously make decisions that must be arbitrated by the architecture and robust to uncertainty. To study interoperability in air traffic management, a new airspace simulation system was composed by integrating a legacy airspace simulation, an air traffic control model, and a new research communication architecture. It was used to evaluate air traffic management concepts by adapting it to handle congested arrival traffic at Newark Liberty International Airport and executing simulations. Results demonstrated the ability of the simulation system to model in detail strategic traffic flow management, predeparture flight planning, and air traffic control working in concert. Subsequent studies can use the simulation system to study interoperability, autonomy, digital communication, and uncertainty in future air traffic management systems.

aircraft scheduling,traffic flow management,autono↗

Leverage modern artificial intelligence (AI) enabled systems for waste reduction

Manufacturing industries continue to face challenges in reducing waste, as upstream strategies such as source reduction and product redesign require a deeper understanding of processes compared to conventional recycling methods. Recent advancements in artificial intelligence (AI) and machine learning (ML) have opened new opportunities to integrate modern computational techniques with traditional waste minimization strategies. This paper explores AI-enabled approaches for product redesign, source reduction, and recycling that can significantly reduce waste generation while improving efficiency and sustainability. AI-driven material substitution and lightweighting in product design enable discovery of novel materials with optimized properties, reducing waste without compromising performance. Reinforcement learning models optimize process parameters, raw material specifications, and machine sequencing to minimize production losses, while Industrial Internet of Things (IIoT) systems paired with AI analytics enhance real-time waste tracking, predictive maintenance, and quality inspection. Furthermore, AI-based demand forecasting and production planning reduce overproduction and excess inventory, as demonstrated in industrial applications. In recycling, ML-powered pattern recognition and robotic sorting technologies achieve higher accuracy in waste segregation, directly improving recycling efficiency. Complementary solutions such as smart bins and AI-enabled waste pickup scheduling optimize collection logistics, reducing both costs and emissions. Although implementation requires upfront investment in infrastructure and training, the long-term benefits include higher material efficiency, reduced waste, improved product quality, and stronger sustainability outcomes across the supply chain. By leveraging AI-enabled systems, manufacturers can align waste minimization efforts with circular economy principles, creating scalable solutions for both industry and society.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design and analysis issues of integrated control systems for high-speed civil transports

A study was conducted to identify, rank, and define development plans for the critical guidance and control design and analysis issues as related to economically viable and environmentally acceptable high-speed civil transport. The issues were identified in a multistep process. First, pertinent literature on supersonic cruise aircraft was reviewed, and experts were consulted to establish the fundamental characteristics and problems inherent to supersonic cruise aircraft. Next, the advanced technologies and strategies being pursued for the high-speed civil transport were considered to determine any additional unique control problems the transport may have. Finally, existing technologies and methods were examined to determine their capabilities for the design and analysis of high-speed civil transport control systems and to identify the shortcomings and issues. Three priority levels - mandatory, highly beneficial, and desirable - were established. Within each of these levels, the issues were further ranked. Technology development plans for each issue were defined. Each plan contains a task breakdown and schedule.

Mccarty, Craig A.↗

Integrated Demand Management: Concepts and Procedures

This report provides a comprehensive description of the Integrated Demand Management concept. Motivation: NASA’s Integrated Demand Management (IDM) research explores the idea that, under certain conditions, time-based flow management (TBFM) arrival operations can benefit from the coordinated use of a strategic traffic management initiative (TMI) to “precondition” the inbound demand. The research was motivated by the observation that TBFM was usually turned off during convective weather, even in facilities where it was routinely used. Our hypothesis was that strategic adjustments to the inbound traffic so that it provided a better match to the off-nominal changes in capacity observed during these conditions could enable TBFM scheduling to continue to provide effective support for arrival traffic management. Concept: IDM proposes that a TMI (e.g., a Collaborative Trajectory Options Program, or CTOP) be used to adjust the rate and/or geographic distribution across flows of the traffic inbound to a high-demand, TBFM-managed airport before that traffic reaches the TBFM planning horizon. After this strategic preconditioning, TBFM can then tactically fine-tune the demand to deliver a well-managed, orderly feed to the destination airport. Coordinated use of these two flow management capabilities is intended to improve system performance in terms of: • Equity of ground delay assignment, avoiding excessive ground delay for TBFM-scheduled departures, without penalizing longer flights; • Throughput, by distributing traffic to maximize use of available capacity; • Predictability for operators, providing advance notice about the impact on individual flights; • Increased flexibility, supporting operator mitigation strategies such as slot swapping or trajectory options; • Efficiency of flight operations, using ground delay more effectively and reducing airborne delay. The operational description in this document highlights how the IDM concept builds upon already existing tools and procedures, and also indicates where tool enhancements could facilitate conduct of IDM operations. However, enhanced tools are not a requirement for concept introduction. In fact, initial deployment that focused on training procedures and rationale for coordinated use of TFMS and TBFM, without changes to existing tools, might be a simpler way to introduce and to familiarize traffic managers with the idea of preconditioning. The concept and procedures described in this document can hopefully provide useful guidance for introduction of IDM into field operations..

IDM↗

Computational Algorithms for Unit Commitment with AC Power Flows (Final Report)

Security-constrained unit commitment (SCUC) is a key component in power system operations. When AC power flow constraints are considered in the SCUC model (AC-SCUC), the problem becomes extremely difficult due to its discrete and non-convex nature, as described in “Grid Optimization Competition Challenge 3 Problem Formulation (GOCC)”. There are four main challenges: (i) Discrete decisions regarding unit online/offline status and start-up/shut-down procedures for every single unit. The number of discrete decision variables increases considerably when a system integrates multiple generators; (ii) Configuration-based combined-cycle formulations, and multi-commodity models that include ramping products, spin/non-spin products, and regulation up/down products. The combined-cycle units introduce additional discrete decision variables and auxiliary service products further complicate the model by connecting multi-commodity products’ continuous and discrete variables; (iii) SCUC models with AC power flow constraints are far more complex due to massive bilinear terms in the large-scale nonlinear power balance equations. The nonlinear power balance equations are further complicated by the discrete step control variables of shunts; (iv) N − 1 contingency analysis. The size of the model increases linearly with the number of contingencies considered, greatly increasing the size of the optimization model. Accordingly, there is an emergent need to develop a robust algorithm capable of deriving a high-quality solution in a short time and passing through contingency tests simultaneously. In this project, we explore innovative techniques to address this challenging problem by integrating advanced polyhedral theory, approximation methods, relaxation strategies, decomposition techniques, and parallel computing. Each technique approaches the problem from a different perspective, leveraging its specific strengths to tackle distinct challenges. Each individual method has demonstrated its effectiveness in the PI’s previous research. Their integration is expected to significantly reduce the computational time required to solve the proposed complex problem. Successful completion of this project has the potential to transform the industry by enhancing optimization solvers capable of handling large-scale day-ahead energy market clearing models within strict time constraints, while incorporating AC power flow constraints. This advancement will lead to reduced overall generation costs and, consequently, increased social welfare.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ares First Stage "Systemology" - Combining Advanced Systems Engineering and Planning Tools to Assure Mission Success

Ares is an integral part of NASA s Constellation architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Ares replaces the Space Shuttle in the post 2010 time frame. Ares I is an in-line, two-stage rocket topped by the Orion Crew Exploration Vehicle, its service module, and a launch abort system. The Ares I first stage is a single, five-segment reusable solid rocket booster derived from the Space Shuttle Program's reusable solid rocket motor. The Ares second or upper stage is propelled by a J-2X main engine fueled with liquid oxygen and liquid hydrogen. This paper describes the advanced systems engineering and planning tools being utilized for the design, test, and qualification of the Ares I first stage element. Included are descriptions of the current first stage design, the milestone schedule requirements, and the marriage of systems engineering, detailed planning efforts, and roadmapping employed to achieve these goals.

Seiler, James↗

Argonne Leadership Computing Facility: 2021 Operational Assessment Report

This Operational Assessment Report describes how the Argonne Leadership Computing Facility (ALCF) met or exceeded every one of its goals for calendar year (CY) 2021 as an advanced scientific computing center. In CY 2021, the ALCF operated its production resource, Theta, an Intel-based Cray XC40 system (11.7-petaflops) augmented with 24 NVIDIA DGX A100-based nodes (3.9-petaflops) that supports diverse workloads, integrating data analytics with artificial intelligence (AI) training and learning in a single platform. In 2021, we began deploying Polaris, our newest 40- petaflops system, and augmented this powerful testbed system with an additional 28 nodes to support the integration of real-time experiments and HPC resources. We also deployed our two largest storage systems yet, named Grand and Eagle, that will bring new services to our users and will power data-driven research for years to come. Last year, Theta delivered a total of 20.8 million node-hours to 16 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) projects and 7.2 million node-hours to ASCR Leadership Computing Challenge (ALCC) projects (32 awarded during the 2020–2021 ALCC year and 17 awarded during the 2021–2022 ALCC year), as well as substantial support to Director’s Discretionary (DD) projects (5.5 million node-hours). As Table ES.1 shows, Theta performed exceptionally well in terms of overall availability (95.1 percent), scheduled availability (99.4 percent), and utilization (98.1 percent; Table 2.1). As of the submission date of this document, ALCF’s user community has published 249 papers in high-quality, peer-reviewed journals and technical proceedings. At the 2021 International Conference for High Performance Computing, Networking, Storage and Analysis (SC’21), Argonne researchers won two HPCwire Readers’ Choice Awards and were part of a Gordon Bell Prize finalist team recognized for developing an AI-enabled, multi-resolution simulation framework for studying complex biomolecular machines. Their framework was used to observe the SARS-CoV-2 replication-transcription machinery in action, by directly integrating experimental data. ALCF also provided a comprehensive program of high-performance computing (HPC) support services to help our community make productive use of the facility’s diverse and growing collection of resources. We are now entering the exascale era, with exascale machines being planned for national laboratories across the country, including Aurora at Argonne National Laboratory (Argonne) in 2023. ALCF researchers have been leading and guiding numerous strategic activities that will push the boundaries of what’s possible in computational science and engineering and allow us to deliver science on day one.

97 MATHEMATICS AND COMPUTING↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Validation of a Simulation System for Studying Interoperability in Future Air Traffic Management Systems

Future air traffic management systems will need to accommodate large numbers of increasingly diverse air vehicles with different operating paradigms. To support this trend, they will digitally share copious amounts of information via a common communication architecture. Operators will deploy programs that create and negotiate flight plans via the architecture’s communication protocols. These programs will autonomously make decisions that must be arbitrated by the architecture and robust to uncertainty. To study interoperability in air traffic management, a new airspace simulation system was composed by integrating a legacy airspace simulation, an air traffic control model, and a new research communication architecture. It was used to evaluate air traffic management concepts by adapting it to handle congested arrival traffic at Newark Liberty International Airport and executing simulations. Results demonstrated the ability of the simulation system to model in detail strategic traffic flow management, predeparture flight planning, and air traffic control working in concert. Subsequent studies can use the simulation system to study interoperability, autonomy, digital communication, and uncertainty in future air traffic management systems.

air traffic control↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities The HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture To complete the development of the HDU from conception in June 2009 to rollout for operations in July 2010, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads, such as the Geology Lab, that those systems will support The utilization of interface design standards and uniquely tailored reviews have allowed for an accelerated design process Scheduled activities include early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development Modeling tools have been effective in hardware systems layout, cable routing and length estimation, and human factors analysis Decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations Incremental test operations leading up to an integrated systems test allows for an orderly systems test program The HDU will begin its journey as an emulation of a Pressurized Excursion Module (PEM) for 2010 field testing and then may evolve to a Pressurized Core Module (PCM) for 2011 and later field tests, depending on agency architecture decisions The HDU deployment will vary slightly from current lunar architecture plans to include developmental hardware and software items and additional systems called opportunities for technology demonstration One of the HDU challenges has been designing to be prepared for the integration of presently unanticipated systems Results of the HDU field tests will influence future designs of habitat systems.

Gill, Tracy↗

Launch Vehicle Demonstrator Using Shuttle Assets

The Marshall Space Flight Center Advanced Concepts Office (ACO) has the leading role for NASA s preliminary conceptual launch vehicle design and performance analysis. Over the past several years the ACO Earth-to-Orbit Team has evaluated thousands of launch vehicle concept variations for a multitude of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). NASA plans to continue human space exploration and space station utilization. Launch vehicles used for heavy lift cargo and crew will be needed. One of the current leading concepts for future heavy lift capability is an inline one and a half stage concept using solid rocket boosters (SRB) and based on current Shuttle technology and elements. Potentially, the quickest and most cost-effective path towards an operational vehicle of this configuration is to make use of a demonstrator vehicle fabricated from existing shuttle assets and relying upon the existing STS launch infrastructure. Such a demonstrator would yield valuable proof-of-concept data and would provide a working test platform allowing for validated systems integration. Using shuttle hardware such as existing RS-25D engines and partial MPS, propellant tanks derived from the External Tank (ET) design and tooling, and four-segment SRB s could reduce the associated upfront development costs and schedule when compared to a concept that would rely on new propulsion technology and engine designs. There are potentially several other additional benefits to this demonstrator concept. Since a concept of this type would be based on man-rated flight proven hardware components, this demonstrator has the potential to evolve into the first iteration of heavy lift crew or cargo and serve as a baseline for block upgrades. This vehicle could also serve as a demonstration and test platform for the Orion Program. Critical spacecraft systems, re-entry and recovery systems, and launch abort systems of Orion could also be demonstrated in early test flights of the launch vehicle demo. Furthermore, an early demonstrator of this type would provide a stop-gap for retaining critical human capital and infrastructure while affording the current emerging generation of young engineers opportunity to work with and capture lessons learned from existing STS program offices and personnel, who were integral in the design and development of the Space Shuttle before these resources are no longer available. The objective of this study is to define candidate launch vehicle demonstration concepts that are based on Space Shuttle assets and determine their performance capabilities and how these demonstration vehicles could evolve to a heavy lift capability to low earth orbit.

Threet, Grady E., Jr.↗

Development of an End-to-end Demonstration Readout Chain for Athena/X-IFU

The X-ray Integral Field Unit(X-IFU) of the Athena observatory, scheduled for launch in the mid2030's, will provide X-ray spectroscopy data with unprecedented spectral and spatial resolution. This will be achieved with a 2kilo-pixel array of transition-edge sensor (TES) microcalorimeters. The complete detection chain is under development by a large international collaboration. In order to perform an end-to-end demonstration of the X-IFU readout chain, a 50 mK test bench is being developed at IRAP in collaboration with CNES. The test bench uses a two-stage ADR cryostat from Entropy GmbH, a 1024-pixelarray, and will initially be operated using a warm electronics chain from NIST and NASA Goddard Space Flight Center. We describe the complete system being installed in the cryostat and the current results obtained with these electronics. We also review the status of the integration of the digital readout electronics (DRE)prototype into the demonstration chain and the plan for integrating and testing the complete X-IFU readout chain.

S Beaumont↗

Integrated Traffic Flow Management Decision Making

A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

Grabbe, Shon R.↗