Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integral operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Electrical power integration for lunar operations

Electrical power for future lunar operations is expected to range from a few kilowatts for an early human outpost to many megawatts for industrial operations in the 21st century. All electrical power must be imported as chemical, solar, nuclear, or directed energy. The slow rotation of the Moon and consequent long lunar night impose severe mass penalties on solar systems needing night delivery from storage. The cost of power depends on the cost of the power systems the cost of its transportation to the Moon, operating cost, and, of course, the life of the power system. The economic feasibility of some proposed lunar ventures depends in part on the cost of power. This paper explores power integration issues, costs, and affordability in the context of the following representative lunar ventures: (1) early human outpost (10 kWe); (2) early permanent lunar base, including experimental ISMU activities (100 kWe); (3) lunar oxygen production serving an evolved lunar base (500 kWe); (4) lunar base production of specialized high-value products for use on Earth (5 kWe); and (5) lunar mining and production of helium-3 (500 kWe). The schema of the paper is to project likely costs of power alternatives (including integration factors) in these power ranges, to select the most economic, to determine power cost contribution to the product or activities, to estimate whether the power cost is economically acceptable, and, finally, to offer suggestions for reaching acceptability where cost problems exist.

Woodcock, Gordon↗

UTM and D-NET: NASA and JAXA's Collaborative Research on Integrating Small UAS with Disaster Response Efforts

Natural disasters, such as flooding, wildfire, hurricane, tornadoes, earthquakes and tsunamis, pose challenges in preserving human life and minimizing the damages to a region. During catastrophic events, timely response of disaster relief personnel, an efficient deployment of resources in the recovery effort, and coordinated information sharing amongst different relief agencies can make a substantial difference in responding to those impacted by the disaster. Many relief activities currently utilize both ground personnel and manned airborne assets during different phases of the disaster response. Typically, multiple organizations support relief activities and this often creates logistics coordination challenges between agencies which can result in wasted time or resources. The Japan Aerospace Exploration Agency (JAXA) has been developing an "Integrated aircraft operation system for disaster relief (D-NET)", which assists collection and sharing of disaster information through the integrated operation of aircraft such as helicopters, aircraft, and satellites, for efficient and safe rescue operations by disaster relief aircraft. Due to the advancement in unmanned aircraft systems (UAS) technologies, public safety organizations have started incorporating small UAS (sUAS) as an asset in their disasters response activities. To address the airspace integration challenges of the influx of sUAS in the United States the National Aeronautics and Space Administration (NASA), under the UAS Traffic Management (UTM) project, has been engaged in research to enable large-scale commercial applications of sUAS operating in low altitude airspace. This paper presents the integration of D-NET, which incorporate sUAS in the planning, information sharing, and operation support of disasters response activities, and UTM, which provides airspace management to enable large scale high density operations. The integration of the DNET and UTM systems enables coordination, data sharing, and airspace management to improve the timeliness of the disaster response, enable relief organization to reduce cost and overhead by using UAS assets and still maintain airspace safety during the relief activities.

UTM↗

Preparation of Flight Operations and IWS Integration of the CELIAS Experiment on the SOHO Spacecraft

During this reporting time period, the following activities took place: (1) generation of several versions of the CELIAS (STOF/SEM/CTOF/MTOF/DPU) commissioning timeline for the first 180 days after launch; (2) identification of several problems with the CELIAS portion of the Project Data Base (PDB); (3) attendance of the Science Operations Working Group (SOWG) Meetings (November 1994, February 1995, May 1995) and Flight Operations Review Meeting (July 1995); (4) participation in Flight Operation Simulations SIM 1 (November 14-18, 1994), SIM 2 (May 1-4, 1995) and SIM3 (August 7-11, 1995); and (5) participation in the Ground System Compatibility Test Rehearsal (April 24-28) 1995), GSCT #2 (May 30-June 14, 1995), GSCT #3 (September 12-22 1995), and GSCT #4b (October 30-November 5, 1995).

Ipavich, Fred↗

Insights Gained from the Ongoing Integrated Arrival/Departure/Surface (IADS) Traffic Flow Operational Prototype

The Insights Gained from the Ongoing Integrated Arrival/Departure/Surface (IADS) Traffic Flow Operational Prototype presentation will include a definition of the learning objectives for the audience, an overview/explanation of the ATD-2 project, an overview of the ATC/Operator data exchange and integration that is foundational for advanced surface capability, and a description of the ATC/Operator data exchange and integration research questions and insights. It will also give an overview of the overhead stream around CLT and a preview of the operational integration benefits, research questions, and insights related to the overhead stream. It will continue with a surface metering process flow overview, a description of local surface demand/capacity imbalance, the benefits of collaborative surface metering, the associated research questions and insights, and wrap up with the next steps planned for ATD-2.

collaborative operational environment↗

Optimization of Advanced Steels for Cyclic Operation through an Integration of Material Testing, Modeling and Novel Component Test Validation

The efforts in this project were focused in three primary objectives, provided below: • To develop the needed microstructural processing and performance relationships and associated material models for specific constituents in fabricated weldments (such as the parent material, heat affected zone regions and weld metal), • Apply these metallurgical relationships through modeling of a welded pressure bearing power plant component subjected to cyclic operational conditions under both mechanical and thermal loading, and • Validate the model through novel structural feature and component tests. An attempt was made to optimize the heat treatment schedule to reduce or eliminate the presence of boron nitride (BN) in the matrix of the Grade 92 material. BN has been shown to be a primary nucleation source for creep damage. Proper evaluation of material behavior, and as assessed in this research, included the influence of geometric notches (such as those from poor fabrication or design) and metallurgical notches (such as weldments or poorly processed parent material). Better practice methodologies were implemented in the theoretical design of a high-temperature, critical component for cyclic operation. It was demonstrated that vessel testing can be reliably performed and provides a critical link between standard testing, structural assessment and validation. While the goal of an improved Grade 92 steel was not achieved in this project, there is considerable value in applying the documented testing and assessment methodologies to assess material and/or component behavior. This is especially true for materials and/or designs which are expected to be subjected to flexible operating modes. Design of a cycling state of the art thick wall steam header for long term operation with a state of the art ferritic steel was a task in this project. Implementation of that task showed how many factors including plant operating mode, creep strength, creep ductility, fatigue strength, and resistance to crack growth should be considered and evaluated to properly design high temperature components for long term service (200,000 operating hours or more) in a modern Fossil energy power plant. The current ASME non-nuclear boiler design code does not mandate this level of complex analysis nor does it provide all the metallurgical and mechanical properties data needed to perform this kind of design analysis.

20 FOSSIL-FUELED POWER PLANTS↗

Preparation of Flight Operations and IWS Integration of the CELIAS Experiment on the SOHO Spacecraft

During this annual progress report time period, the following activities took place: (1) Generation of several versions of the CELIAS (STOF/SEM/CTOF/MTOF/DPU) commissioning timeline for the first 180 days after launch. These were written and submitted by A. Galvin after consultation (phone, fax, e-mail, meetings) with the CELIAS Instrument Manager and Lead-Co-I's. (2) Identification of several problems with the CELIAS portion of the Project Data Base (PDB). (3) Meetings with the Flight Operations Team regarding PDB, critical commands, etc. (4) Attend Science Operations Working Group (SOWG) Meetings (November 1994, February 1995, May 1995) and Flight Operations Review Meeting (July 1995). (5) Participate in Flight Operation Simulations SIM 1 (November 14-18, 1994), SIM 2 (May 1-4, 1995) and SIM3 (August 7-11, 1995). (6) Participate in the Ground System Compatibility Test Rehearsal (April 24- 28, 1995), GSCT #2 (May 30-June 14, 1995), GSCT #3 (September 12-22, 1995), and GSCT #4b (October 30-November 5, 1995). A small portion of the documentation for the above cited activities is appended.

Ipavich, Fred↗

Newly Enacted Intent Changes to ADS-B MASPS: Emphasis on Operations, Compatibility, and Integrity

Significant changes to the intent reporting structure in the Minimum Aviation System Performance Standards (MASPS) for Automatic Dependent Surveillance Broadcast (ADS-B) have recently been approved by RTCA Special Committee 186. The re-structured intent formats incorporate two major changes to the current MASPS (DO-242): addition of a Target State (TS) report that provides information on the horizontal and vertical targets for the current flight segment and replacement of the current Trajectory Change Point (TCP) and TCP+1 reports with Trajectory Change (TC) reports. TC reports include expanded information about TCPs and their connecting flight segments, in addition to making provisions for trajectory conformance elements. New intent elements are designed to accommodate a greater range of intent information, better reflect operational use and capabilities of existing and future aircraft avionics, and aid trajectory synthesis and conformance monitoring systems. These elements are expected to benefit near-term and future Air Traffic Management (ATM) applications, including separation assurance, local traffic flow management, and conformance monitoring. The current MASPS revision (DO-242A) implements those intent elements that are supported by current avionics standards and data buses. Additional elements are provisioned for inclusion in future MASPS revisions (beyond DO-242A) as avionics systems are evolved.

Barhydt, Richard↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Preliminary Experimental Results of Integrated Gasification Fuel Cell Operation Using Hardware Simulation

A newly developed integrated gasification fuel cell (IGFC) hybrid system concept has been tested using the Hybrid Performance (Hyper) project hardware-based simulation facility at the U.S. Department of Energy, National Energy Technology Laboratory. The cathode-loop hardware facility, previously connected to the real-time fuel cell model, was integrated with a real-time model of a gasifier of solid (biomass and fossil) fuel. The fuel cells are operated at the compressor delivery pressure, and they are fueled by an updraft atmospheric gasifier, through the syngas conditioning train for tar removal and syngas compression. The system was brought to steady state; then several perturbations in open loop (variable speed) and closed loop (constant speed) were performed in order to characterize the IGFC behavior. Coupled experiments and computations have shown the feasibility of relatively fast control of the plant as well as a possible mitigation strategy to reduce the thermal stress on the fuel cells as a consequence of load variation and change in gasifier operating conditions. Results also provided an insight into the different features of variable versus constant speed operation of the gas turbine section.

10 SYNTHETIC FUELS↗

Energy Storage Sizing and Operation of an Integrated Utility-Scale PV+ESS Power Plant

Integration of an energy storage system (ESS) into a large-scale grid-connected photovoltaic (PV) power plant is highly desirable to improve performance of the system and overcome the stochastic nature of PV power generation. Algorithms to size ESS within an integrated PV and ESS ( PV+ESS) power plant, conventionally, require a large number of high-resolution samples of PV generation. These algorithms are computationally expensive. In this paper, a two-day optimization algorithm that utilizes n-step constant power output dispatch every day from the PV+ESS power plant is proposed to size the ESS. Additionally, an n-step power dispatch every day through the one-year timeframe based optimization of the size of ESS is also performed. The proposed methods are computationally cheaper and provide acceptable accuracy with respect to the conventional sizing methods. The economics identified from the proposed methods are compared with the typical day-ahead hourly dispatch-based power production from the PV+ESS power plant. This comparison has shown similar economic performance showcasing the accuracy of the proposed methods in sizing the ESS. It also shows the potential for operating PV+ESS power plant in n-step constant power generation mode.

Xia, Qian↗

Final Report for LDRD Project 05-ERD-050: "Developing a Reactive Chemistry Capability for the NARAC Operational Model (LODI)"

In support of the National Security efforts of LLNL, this project addressed the existing imbalance between dispersion and chemical capabilities of LODI (Lagrangian Operational Dispersion Integrator--the NARAC operational dispersion model). We have demonstrated potentially large effects of atmospheric chemistry on the impact of chemical releases (e.g., industrial chemicals and nerve agents). Prior to our work, LODI could only handle chains of first-order losses (exponential decays) that were independent of time and space, limiting NARAC's capability to respond when reactive chemistry is important. We significantly upgraded the chemistry and aerosol capability of LODI to handle (1) arbitrary networks of chemical reactions, (2) mixing and reactions with ambient species, (3) evaporation and condensation of aerosols, and (4) heat liberated from chemical reactions and aerosol condensation (which can cause a cold and dense plume hugging the ground to rise into the atmosphere, then descend to the ground again as droplets). When this is made operational, it will significantly improve NARAC's ability to respond to terrorist attacks and industrial accidents that involve reactive chemistry, including many chemical agents and toxic industrial chemicals (TICS). As a dual-use, the resulting model also has the potential to be a state-of-the-art air-quality model. Chemical releases are the most common type of airborne hazardous release and many operational applications involve such scenarios. The new capability we developed is therefore relevant to the needs of the Department of Energy (DOE), Department of Homeland Security (DHS) and Department of Defense (DoD).

54 ENVIRONMENTAL SCIENCES↗

Integrated mission management operations

Operations required to launch a modular space station and to provides sustaining ground operations for support of that orbiting station throughout its 10 year mission are studied. A baseline, incrementally manned program and attendent experiment program options are derived. In addition, features of the program that significantly effect initial development and early operating costs are identified, and their impact on the program is assessed. A preliminary design of the approved modular space station configuration is formulated.

Source record↗

Skylab experiment integration overview

The complex Skylab experiment integration task entailed extensive technical interfacing and liaison. The integrator provided continuity as the experiment evolved through the major program phases. The phases included experiment proposal, experiment development, module integration testing, operations support planning, integrated systems testing, and mission support and evaluation. Skylab experiment program responsibilities are discussed along with a compatibility analysis, questions of documentation, status reviews, and aspects of design philosphy.

Schrock, S. R.↗

An integrated transportation and operations comparison of space and ground based OTV's

This paper presents the results of a comparison of space vs. ground basing of orbital transfer vehicles (OTV). The comparison was done assuming an 11-year mission model beginning in 1995 and averaging over 100 MT of payloads per year to GEO. When analyzed from a total transportation standpoint, the launch system employed had the greatest impact on the basing mode comparison. A launch fleet consisting of both a basic STS and a Shuttle derivative cargo vehicle provided the least cost. Only a small advantage (3%) was found in flight performance for the space based (SB) OTV once it incorporated the necessary provisions for space debris protection and on-orbit maintenance. Propellant storage and transfer losses associated with the SB OTV amounted to 12% of the actual flight propellant requirement. Turnaround of the SB OTV required a crew of 3 and 40% duty cycle. The life cycle cost comparison including all involved space elements indicated less than a 10% difference between basing modes. The SB OTV however is judged to provide more flexibility in launch manifesting, simplified recovery operations and greater potential for improvement.

Davis, E. E.↗